Turn your Data into Knowledge
Modularize your data for repeatable
and accurate usage
Ad Ghauri
Current State Data Maturity
Data
Information
Knowledge
Inaccurate, redundant,
duplicated, unreliable, and
unknown data resides in ERP,
MRP, MES, MRO, CAD, DCS,
Simulation, Design & Engineering
systems throughout enterprises
Required information exists in
enterprises but is stored in
multiple systems not linked to
physical assets (Plants, Wells,
Platforms) with little context of
business and operating model?
Enterprise knowledge is not
modularized to enable reuse and
repurpose for new projects and
information in not accessible in
the form of knowledge for
operations, training, and projects.
Future State Data Maturity
Data
Information
Knowledge
Take your overwhelming unstructured
data from simulation, design, engineering,
operations and maintenance systems
Turn it into structured data while
removing redundancies and inefficiencies.
Filter your structured data to
purposeful information. Integrate
this data into your business
processes and assets by useful
classification so that it becomes
manageable and easily accessible.
Enable your employees, partners,
and extended supply chain to easily
access, re-use, share, and
collaborate accurate information in
business processes and applications
with certainty
Take your overwhelming unstructured data from simulation, design, engineering, operations and maintenance systems
Turn it into structured data while removing redundancies and inefficiencies.
Corporate data
capture and re-
alignment
• Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and
external sources when captured and structured provides better control. Different disciplines value data differently and its value is
realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy.
• Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous.
• Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental
and quality compliances across corporation may fail.
Engineering
data
structuring in
context of
plant
• Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more
conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer,
procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M
phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant
design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures
reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains.
• Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases.
Procurement
data is driven
by construction
timelines and
project
controls
• Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates,
Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and
managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for
Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections,
Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction.
• Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct
materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule.
Construction
mirrors design
and is driven
by project
controls
• Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as
constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site
layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls,
plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user.
• Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all
phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with
project cost, schedule, work, and asset breakdown structures.
Operations and
Maintenance
requires data
accuracy and
reliability
strategies
• Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply
chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall,
warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally.
• Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are
progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model,
through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially.
Did you know that even today inaccurate, redundant, duplicated, unreliable, and unknown data resides in ERP, MRP, MES, MRO, CAD, DCS,
Simulation, Design & Engineering systems throughout enterprises
Data to Information
Filter your structured data to purposeful information. Integrate this data into your business processes and assets by useful classification so
that it becomes manageable and easily accessible.
Corporate
information
accessible
across the
enterprise
• Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and
external sources when captured and structured provides better control. Different disciplines value data differently and its value is
realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy.
• Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous.
• Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental
and quality compliances across corporation may fail.
Engineering
information
available for
application
• Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more
conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer,
procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M
phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant
design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures
reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains.
• Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases.
Procurement
information
and project
controls
synched up
• Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates,
Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and
managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for
Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections,
Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction.
• Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct
materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule.
Construction is
done right first
time and on
time
• Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as
constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site
layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls,
plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user.
• Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all
phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with
project cost, schedule, work, and asset breakdown structures.
Operations and
Maintenance is
safer and more
reliable
• Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply
chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall,
warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally.
• Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are
progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model,
through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially.
Did you know that even today the required information exists in enterprises but is stored in multiple systems not linked to physical assets
(Plants, Wells, Platforms) with little context of business and operating model?
Information to Knowledge
Did you know that information is classification of data
enabling quick and relevant access at the time of need
and application.
Categorization of information transformation into
knowledge across different organizational disciplines
helps to gage importance of influential data and how
to best access it.
Enable your employees, partners, and extended supply chain to easily access, re-use, share, and collaborate accurate information in
business processes and applications with certainty
Corporate
knowledge is
used, reused,
and trusted
• Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and
external sources when captured and structured provides better control. Different disciplines value data differently and its value is
realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy.
• Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous.
• Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental
and quality compliances across corporation may fail.
Engineering
knowledge is
accessible real-
time for
training,
analysis, and
execution
• Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more
conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer,
procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M
phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant
design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures
reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains.
• Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases.
Procurement
knowledge
fully
embedded in
project
controls
• Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates,
Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and
managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for
Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections,
Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction.
• Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct
materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule.
Construction is
modularized
based on
global design
• Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as
constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site
layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls,
plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user.
• Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all
phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with
project cost, schedule, work, and asset breakdown structures.
Operations and
Maintenance is
more proactive
and less
reactive
• Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply
chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall,
warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally.
• Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are
progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model,
through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially.
Did you know that even today the information in enterprises is not modularized to enable reuse and repurpose for new projects? And
information in not accessible in the form of knowledge for operations, training, and projects.
Knowledge to Business Intelligence
Did you know that Knowledge is lost by companies
every day as one or more of their employees leave the
company
The business intelligence tell us where and what is
happing and provides trends for how to best apply
what we know and what we don’t…
Data transformation
Data Information Knowledge
What should go here?
What do you think
knowledge is?
Is knowledge an
application of
information gained from
experience?
Or is it where data is used
as information to make
decisions based on
experience?
Facts, information, and skills acquired by a person through experience or education; the
theoretical or practical understanding of a subject.
Awareness or familiarity gained by experience of a fact or situation.
Definitionfrom Google.com

More Related Content

What's hot

ARCHIBUS-StrategicSpacePlanning
ARCHIBUS-StrategicSpacePlanningARCHIBUS-StrategicSpacePlanning
ARCHIBUS-StrategicSpacePlanningMichael Willette
 
PHICHIT RESUME 2017
PHICHIT RESUME 2017PHICHIT RESUME 2017
PHICHIT RESUME 2017Phon Phichit
 
Sisg Services Overview
Sisg Services OverviewSisg Services Overview
Sisg Services Overviewdgetty
 
Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju AlexBiju Alex
 
Whitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsWhitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsHappiest Minds Technologies
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16Robin White, PMP
 
Mehul Desai Resume_2016
Mehul Desai Resume_2016Mehul Desai Resume_2016
Mehul Desai Resume_2016Mehul Desai
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsBarcoding, Inc.
 
Real Time Analytics
Real Time AnalyticsReal Time Analytics
Real Time AnalyticsMohsin Hakim
 
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...Rolta
 
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...Amber Wallace
 
Analytics and AIM Improve Operational and Asset Performance
Analytics and AIM Improve Operational and Asset PerformanceAnalytics and AIM Improve Operational and Asset Performance
Analytics and AIM Improve Operational and Asset PerformanceRolta
 

What's hot (19)

Peter J. Simpson Resume
Peter J. Simpson ResumePeter J. Simpson Resume
Peter J. Simpson Resume
 
ARCHIBUS-StrategicSpacePlanning
ARCHIBUS-StrategicSpacePlanningARCHIBUS-StrategicSpacePlanning
ARCHIBUS-StrategicSpacePlanning
 
PHICHIT RESUME 2017
PHICHIT RESUME 2017PHICHIT RESUME 2017
PHICHIT RESUME 2017
 
Sisg Services Overview
Sisg Services OverviewSisg Services Overview
Sisg Services Overview
 
Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju Alex
 
WCoffman Resume
WCoffman ResumeWCoffman Resume
WCoffman Resume
 
Whitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsWhitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest Minds
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
 
Vivek cv
Vivek cvVivek cv
Vivek cv
 
Mehul Desai Resume_2016
Mehul Desai Resume_2016Mehul Desai Resume_2016
Mehul Desai Resume_2016
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management Systems
 
Resume margaret plass - 2016
Resume   margaret plass - 2016Resume   margaret plass - 2016
Resume margaret plass - 2016
 
Kenneth M. Fischler
Kenneth M. FischlerKenneth M. Fischler
Kenneth M. Fischler
 
Roberge_Resume
Roberge_ResumeRoberge_Resume
Roberge_Resume
 
Real Time Analytics
Real Time AnalyticsReal Time Analytics
Real Time Analytics
 
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...
Achieving Operational Excellence in the Upstream Oil and Gas Industry with th...
 
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
WEBINAR: Align your Enterprise with Powerful Analytics! Oracle EPBCS (Enterpr...
 
Analytics and AIM Improve Operational and Asset Performance
Analytics and AIM Improve Operational and Asset PerformanceAnalytics and AIM Improve Operational and Asset Performance
Analytics and AIM Improve Operational and Asset Performance
 
Chapter 12 developiong business&it solutions
Chapter 12  developiong business&it solutionsChapter 12  developiong business&it solutions
Chapter 12 developiong business&it solutions
 

Similar to Turn your Data into Knowledge

Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile ResumeMelissa Gilmore
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile ResumeMelissa Gilmore
 
Resume LinkedIn 05212016 I
Resume LinkedIn 05212016 IResume LinkedIn 05212016 I
Resume LinkedIn 05212016 IKevin Smith
 
AustinJo_08192011_10222016
AustinJo_08192011_10222016AustinJo_08192011_10222016
AustinJo_08192011_10222016Jo Ann Austin
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Estuate EDM Checklist
Estuate EDM ChecklistEstuate EDM Checklist
Estuate EDM ChecklistEstuate, Inc.
 
John Griffith Oct2012 Business Analysis Mgr
John Griffith Oct2012 Business Analysis MgrJohn Griffith Oct2012 Business Analysis Mgr
John Griffith Oct2012 Business Analysis Mgrjgriffith080502
 
Utilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyUtilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyThomas Bronack
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel millAsher Jawad
 
Frank Presto resume 7-31-16
Frank Presto resume 7-31-16Frank Presto resume 7-31-16
Frank Presto resume 7-31-16Frank Presto
 
22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUEBryan Semple
 
Hieber, Bruce Resume
Hieber, Bruce ResumeHieber, Bruce Resume
Hieber, Bruce ResumeBruceHieber
 
mldearthresume rev1 2016
mldearthresume rev1 2016mldearthresume rev1 2016
mldearthresume rev1 2016Michelle Dearth
 
Designing Enterprise Applications for Speed and Agility
Designing Enterprise Applications for Speed and AgilityDesigning Enterprise Applications for Speed and Agility
Designing Enterprise Applications for Speed and AgilityKenandy
 

Similar to Turn your Data into Knowledge (20)

Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile Resume
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile Resume
 
Himmelrich 8-2015
Himmelrich 8-2015Himmelrich 8-2015
Himmelrich 8-2015
 
Resume LinkedIn 05212016 I
Resume LinkedIn 05212016 IResume LinkedIn 05212016 I
Resume LinkedIn 05212016 I
 
Sunil Vuppu
Sunil VuppuSunil Vuppu
Sunil Vuppu
 
AustinJo_08192011_10222016
AustinJo_08192011_10222016AustinJo_08192011_10222016
AustinJo_08192011_10222016
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Estuate EDM Checklist
Estuate EDM ChecklistEstuate EDM Checklist
Estuate EDM Checklist
 
John Griffith Oct2012 Business Analysis Mgr
John Griffith Oct2012 Business Analysis MgrJohn Griffith Oct2012 Business Analysis Mgr
John Griffith Oct2012 Business Analysis Mgr
 
Utilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiencyUtilizing Dashboards to improve efficiency
Utilizing Dashboards to improve efficiency
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel mill
 
Frank Presto resume 7-31-16
Frank Presto resume 7-31-16Frank Presto resume 7-31-16
Frank Presto resume 7-31-16
 
22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE
 
Burge Stephen BA 1416
Burge Stephen BA 1416Burge Stephen BA 1416
Burge Stephen BA 1416
 
SPGregory_Resume
SPGregory_ResumeSPGregory_Resume
SPGregory_Resume
 
Hieber, Bruce Resume
Hieber, Bruce ResumeHieber, Bruce Resume
Hieber, Bruce Resume
 
AnnetteCarperResume
AnnetteCarperResumeAnnetteCarperResume
AnnetteCarperResume
 
mldearthresume rev1 2016
mldearthresume rev1 2016mldearthresume rev1 2016
mldearthresume rev1 2016
 
Designing Enterprise Applications for Speed and Agility
Designing Enterprise Applications for Speed and AgilityDesigning Enterprise Applications for Speed and Agility
Designing Enterprise Applications for Speed and Agility
 
Datacenter
DatacenterDatacenter
Datacenter
 

More from Ad Ghauri

Best Practices and industry definition overview of Substitutes and Alternates...
Best Practices and industry definition overview of Substitutes and Alternates...Best Practices and industry definition overview of Substitutes and Alternates...
Best Practices and industry definition overview of Substitutes and Alternates...Ad Ghauri
 
List of values Best Practices
List of values Best PracticesList of values Best Practices
List of values Best PracticesAd Ghauri
 
Understanding change impact across the electronics software, hardware, and fi...
Understanding change impact across the electronics software, hardware, and fi...Understanding change impact across the electronics software, hardware, and fi...
Understanding change impact across the electronics software, hardware, and fi...Ad Ghauri
 
Bill of Material Federation
Bill of Material Federation Bill of Material Federation
Bill of Material Federation Ad Ghauri
 
Overview&Framework 1-Manage Software and Firmware Files
Overview&Framework 1-Manage Software and Firmware FilesOverview&Framework 1-Manage Software and Firmware Files
Overview&Framework 1-Manage Software and Firmware FilesAd Ghauri
 
Framework Change Impact Analysis
Framework Change Impact AnalysisFramework Change Impact Analysis
Framework Change Impact AnalysisAd Ghauri
 
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786Green&SustainableDevelopment_QuestionSetAppendices-03252013v786
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786Ad Ghauri
 

More from Ad Ghauri (8)

Best Practices and industry definition overview of Substitutes and Alternates...
Best Practices and industry definition overview of Substitutes and Alternates...Best Practices and industry definition overview of Substitutes and Alternates...
Best Practices and industry definition overview of Substitutes and Alternates...
 
List of values Best Practices
List of values Best PracticesList of values Best Practices
List of values Best Practices
 
Understanding change impact across the electronics software, hardware, and fi...
Understanding change impact across the electronics software, hardware, and fi...Understanding change impact across the electronics software, hardware, and fi...
Understanding change impact across the electronics software, hardware, and fi...
 
Bill of Material Federation
Bill of Material Federation Bill of Material Federation
Bill of Material Federation
 
FLC_Temp
FLC_TempFLC_Temp
FLC_Temp
 
Overview&Framework 1-Manage Software and Firmware Files
Overview&Framework 1-Manage Software and Firmware FilesOverview&Framework 1-Manage Software and Firmware Files
Overview&Framework 1-Manage Software and Firmware Files
 
Framework Change Impact Analysis
Framework Change Impact AnalysisFramework Change Impact Analysis
Framework Change Impact Analysis
 
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786Green&SustainableDevelopment_QuestionSetAppendices-03252013v786
Green&SustainableDevelopment_QuestionSetAppendices-03252013v786
 

Turn your Data into Knowledge

  • 1. Turn your Data into Knowledge Modularize your data for repeatable and accurate usage Ad Ghauri
  • 2. Current State Data Maturity Data Information Knowledge Inaccurate, redundant, duplicated, unreliable, and unknown data resides in ERP, MRP, MES, MRO, CAD, DCS, Simulation, Design & Engineering systems throughout enterprises Required information exists in enterprises but is stored in multiple systems not linked to physical assets (Plants, Wells, Platforms) with little context of business and operating model? Enterprise knowledge is not modularized to enable reuse and repurpose for new projects and information in not accessible in the form of knowledge for operations, training, and projects.
  • 3. Future State Data Maturity Data Information Knowledge Take your overwhelming unstructured data from simulation, design, engineering, operations and maintenance systems Turn it into structured data while removing redundancies and inefficiencies. Filter your structured data to purposeful information. Integrate this data into your business processes and assets by useful classification so that it becomes manageable and easily accessible. Enable your employees, partners, and extended supply chain to easily access, re-use, share, and collaborate accurate information in business processes and applications with certainty
  • 4. Take your overwhelming unstructured data from simulation, design, engineering, operations and maintenance systems Turn it into structured data while removing redundancies and inefficiencies. Corporate data capture and re- alignment • Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and external sources when captured and structured provides better control. Different disciplines value data differently and its value is realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy. • Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous. • Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental and quality compliances across corporation may fail. Engineering data structuring in context of plant • Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer, procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains. • Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases. Procurement data is driven by construction timelines and project controls • Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates, Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections, Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction. • Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule. Construction mirrors design and is driven by project controls • Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls, plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user. • Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with project cost, schedule, work, and asset breakdown structures. Operations and Maintenance requires data accuracy and reliability strategies • Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall, warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally. • Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model, through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially. Did you know that even today inaccurate, redundant, duplicated, unreliable, and unknown data resides in ERP, MRP, MES, MRO, CAD, DCS, Simulation, Design & Engineering systems throughout enterprises Data to Information
  • 5. Filter your structured data to purposeful information. Integrate this data into your business processes and assets by useful classification so that it becomes manageable and easily accessible. Corporate information accessible across the enterprise • Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and external sources when captured and structured provides better control. Different disciplines value data differently and its value is realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy. • Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous. • Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental and quality compliances across corporation may fail. Engineering information available for application • Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer, procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains. • Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases. Procurement information and project controls synched up • Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates, Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections, Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction. • Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule. Construction is done right first time and on time • Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls, plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user. • Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with project cost, schedule, work, and asset breakdown structures. Operations and Maintenance is safer and more reliable • Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall, warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally. • Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model, through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially. Did you know that even today the required information exists in enterprises but is stored in multiple systems not linked to physical assets (Plants, Wells, Platforms) with little context of business and operating model? Information to Knowledge Did you know that information is classification of data enabling quick and relevant access at the time of need and application. Categorization of information transformation into knowledge across different organizational disciplines helps to gage importance of influential data and how to best access it.
  • 6. Enable your employees, partners, and extended supply chain to easily access, re-use, share, and collaborate accurate information in business processes and applications with certainty Corporate knowledge is used, reused, and trusted • Data from multiple systems and sources is often difficult to manage and control . Overwhelming data exchange across internal and external sources when captured and structured provides better control. Different disciplines value data differently and its value is realized when used with confidence. Corporate decisions are made based on its authenticity and accuracy. • Multiple versions of data lead to time consuming and bad decision making. Obsolete data is not useful and is sometimes dangerous. • Embedded data in policy and procedural documentation needs to reflect plant as-builds. Otherwise regulatory, safety, environmental and quality compliances across corporation may fail. Engineering knowledge is accessible real- time for training, analysis, and execution • Engineering data is created to meet business, operational, corporate or regulatory requirements. In turn driving one or more conceptual designs. Conceptual designs are refined enabling corporate to solicit and select the most efficient EPC to build engineer, procure, build and commission the plant. The engineering data is further created, updated and refined through FEED, EPC, and O&M phases by multiple organizations. It has the longest life, as if structured efficiently can be re-used beyond EOL of the plant. The plant design basis is continually updated to ensure that it reflects plant as-built. Structured data across multiple organizations ensures reliable, latest, and accurate data is transmitted and exchanged up and down the operational/engineering supply chains. • Budgeted Deliverables, 3D Model, Parsed MTO, and Quantity Estimate are tracked in plant context & its phases. Procurement knowledge fully embedded in project controls • Procurement data, onsite delivery and material management timelines are managed and aligned. Parsed MTO, ROS Dates, Prioritization and Material Receipt and Release are tracked in plant context & aligned across phases. Documentation created and managed for Bidders Lists, Purchase Order Pro-Forma, Contracts Pro-Forma and Transportation and Logistics. Documentation for Engineering Specifications, Engineering Quantities, Bid evaluations, and Contract award. Documentation for shop/site Inspections, Track Status, Expedite per ROS Dates. Documentation for Transport & Receive, Warehouse, Maintain, and Release to Construction. • Construction & vendor lead times influenced by Engineering drive procurement process & data. It is crucial to order the correct materials on-time. Orders placed with obsolete Engineering design impacts cost and schedule. Construction is modularized based on global design • Construction data is created and updated mostly by field engineering. It is imperative to build as per design and update design as constructed, as there are multiple organizations using the same data. Construction data is created and update for construction & site layout plans, temporary facilities, structural concrete/steel, mechanical and electrical equipment, piping & instrumentation controls, plant turnover, startup & commissioning, performance testing, and finally plant/data handover to owner/end-user. • Appropriate project controls enable cost, work, plant, and schedule breakdown structures are integrated and streamlined across all phases of Project Lifecycle and organizations involved. The data created and updated during this phase must be 100% aligned with project cost, schedule, work, and asset breakdown structures. Operations and Maintenance is more proactive and less reactive • Many plants are built based on design basis that overtime has many as-built changes to meet geographical, regulatory and supply chain constraints. These as-builds should be kept up to date in corporate records to ensure complete alignment such that recall, warranties, and reliability is managed holistically. Issues in design, form, fit and function of equipment should not only be dealt locally. • Safety, environment and regulatory compliance is maintained across the corporation and extended enterprise. Levels of modeling are progressively maturated from 2D Drawings and Sketches, 3D CAD Model with data attribute links, 4D Construction Simulation Model, through 5D Cost Tracking Model. As higher levels of data maturity impacts O&M exponentially. Did you know that even today the information in enterprises is not modularized to enable reuse and repurpose for new projects? And information in not accessible in the form of knowledge for operations, training, and projects. Knowledge to Business Intelligence Did you know that Knowledge is lost by companies every day as one or more of their employees leave the company The business intelligence tell us where and what is happing and provides trends for how to best apply what we know and what we don’t…
  • 7. Data transformation Data Information Knowledge What should go here? What do you think knowledge is? Is knowledge an application of information gained from experience? Or is it where data is used as information to make decisions based on experience? Facts, information, and skills acquired by a person through experience or education; the theoretical or practical understanding of a subject. Awareness or familiarity gained by experience of a fact or situation. Definitionfrom Google.com