SlideShare a Scribd company logo
1 of 4
Download to read offline
ABDUL MUKIS MISBACHI
1
_______________________________________________________________
PERSONAL DETAIL
PDOB : Semarang, September 1, 1972
Marital Status : Married
Address : Dusun Glidag Rt 53 Rw 09, Kec. Playen, Kab. Gunung Kidul – D.I Yogyakarta
Phone Number : +62856.6972.5366, +62812.6957.6748
Email : muis.ab72@gmail.com
WORK EXPERIENCE
Mei’2013 – Present
PIC Asia-Pacific Sdn.Bhd
Operational Maintenance Mechanical Engineer at APR Energy Nias 15 MW Diesel
Power Plant.
• Responsible to continuitas operating and maintenance unit engine generatorsets, .
• Prepare schedule running and maintenance unit engine generatorsets, unit equipment
auxiliarys supporting and make reported daily, weekly, monthly to manager powerplant.
• Analyse troubleshooting and quality control after job maintenance finished.
• Make improvement performance will be unit engine or auxiliarys problem and prepare planning
for maintenance troubleshooting.
• Analysing work order and prepare manpower, material and equipment schedule so that no over lap
on each other
• Monitor & control actual progress and schedule, a scheduler is required to communicate target &
motivate responsible person for activity, which appear behind schedule to follow schedule and will
not affect other activities.
Equipment Responsibilities:
Unit genset Caterpillar 3516B, unit fuel skid equipment.
ABDUL MUKIS MISBACHI
2
November’2009 – 31 Desember 2012
PT Central Daya Energi, Truba Manunggal Group.
At Diesel PowerPlant 65 Megawatt site Palembang – Supervisor Technician Maintenance and
Operational Mechanical:
• Responsible to continuitas operating and maintenance Overhoule unit engine generatorsets,
unit equipment auxiliarys like waterpumps, oil pumps, fuel pumps, unit heatexchangers, unit
separator, unit boiler, unit radiator and air compressor, etc. supporting for supplay electrical
network.
• Prepare schedule running and maintenance unit engine generatorsets, unit equipment
auxiliarys supporting and make reported daily, weekly, monthly and yearly to manager
powerplant.
• Analyse troubleshooting and quality control after job maintenance finished.
• Make improvement performance will be unit engine or auxiliarys problem and prepare planning
for maintenance troubleshooting.
• Analysing work order and prepare manpower, material and equipment schedule so that no over lap
on each other
• Monitor & control actual progress and schedule, a scheduler is required to communicate target &
motivate responsible person for activity, which appear behind schedule to follow schedule and will
not affect other activities.
Equipment Responsibilities:
Engine Wartsila Vasa 16V46, Engine Sulzer ZAV40S, Engine Wartsila Nohab 16V25, Engine Perkin
3008TAG3A, Engine MAN D2842 LE21, Separator AlvaLaval LOPX710SFD-34, Separator AlvaLaval
FOPX613TFD-20, Air Compressor Tamrotor FS15, Air Compresor Spere HL2-140, Boiler "Unex" - H-185,
Boiler "Unex"-CHB-1500, Overhead crane 10, 5, 2 ton, Forklift Mitsubishi FD25, Fuelpump IMO ACG
052N5 IVBO, LubOilpump IMO ABQ 110 L5 IRYP, IMO ACE 038N1 IVBO, IMO ACE 032N1 IVBO,
Separator Westfalia OSA 20-02-066, Reheat exchanger "APV" A085 MGS-10, Radiator Fincoil : FBLGE-13-7-
N1-H68DN 100+102 DN125, Waterpump CCM Sulzer GRAZ125.135/295.U3DW17750Y.
September’
2009 – Nov’2009
Moving Engine project, From Lampung to Balikpapan Engine Wartsila Vasa 30 MegaWatt 320 ton
weight.
PT Central Daya Energi, Truba Manunggal Group - Leader Mechanikal Dismantling, Installing and
Commisioning
.
• Responsible to execution prosses dismantling, installing and commissioning unit engines
generators set and equipment auxiliarys system in planning schedules.
• Reporting to manager project for daily, weekly and monthly progress job finished.
• Prepare and planning with person ware house consumable parts for supporting job.
• Make list data equipment for prosses dismantling and packaging with person warehouse
• Co-ordinating workloads with the tehnician, warehouse person and team jacking forewarder
equipment.
ABDUL MUKIS MISBACHI
3
• Monitor & control actual progress and schedule, a scheduler is required to communicate target
& motivate responsible person for activity, which appear behind schedule to follow schedule
and will not affect other activities.
Equipment Responsibilities:
Engine Wartsila Vasa 16V46, Separator AlvaLaval LOPX710SFD-34, Separator AlvaLaval FOPX613TFD-
20, Fuelpump IMO ACG 052N5 IVBO, LubOilpump IMO ACE 038N1 IVBO, IMO ACE 032N1 IVBO, Reheat
exchanger "APV" A085 MGS-10, Radiator Fincoil : FBLGE-13-7-N1-H68DN 100+102 DN125,
August’ 2008 – August 2009
Coal Steam Fire Power Plant 2 x 30 MW, Project Lampung
PT Central Daya Energi, Truba Manunggal Group, Staff operating for WTP plant
• Responsible to reporting daily, weekly and monthly activity progress job project finished.
• Prepare list data for superior project before activity job beginning
• Prepare documentation and records employee personnel files to ensure that all records and
data are correctly, effectively and accurately schedule job project.
January ‘95 – August’ 2008
PT Aruna Wijaya Sakti, Pertambakan Inti Rakyat, Lampung
At Diesel Power Plant 60 MegaWatt – Senior Technician mechanical operational and maintenance.
• Responsible to maintenance and operational engine generator sets, unit auxiliarys equipment
auxiliarys like waterpumps, oil pumps, fuel pumps, unit heatexchangers, unit separator, unit
boiler, unit radiator and air compressor, etc for supporting continuitas supplay elektrical
network.
• Maintenance trouble shooting unit engine or auxiliarys equipment will be damage
• Prepare execution job order and give feedback to operator and superior after job order finished
• Make report data service job activitiy maintenance or trouble records and give improvement
performance when unit engine or auxilarys problem.
• Prepare material consumables need for maintenance and troubleshooting with person
warehouse.
• Monitor & control actual progress and schedule, a scheduler is required to communicate target
& motivate responsible person for activity, which appear behind schedule to follow schedule
and will not affect other activities
Equipment Responsibilities:
Engine Wartsila Nohab 16V25, Separator AlvaLaval LOPX, Separator AlvaLaval MOPX, Fuelpump IMO
ACG 052N5 IVBO, LubOilpump IMO ACE 038N1 IVBO, IMO ACE 032N1 IVB, Radiator, Overhead crane 2
ton, Forklift Mitsubishi FD25, Air compressor ATLASS Copco, Air compressor Hatlapa 30B
ABDUL MUKIS MISBACHI
4
August ‘91 – January ‘95
PT Dipasena Citra Darmaja, Lampung – Technician Mechanical Engineering Departement
• Responsible to maintenance and service engine generator sets for supporting continuitas
supplay elektrikal network.
• Maintenance trouble shooting unit engine and overhoule will be damage
• Prepare execution job order and give feedback to operator and superior after job order finished
• Make report data service job activitiy maintenance or service records and give improvement
performance when unit engine problem
• Prepare and request part material consumables need for maintenance and service with person
warehouse.
Equipment Responsibilities:
Engine Yanmar TS230, Engine Yanmar TS220, Engine Yanmar TS65, Engine Yanmar TF155, Yanmar
TF105, Engine Kubota 10KW, Engine Honda 5KW, Engine Dongfeng 8KW, Engine Dongfeng 5KW
EDUCATIONAL BACKGROUND
1991: Tehnical High School (STM) 4 Semarang, vocational Mesin Automotive.
OTHER SKILLS
1. English Language, speaking and writing, communicates well with expatriate employee and
superiors. Computer Programs such as Microsoft Office Programs, Windows operation system,
VISIO and Familiar with Internet.
2. Familiar Operated Digital Control System (DCS) Wartsila Vasa.
3. Famliar Operated Digital Control system (DCS) Sulzer, Manual Control System Sulzer.
4. Familar Operated Digital and Manual Control System Wartsila Nohab.
5. Familiar Operated Digital Control DEIF (ACG-4), EMCP Control for Caterpilar Engines.
6. Familiar Operated ET Cat Tool For Sevices and Maintenance Engines.
COURSES & TRAINING
August 1995: Training system of Engine Diesel Wartsila Nohab 16V25 by Wartsila Ltd, Sweden site Diesel
PowerPlant AWS Lampung. Certified
Marc – May 2008: In House Training “ Coal Steam Fire Power Plant”, by Indonesia Profesional
Development Centre (IPDC), Hotel Grande Bandar.Lampung, Certified
Juni – July 2008: On The Job Training In Operational & Maintenance of Coal Steam Fire PowerPlant, by
Sektor Pembangkitan PLTU Tarahan, Lampung. Certified
February 2011: Training TurboCharger ABB Product, Jakarta. Certified
January 2015 : Training Fire Fighting by Damkar Baricade Medan Sumut, Certified

More Related Content

Similar to CV Abdul Mukis Misbachi (20)

Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
 
EngineerResume
EngineerResumeEngineerResume
EngineerResume
 
Deepak- Resume
Deepak- ResumeDeepak- Resume
Deepak- Resume
 
Efoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CVEfoghe Oscar - Genset Electrical & Maint CV
Efoghe Oscar - Genset Electrical & Maint CV
 
Resume-vel
Resume-velResume-vel
Resume-vel
 
CV016092015
CV016092015CV016092015
CV016092015
 
sendhil7y6m
sendhil7y6msendhil7y6m
sendhil7y6m
 
Snehal Resume
Snehal ResumeSnehal Resume
Snehal Resume
 
Thomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPointThomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPoint
 
Roy sayre 01.2016
Roy sayre 01.2016Roy sayre 01.2016
Roy sayre 01.2016
 
Cv resume jimmy c. bernal
Cv resume jimmy c. bernalCv resume jimmy c. bernal
Cv resume jimmy c. bernal
 
Cv resume jimmy c. bernal
Cv resume jimmy c. bernalCv resume jimmy c. bernal
Cv resume jimmy c. bernal
 
WISNU CV
WISNU CVWISNU CV
WISNU CV
 
dinesh.Resume.new (2)
dinesh.Resume.new (2)dinesh.Resume.new (2)
dinesh.Resume.new (2)
 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copy
 
ketul
ketulketul
ketul
 
Resume
ResumeResume
Resume
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
CV of Partha 2015 (2)
CV of Partha 2015 (2)CV of Partha 2015 (2)
CV of Partha 2015 (2)
 
nickbiodata160427
nickbiodata160427nickbiodata160427
nickbiodata160427
 

CV Abdul Mukis Misbachi

  • 1. ABDUL MUKIS MISBACHI 1 _______________________________________________________________ PERSONAL DETAIL PDOB : Semarang, September 1, 1972 Marital Status : Married Address : Dusun Glidag Rt 53 Rw 09, Kec. Playen, Kab. Gunung Kidul – D.I Yogyakarta Phone Number : +62856.6972.5366, +62812.6957.6748 Email : muis.ab72@gmail.com WORK EXPERIENCE Mei’2013 – Present PIC Asia-Pacific Sdn.Bhd Operational Maintenance Mechanical Engineer at APR Energy Nias 15 MW Diesel Power Plant. • Responsible to continuitas operating and maintenance unit engine generatorsets, . • Prepare schedule running and maintenance unit engine generatorsets, unit equipment auxiliarys supporting and make reported daily, weekly, monthly to manager powerplant. • Analyse troubleshooting and quality control after job maintenance finished. • Make improvement performance will be unit engine or auxiliarys problem and prepare planning for maintenance troubleshooting. • Analysing work order and prepare manpower, material and equipment schedule so that no over lap on each other • Monitor & control actual progress and schedule, a scheduler is required to communicate target & motivate responsible person for activity, which appear behind schedule to follow schedule and will not affect other activities. Equipment Responsibilities: Unit genset Caterpillar 3516B, unit fuel skid equipment.
  • 2. ABDUL MUKIS MISBACHI 2 November’2009 – 31 Desember 2012 PT Central Daya Energi, Truba Manunggal Group. At Diesel PowerPlant 65 Megawatt site Palembang – Supervisor Technician Maintenance and Operational Mechanical: • Responsible to continuitas operating and maintenance Overhoule unit engine generatorsets, unit equipment auxiliarys like waterpumps, oil pumps, fuel pumps, unit heatexchangers, unit separator, unit boiler, unit radiator and air compressor, etc. supporting for supplay electrical network. • Prepare schedule running and maintenance unit engine generatorsets, unit equipment auxiliarys supporting and make reported daily, weekly, monthly and yearly to manager powerplant. • Analyse troubleshooting and quality control after job maintenance finished. • Make improvement performance will be unit engine or auxiliarys problem and prepare planning for maintenance troubleshooting. • Analysing work order and prepare manpower, material and equipment schedule so that no over lap on each other • Monitor & control actual progress and schedule, a scheduler is required to communicate target & motivate responsible person for activity, which appear behind schedule to follow schedule and will not affect other activities. Equipment Responsibilities: Engine Wartsila Vasa 16V46, Engine Sulzer ZAV40S, Engine Wartsila Nohab 16V25, Engine Perkin 3008TAG3A, Engine MAN D2842 LE21, Separator AlvaLaval LOPX710SFD-34, Separator AlvaLaval FOPX613TFD-20, Air Compressor Tamrotor FS15, Air Compresor Spere HL2-140, Boiler "Unex" - H-185, Boiler "Unex"-CHB-1500, Overhead crane 10, 5, 2 ton, Forklift Mitsubishi FD25, Fuelpump IMO ACG 052N5 IVBO, LubOilpump IMO ABQ 110 L5 IRYP, IMO ACE 038N1 IVBO, IMO ACE 032N1 IVBO, Separator Westfalia OSA 20-02-066, Reheat exchanger "APV" A085 MGS-10, Radiator Fincoil : FBLGE-13-7- N1-H68DN 100+102 DN125, Waterpump CCM Sulzer GRAZ125.135/295.U3DW17750Y. September’ 2009 – Nov’2009 Moving Engine project, From Lampung to Balikpapan Engine Wartsila Vasa 30 MegaWatt 320 ton weight. PT Central Daya Energi, Truba Manunggal Group - Leader Mechanikal Dismantling, Installing and Commisioning . • Responsible to execution prosses dismantling, installing and commissioning unit engines generators set and equipment auxiliarys system in planning schedules. • Reporting to manager project for daily, weekly and monthly progress job finished. • Prepare and planning with person ware house consumable parts for supporting job. • Make list data equipment for prosses dismantling and packaging with person warehouse • Co-ordinating workloads with the tehnician, warehouse person and team jacking forewarder equipment.
  • 3. ABDUL MUKIS MISBACHI 3 • Monitor & control actual progress and schedule, a scheduler is required to communicate target & motivate responsible person for activity, which appear behind schedule to follow schedule and will not affect other activities. Equipment Responsibilities: Engine Wartsila Vasa 16V46, Separator AlvaLaval LOPX710SFD-34, Separator AlvaLaval FOPX613TFD- 20, Fuelpump IMO ACG 052N5 IVBO, LubOilpump IMO ACE 038N1 IVBO, IMO ACE 032N1 IVBO, Reheat exchanger "APV" A085 MGS-10, Radiator Fincoil : FBLGE-13-7-N1-H68DN 100+102 DN125, August’ 2008 – August 2009 Coal Steam Fire Power Plant 2 x 30 MW, Project Lampung PT Central Daya Energi, Truba Manunggal Group, Staff operating for WTP plant • Responsible to reporting daily, weekly and monthly activity progress job project finished. • Prepare list data for superior project before activity job beginning • Prepare documentation and records employee personnel files to ensure that all records and data are correctly, effectively and accurately schedule job project. January ‘95 – August’ 2008 PT Aruna Wijaya Sakti, Pertambakan Inti Rakyat, Lampung At Diesel Power Plant 60 MegaWatt – Senior Technician mechanical operational and maintenance. • Responsible to maintenance and operational engine generator sets, unit auxiliarys equipment auxiliarys like waterpumps, oil pumps, fuel pumps, unit heatexchangers, unit separator, unit boiler, unit radiator and air compressor, etc for supporting continuitas supplay elektrical network. • Maintenance trouble shooting unit engine or auxiliarys equipment will be damage • Prepare execution job order and give feedback to operator and superior after job order finished • Make report data service job activitiy maintenance or trouble records and give improvement performance when unit engine or auxilarys problem. • Prepare material consumables need for maintenance and troubleshooting with person warehouse. • Monitor & control actual progress and schedule, a scheduler is required to communicate target & motivate responsible person for activity, which appear behind schedule to follow schedule and will not affect other activities Equipment Responsibilities: Engine Wartsila Nohab 16V25, Separator AlvaLaval LOPX, Separator AlvaLaval MOPX, Fuelpump IMO ACG 052N5 IVBO, LubOilpump IMO ACE 038N1 IVBO, IMO ACE 032N1 IVB, Radiator, Overhead crane 2 ton, Forklift Mitsubishi FD25, Air compressor ATLASS Copco, Air compressor Hatlapa 30B
  • 4. ABDUL MUKIS MISBACHI 4 August ‘91 – January ‘95 PT Dipasena Citra Darmaja, Lampung – Technician Mechanical Engineering Departement • Responsible to maintenance and service engine generator sets for supporting continuitas supplay elektrikal network. • Maintenance trouble shooting unit engine and overhoule will be damage • Prepare execution job order and give feedback to operator and superior after job order finished • Make report data service job activitiy maintenance or service records and give improvement performance when unit engine problem • Prepare and request part material consumables need for maintenance and service with person warehouse. Equipment Responsibilities: Engine Yanmar TS230, Engine Yanmar TS220, Engine Yanmar TS65, Engine Yanmar TF155, Yanmar TF105, Engine Kubota 10KW, Engine Honda 5KW, Engine Dongfeng 8KW, Engine Dongfeng 5KW EDUCATIONAL BACKGROUND 1991: Tehnical High School (STM) 4 Semarang, vocational Mesin Automotive. OTHER SKILLS 1. English Language, speaking and writing, communicates well with expatriate employee and superiors. Computer Programs such as Microsoft Office Programs, Windows operation system, VISIO and Familiar with Internet. 2. Familiar Operated Digital Control System (DCS) Wartsila Vasa. 3. Famliar Operated Digital Control system (DCS) Sulzer, Manual Control System Sulzer. 4. Familar Operated Digital and Manual Control System Wartsila Nohab. 5. Familiar Operated Digital Control DEIF (ACG-4), EMCP Control for Caterpilar Engines. 6. Familiar Operated ET Cat Tool For Sevices and Maintenance Engines. COURSES & TRAINING August 1995: Training system of Engine Diesel Wartsila Nohab 16V25 by Wartsila Ltd, Sweden site Diesel PowerPlant AWS Lampung. Certified Marc – May 2008: In House Training “ Coal Steam Fire Power Plant”, by Indonesia Profesional Development Centre (IPDC), Hotel Grande Bandar.Lampung, Certified Juni – July 2008: On The Job Training In Operational & Maintenance of Coal Steam Fire PowerPlant, by Sektor Pembangkitan PLTU Tarahan, Lampung. Certified February 2011: Training TurboCharger ABB Product, Jakarta. Certified January 2015 : Training Fire Fighting by Damkar Baricade Medan Sumut, Certified