Complete Contract Control
Improving performance and profitability
of capital projects
June 2016
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
Input Cost Inflation and
Contract Management Indiscipline
are undermining the oil industry’s
ability to deliver complex
projects successfully.
The Business Challenge
2
Context: Why this is a priority NOW
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 3
THE COST/PRICE GAP FACING THE INDUSTRY
Price Index now below 100
Cost Index now at 170
Project execution
needs to capture
efficiency gains
from better
governance and
enhanced capital
discipline
Re-base the cost and price index at 100 in 2004
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
Context: Control
4
OUTSIDE OUR CONTROL WITHIN OUR CONTROL
Capital discipline and strong governance:
• Defined Business Processes
for all contractor/operator interactions.
• Structured Communication exchange
via a single channel.
• Use of Early Warning Indicators to
mitigate risk
• Collaborative Change Control
Management
• Audit Trail
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
• Enforced Discipline and Transparency
– All contractually significant communications
received, recorded, reviewed, issued via ProCon
– Repeated reminders to respond to outstanding
communication
– All Operator to Contractor communications
approved by single authority (Company
Representative)
– All parties share same database of
communication registers and final decisions
made - single source of truth
• Claims Defence Readiness
– No claims….yet, but
– Complete audit trail of key decisions made
throughout project is available
• Streamlined & Connected Decision Making
– ProCon available & used by all functions for
contractually significant communications:
• CP
• Finance
• Project Services
• Engineering
• Legal
• Stakeholders
• In first 2 years…
– 14,000+ contractual communications
– Approximately 60 variations managed
Case Study – Complete Contract Control
5
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 6
A contract risk management solution, that connects
all decision makers to protect capital investment,
drive performance and improve profitability when
building and operating high value assets.
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 7
THE ProCon SUITE
REGISTRATION
PRE-QUALIFICATION
ONLINE TENDER MANAGEMENT
CONTRACT AWARD
TENDER PERFORMANCE
ANALYSIS
MANAGE COMMUNICATIONS
CONTROL CHANGES
& OBLIGATIONS
TRACK & VERIFY PAYMENTS
& BUDGET CONTROL
MANAGE CLAIMS & DISPUTES
LESSONS LEARNT & FEEDBACK
PRE-AWARD POST-AWARD
COMPLETE CONTRACT
CONTROL
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
Organisation/Governance
• Many interfaces:
• Governments, private partners, contractors, etc.
• 1000s of contractually significant communications
• Poorly defined contract management processes
• Required compliance to governance
• Critical information scattered across ad hoc systems –
spreadsheets, emails, hard drives
• Insufficient tracking of contractual obligations
8
Extremely difficult to
defend against claims
Reactive rather than
proactive risk
management
Owner Operator
EPC/M
Supplier
Supplier
Asset Build
phase
Maintenance,
Repair,
Operations
ProCon
Contract Communication Registers
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 9
Owner Operator Portal
Contractor Portal
CONTRACT TEAM
Liability?
Claim Potential?
Manage Change
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 10
COST TEAM SCHEDULE/PLANNER
TEAM
ENGINEERING/DESIGN
TEAM
FINANCE
DAY TWO ALIGNMENT
Earned Value
Cost to Complete
Time to
Complete
Delays-resourcing
Knock-on Effect
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 11
ProCon: POST-AWARD | FINANCIAL HEALTH
8over8 - AVEVA Knowledge Transfer 12
THE ProCon CHRONICLES
8over8 - AVEVA Knowledge Transfer 13
THE ProCon CHRONICLES
COMMUNICATION TYPE
CONTRACT ROLE
TIME & DATE
REVISION HISTORY
CUSTOM TAGS
OWNER ROLE
ERP
Document Management
Engineering
ProCon
• Contract Change Orders
• Governance and standards
• Enhanced contract
performance
• Contractor relationship
management
• Claims defence – risk
mitigation
• Business analytics –
enhanced decision making
• Tendering and contract
portfolio planning
ProCon Integration
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 14
Project Controls
Supply Chain /
Procurement
Engineering
Management
Facilities
Management
Contractors
Document
Management
Project Control / Cost Management
Desktop
ProCon Analytics & Dashboards
Early Warning & Contract Management Decision Support
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 16
ProCon:
ANALYTICS
AND DASHBOARDS
Live Tenders Summary
Total Tender Budget Total Number of Tenders Actual Duration Vs. Planned Duration Overdue Tenders
$3.84 Billion 22 22.86% 86.36%
$1.76 B. (3)
$1.76 B. (3)
$1.76 B. (3)
$1.76 B. (3)
$1.76 B. (3)
EPC Greater than $50MM
[AG] – Major Tender Competitive Bidding
Minor Tender Competitive Bidding
[Europe] – Major Tender Competitive Bidding
Europe Approved Fast Track Tender
Tender template
NumberofTenders
Tenders due to complete
within next 30 days
0
Tenders without ProCon
activity (over 30 days)
16
Total Tender Budget
$3.84 Billion
Total Tender Budget
$3.84 Billion
Contract Commitment Vs. Tender Budget Value
-1.9%
$30.68 Million $31.26 Million
Total Contract Commitment value Total Tender Budget Value
Actual Duration Vs. Planned Duration
40.52%
By schedule time
261%
12%
-17%
-49%-54%
Award
Create documents
Dispatch/Trading
Shortlist
Review
Total Open schedule items by Completed Tenders
226
19 120 26 24 35
Award
Create Documents
Dispatch/Trading Review Shortlist
Actual Duration Vs. Planned Duration
$15.31M (2. tenders) $30M (1. tenders)
$30M (1. tenders)
$30M (1. tenders)
$30M (1. tenders)
$15.31M (2.
tenders)
$15.31M (2.
tenders)
$15.31M (2.
tenders)
$15.31M (2.
tenders)
$15.31M (2.
tenders)
Completed Tenders without Contract Awarded
1
In progress
overdue
19
3
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 17
ProCon:
ANALYTICS
AND
DASHBOARDS
18
ProCon: Customers & Partners
[easy, transparent, secure]
“We deploy ProCon on our
16 largest projects but
there’s scope to extend it
further. The Prelude
deployment of ProCon has
been a pathfinder for Shell
and is the benchmark for
other projects to work
against.”
“ProCon’s transparency
gives you the big picture
and the close-up view
of every detail into
project-critical processes
and procedures”
BG
“Every step of the way, ProCon
creates an audit trail. Claims
avoidance is essential in Australia
where contractors will make claims
whenever they feel they can get
away with it”
“ProCon addressed an
important productivity
challenge delivering some
impressive savings — every
business day”
Woodside
“ProCon defined a robust
and disciplined approach
to high risk commercial
engagements.”
Wintershall
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 19
ROIs confirm these beliefs…
ProCon replaced 10 lawyers at
Arrow responding to a claim for
a week; estimated savings of
1680 lawyer hours and $22m in
avoided claims
$12bn Shell Prelude -
first FLNG ever built -
zero claims
BP Angola recovered
$1bn from JV partner for
valid project changes
Oil major’s capital over-runs
reduced from 157% to 103%
of forecast budget
ProCon is saving $1m
daily at Woodside - 3% of
the Woodside capex
$22M SAVED ZERO CLAIMS +$1BN
54% SAVED +$1M PER DAY
$60-$100m
AVERAGE
bottom line savings on a $2bn capex project
For More Information Please Contact
Mounir Boemond, Regional Manager – Europe, Russia & CIS
m.bomeond@8over8.com
Anara Ubinamin, Business Development Executive
a.ubinamin@8over8.com
8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 20
© 2016 8over8, an AVEVA Group company. All rights reserved. All trademarks herein are the property of their
respective owners. 8over8 and the 8over8 logo are trademarks of 8over8.
8over8.com/
@8over8
/8over8
8over8.com/resources/thought-leadership/

More Related Content

What's hot

World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
Robert Jutson
 
DLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIADLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIA
Richard Goins
 

What's hot (15)

Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
1. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV0110151. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV011015
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
 
Crossrail: lessons in governance
Crossrail: lessons in governanceCrossrail: lessons in governance
Crossrail: lessons in governance
 
Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Portfolio management in Rolls-Royce today
Portfolio management in Rolls-Royce todayPortfolio management in Rolls-Royce today
Portfolio management in Rolls-Royce today
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
 
1. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV0110151. Roger Garrini - good governance guidance GOV011015
1. Roger Garrini - good governance guidance GOV011015
 
Magenic - Flexability
Magenic - FlexabilityMagenic - Flexability
Magenic - Flexability
 
Portfolio Cost Management in Offshore Software Development Outsourcing Relat...
Portfolio Cost Management in Offshore Software Development  Outsourcing Relat...Portfolio Cost Management in Offshore Software Development  Outsourcing Relat...
Portfolio Cost Management in Offshore Software Development Outsourcing Relat...
 
Prathibha Kamtam-Resume
Prathibha Kamtam-ResumePrathibha Kamtam-Resume
Prathibha Kamtam-Resume
 
Setting the foundations for benefits management at Heathrow
Setting the foundations for benefits management at HeathrowSetting the foundations for benefits management at Heathrow
Setting the foundations for benefits management at Heathrow
 
Breakthrough competences in the development of public administration
Breakthrough competences in the development of public administrationBreakthrough competences in the development of public administration
Breakthrough competences in the development of public administration
 
cleverti - Nearshore outsourcing IT services from Portugal
cleverti - Nearshore outsourcing IT services from Portugalcleverti - Nearshore outsourcing IT services from Portugal
cleverti - Nearshore outsourcing IT services from Portugal
 
DLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIADLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIA
 

Viewers also liked

Viewers also liked (6)

Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
Hazardous Area Equipment Certification - ATEX (Zone 1 Zone 2), IEC Ex, NEMA (...
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 
Document Management With Workflow Presentation
Document Management With Workflow PresentationDocument Management With Workflow Presentation
Document Management With Workflow Presentation
 

Similar to AVEVA ProCon Complete Contract Control

Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
Eversheds Sutherland
 
Profile-C&N Inventions CC'v3
Profile-C&N Inventions CC'v3Profile-C&N Inventions CC'v3
Profile-C&N Inventions CC'v3
Conrad Sebego
 
2015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-12015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-1
ada ades
 
04/28/2010 Meeting - Contract Compliance
04/28/2010 Meeting - Contract Compliance04/28/2010 Meeting - Contract Compliance
04/28/2010 Meeting - Contract Compliance
acfesj
 

Similar to AVEVA ProCon Complete Contract Control (20)

8over8 Complete Contract Control
8over8 Complete Contract Control8over8 Complete Contract Control
8over8 Complete Contract Control
 
Effectively Managing Contracts
Effectively Managing ContractsEffectively Managing Contracts
Effectively Managing Contracts
 
Why AVEVA ProCon should be on your radar
Why AVEVA ProCon should be on your radarWhy AVEVA ProCon should be on your radar
Why AVEVA ProCon should be on your radar
 
october 2016 investor update
october 2016 investor updateoctober 2016 investor update
october 2016 investor update
 
Cb&i november 2016 investor update
Cb&i november 2016 investor updateCb&i november 2016 investor update
Cb&i november 2016 investor update
 
Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
 
Profile-C&N Inventions CC'v3
Profile-C&N Inventions CC'v3Profile-C&N Inventions CC'v3
Profile-C&N Inventions CC'v3
 
Bp's kpi
Bp's kpiBp's kpi
Bp's kpi
 
Overview of the problem.pptx
Overview of the problem.pptxOverview of the problem.pptx
Overview of the problem.pptx
 
Better Business Cases - APMG
Better Business Cases - APMGBetter Business Cases - APMG
Better Business Cases - APMG
 
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
 
2015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-12015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-1
 
2015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-12015 form-10-k-and-strategy-discussion 041916-1
2015 form-10-k-and-strategy-discussion 041916-1
 
Meec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copyMeec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copy
 
04/28/2010 Meeting - Contract Compliance
04/28/2010 Meeting - Contract Compliance04/28/2010 Meeting - Contract Compliance
04/28/2010 Meeting - Contract Compliance
 
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
BioLargo's Corporate Deck for LD Micro Main Event XII (2019)
 
BioLargo Deck for LD micro 2019 06042019
BioLargo Deck for LD micro 2019 06042019BioLargo Deck for LD micro 2019 06042019
BioLargo Deck for LD micro 2019 06042019
 
Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...Service Contract Analytics - Leverage analytics to improve revenue and profit...
Service Contract Analytics - Leverage analytics to improve revenue and profit...
 
Investor presentation august_2017
Investor presentation august_2017Investor presentation august_2017
Investor presentation august_2017
 
Investor presentation march_2017
Investor presentation march_2017Investor presentation march_2017
Investor presentation march_2017
 

Recently uploaded

+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 

Recently uploaded (20)

Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdfAzure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
 
Define the academic and professional writing..pdf
Define the academic and professional writing..pdfDefine the academic and professional writing..pdf
Define the academic and professional writing..pdf
 
Exploring the Best Video Editing App.pdf
Exploring the Best Video Editing App.pdfExploring the Best Video Editing App.pdf
Exploring the Best Video Editing App.pdf
 
VTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learnVTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learn
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
 
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
 

AVEVA ProCon Complete Contract Control

  • 1. Complete Contract Control Improving performance and profitability of capital projects June 2016
  • 2. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. Input Cost Inflation and Contract Management Indiscipline are undermining the oil industry’s ability to deliver complex projects successfully. The Business Challenge 2
  • 3. Context: Why this is a priority NOW 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 3 THE COST/PRICE GAP FACING THE INDUSTRY Price Index now below 100 Cost Index now at 170 Project execution needs to capture efficiency gains from better governance and enhanced capital discipline Re-base the cost and price index at 100 in 2004
  • 4. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. Context: Control 4 OUTSIDE OUR CONTROL WITHIN OUR CONTROL Capital discipline and strong governance: • Defined Business Processes for all contractor/operator interactions. • Structured Communication exchange via a single channel. • Use of Early Warning Indicators to mitigate risk • Collaborative Change Control Management • Audit Trail
  • 5. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. • Enforced Discipline and Transparency – All contractually significant communications received, recorded, reviewed, issued via ProCon – Repeated reminders to respond to outstanding communication – All Operator to Contractor communications approved by single authority (Company Representative) – All parties share same database of communication registers and final decisions made - single source of truth • Claims Defence Readiness – No claims….yet, but – Complete audit trail of key decisions made throughout project is available • Streamlined & Connected Decision Making – ProCon available & used by all functions for contractually significant communications: • CP • Finance • Project Services • Engineering • Legal • Stakeholders • In first 2 years… – 14,000+ contractual communications – Approximately 60 variations managed Case Study – Complete Contract Control 5
  • 6. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 6 A contract risk management solution, that connects all decision makers to protect capital investment, drive performance and improve profitability when building and operating high value assets.
  • 7. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 7 THE ProCon SUITE REGISTRATION PRE-QUALIFICATION ONLINE TENDER MANAGEMENT CONTRACT AWARD TENDER PERFORMANCE ANALYSIS MANAGE COMMUNICATIONS CONTROL CHANGES & OBLIGATIONS TRACK & VERIFY PAYMENTS & BUDGET CONTROL MANAGE CLAIMS & DISPUTES LESSONS LEARNT & FEEDBACK PRE-AWARD POST-AWARD COMPLETE CONTRACT CONTROL
  • 8. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. Organisation/Governance • Many interfaces: • Governments, private partners, contractors, etc. • 1000s of contractually significant communications • Poorly defined contract management processes • Required compliance to governance • Critical information scattered across ad hoc systems – spreadsheets, emails, hard drives • Insufficient tracking of contractual obligations 8 Extremely difficult to defend against claims Reactive rather than proactive risk management Owner Operator EPC/M Supplier Supplier Asset Build phase Maintenance, Repair, Operations ProCon
  • 9. Contract Communication Registers 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 9 Owner Operator Portal Contractor Portal
  • 10. CONTRACT TEAM Liability? Claim Potential? Manage Change 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 10 COST TEAM SCHEDULE/PLANNER TEAM ENGINEERING/DESIGN TEAM FINANCE DAY TWO ALIGNMENT Earned Value Cost to Complete Time to Complete Delays-resourcing Knock-on Effect
  • 11. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 11 ProCon: POST-AWARD | FINANCIAL HEALTH
  • 12. 8over8 - AVEVA Knowledge Transfer 12 THE ProCon CHRONICLES
  • 13. 8over8 - AVEVA Knowledge Transfer 13 THE ProCon CHRONICLES COMMUNICATION TYPE CONTRACT ROLE TIME & DATE REVISION HISTORY CUSTOM TAGS OWNER ROLE
  • 14. ERP Document Management Engineering ProCon • Contract Change Orders • Governance and standards • Enhanced contract performance • Contractor relationship management • Claims defence – risk mitigation • Business analytics – enhanced decision making • Tendering and contract portfolio planning ProCon Integration 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 14 Project Controls Supply Chain / Procurement Engineering Management Facilities Management Contractors Document Management Project Control / Cost Management Desktop
  • 15. ProCon Analytics & Dashboards Early Warning & Contract Management Decision Support
  • 16. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 16 ProCon: ANALYTICS AND DASHBOARDS Live Tenders Summary Total Tender Budget Total Number of Tenders Actual Duration Vs. Planned Duration Overdue Tenders $3.84 Billion 22 22.86% 86.36% $1.76 B. (3) $1.76 B. (3) $1.76 B. (3) $1.76 B. (3) $1.76 B. (3) EPC Greater than $50MM [AG] – Major Tender Competitive Bidding Minor Tender Competitive Bidding [Europe] – Major Tender Competitive Bidding Europe Approved Fast Track Tender Tender template NumberofTenders Tenders due to complete within next 30 days 0 Tenders without ProCon activity (over 30 days) 16 Total Tender Budget $3.84 Billion Total Tender Budget $3.84 Billion Contract Commitment Vs. Tender Budget Value -1.9% $30.68 Million $31.26 Million Total Contract Commitment value Total Tender Budget Value Actual Duration Vs. Planned Duration 40.52% By schedule time 261% 12% -17% -49%-54% Award Create documents Dispatch/Trading Shortlist Review Total Open schedule items by Completed Tenders 226 19 120 26 24 35 Award Create Documents Dispatch/Trading Review Shortlist Actual Duration Vs. Planned Duration $15.31M (2. tenders) $30M (1. tenders) $30M (1. tenders) $30M (1. tenders) $30M (1. tenders) $15.31M (2. tenders) $15.31M (2. tenders) $15.31M (2. tenders) $15.31M (2. tenders) $15.31M (2. tenders) Completed Tenders without Contract Awarded 1 In progress overdue 19 3
  • 17. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 17 ProCon: ANALYTICS AND DASHBOARDS
  • 18. 18 ProCon: Customers & Partners [easy, transparent, secure] “We deploy ProCon on our 16 largest projects but there’s scope to extend it further. The Prelude deployment of ProCon has been a pathfinder for Shell and is the benchmark for other projects to work against.” “ProCon’s transparency gives you the big picture and the close-up view of every detail into project-critical processes and procedures” BG “Every step of the way, ProCon creates an audit trail. Claims avoidance is essential in Australia where contractors will make claims whenever they feel they can get away with it” “ProCon addressed an important productivity challenge delivering some impressive savings — every business day” Woodside “ProCon defined a robust and disciplined approach to high risk commercial engagements.” Wintershall 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved.
  • 19. 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 19 ROIs confirm these beliefs… ProCon replaced 10 lawyers at Arrow responding to a claim for a week; estimated savings of 1680 lawyer hours and $22m in avoided claims $12bn Shell Prelude - first FLNG ever built - zero claims BP Angola recovered $1bn from JV partner for valid project changes Oil major’s capital over-runs reduced from 157% to 103% of forecast budget ProCon is saving $1m daily at Woodside - 3% of the Woodside capex $22M SAVED ZERO CLAIMS +$1BN 54% SAVED +$1M PER DAY $60-$100m AVERAGE bottom line savings on a $2bn capex project
  • 20. For More Information Please Contact Mounir Boemond, Regional Manager – Europe, Russia & CIS m.bomeond@8over8.com Anara Ubinamin, Business Development Executive a.ubinamin@8over8.com 8over8 Limited, an AVEVA Group Company, 2016 All rights reserved. 20
  • 21. © 2016 8over8, an AVEVA Group company. All rights reserved. All trademarks herein are the property of their respective owners. 8over8 and the 8over8 logo are trademarks of 8over8. 8over8.com/ @8over8 /8over8 8over8.com/resources/thought-leadership/

Editor's Notes

  1. Each sphere represents a communication Each communication in ProCon contains: Communication type Role that sent and received the communication The time and data stamp of the communication Detailed data of the commination itself Custom tags and attributes as needed Contractor claims that Owner owes them $1M more Owner PM asks the team if this is a legitimate claim? Without ProCon try sifting through all the spheres to find the evidence to defend “NO” on the claim is almost impossible With ProCon the PM can follow the “Chronicle” and find the evidence needed quickly with one click to reject or accept the claim
  2. Each sphere represents a communication Each communication in ProCon contains: Communication type Role that sent and received the communication The time and data stamp of the communication Detailed data of the commination itself Custom tags and attributes as needed Contractor claims that Owner owes them $1M more Owner PM asks the team if this is a legitimate claim? Without ProCon try sifting through all the spheres to find the evidence to defend “NO” on the claim is almost impossible With ProCon the PM can follow the “Chronicle” and find the evidence needed quickly with one click to reject or accept the claim