Oil & gas projects
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Oil & gas projects

on

  • 564 views

 

Statistics

Views

Total Views
564
Views on SlideShare
564
Embed Views
0

Actions

Likes
0
Downloads
6
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

CC Attribution-ShareAlike LicenseCC Attribution-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Oil & gas projects Document Transcript

  • 1. Oil & Gas Sectors Projects Oil In the field of oil production, Y&V executes projects based on the highest quality and safety standards, designing, building or revamping central processing facilities or main stations, clusters, production gathering systems, flow stations, valve stations, oil treatment (dehydration, desalting and stabilization), oil transportation and storage, pumping, oilfield power generation and distribution, and oil secondary recovery. Y&V provides solutions for heavy oil upgrading and refining, with the purpose of increasing equipment and process efficiency focused on the use of less-pollutant technologies, one of today’s greater challenges for oil companies. Process units: atmospheric distillation units, vacuum distillation units, hydrotreating units, burning systems, alkylation, catalytic cracking, delayed coker unit, gas and liquid fractionation. Auxiliary units: amine regeneration units, sour water treatment units, hydrogen recovery units, sulfur recovery units. Utilities and offsites: power generation and distribution facilities, wastewater treatment plants, nitrogen system, fuel gas system, plant and instrument air system, storage facilities, water cooling systems, steam and condensate generation units. Gas Y&V specializes in developing projects focused on producing and treating natural gas, covering different processes such as dehydration, gas liquid extraction plants, sweetening, separation, compression, valve stations, transportation and storage, liquefied natural gas facilities and regasification. Oil & Gas Projects Compressor Plant and Flux Station Mata 8 START DATE: February 2001 COMPLETETION DATE: November 2001
  • 2. CLIENT: SADE - PEREZ COMPANC read more... Pigap II Dehydration Plant START DATE: September 1995 COMPLETETION DATE: September 1996 CLIENT: PDVSA GAS, S.A. read more... Bajo Grande – Ulé – Amuay Transportation System Expansion START DATE: April 2006 COMPLETETION DATE: September 2006 CLIENT: PDVSA GAS, S.A. read more... San Joaquin, IV Train Liquid Extraction Plant START DATE: April 2007 COMPLETETION DATE: December 2009 CLIENT: PDVSA GAS, S.A. read more...
  • 3. Ethane Plant Refurbishing - San Joaquin Cryogenic Complex START DATE: November 2008 COMPLETETION DATE: August 2011 CLIENT: PDVSA GAS, S.A. read more... Gas Refurbishing Plant for the Internal Market (PAGMI) START DATE: October 2010 COMPLETETION DATE: October 2011 CLIENT: PDVSA GAS, S.A. read more... GNL Re-gasification Terminal and Plant START DATE: January 2012 COMPLETETION DATE: December 2012 CLIENT: Promigas, Vicini, Propagas. read more...
  • 4. GNL Terminal Feasibility Research, covering the Colombian Caribbean Region Market START DATE: May 2.011 COMPLETETION DATE: In process CLIENT: PROMIGAS read more... Tomoporo Production Area Development START DATE: January 2005 COMPLETETION DATE: October 2006 CLIENT: PDVSA PETRÓLEO, S.A read more... Ultra Low Sulfur Diesel Hydro treatment Projects, Design, Engineering, Procurement and Construction START DATE: January 2005 COMPLETETION DATE: October 2005 CLIENT: CITGO read more...
  • 5. HNAY Unit (Package “A”) and Offsite (Packages “B” Y “C”) of the New Hydro treatment of Gasoline Unit START DATE: April 2006 COMPLETETION DATE: April 2008 CLIENT: PDVSA PETRÓLEO, S.A. read more... Paraguaná Refinery Project Portfolio START DATE: January 2009 COMPLETETION DATE: January 2011 CLIENT: PDVSA PETRÓLEO, S.A. read more... Projects for the Executive Management New Refinery Improvement and Terminals START DATE: November 2009 COMPLETETION DATE: November 2012 CLIENT: PDVSA PETRÓLEO, S.A. read more...
  • 6. LCR TIER II Compliance Project START DATE: November 2004 COMPLETETION DATE: October 2005 CLIENT: CITGO read more... General Lázaro Cárdenas Integral Re-configuration Project START DATE: April 2004 COMPLETETION DATE: January 2010 CLIENT: PEMEX. read more... Production and Clusters Main Station START DATE: December 1998 COMPLETETION DATE: September 2003 CLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil) read more...
  • 7. El Palito Refinery Expansion START DATE: January 2008 COMPLETETION DATE: May 2012 CLIENT: PDVSA PETRÓLEO, S.A. read more... Project Portfolio for the Paraguaná Refining Center (B Package) START DATE: April 2004 COMPLETETION DATE: April 2005 CLIENT: PDVSA PETRÓLEO, S.A. read more... Residual Water Treatment Plant START DATE: May 2001 COMPLETETION DATE: January 2004 CLIENT: PDVSA PETRÓLEO, S.A. read more...
  • 8. Superficial Installations Associated to the Expansion and New clusters in the Perforation Plan for 2 START DATE: November 2007 COMPLETETION DATE: February 2010 CLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil) read more... Horizon Oil Sands Project / Secondary Upgrading (SUG) START DATE: November 2006 COMPLETETION DATE: July 2008 CLIENT: CNRL (Canadian Natural Resources) read more... Superficial Production Installation of PETROURICA, Bloque Junín 4 START DATE: February 2012 COMPLETETION DATE: In Construction CLIENT: PETROURICA (Pdvsa CVP, CNPC) read more...
  • 9. Early Production of New Developments at Carabobo Block Production Processing Plant START DATE: May 2012 COMPLETETION DATE: In construction CLIENT: PETROCARABOBO (PDVSA CVP, REPSOL, PETRONAS, ONGC Videsh LTD, Oil India Limited and India Oil Corporation Limited. read more... Puerto La Cruz Refinery Deep Conversion Project START DATE: October 2011 COMPLETETION DATE: In Execution CLIENT: PDVSA PETRÓLEO, S.A. read more... Expansion of the Main Production Station (MSUP Project) START DATE: March 2012 COMPLETETION DATE: In process CLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil) read more...
  • 10. Riohacha Production Field Reactivation START DATE: January 2012 COMPLETETION DATE: September 2012 CLIENT: CHEVRON read more... Production Facilities and Extra Heavy Crude Improvement in the Orinoco Oil Belt Blocks. START DATE: June 2009 COMPLETETION DATE: June 2011 CLIENT: PDVSA CVP read more... Operational Project Development in Rubiales and Quifa Fields START DATE: June 2011 COMPLETETION DATE: June 2013 CLIENT: PACIFIC RUBIALES ENERGY (PRE) read more...