081204 Virtual Design & Construction

2,374 views

Published on

VD&C Open House Presentation

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,374
On SlideShare
0
From Embeds
0
Number of Embeds
31
Actions
Shares
0
Downloads
0
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

081204 Virtual Design & Construction

  1. 1. Virtual Design & Construction Rocio Gonzalez VD&C Coordinator
  2. 2. Virtual Design and Construction incorporates BIM or Building Information Modeling into the construction process. A paradigm shift for the AEC industry. It is the creation of intelligent product models that identify constructible elements or problems of a building which are shared among the different disciplines: Integrated Project Delivery. VD&C integrates design, engineering and construction operations.
  3. 3. Team VD&C • 40people in 7 divisions trained in the Vico Constructor suite. • 45 people in 5 divisions trained in NavisWorks Jetstream. • SketchUp Training is available to anyone in Operations.
  4. 4. Projects 75 VD&C modeled • projects. 33 used by • operations teams. 20.25 million • Virtual SQ FT Construction value • over $4.5 Billion.
  5. 5. • Lodge Resort and Spa in Ritz Carlton North Lake Tahoe, California. • The complex includes two main structures connected by an underground pedestrian tunnel, with the main structure housing more than 170 hotel rooms, meeting spaces, an attached four-level parking structure and a 19,000-square-foot spa. • Several conflicts between steel framing and roofing were identified and solved before construction.
  6. 6. Ritz Carlton at NorthStar Lake Tahoe
  7. 7. Four Seasons Denver
  8. 8. Kaiser MOB Orange County
  9. 9. Kaiser MOB Orange County
  10. 10. CHOC Proposal Orange County
  11. 11. CHOC Logistics
  12. 12. University Research Park Orange County
  13. 13. Valley View Hotel San Diego
  14. 14. Valley View Hotel San Diego
  15. 15. How is VD&C changing our industry …
  16. 16. OWNER ARCHITECT IDEAS STRUCT MEP VD&C DESIGN SUB BUILD GC Fragmented Industry
  17. 17. RFI Process RFI Architect RFI RFI G.C. Structural Eng.
  18. 18. How to get the end result …
  19. 19. VD&C Process Identify Project Goals Model Scope/Setup Obtain Digital Files VD&C Schedule Structural & Architectural Model Integrate Integrate RFIs & Submittals MEP Systems Clash MEP Systems Proceed with Architect’s Model Updates Approval Construction
  20. 20. VD&C helps us … … manage the quality of design documents …better communicate constructability issues to the client, design team, and subcontractors …provide better service for our clients …provide new business services …detect constructability issues before reaching the site …provide full Integrated Project Delivery
  21. 21. Examples …
  22. 22. Neiman Marcus • Two VD&C Projects – First project in Los Angeles • High Success Rate – Positive outcome on coordination of lights – Lessen Amount of Material Waste: HVAC – Able to visualize conflicts beforehand • Owner insisted on having VD&C as part of Neiman Marcus Bellevue
  23. 23. Neiman Marcus Topanga Woodland Hills, CA • ELS Architects & Cortland Morgan Architects • Two Stories High End Retail • 120,000 SF • Design-Bid-Build • $22 Million • July 2008
  24. 24. Neiman Marcus Seattle Seattle, WA • SJW Architects & Designers • Three Stories High End Retail + Basement • 123,550 SF • Design-Bid-Build • $12.5 Million • June 26, 2009
  25. 25. Project Goals • Find and resolve conflicts before construction • Coordinate more than 5,500 light fixtures – Lights took precedent over other trades • Manage Risk: Use the model to communicate conflicts and to generate better solutions through a collaborative effort. • Reduce number of RFIs and Response Latency
  26. 26. VD&C Scope • Structure per plans and as built dwgs. • Reflected ceilings • Light fixtures layout and coordination • Interior & fire rated walls • MEPFP coordination • Model updates per Bulletins, RFIs, and Weekly Coordination Meetings • Pipe rack – Topanga • Cable tray • Plumbing
  27. 27. Communication NM Topanga • Close to Main Office – Weekly coordination meetings on site NM Seattle • Go to Meeting – Weekly, online coordination meetings
  28. 28. Topanga VD&C Model • Preparation of cut sheets through 3D model – Used in coordination meetings on site
  29. 29. Bellevue VD&C Model • Representational modeling based on dimensions • 3D Coordination Meetings via online conferences
  30. 30. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  31. 31. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  32. 32. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  33. 33. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  34. 34. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Online Coordination Meetings
  35. 35. Communication: LA to Seattle • Model Setup • Append Drawings – NavisWorks • Clash Detection • Create Reports and Logs • Distribute Reports – HTML Files • Distribute Navis File – Saved Viewpoints included • Coordination Meetings – Online vs. In Person
  36. 36. Further Applications of VD&C
  37. 37. Site Logistics 2 1 3 4
  38. 38. Pedestrian & Vehicular Access
  39. 39. Hoisting • Farmers Market
  40. 40. Delivery Access and Timing
  41. 41. Establish Preliminary Quantities
  42. 42. Assist with Schedule
  43. 43. ACC Window Shade Study Building With Shades Building Without Shades
  44. 44. Trimble Total Station
  45. 45. Virtual Building->Virtual Management • Model-Based benefits today: – 3D/4D -> DIGITAL ASSET • Other benefits: – Operations – Energy Analysis – Safety/Maximized Efficiency – Facility Management • Communication
  46. 46. Integrated Project Delivery A paradigm shift for the AEC industry that requires: • No Silos • A mental Shift to New Ways of Relating • Collaborative, Integrated, Partnered, Fluid Are you ready?
  47. 47. Q&A

×