1. COST CONTROL ENGINEER / Sr. QUANTITY SURVEYOR
HYDER ALIKHAN.A
COST CONTROL ENGINEER / QS
Sustainable Builders.LLC, P.O. Box 74429,
Dubai – United Arab Emirates.
E-Mail: hyderalikhan5355@gmail.com
Mobile: +97150-7636098
Passport No: K 8750032
OBJECTIVE To lead a challenging and exciting career as a Cost Control Engineer / Sr. Quantity
Surveyor in an Organization that lends one a supportive and operative learning
environment with ample chances to contribute and diversify my knowledge and skills
and offer me a good potential for future growth.
PROFESSIONAL 15 YEARS EXPERIENCE DETAILS
Company Sustainable Builders llc., Al Barari group – Dubai, UAE.
Period February 2015 to Till Date
Position held COST CONTROL ENGINEER / Sr. QUANTITY SURVEYOR
Roles Executed
Analysis the Project Budget & Quantity with reference of Activity and
Resource codes element in to the Candy (CCS) file.
Linking the program and BOQ in Link and forecast module with Candy
(CCS) software.
Verify and allocate the Activity, Cost Codes in the Project Candy Budget
File & Upload the Project Candy file to Build Smart (ERP) system.
Preparation of Project incurred Cost report each month according to Build
smart (ERP) systemGeneral Ledger Report.
Preparing forecasting report of total project cost and resource based cost.
Prepare the Labor Budget and circulate to the Project Team.
Prepare the Labor Report each month and compare with Budget.
Prepare the Actual Vs Budget comparison for the entire material request and
the subcontracts jobs.
Prepare the Valuation report for the entire Project each month to get Earned
Value Analysis for the ongoing projects
Prepare the Consolidated Cost Report.
Certify the SubcontractorPayment Certificate along with supporting
documents.
Verify the Budget Transfer, Variation & Scope changes log.
To cross checking LPO comparison & Sub-contractor agreements.
Follows up overall progress and maintaining records.
Quantity Take off from drawings approved for construction.
Follow the site Store-keeper to get the material Received and stockdetails.
Resolve the Budget issue and support the Site Quantity Surveyors regarding
Budget Problems.
Reporting to Commercial Director & Project’s Director.
PROJECTS HANDLED
Seventh Heaven - Dubai.
Ashjar Phase -01- Dubai.
The Nest Villas – Dubai.
2. COST CONTROL ENGINEER
Company TROJAN HOLDING, Abu Dhabi - UAE.
Period January 2011 to Dec 2014
Position held GROUP COST CONTROLENGINEER / Sr. QUANTITY SURVEYOR
Roles Executed
Analysis the Project Budget & Quantity with reference of Activity and
Resource codes element in to the Candy (CCS) file.
Linking the program and BOQ in Link and forecast module with Candy
(CCS) software
Verify all the Activity, Cost Codes in the Project Budget File & Upload in
to the Candy file to Build Smart software.
Prepare the Labor Budget and circulate to the Project Team.
Preparation of Project incurred cost report every month according to Oracle
Account General Ledger & Build smart Ledger Report.
Preparing cost report from actual amount by applying cost codes for ledger
and comparing it with BCWP arrived from cost and allowable module in ccs
candy.
Following the site Store-keeper to get the material Received and stock
details.
Verify the Budget Transfer, Variation & Scope changes log.
Compare the LPO according to Budget in candy software.
To cross checking LPO comparison & Sub-contractor agreements.
Prepare the Budget Comparison against material Purchase.
Support the Site Quantity Surveyors regarding Budget Problems.
Approve the LPO in Oracle & build smart software.
Reporting to Cost Control Manager & Managing Director.
PROJECTS HANDLED
Institute of Applied Technology project - Abu Dhabi.
Al Ajban poultry Farm Project- Ajban.
Al- Aryam Residentional Villa project - Abu Dhabi
Basement villa & Private Villa Project - Abu Dhabi.
Seychelles Coast Guard & military training facility project - Seychelles.
Mosque and Memorization Center - Abu Dhabi
Command of Military Work project – Abu Dhabi.
Special Care housing Project – Ajban.
Jebel hafeet project – 3000 villas - Al-ain
Royal Advance Electro mechanical Works – Abu Dhabi
Al Maha Modular Industries – Abu Dhabi.
Afghanistan low Cost villa Project – Afghanistan.
Akoya for Damac Project – Dubai.
Nalaya Community Villa – Abu Dhabi.
Yas Island Zone – K Project, Abudhabi.
PROJECTS HANDLED
Emirati Housing Development Project -2000 villas – Alain.
Urbela Project – Erbil, Iraq.
COMPANY HANDLING
Trojan General Contracting Co .llc
National Project Contruction Co llc.
Royal Advance Electro Mechanical Co llc.
Al maha Modular Industries.
Al Ajban Poultary Farm.
Reem Emirates Aluminum llc.
Hi-Tech Precast Factory llc.
3. COST CONTROL ENGINEER / Sr. QUANTITY SURVEYOR
Company TAAHUD GENERAL CONTRACTING Co.llc, Abu Dhabi -UAE.
Period June. 2010 to January 2011.
Position held QUANTITY SURVEYOR / JUNIOR ESTIMATOR (Tendering
Department)
Roles Executed
Conceptualization, Analysis of Tender Document.
Preparation of quantity calculation according to Tender Document.
Prepare the pricing schedule for tender.
Prepare the Bill of Quantities ( BOQ)
Reporting to Managing Director.
PROJECTS HANDLED
ADNOC Corporate Head Quarters car parking project – Abu Dhabi.
Residential building project – Abu Dhabi.
Company and Contractor camp Project – Ruwais.
Oman airport project.
Company YUKSEL CONSTRUCTION CO.INC, DOHA - QATAR.
Period Dec. 2007 to Dec. 2009.
Position held QUANTITY SURVEYOR - (Total Project worth is Qrs.740,000,000.00)
Roles Executed
Conceptualization, Analysis of Boq, Sub-Contractor work order.
Preparation of payment certificate for Client and Sub-Contractor.
Site inspection and providing solutions for the problems arising.
Quantity certification According to Shop drawing verifications.
Variation order preparation.
PROJECTS HANDLED
New Doha International Airport Project (JV), Doha-Qatar.
North / South Extension of Ras Abu Abboud Road (JV) Project, Doha-
Qatar.
Tunnel & Underpass Zone1 & Zone 2 (JV) Project, Doha-Qatar.
Bridge Construction project on-shore Project. Doha-Qatar.
Clients NEW DOHA INTERNATIONAL AIRPORT COMMITTEE (NDIA)
Works done
Monthly payment application prepared and submits to client.
Based on agreement Quantity certification of Earth works.
Based on agreement Quantity certification of demolition.
Based on agreement Quantity certification of Sub-Grade Preparation.
Quantity Certification of Sub-base & flexible surface.
Quantity Certification of Water-Proofing work.
Quantity Certification of Pipeline laying.
Quantity Certification of Mechanical Work.
Quantity Certification of utility works.
Quantity Certification of Structure & Irrigation &Landscaping.
Working as s Section Engineer for a Bridge project.
Company ROMAN TARMAT LTD, MUMBAI, INDIA
Period Oct. 2004 to Nov. 2007.
Position held SITE CO-ORDINATOR (RUNWAYS & APRON)Roles Executed
4. COST CONTROL ENGINEER
Execute the work as per Design & Details.
Co-ordination Related to work with site engineer & Client.
Site inspection and providing solutions for the problems arising
Reporting to General Manger about work.
PROJECTS HANDLED
Jobs
Tiruchirapalli International Airport (Strengthening of Runway & Taxi
Way & New Apron Construction) Project, Tiruchirapalli.
Chennai International Airport (Strengthening of Runway), Chennai.
Chennai Domestic Airport (Strengthening of Runway & Apron), Chennai.
Kochi International Airport (Strengthening of Runway & Taxiway),
Kerala.
Mumbai International Airport (Strengthening of Runway & Apron),
Mumbai.
Works done
Co-Ordination with Site engineer to improve the work Speed.
Co-ordination with Surveyor for level.
Co-ordination with QC for inspection.
Analysis of Shop drawings.
Analysis the Quantity of Materials.
Work execute as per planning schedule.
Procure the Required material for project.
Client ● AIRPORT AUTHORITY OF INDIA.
Company U.R.C Construction (p) ltd, Erode.
Period JULY 2001 to Sep.2004
Position held Site Engineer
Roles Executed
Execute the work.
Daily report Preparation
Material Requirement.
Organizing and Development.
PROJECTS HANDLED
Job HOSPITAL BUILDING Construction Project, Trichy, India
Client MARUTHI HOSPITAL COMMITTEE.
Work done
Construction of Phase 1& Phase2 Building (G+7)
Execute the daily activity.
Execute the work as per Shop drawings.
Maintain the manpower Detail.
Calculation of Rebar.
Calculation of concrete quantity.
Inspect the work.
Job RAILWAY OVER BRIDGE PROJECT, TRICHY, INDIA
Client TAMILNADU HIGHWAYS DEPARTMENT. INDIA.
5. COST CONTROL ENGINEER / Sr. QUANTITY SURVEYOR
Work done
Railway Crossing Over Bridge, 1 km length, city of Trichy.
Execute the daily activity.
Execute the work as per Shop drawings.
Maintain the manpower Detail.
Calculation of Rebar.
Calculation of concrete quantity.
Inspect the work as per shop drawing.
Job RESIDENTIAL BUILDINGS, TRICHY, INDIA
Work done
Execute the daily activity.
Execute the work as per Shop drawings.
Maintain the manpower Detail.
Calculation of Rebar.
Calculation of concrete quantity.
AREA SPECIALIZATION
● Concrete Structures
● Steel Structures
● Pavements Structures
● Quantity Calculation
● Document’s Checking for Subcontractor or Supplier.
● Cost Control System.
EDUCATIONAL DETAILS
Certified Cost Control December 2013
Professional (CCP) Association for the Advancement of Cost Engineering (AACE)
International, USA
B.Tech. in June 2005
Civil Engineering Sastra College of Technology, Tanjore, Deemed University
(Part-Time) Tanjore, INDIA
Diploma in May 2001.
Civil Engineering M.I.E.T College of Technology, Anna University,
Tirchirapalli, INDIA.
COMPUTER SKILLS
Oracle Application.
Build Smart
Construction computer software (CCS)
NIMS
RAI Software.
AutoCAD, MS-Office.
Basic knowledge in Primavera & Staad-Pro.
6. COST CONTROL ENGINEER
ACQUIRED TALENTS
Good communication skill in English, Hindi, Tamil, Urdu, Malayalam.
Personal initiative.
PERSONAL DETAILS
Father’s Name : A. Alikhan.
Date of Birth : 17.04.1983.
Sex : Male
Marital Status : Married
Nationality : Indian.
Religion : Muslim.
Languages Known : English, Tamil, Malayalam, and Hindi & Urdu.
Permanent Address : 47/3, Single Tower Mosque Street,
Tennur High Road,
Tiruchirapalli – 620017,
Tamil Nadu, India.
Ph: (+) 91-431-4021785.
Mob: (+) 91 -94422-42015.
UAE Driving License : 956885