23. Summary Results and Recommendations
WETLAND ID Phase I Conceptual Recommendation
A-J +0.5' to +1.5' +0.5' - 1.5' Construct connection to east
A-T Good Match Good Match N/A
B-Q Good Match Good Match N/A
C-A -1.0' to +0.5' -1.0' to +0.5' Modify proposed control structure from BP1
C-M +0.5' to +1.5' +0.5' to +1.5' Divert water to create wetlands
C-P/Q Good Match Good Match N/A
D-H Good Match Good Match N/A
D-O match to +0.5' match to +0.75' Divert water to create wetlands
E-H -0.5' -0.5' Construct ditch block in proposed ditches
F-D(N) Good Match N/A N/A
F-D(S) Good Match match to +/-0.25' N/A
F-M match to -0.5' match to +0.5' Could Connect to SWM4 in Phase I
F-O Good Match Good Match N/A
G-B +0.5' to +1.0' +0.5' to +1.0' Divert flow into adjacent ditch
G-E Good Match Good Match N/A
I-F Good Match Good Match N/A
I-N Good Match Good Match N/A