Construction of Vehicular Underpass at
Ashram Intersection
(Total Length = 300m)
Safety in Construction Zone
Prepared by : Md Abdur Rahman
Presentation Outline
• Audit Team
• Project Background
• Principles and Planning of Work Zone Traffic Management
• Work Zone Safety Audit Methodology
• Temporary Traffic Control Zone Element Audit
Advance Warning Zone
Approach Transition Zone
Activity zone
Terminal Transition zone
Work Zone End
• Measures for Vulnerable Road Users (VRUs)
• Deployment of Personnel and Safety Compliance
• Major Findings
Project Introduction
Project Background
Ashram
Intersection
Project Background
Direction towards (India Gate)
Project Background(Sailent Features)
1. Traffic at Ashram intersection is serving for
approx. 4 lakhs PCU/day
2. This Underpass is under construction at
the third level
3. Flyover is already constructed and
functioning at Asharam intersection
4. Length of the under pass is 300m
5. Two approach arms are Faridabad side &
India gate side having approach based
signal during construction
6. From the India gate side Nizamudin ROB
will merge near the Ashram Intersection.
7. Distance of mouth of Nizamudin ROB from
underpass is only 120m (safety Concern)
Importance of Construction stage RSA
oConstruction and maintenance work may pose various hazards for both
the site operatives and road users.
oProper signage and safety measures are required to warn and safeguard
the road users along with workers.
oIndian Road Congress; through its special publication IRC:SP:55 2014 has
standardised the safety measures to be adopted at work zones.
oAt all work places these standards for proper warning signage and safety
measures are to be adopted.
oTo ensure the adherence of these safety measures proper road safety
audit is required to avoid any accident or mis happening.
It is the safety plans with basic safety features and care needs to be taken so that
anyone coming along the road or the footpath from any direction understands exactly
what is happening and what is expected of him/her. The aim should be to facilitate the
passage of road users through such work zones using roadway geometries, roadside
features, and Traffic Control (TC) devices comparable to those for normal highway
operations. Thus, road user movement should be free from any hazard.
A WTMP should describe traffic control measures to be used for facilitating the safe
and efficient movement of road users through a work zone. WTMP should play a vital
role in providing reasonably safe and efficient road traffic flow for all road users when
a work zone temporarily disrupts normal traffic flow.
Principles and Planning of Work Zone Traffic Management
• Provide Safety for Road Users and Workers
• Minimize Hindrance or Delay to Road Users
• Provide Clear and Positive Guidance to Road Users
• Ensure Roadside Safety Maintenance
• Ensure that Planners and Decision Makers have the Necessary Knowledge
• Provide Good Public Relations
Important Consideration for Work Zone Traffic Management
Deployment of Personnel and Safety Compliance
Measures for Vulnerable Road Users (VRUs)
Traffic Control Devices
Advance Warning Zone , Approach Transition Zone
,Activity Zone, Terminal Transition Zone and Work Zone
End
Work Zone Safety Audit Methodology
Detailed Site Visit / Construction Stage Audit
Temporary Traffic Control Zones IRC:SP:55-2014
• The Traffic Control Zone can
be divided into:
• Advance Warning Zone
• Approach Transition Zone
• Working Zone and
• Terminal Transition Zone.
Traffic
Control
Zone
Terminal Transition
Zone
Working Zone
Approach Transition
Zone
Advance Warning Zone
Temporary Traffic Control Zones IRC:SP:55-2014
Source: IRC:SP:55-2014
OBSERVATIONS ON SITE BY SAFETY EXPERT
Observation: Traffic Management Plan is completely missing , Chevron & Hazard marking missing, Zebra
crossing is not up to complete carriageway not much provision for pedestrian. Buffer is not clear
(Entry, Exit and not proper tapering is done with delineators)
Reason of concern: Prior information of work zone missing, Risk
Priorty Highly desirable
Rcommendation: It should be as per IRC:SP:55-2014
Observation/Safety Concerns:
Approach Transition Zone Taper length (ATL) is negligible or too short. It may cause risk of accident due to lateral
shifting of moving vehicle from the normal pathway.
Risk: High
Recommendation:
As Per IRC 55:2014 Table 4.1 approach taper length shall be 1 (width of hazard including buffer ) :12 for speed
upto 50 km/Hr. at the start of traffic control zones.
Priority:
Highly desirable
Advance Warning Zone (Friends colony to Bhogal)
Observation/Safety Concerns:
New jersey barriers are missing. Road condition is very poor which is very hazardous for
road users.
Risk: High
Recommendation :
New jersey barriers shall be provided as against existing thin metal sheets. Existing road
shall be black topped
Priority :
Highly Desirable
Approach Transition Zone
Observation/Safety Concerns:
Proper road sign boards & New jersey barriers are missing.
Risk: Medium
Recommendation :
Proper road sign boards & New jersey barriers are proposed.
Priority:
Desirable
Work/Activity Zone
The activity zone is the section of the highway where the construction activity takes
place. It comprises the work space, the traffic space, and the buffer space
Observation/Safety Concerns:
GI Sheets as channelizing devices between work zone and traffic space without buffer zone.
Vehicles and pedestrians may fall in to excavation work area.
Risk : Very High
Recommendation :
Provide new jersey barrier with delineators and lighting devices with buffer space to protect
vehicles moving on traffic space.
Priority :
Essential
Work/Activity Zone
Observation/Safety Concerns:
There are no advance Warning Zone Signs observed.
Without Advance Warning Sign Board, vehicles may approach to Work Zone at high speed leads to crash.
Risk: - High
Recommendation :
As Per IRC 55:2014 Table 4.1 advance warning Sign should be installed before 180m of Work Zone for desired
speed of less than or equal to 50 km/Hr.
Placement of Man At Work, Speed Limit & reduction in the no. of lanes sign.
Priority :
Highly desirable
Advance Warning Zone
Observation/Safety Concerns:
There is no proper provision for pedestrian road crossing.
Risk: High
Recommendation :
There should be a well defined pedestrian crossing for pedestrian in connection with footpath
Priority :
Highly Desirable.
Work/Activity Zone
Observation/Safety Concerns:
There are no Terminal Transition Zone Signs observed due to which vehicles may approach to Work Zone at high
speed leading to crash. It may also cause casualties to pedestrians or other VRUs by traffic.
Risk: High
Recommendation :
The work zone end length shall extend from the end of terminal taper length to the last traffic control device such
as sign showing the end of road work.
Provide Work zone warning & Information Traffic signs
Priority :
Desirable
Terminal Transition Zone
Observation/Safety Concerns:
• Terminal Transition Zone Taper length (TTL) is to short. It may cause risk of accident
due to traffic from deviated path to their normal path
Risk: High
Recommendation:
As Per IRC 55:2014
Priority:
Highly desirable
Terminal Transition Zone
Observation:
Diversion signs are not proper
Reason of concern: Safety not
indicating proper direction for
smooth flow of traffic
Recommendation: It should be
as per IRC: 67 2012
Observation: Along the full rotary type movement two signals are provided for smooth flow of
traffic during peak hour. But chaos for NMTs
Reason of concern: But there are no markings for pedestrians, which is very risky as at the
other side metro station is also there
Recommendation: It should be as per IRC:35-2015 for pedestrians it should be recommended
as per IRC 103.
Observation:
This is left side entering to mathura road from ring road having three and a half lane road
including bus lane at present only one and a half lane is in use. Bus stand has been shifted.
Reason of concern: No arrow markings , no edge marking, no delineators
Recommendation: It should be as per IRC: 35-2015
Observation: Along the full Median side this type of FMM are placed not as per standard
spacing
Recommendation: It should be as per IRC:67-2012
Observation: Edge marking is
missing, barricading is of Tin type
Reason of concern: safety
Recommendation: It should be as
per IRC: 35-2015. Barricading to be
of type New Jersey
Observation: From Friend colony to Ashram intersection (Night time). construction zone Plan
is totally missing
Only Flexible median markers are provided
Reason of concern: Prior information of work zone
Recommendation: It should be as per IRC:SP:55-2001
Observation:
Faridabad to ashram intersection (Night
Time). Overhead gantry sign boards are
there but camoflauge it is visible from
10m only
Reason of concern:
Visiblity of sign boards
Recommendation:
Sign boards should be as per IRC
64(2012)
Observation: Delineation signs are totally missing in the construction zone or if placed not
proper
Reason of concern: Visibility issue, and hazardous risky
Recommendation: It should be as per IRC:35-
Observation:
Pavement surfacing is in bad condition
Reason of concern:
Riding quality is not good, which again
causes jam
Recommendation: Wearing coarse should
be put at construction zone pavement
surface should be maintained properly
with good roughness index
Observation:
No Retro reflective sheets , no sign
boards along the barricading as well as
on road
Reason of concern: visibility
Recommendation: It should be done as
per DS (4895)
Observation:
Edge marking is completely missing
on the carriageway
Reason of concern:
Risky, no demarcation of the
barricading
Recommendation: It should be done
as per IRC 55
Observation/Safety Concerns:
No sign of End Road Work is provided
Risk: High
Recommendation :
Proper sign should be provided on the
terminal transition zone.
Priority :
Essential
Terminal Transition Zone
Measures for Vulnerable Road Users (VRUs)
Observation/Safety Concerns:
• Discontinuous provision for Pedestrians, and no provision for differently abled
persons and people with visual impairment, for negotiate a work site or to cross
the roads within a work site.
• Existing footpath is discontinuous and absent of protected temporary footpaths
and formal pedestrian crossings
Risk : High
Recommendation :
Provision of continuous footpath (combination of existing and temporary footpaths (Min.
1 meter wide) with pedestrian barriers as per site condition
Priority :
Highly Desirable
Deployment of Personnel and Safety Compliance
• Work was on hold by pollution control board due to
higher Air Quality Index. Therefore Audit doesn't
cover any observations on workers, supervisors
and inspecting officers safety.
Good Industry Practices
• Deployment of flagman for controlling the traffic
during the peak and off-peak hours of traffic flow at
the construction zones.
• All the workers, exposed to moving roadway traffic
or equipment in road construction zones shall
wear high-visibility safety apparel, headgear,
boots, gloves and protective gears for their
protection.
• All workers and supervisors must adhere to safety
as per HSE norms and good industry practices.
• There are no advance Warning Zone Signs i.e. Man At Work, Speed Limit & reduction
in the no. of lanes sign.
• Approach Transition Zone Taper length (ATL) is to short in length.
• Improper channelizing devices between work zone and traffic space without buffer
zone at many locations
• Terminal Transition Zone Taper length (TTL) is to short. It may cause risk of accident
due to traffic from deviated path to their normal path
• The work zone end is without traffic control device such as sign showing the end of
road work
• Discontinuous provision for Pedestrians, and no provision for differently abled
persons and people with visual impairment, for negotiate a work site or to cross the
roads within a work site
• Existing footpath is discontinuous and absent of protected temporary footpaths and
formal pedestrian crossings
• Flagman's were also not observed for facilitation to pedestrians and vehicular traffic
at many hazardous locations.
• *Night time safety measures are not seen at site
Major Findings
Safety in construction stage (by Md Abdur Rahman)

More Related Content

Similar to Safety in construction stage (by Md Abdur Rahman)

Road Safety Audit Malaysian
Road Safety Audit Malaysian Road Safety Audit Malaysian
Road Safety Audit Malaysian uitm pulau pinang
 
Road safety.pptx
Road safety.pptxRoad safety.pptx
Road safety.pptxKiranNaik84
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineersHaider Jafferi
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangalshrikrishna kesharwani
 
Unit- 3 Highway Geometric design
Unit- 3 Highway Geometric designUnit- 3 Highway Geometric design
Unit- 3 Highway Geometric designRNRANGANATH
 
Road safety tools for authorities
Road safety tools for authorities  Road safety tools for authorities
Road safety tools for authorities Tristan Wiggill
 
1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talash1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talashMalyar Talash
 
Standards and guides for designing Temporary Traffic Management
Standards and guides for designing Temporary Traffic Management Standards and guides for designing Temporary Traffic Management
Standards and guides for designing Temporary Traffic Management MarkRichardsTechIOSH
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone SafetySelva Prakash
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric designBashaFayissa1
 
2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptxRijuDasgupta
 
1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdfManiNarendraVerma
 
Road safety audit case study
Road safety audit case studyRoad safety audit case study
Road safety audit case studyHardik Dhaduk
 
Highway Safety Power Point Presentation by Pankaj Pal.pptx
Highway Safety Power Point Presentation by Pankaj Pal.pptxHighway Safety Power Point Presentation by Pankaj Pal.pptx
Highway Safety Power Point Presentation by Pankaj Pal.pptxPankaj Pal
 
RSA news letter.docx
RSA news letter.docxRSA news letter.docx
RSA news letter.docxUmesh Sangwan
 
Work Zone Safety.pptx flagger responsiblity
Work Zone Safety.pptx flagger responsiblityWork Zone Safety.pptx flagger responsiblity
Work Zone Safety.pptx flagger responsiblityMohammadImtiazAli2
 

Similar to Safety in construction stage (by Md Abdur Rahman) (20)

Road Safety Audit Malaysian
Road Safety Audit Malaysian Road Safety Audit Malaysian
Road Safety Audit Malaysian
 
Road Safety Faults in Road Construction EN
Road Safety Faults in Road Construction ENRoad Safety Faults in Road Construction EN
Road Safety Faults in Road Construction EN
 
Road safety.pptx
Road safety.pptxRoad safety.pptx
Road safety.pptx
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangal
 
Unit- 3 Highway Geometric design
Unit- 3 Highway Geometric designUnit- 3 Highway Geometric design
Unit- 3 Highway Geometric design
 
Road safety tools for authorities
Road safety tools for authorities  Road safety tools for authorities
Road safety tools for authorities
 
Highway safety
Highway safetyHighway safety
Highway safety
 
1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talash1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talash
 
Standards and guides for designing Temporary Traffic Management
Standards and guides for designing Temporary Traffic Management Standards and guides for designing Temporary Traffic Management
Standards and guides for designing Temporary Traffic Management
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric design
 
2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx
 
1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf1.3_Road Signs & Markings.pdf
1.3_Road Signs & Markings.pdf
 
Safety
SafetySafety
Safety
 
Road safety audit case study
Road safety audit case studyRoad safety audit case study
Road safety audit case study
 
Heavy Highway Training
Heavy Highway TrainingHeavy Highway Training
Heavy Highway Training
 
Highway Safety Power Point Presentation by Pankaj Pal.pptx
Highway Safety Power Point Presentation by Pankaj Pal.pptxHighway Safety Power Point Presentation by Pankaj Pal.pptx
Highway Safety Power Point Presentation by Pankaj Pal.pptx
 
RSA news letter.docx
RSA news letter.docxRSA news letter.docx
RSA news letter.docx
 
Work Zone Safety.pptx flagger responsiblity
Work Zone Safety.pptx flagger responsiblityWork Zone Safety.pptx flagger responsiblity
Work Zone Safety.pptx flagger responsiblity
 

Recently uploaded

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 

Recently uploaded (20)

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 

Safety in construction stage (by Md Abdur Rahman)

  • 1. Construction of Vehicular Underpass at Ashram Intersection (Total Length = 300m) Safety in Construction Zone Prepared by : Md Abdur Rahman
  • 2. Presentation Outline • Audit Team • Project Background • Principles and Planning of Work Zone Traffic Management • Work Zone Safety Audit Methodology • Temporary Traffic Control Zone Element Audit Advance Warning Zone Approach Transition Zone Activity zone Terminal Transition zone Work Zone End • Measures for Vulnerable Road Users (VRUs) • Deployment of Personnel and Safety Compliance • Major Findings
  • 6. Project Background(Sailent Features) 1. Traffic at Ashram intersection is serving for approx. 4 lakhs PCU/day 2. This Underpass is under construction at the third level 3. Flyover is already constructed and functioning at Asharam intersection 4. Length of the under pass is 300m 5. Two approach arms are Faridabad side & India gate side having approach based signal during construction 6. From the India gate side Nizamudin ROB will merge near the Ashram Intersection. 7. Distance of mouth of Nizamudin ROB from underpass is only 120m (safety Concern)
  • 7. Importance of Construction stage RSA oConstruction and maintenance work may pose various hazards for both the site operatives and road users. oProper signage and safety measures are required to warn and safeguard the road users along with workers. oIndian Road Congress; through its special publication IRC:SP:55 2014 has standardised the safety measures to be adopted at work zones. oAt all work places these standards for proper warning signage and safety measures are to be adopted. oTo ensure the adherence of these safety measures proper road safety audit is required to avoid any accident or mis happening.
  • 8. It is the safety plans with basic safety features and care needs to be taken so that anyone coming along the road or the footpath from any direction understands exactly what is happening and what is expected of him/her. The aim should be to facilitate the passage of road users through such work zones using roadway geometries, roadside features, and Traffic Control (TC) devices comparable to those for normal highway operations. Thus, road user movement should be free from any hazard. A WTMP should describe traffic control measures to be used for facilitating the safe and efficient movement of road users through a work zone. WTMP should play a vital role in providing reasonably safe and efficient road traffic flow for all road users when a work zone temporarily disrupts normal traffic flow. Principles and Planning of Work Zone Traffic Management • Provide Safety for Road Users and Workers • Minimize Hindrance or Delay to Road Users • Provide Clear and Positive Guidance to Road Users • Ensure Roadside Safety Maintenance • Ensure that Planners and Decision Makers have the Necessary Knowledge • Provide Good Public Relations Important Consideration for Work Zone Traffic Management
  • 9. Deployment of Personnel and Safety Compliance Measures for Vulnerable Road Users (VRUs) Traffic Control Devices Advance Warning Zone , Approach Transition Zone ,Activity Zone, Terminal Transition Zone and Work Zone End Work Zone Safety Audit Methodology Detailed Site Visit / Construction Stage Audit
  • 10. Temporary Traffic Control Zones IRC:SP:55-2014 • The Traffic Control Zone can be divided into: • Advance Warning Zone • Approach Transition Zone • Working Zone and • Terminal Transition Zone. Traffic Control Zone Terminal Transition Zone Working Zone Approach Transition Zone Advance Warning Zone
  • 11. Temporary Traffic Control Zones IRC:SP:55-2014 Source: IRC:SP:55-2014
  • 12. OBSERVATIONS ON SITE BY SAFETY EXPERT
  • 13. Observation: Traffic Management Plan is completely missing , Chevron & Hazard marking missing, Zebra crossing is not up to complete carriageway not much provision for pedestrian. Buffer is not clear (Entry, Exit and not proper tapering is done with delineators) Reason of concern: Prior information of work zone missing, Risk Priorty Highly desirable Rcommendation: It should be as per IRC:SP:55-2014
  • 14. Observation/Safety Concerns: Approach Transition Zone Taper length (ATL) is negligible or too short. It may cause risk of accident due to lateral shifting of moving vehicle from the normal pathway. Risk: High Recommendation: As Per IRC 55:2014 Table 4.1 approach taper length shall be 1 (width of hazard including buffer ) :12 for speed upto 50 km/Hr. at the start of traffic control zones. Priority: Highly desirable Advance Warning Zone (Friends colony to Bhogal)
  • 15. Observation/Safety Concerns: New jersey barriers are missing. Road condition is very poor which is very hazardous for road users. Risk: High Recommendation : New jersey barriers shall be provided as against existing thin metal sheets. Existing road shall be black topped Priority : Highly Desirable Approach Transition Zone
  • 16. Observation/Safety Concerns: Proper road sign boards & New jersey barriers are missing. Risk: Medium Recommendation : Proper road sign boards & New jersey barriers are proposed. Priority: Desirable Work/Activity Zone The activity zone is the section of the highway where the construction activity takes place. It comprises the work space, the traffic space, and the buffer space
  • 17. Observation/Safety Concerns: GI Sheets as channelizing devices between work zone and traffic space without buffer zone. Vehicles and pedestrians may fall in to excavation work area. Risk : Very High Recommendation : Provide new jersey barrier with delineators and lighting devices with buffer space to protect vehicles moving on traffic space. Priority : Essential Work/Activity Zone
  • 18. Observation/Safety Concerns: There are no advance Warning Zone Signs observed. Without Advance Warning Sign Board, vehicles may approach to Work Zone at high speed leads to crash. Risk: - High Recommendation : As Per IRC 55:2014 Table 4.1 advance warning Sign should be installed before 180m of Work Zone for desired speed of less than or equal to 50 km/Hr. Placement of Man At Work, Speed Limit & reduction in the no. of lanes sign. Priority : Highly desirable Advance Warning Zone
  • 19. Observation/Safety Concerns: There is no proper provision for pedestrian road crossing. Risk: High Recommendation : There should be a well defined pedestrian crossing for pedestrian in connection with footpath Priority : Highly Desirable. Work/Activity Zone
  • 20. Observation/Safety Concerns: There are no Terminal Transition Zone Signs observed due to which vehicles may approach to Work Zone at high speed leading to crash. It may also cause casualties to pedestrians or other VRUs by traffic. Risk: High Recommendation : The work zone end length shall extend from the end of terminal taper length to the last traffic control device such as sign showing the end of road work. Provide Work zone warning & Information Traffic signs Priority : Desirable Terminal Transition Zone
  • 21. Observation/Safety Concerns: • Terminal Transition Zone Taper length (TTL) is to short. It may cause risk of accident due to traffic from deviated path to their normal path Risk: High Recommendation: As Per IRC 55:2014 Priority: Highly desirable Terminal Transition Zone
  • 22. Observation: Diversion signs are not proper Reason of concern: Safety not indicating proper direction for smooth flow of traffic Recommendation: It should be as per IRC: 67 2012
  • 23. Observation: Along the full rotary type movement two signals are provided for smooth flow of traffic during peak hour. But chaos for NMTs Reason of concern: But there are no markings for pedestrians, which is very risky as at the other side metro station is also there Recommendation: It should be as per IRC:35-2015 for pedestrians it should be recommended as per IRC 103.
  • 24. Observation: This is left side entering to mathura road from ring road having three and a half lane road including bus lane at present only one and a half lane is in use. Bus stand has been shifted. Reason of concern: No arrow markings , no edge marking, no delineators Recommendation: It should be as per IRC: 35-2015
  • 25. Observation: Along the full Median side this type of FMM are placed not as per standard spacing Recommendation: It should be as per IRC:67-2012
  • 26. Observation: Edge marking is missing, barricading is of Tin type Reason of concern: safety Recommendation: It should be as per IRC: 35-2015. Barricading to be of type New Jersey
  • 27. Observation: From Friend colony to Ashram intersection (Night time). construction zone Plan is totally missing Only Flexible median markers are provided Reason of concern: Prior information of work zone Recommendation: It should be as per IRC:SP:55-2001
  • 28. Observation: Faridabad to ashram intersection (Night Time). Overhead gantry sign boards are there but camoflauge it is visible from 10m only Reason of concern: Visiblity of sign boards Recommendation: Sign boards should be as per IRC 64(2012)
  • 29. Observation: Delineation signs are totally missing in the construction zone or if placed not proper Reason of concern: Visibility issue, and hazardous risky Recommendation: It should be as per IRC:35-
  • 30. Observation: Pavement surfacing is in bad condition Reason of concern: Riding quality is not good, which again causes jam Recommendation: Wearing coarse should be put at construction zone pavement surface should be maintained properly with good roughness index
  • 31. Observation: No Retro reflective sheets , no sign boards along the barricading as well as on road Reason of concern: visibility Recommendation: It should be done as per DS (4895)
  • 32. Observation: Edge marking is completely missing on the carriageway Reason of concern: Risky, no demarcation of the barricading Recommendation: It should be done as per IRC 55
  • 33. Observation/Safety Concerns: No sign of End Road Work is provided Risk: High Recommendation : Proper sign should be provided on the terminal transition zone. Priority : Essential Terminal Transition Zone
  • 34. Measures for Vulnerable Road Users (VRUs) Observation/Safety Concerns: • Discontinuous provision for Pedestrians, and no provision for differently abled persons and people with visual impairment, for negotiate a work site or to cross the roads within a work site. • Existing footpath is discontinuous and absent of protected temporary footpaths and formal pedestrian crossings Risk : High Recommendation : Provision of continuous footpath (combination of existing and temporary footpaths (Min. 1 meter wide) with pedestrian barriers as per site condition Priority : Highly Desirable
  • 35. Deployment of Personnel and Safety Compliance • Work was on hold by pollution control board due to higher Air Quality Index. Therefore Audit doesn't cover any observations on workers, supervisors and inspecting officers safety. Good Industry Practices • Deployment of flagman for controlling the traffic during the peak and off-peak hours of traffic flow at the construction zones. • All the workers, exposed to moving roadway traffic or equipment in road construction zones shall wear high-visibility safety apparel, headgear, boots, gloves and protective gears for their protection. • All workers and supervisors must adhere to safety as per HSE norms and good industry practices.
  • 36. • There are no advance Warning Zone Signs i.e. Man At Work, Speed Limit & reduction in the no. of lanes sign. • Approach Transition Zone Taper length (ATL) is to short in length. • Improper channelizing devices between work zone and traffic space without buffer zone at many locations • Terminal Transition Zone Taper length (TTL) is to short. It may cause risk of accident due to traffic from deviated path to their normal path • The work zone end is without traffic control device such as sign showing the end of road work • Discontinuous provision for Pedestrians, and no provision for differently abled persons and people with visual impairment, for negotiate a work site or to cross the roads within a work site • Existing footpath is discontinuous and absent of protected temporary footpaths and formal pedestrian crossings • Flagman's were also not observed for facilitation to pedestrians and vehicular traffic at many hazardous locations. • *Night time safety measures are not seen at site Major Findings