Better Business Cases 
Richard Pharro 
CEO
IP Acknowledgements 
• APMG™ and APM Group™ are trade marks of the APM Group Ltd. 
• The APMG, APM Group and Swirl Device logos are a trade marks of 
The APM Group Limited. 
• Any third party copyright or other intellectual property rights 
subsisting in this presentation, including without limitation any text, 
images, graphics, trade marks, etc. are owned by the third-party 
providers concerned and any use of said third party intellectual 
property rights is intended for reference purposes only. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
About APM Group 
• Established in 1993 
• Accredited by UKAS in 2000 
• 2012 Queen’s Award for Enterprise for our 
international activities 
• Awarded IIP Gold in 2010 and again in 
2013 
• Administer Certification and Accreditation 
Schemes 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Our Partners 
NHS Health Informatics 
World Bank Group 
IPMA 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Project Outcomes 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Why can’t all projects succeed? 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
German Projects 
• Inpol-neu: a system for the federal and state police 
failed causing 75 Mio € damage. 
Secretary of the Interior (BMI) 
• Fiscus: an application for the tax authorities failed 
causing 125 Mio € damage 
Secretary of Finance (BMF) 
• Maut: a road charge application for federal highways 
(“Autobahnen”). A loss of billions of revenue in the first 
years of operation 
Secretary of Traffic (BMVBS) 
Source: PRINCE2® In the Public Service and The Government of the Federal Republic of Germany. 
Status Report. April 2012. By Wolfgang Ksoll. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” 
PRINCE2® is a Registered Trade Mark of Axelos
“KPMG survey of Project Management practices in New Zealand finds 
some truly startling results; 
Survey shows an incredible 70% of 
organizations have suffered at least one project 
failure in the prior 12 months! 
50% of respondents also indicated that their 
project failed to consistently achieve what they 
set out to achieve!” 
Source : KPMG (New Zealand) 
Type of survey : Survey of 100 businesses across a broad cross section of industries 
Date : Dec 2010 
New Zealand Projects 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
US Projects 
“Only 30% of our projects and programs are 
successful”1 
1. United States Government Accountability Office. Report to congressional committees. 
Defence Acquisitions – Assessments of Selected Weapon Programs. March 2008. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
UK Projects 
“Study of government projects reveals $4billion in wasted efforts as a 
result of failed projects. 
‘Only 30% of our projects and programs are successful’ - Joe Harley, 
programme and systems delivery officer at the Department for Work 
and Pensions.” 
Source : Guardian Newspaper (UK) 
Scope : Investigation into government waste in the UK since year 2000 
Date : 5 Jan 2008 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Cyber Space Projects 
“A study of 5,400 large scale IT projects (projects with initial budgets 
greater than $15M) finds that the well known problems with IT Project 
Management are persisting. Among the key findings quoted from the 
report: 
– 17 percent of large IT projects go so badly that they can threaten the 
very existence of the company 
– On average, large IT projects run 45 percent over budget and 7 percent 
over time, while delivering 56 percent less value than predicted” 
Source : McKinsey & Company in conjunction with the University of Oxford 
Type of survey : Study on large scale IT Projects 
Date : 2012 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
‘Troubled projects’ = disappointing 
outcomes 
Research suggests 
that commercial 
issues are the 
primary cause in 
~70% 
of ‘troubled 
projects’… 
….and the likelihood 
of significant 
innovation or 
incremental value 
reduced by 
≥ 60% 
© IACCM 2013
Major causes and frequency of losses 
© IACCM 2013
An urgent need for improvement 
Only 11% feel that their organization is well equipped for the future; 
89% believe that their contract management processes and management 
© IACCM 2013 
must improve. 
Observed disadvantages from lack of process ownership 
• Longer lead times • Less flexible 
• Lower level of automation • Poor management visibility into contract 
performance 
• Increased risk of unauthorised commitments • Delayed take up of contract models / terms 
• High personnel turnover • Poor decision making 
• Perception of being difficult in the market • Reduced customer / vendor loyalty
Conclusion 
We probably have a problem that current 
practices haven't solved in the last 50 years? 
Can Agile and Better Business Cases help? 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Why are Business Cases important? 
A business case provides decision makers and the public as well as the private sector with a 
management tool for transparent, evidence-based decision making. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
The Five Case Model 
(from HM Treasury) 
A framework for ‘thinking’ to help answer three basic questions 
‘where are we now?’, 
‘where do we want to be?’ and 
‘how are we going to get there?’ 
A step by step guide to developing a business case by: 
The process is about 
thinking not writing 
•Establishing a clear need for intervention - the case for change. 
•Setting clear objectives – desired outcome 
•Considering a wide range of potential solutions - an optimal balance 
of benefits, cost and risk. 
•Putting the arrangements in place to successfully deliver the proposal. Successful 
execution 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” 
The process is about 
thinking not writing
The Five Case Model 
The 5 key elements of good practice business cases 
Management 
Economic 
Strategic 
Financial Commercial 
Applicable - strategic 
fit & business needs 
Appropriate – 
optimises public 
value 
Attractive – to supply 
side and feasible 
Achievable – can 
be successfully 
delivered 
Affordable – within 
budget 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Three Types of Business Case 
1. The key purpose of Strategic Outline Case is to: 
– establish the strategic context for the spending proposal; 
– evidence the case for change; 
– establish the preferred way forward 
2. The key purpose of the Outline Business Case is to: 
– revisit the SOC assumptions and main findings 
– establish the preferred option 
– put in place the arrangements for the procurement of the scheme 
3. The key purpose of the Full Business Case is to: 
– revisit OBC assumptions and main finding; 
– evidence that the most economically advantageous tender (MEAT) for 
the scheme has been accepted; 
– establish that the management arrangements for successful delivery are 
in place. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
The suggested process (use with 
care) 
Workshop Objectives Key participants Outputs 
Workshop 1: • To define and agree business 
needs, potential scope and 
• Senior Responsible 
Owner; 
• SMART spending 
objectives; 
Determining the spending objectives; • Board members; • Business needs and 
case for change and • To define and agree desired • Programme director; potential scope; 
options for service outcomes and service outputs; • Project manager; • CSFs and benefits 
delivery • To define and agree the CSFs and • External stakeholders or criteria; 
benefit criteria for assessing the commissioners; • Long list of options; 
(SOC Stage) options; • Customer and/or user • Fundamentals of the 
• To identify the potential options for 
service delivery. • 
representatives; 
Technical adviser; 
SOC. 
• Financial adviser; 
• Facilitator. 
Workshop 2: • To sift the long list and generate 
the short list; 
• External stakeholders or 
commissioners; 
• Short-listed options with 
preliminary assessment; 
Assessing the • To identify and assess the • Director of finance; • Outline benefits 
options potential costs, benefits and risks • Economic adviser; realisation plan; 
associated with the short-listed • Customer and/or user • Inputs for economic 
(SOC/OBC stage) options. representatives; appraisal. 
• Project manager; 
• Facilitator. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
The suggested process (cont…) 
Workshop Objectives Key participants Outputs 
Workshop 3: 
• To develop the PSC; • 
External stakeholders 
or • Preliminary PSC with 
Developing the • To address all relevant issues, 
including risks, affordability and • 
commissioners; 
Director of finance; • 
indicative costs; 
Fundamentals of the 
reference project/ implementation. • Economic adviser; economic and financial 
outline PSC • Customer and/or user 
representatives; 
cases. 
(OBC stage) • Project manager; 
• Facilitator. 
specification; • External stakeholders 
or commissioners; • Preliminary risk 
allocation matrix (RAM); 
Workshop 4: • To develop the service 
Developing the deal • To develop the apportionment of • Director of finance; • Potential deal; 
risk and underpinning payment • Economic adviser; • Fundamentals of the 
(OBC stage) • mechanisms; 
To develop the proposed 
contract. 
• Customer and/or user 
representatives; 
commercial case. 
• Project manager; 
• Facilitator. 
Workshop 5: • To develop the procurement • 
External stakeholders 
or • Procurement strategy; 
strategy; commissioners; • Management and 
Successful delivery • To develop the project plan; • Director of finance; delivery arrangements; 
arrangements • To develop supporting strategies • Economic adviser; • Post project evaluation 
(OBC stage) 
(for change management and 
contract management etc). 
• Customer and/or user. arrangements. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Sources of help 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Publications 
• Get your copy. The five case model is freely available via: 
http://wales.gov.uk/funding/wiipindex/5cmodel/?status=close.d&lang=en 
• Currently no plans to make the model available in hard copy format 
• Guidance consolidates other reference sources and is consistent with 
HM Treasury’s “Green Book Guidance on Appraisal of Policies, 
Programmes and Projects” – UK Government’s central guidance for 
appraisal and evaluation of all policies, programmes and projects 
(available at http://www.hm-treasury.gov.uk/data_greenbook_index.htm). 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
BBC Training Companies 
Approved 
•Cupe Projects Ltd 
•Demos 
•Eleisha Training Ltd 
•Explosive Learning Solutions 
•Harry Baker Professionals Ltd 
•Inspiring projects 
•PA Consulting 
•PearceMayfield 
•QRP Management Methods 
•The Knowledge Academy 
For more information go to:- 
http://www.apmg-international.com/en/qualifications/better-business-cases/ 
better-business-cases.aspx 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” 
Pending Accreditation 
•Bizness Academie SAS 
•CC Learning 
•Deloitte MCS Limited 
•E-quality Italia 
•Pink Elephant UK 
•Raj Khanna Associates Ltd 
•Snap Tech (Pty) Ltd 
•Training ByteSize Ltd
Courses and Qualifications 
• Foundation Course and Exam 
– Classroom course 2 days followed by closed book exam 
– Closed book, multiple choice, 50 questions 
– 50% pass mark 40 minutes duration 
• Practitioner Course and Exam 
– Classroom course 3 days followed by an exam on day 3 
– Open book exam 
– 4 questions per paper, with 20 marks available per question 
– 50% pass mark 2 ½ hours duration 
• Reviewer Course 
– Under development/discussion
Benefits 
For Organizations:- 
•Reduction in unnecessary spending and consultancy costs. 
•A process and guidance designed to optimize value from change initiatives. 
•A clear, proportionate approval process and improved, more informed decision making. 
•Complements existing best practice 
•Short courses minimize disruption to business as usual. 
For Individuals:- 
•Improved understanding of the Better Business Cases process, relevant not only to 
those producing business cases and spending proposals, but also those reviewing. 
•Understanding of an established and proven methodology which can be applied at both 
strategic (macro) and tactical (micro) levels. 
•Recognized certification for a core business competency for so many in mid and 
senior management roles.
Conclusion 
Better Business Cases lead to: 
• better decisions 
• better investments 
• achievement of better outcomes. 
It is about the thinking not the writing 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
A final thought 
$45 billion a year spent by NGOs. 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
Any questions 
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
“ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”

More Related Content

What's hot

Agile Executive Briefing - Situational Assessment + 50k Ft View
Agile Executive Briefing - Situational Assessment + 50k Ft ViewAgile Executive Briefing - Situational Assessment + 50k Ft View
Agile Executive Briefing - Situational Assessment + 50k Ft ViewMichael Sahota
 
Adaptive Strategy Combining OKR and Lean Portfolio Management
Adaptive Strategy Combining OKR and Lean Portfolio ManagementAdaptive Strategy Combining OKR and Lean Portfolio Management
Adaptive Strategy Combining OKR and Lean Portfolio ManagementEmiliano Soldi
 
Sustainability And Environmental Management Powerpoint Presentation Slides
Sustainability And Environmental Management Powerpoint Presentation SlidesSustainability And Environmental Management Powerpoint Presentation Slides
Sustainability And Environmental Management Powerpoint Presentation SlidesSlideTeam
 
Beyond budgeting - an agile management model for new business and people rea...
Beyond budgeting  - an agile management model for new business and people rea...Beyond budgeting  - an agile management model for new business and people rea...
Beyond budgeting - an agile management model for new business and people rea...Smidigkonferansen
 
Strategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and TemplatesStrategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and TemplatesAurelien Domont, MBA
 
AES22 - Bien démarrer sa transformation SAFe avec un LACE
AES22 - Bien démarrer sa transformation SAFe avec un LACEAES22 - Bien démarrer sa transformation SAFe avec un LACE
AES22 - Bien démarrer sa transformation SAFe avec un LACEAgile En Seine
 
Remote PI Planning: ScrumMaster & RTE Edition
Remote PI Planning: ScrumMaster & RTE Edition   Remote PI Planning: ScrumMaster & RTE Edition
Remote PI Planning: ScrumMaster & RTE Edition Laura Caldie Richardson
 
Strategic Thinking, Vision and Leadership
Strategic Thinking, Vision and LeadershipStrategic Thinking, Vision and Leadership
Strategic Thinking, Vision and LeadershipDr. John Persico
 
Prosci Masterclass - ACMP 2017 Slides
Prosci Masterclass - ACMP 2017 SlidesProsci Masterclass - ACMP 2017 Slides
Prosci Masterclass - ACMP 2017 SlidesTim Creasey
 
Strategic Planning, Execution Frameworks & Organizational Health
Strategic Planning, Execution Frameworks & Organizational HealthStrategic Planning, Execution Frameworks & Organizational Health
Strategic Planning, Execution Frameworks & Organizational HealthRichard Swartzbaugh
 
8 project management reports you need for your project
8 project management reports you need for your project8 project management reports you need for your project
8 project management reports you need for your projectPM Majik
 
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...Society of Women Engineers
 
Feasibility Study Template for Electronic Software Distribution
Feasibility Study Template for Electronic Software DistributionFeasibility Study Template for Electronic Software Distribution
Feasibility Study Template for Electronic Software DistributionFlevy.com Best Practices
 

What's hot (20)

Agile portfolio management
Agile portfolio managementAgile portfolio management
Agile portfolio management
 
Business case a_caponera
Business case a_caponeraBusiness case a_caponera
Business case a_caponera
 
Agile Executive Briefing - Situational Assessment + 50k Ft View
Agile Executive Briefing - Situational Assessment + 50k Ft ViewAgile Executive Briefing - Situational Assessment + 50k Ft View
Agile Executive Briefing - Situational Assessment + 50k Ft View
 
Project governance
Project governanceProject governance
Project governance
 
Adaptive Strategy Combining OKR and Lean Portfolio Management
Adaptive Strategy Combining OKR and Lean Portfolio ManagementAdaptive Strategy Combining OKR and Lean Portfolio Management
Adaptive Strategy Combining OKR and Lean Portfolio Management
 
BBC - Better Business Cases - Foundation
BBC - Better Business Cases - FoundationBBC - Better Business Cases - Foundation
BBC - Better Business Cases - Foundation
 
Agile Business Value
Agile Business ValueAgile Business Value
Agile Business Value
 
Sustainability And Environmental Management Powerpoint Presentation Slides
Sustainability And Environmental Management Powerpoint Presentation SlidesSustainability And Environmental Management Powerpoint Presentation Slides
Sustainability And Environmental Management Powerpoint Presentation Slides
 
Beyond budgeting - an agile management model for new business and people rea...
Beyond budgeting  - an agile management model for new business and people rea...Beyond budgeting  - an agile management model for new business and people rea...
Beyond budgeting - an agile management model for new business and people rea...
 
Strategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and TemplatesStrategic Planning Toolkit - Framework, Best Practices and Templates
Strategic Planning Toolkit - Framework, Best Practices and Templates
 
PgMP - Introduction to Program Management
PgMP -  Introduction to Program ManagementPgMP -  Introduction to Program Management
PgMP - Introduction to Program Management
 
Agile Metrics
Agile MetricsAgile Metrics
Agile Metrics
 
AES22 - Bien démarrer sa transformation SAFe avec un LACE
AES22 - Bien démarrer sa transformation SAFe avec un LACEAES22 - Bien démarrer sa transformation SAFe avec un LACE
AES22 - Bien démarrer sa transformation SAFe avec un LACE
 
Remote PI Planning: ScrumMaster & RTE Edition
Remote PI Planning: ScrumMaster & RTE Edition   Remote PI Planning: ScrumMaster & RTE Edition
Remote PI Planning: ScrumMaster & RTE Edition
 
Strategic Thinking, Vision and Leadership
Strategic Thinking, Vision and LeadershipStrategic Thinking, Vision and Leadership
Strategic Thinking, Vision and Leadership
 
Prosci Masterclass - ACMP 2017 Slides
Prosci Masterclass - ACMP 2017 SlidesProsci Masterclass - ACMP 2017 Slides
Prosci Masterclass - ACMP 2017 Slides
 
Strategic Planning, Execution Frameworks & Organizational Health
Strategic Planning, Execution Frameworks & Organizational HealthStrategic Planning, Execution Frameworks & Organizational Health
Strategic Planning, Execution Frameworks & Organizational Health
 
8 project management reports you need for your project
8 project management reports you need for your project8 project management reports you need for your project
8 project management reports you need for your project
 
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...
Building Successful Cross-cultural and Cross-functional Teams to Achieve Goal...
 
Feasibility Study Template for Electronic Software Distribution
Feasibility Study Template for Electronic Software DistributionFeasibility Study Template for Electronic Software Distribution
Feasibility Study Template for Electronic Software Distribution
 

Similar to Better Business Cases - APMG

Does your Board exhibit good governance of project and change management?, 22...
Does your Board exhibit good governance of project and change management?, 22...Does your Board exhibit good governance of project and change management?, 22...
Does your Board exhibit good governance of project and change management?, 22...Association for Project Management
 
Does your Board exhibit good governance of project/change management?
Does your Board exhibit good governance of project/change management?Does your Board exhibit good governance of project/change management?
Does your Board exhibit good governance of project/change management?Association for Project Management
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Carolyn Reid
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinarAli Zeeshan
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesAli Zeeshan
 
SME Instrument - Roubaud - recipe4success
SME Instrument - Roubaud - recipe4successSME Instrument - Roubaud - recipe4success
SME Instrument - Roubaud - recipe4successAVOprezentace
 
Better business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case ModelBetter business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case ModelTraining Bytesize
 
11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterprise11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterpriseabcde123321
 
Building relationships within the oil & gas sector may 2013
Building relationships within the oil & gas sector may 2013Building relationships within the oil & gas sector may 2013
Building relationships within the oil & gas sector may 2013Renato Azevedo
 
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Suhas Dutta
 
Better business cases overview presentation and notes
Better business cases overview presentation and notesBetter business cases overview presentation and notes
Better business cases overview presentation and notesMartyn Kinch
 
Top tips for joint bidding
Top tips for joint biddingTop tips for joint bidding
Top tips for joint biddingwalescva
 
2.requirements management
2.requirements management2.requirements management
2.requirements managementPanos Fitsilis
 
Tadd Spiegel Resume 2016 NY-J 4.4.16
Tadd Spiegel Resume 2016 NY-J 4.4.16Tadd Spiegel Resume 2016 NY-J 4.4.16
Tadd Spiegel Resume 2016 NY-J 4.4.16Tadd Spiegel
 

Similar to Better Business Cases - APMG (20)

Does your Board exhibit good governance of project and change management?, 22...
Does your Board exhibit good governance of project and change management?, 22...Does your Board exhibit good governance of project and change management?, 22...
Does your Board exhibit good governance of project and change management?, 22...
 
Does your Board exhibit good governance of project/change management?
Does your Board exhibit good governance of project/change management?Does your Board exhibit good governance of project/change management?
Does your Board exhibit good governance of project/change management?
 
Building better business cases - Nick Wensley
Building better business cases - Nick WensleyBuilding better business cases - Nick Wensley
Building better business cases - Nick Wensley
 
Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slides
 
SME Instrument - Roubaud - recipe4success
SME Instrument - Roubaud - recipe4successSME Instrument - Roubaud - recipe4success
SME Instrument - Roubaud - recipe4success
 
Project report
Project reportProject report
Project report
 
Better business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case ModelBetter business cases overview presentation - 5 Case Model
Better business cases overview presentation - 5 Case Model
 
1. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV0110151. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV011015
 
11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterprise11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterprise
 
Building relationships within the oil & gas sector may 2013
Building relationships within the oil & gas sector may 2013Building relationships within the oil & gas sector may 2013
Building relationships within the oil & gas sector may 2013
 
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
 
Better business cases overview presentation and notes
Better business cases overview presentation and notesBetter business cases overview presentation and notes
Better business cases overview presentation and notes
 
Top tips for joint bidding
Top tips for joint biddingTop tips for joint bidding
Top tips for joint bidding
 
EU funding for SME's and Startups
EU funding for SME's and Startups EU funding for SME's and Startups
EU funding for SME's and Startups
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
Tadd Spiegel Resume 2016 NY-J 4.4.16
Tadd Spiegel Resume 2016 NY-J 4.4.16Tadd Spiegel Resume 2016 NY-J 4.4.16
Tadd Spiegel Resume 2016 NY-J 4.4.16
 

More from Association for Project Management

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Association for Project Management
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...Association for Project Management
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Association for Project Management
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...Association for Project Management
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Association for Project Management
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Association for Project Management
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Association for Project Management
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 

More from Association for Project Management (20)

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 

Recently uploaded

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 

Better Business Cases - APMG

  • 1. Better Business Cases Richard Pharro CEO
  • 2. IP Acknowledgements • APMG™ and APM Group™ are trade marks of the APM Group Ltd. • The APMG, APM Group and Swirl Device logos are a trade marks of The APM Group Limited. • Any third party copyright or other intellectual property rights subsisting in this presentation, including without limitation any text, images, graphics, trade marks, etc. are owned by the third-party providers concerned and any use of said third party intellectual property rights is intended for reference purposes only. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 3. About APM Group • Established in 1993 • Accredited by UKAS in 2000 • 2012 Queen’s Award for Enterprise for our international activities • Awarded IIP Gold in 2010 and again in 2013 • Administer Certification and Accreditation Schemes “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 4. Our Partners NHS Health Informatics World Bank Group IPMA “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 5. Project Outcomes “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 6. Why can’t all projects succeed? “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 7. German Projects • Inpol-neu: a system for the federal and state police failed causing 75 Mio € damage. Secretary of the Interior (BMI) • Fiscus: an application for the tax authorities failed causing 125 Mio € damage Secretary of Finance (BMF) • Maut: a road charge application for federal highways (“Autobahnen”). A loss of billions of revenue in the first years of operation Secretary of Traffic (BMVBS) Source: PRINCE2® In the Public Service and The Government of the Federal Republic of Germany. Status Report. April 2012. By Wolfgang Ksoll. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” PRINCE2® is a Registered Trade Mark of Axelos
  • 8. “KPMG survey of Project Management practices in New Zealand finds some truly startling results; Survey shows an incredible 70% of organizations have suffered at least one project failure in the prior 12 months! 50% of respondents also indicated that their project failed to consistently achieve what they set out to achieve!” Source : KPMG (New Zealand) Type of survey : Survey of 100 businesses across a broad cross section of industries Date : Dec 2010 New Zealand Projects “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 9. US Projects “Only 30% of our projects and programs are successful”1 1. United States Government Accountability Office. Report to congressional committees. Defence Acquisitions – Assessments of Selected Weapon Programs. March 2008. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 10. UK Projects “Study of government projects reveals $4billion in wasted efforts as a result of failed projects. ‘Only 30% of our projects and programs are successful’ - Joe Harley, programme and systems delivery officer at the Department for Work and Pensions.” Source : Guardian Newspaper (UK) Scope : Investigation into government waste in the UK since year 2000 Date : 5 Jan 2008 “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 11. Cyber Space Projects “A study of 5,400 large scale IT projects (projects with initial budgets greater than $15M) finds that the well known problems with IT Project Management are persisting. Among the key findings quoted from the report: – 17 percent of large IT projects go so badly that they can threaten the very existence of the company – On average, large IT projects run 45 percent over budget and 7 percent over time, while delivering 56 percent less value than predicted” Source : McKinsey & Company in conjunction with the University of Oxford Type of survey : Study on large scale IT Projects Date : 2012 “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 12. ‘Troubled projects’ = disappointing outcomes Research suggests that commercial issues are the primary cause in ~70% of ‘troubled projects’… ….and the likelihood of significant innovation or incremental value reduced by ≥ 60% © IACCM 2013
  • 13. Major causes and frequency of losses © IACCM 2013
  • 14. An urgent need for improvement Only 11% feel that their organization is well equipped for the future; 89% believe that their contract management processes and management © IACCM 2013 must improve. Observed disadvantages from lack of process ownership • Longer lead times • Less flexible • Lower level of automation • Poor management visibility into contract performance • Increased risk of unauthorised commitments • Delayed take up of contract models / terms • High personnel turnover • Poor decision making • Perception of being difficult in the market • Reduced customer / vendor loyalty
  • 15. Conclusion We probably have a problem that current practices haven't solved in the last 50 years? Can Agile and Better Business Cases help? “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 16. Why are Business Cases important? A business case provides decision makers and the public as well as the private sector with a management tool for transparent, evidence-based decision making. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 17. The Five Case Model (from HM Treasury) A framework for ‘thinking’ to help answer three basic questions ‘where are we now?’, ‘where do we want to be?’ and ‘how are we going to get there?’ A step by step guide to developing a business case by: The process is about thinking not writing •Establishing a clear need for intervention - the case for change. •Setting clear objectives – desired outcome •Considering a wide range of potential solutions - an optimal balance of benefits, cost and risk. •Putting the arrangements in place to successfully deliver the proposal. Successful execution “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” The process is about thinking not writing
  • 18. The Five Case Model The 5 key elements of good practice business cases Management Economic Strategic Financial Commercial Applicable - strategic fit & business needs Appropriate – optimises public value Attractive – to supply side and feasible Achievable – can be successfully delivered Affordable – within budget “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 19. Three Types of Business Case 1. The key purpose of Strategic Outline Case is to: – establish the strategic context for the spending proposal; – evidence the case for change; – establish the preferred way forward 2. The key purpose of the Outline Business Case is to: – revisit the SOC assumptions and main findings – establish the preferred option – put in place the arrangements for the procurement of the scheme 3. The key purpose of the Full Business Case is to: – revisit OBC assumptions and main finding; – evidence that the most economically advantageous tender (MEAT) for the scheme has been accepted; – establish that the management arrangements for successful delivery are in place. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 20. The suggested process (use with care) Workshop Objectives Key participants Outputs Workshop 1: • To define and agree business needs, potential scope and • Senior Responsible Owner; • SMART spending objectives; Determining the spending objectives; • Board members; • Business needs and case for change and • To define and agree desired • Programme director; potential scope; options for service outcomes and service outputs; • Project manager; • CSFs and benefits delivery • To define and agree the CSFs and • External stakeholders or criteria; benefit criteria for assessing the commissioners; • Long list of options; (SOC Stage) options; • Customer and/or user • Fundamentals of the • To identify the potential options for service delivery. • representatives; Technical adviser; SOC. • Financial adviser; • Facilitator. Workshop 2: • To sift the long list and generate the short list; • External stakeholders or commissioners; • Short-listed options with preliminary assessment; Assessing the • To identify and assess the • Director of finance; • Outline benefits options potential costs, benefits and risks • Economic adviser; realisation plan; associated with the short-listed • Customer and/or user • Inputs for economic (SOC/OBC stage) options. representatives; appraisal. • Project manager; • Facilitator. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 21. The suggested process (cont…) Workshop Objectives Key participants Outputs Workshop 3: • To develop the PSC; • External stakeholders or • Preliminary PSC with Developing the • To address all relevant issues, including risks, affordability and • commissioners; Director of finance; • indicative costs; Fundamentals of the reference project/ implementation. • Economic adviser; economic and financial outline PSC • Customer and/or user representatives; cases. (OBC stage) • Project manager; • Facilitator. specification; • External stakeholders or commissioners; • Preliminary risk allocation matrix (RAM); Workshop 4: • To develop the service Developing the deal • To develop the apportionment of • Director of finance; • Potential deal; risk and underpinning payment • Economic adviser; • Fundamentals of the (OBC stage) • mechanisms; To develop the proposed contract. • Customer and/or user representatives; commercial case. • Project manager; • Facilitator. Workshop 5: • To develop the procurement • External stakeholders or • Procurement strategy; strategy; commissioners; • Management and Successful delivery • To develop the project plan; • Director of finance; delivery arrangements; arrangements • To develop supporting strategies • Economic adviser; • Post project evaluation (OBC stage) (for change management and contract management etc). • Customer and/or user. arrangements. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 22. Sources of help “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 23. Publications • Get your copy. The five case model is freely available via: http://wales.gov.uk/funding/wiipindex/5cmodel/?status=close.d&lang=en • Currently no plans to make the model available in hard copy format • Guidance consolidates other reference sources and is consistent with HM Treasury’s “Green Book Guidance on Appraisal of Policies, Programmes and Projects” – UK Government’s central guidance for appraisal and evaluation of all policies, programmes and projects (available at http://www.hm-treasury.gov.uk/data_greenbook_index.htm). “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 24. BBC Training Companies Approved •Cupe Projects Ltd •Demos •Eleisha Training Ltd •Explosive Learning Solutions •Harry Baker Professionals Ltd •Inspiring projects •PA Consulting •PearceMayfield •QRP Management Methods •The Knowledge Academy For more information go to:- http://www.apmg-international.com/en/qualifications/better-business-cases/ better-business-cases.aspx “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ” Pending Accreditation •Bizness Academie SAS •CC Learning •Deloitte MCS Limited •E-quality Italia •Pink Elephant UK •Raj Khanna Associates Ltd •Snap Tech (Pty) Ltd •Training ByteSize Ltd
  • 25. Courses and Qualifications • Foundation Course and Exam – Classroom course 2 days followed by closed book exam – Closed book, multiple choice, 50 questions – 50% pass mark 40 minutes duration • Practitioner Course and Exam – Classroom course 3 days followed by an exam on day 3 – Open book exam – 4 questions per paper, with 20 marks available per question – 50% pass mark 2 ½ hours duration • Reviewer Course – Under development/discussion
  • 26. Benefits For Organizations:- •Reduction in unnecessary spending and consultancy costs. •A process and guidance designed to optimize value from change initiatives. •A clear, proportionate approval process and improved, more informed decision making. •Complements existing best practice •Short courses minimize disruption to business as usual. For Individuals:- •Improved understanding of the Better Business Cases process, relevant not only to those producing business cases and spending proposals, but also those reviewing. •Understanding of an established and proven methodology which can be applied at both strategic (macro) and tactical (micro) levels. •Recognized certification for a core business competency for so many in mid and senior management roles.
  • 27. Conclusion Better Business Cases lead to: • better decisions • better investments • achievement of better outcomes. It is about the thinking not the writing “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 28. A final thought $45 billion a year spent by NGOs. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 29. Any questions “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”
  • 30. “ © The APM Gro up Ltd. 20 1 4. All rights re se rve d. ”

Editor's Notes

  1. It’s very important and useful for an implementation team to understand the most frequent courses of loss. Where things go wrong, why do they go wrong?   If we understand that then surely as an implementation team, we can do some good work to guard against those probabilities.   Number one is disagreement over contract scope. It’s disagreement over what we agreed. We’ve talked earlier about the importance of understanding and prioritizing requirements, of ensuring open dialogue between the parties about requirements and capabilities – a degree of openness and honesty.   As an implementation team, we can make things significantly worse if we don’t have proper diligence and rigor in the way that we manage contract changes. Weaknesses in contract change management mean that even if we agreed at the outset about what we were trying to achieve we’re no longer in agreement by the time delivery occurs.   There’s also the potential for performance failures due to over-commitment. It’s not unusual for selling organizations to overstate some of their capabilities or to commit resources without adequate internal discussion.   The list continues with disagreement over things like price and charge: is this a chargeable change or a non-chargeable change? Is a price change or escalation something that’s permitted or not permitted?   Pricing remains inevitably a very sensitive issue because it’s an economic deal.   An inappropriate contract structure or an agreement is another common cause of failure. If the negotiating teams didn’t understand the structure of the agreement and relationship that’s needed, this can undermine the eventual performance.   Finally, there are issues with subcontractors: failure to get good back-to-back agreements, failure to manage subcontractors through techniques that reflect the prime contract – these will often cause delays, pricing issues or other performance problems.
  2. The five key components of this methodology are; The Strategic Case: It demonstrates that the spending proposal provides business synergy and strategic fit and is predicated upon as a robust and evidence based case for change. The Economic Case: It demonstrates that the spending proposal optimises public value. The Commercial Case: It demonstrates that the ‘preferred option’ will result in a viable procurement and well-structured deal. The Financial Case: It demonstrates that the ‘preferred option’ will result in a fundable and affordable deal. The Management Case: It demonstrates that the ‘preferred option’ is capable of being delivered successfully, in accordance with recognised best practise.