Project Synopsis
The Socio-Economic Case for Mini / Modular Refineries in the Niger Delta
2	
Definition & Characteristics
§ Small capacity (+/- 6,000 to 10,000 barrels) crude oil processing capability.
§ Simple design, easy operation, and expandable by addition of more fractionating units.
§ Expected Output per day: +/- 530,000 – 880,000 litres of petrol; +/- 280,000 – 470,000 litres of diesel; +/- 70,000 –
120,000 litres of kerosene. * Lower values correspond to the minimum capacity, while higher values correspond to
the higher capacity refinery. The higher case values represent 27 trucks of petrol, 14 trucks of diesel and 4 trucks
of kerosene per day. One truck capacity being 33,000 litres.
Purpose & Objectives
§ To deliver a ‘prototype modular mini refinery’ of an optimum capacity with supporting facilities and off-sites,
integrating with existing adjacent crude oil production facilities.
§ Utilize and add value to the abundant crude oil resource of the State.
Why?
§ Provide direct employment to +/- 300 skilled people, with employment inter-linkages to over 5000 persons via
contractors and sub-contractors, solving other socio-economic problems.
3	
§ Reverse the imminent migration of jobs out of the Niger Delta by providing employment opportunities to youths
who would otherwise be tempted to engage in militancy, thereby enhancing security and prosperity for all. Be a
catalyst for development.
§ Guarantee profitability in a short time frame: a small initial investment pays out in just its second year.
§ Ensure availability of much needed petroleum products in the immediate vicinity.
§ Be a catalyst for prosperity, industrial growth and manpower development in the wide petroleum sector.
§ Possesses tremendous scope for replication in many places, as demand for petroleum products in region is high,
which cannot be met by the existing ‘epileptic’ refineries, while reducing supply logistics and complexities.
§ Discourage establishment of illegal refining operations (plagued by inefficient, unsafe and environmental
degradation issues) as its operations are legal, cheaper and safer.
(The dangers of illegal and primitive refining operations)
4	
§ Foster cooperation between industry and communities as all stakeholders are to be consulted and able to part-
take in its establishment and operation.
§ Be designed to be simple to operate, as to lay a good foundation for training indigenous manpower in technical
and managerial skills required for more complex projects in the oil and gas sector.
§ Exploit synergies with improvement of local communities via provision of fire fighting capability, clinic, water and
electric power supply and other community assistance projects.
§ Be politically expedient to establish a petroleum-based industry as a ‘quick-win’ investment vehicle, and exploit
further synergies and increased demand for basic petroleum products.
§ The Sponsor’s profitability is guaranteed. In any case the State Government receives royalties and taxes plus
employees’ and traders’ transactions taxes including VAT. Expansion can therefore be financed from within.
Such revenues can also be used by the benefitting local government in off-setting educational, health and
infrastructure project costs.
Key Success Factors
The main driver for this project is to monetize oil reserves in a selected area of the Niger Delta, involving implementation
of a simple technology-based production project, with inter-linkages to local economic participation.
Oil was discovered in the Niger Delta in 1958, but there are no facilities that encourage indigenous participation, majorly
due to size, sophistication and other non-viable socio-economic factors. A modular mini petroleum refinery is a simple,
short duration project with linkages to encourage local participation, with good payout even in the short term, and
capable of ensuring availability of scarce basic petroleum products in the immediate vicinity.
5	
Furthermore, phased development that would leverage on economics of scale, improved investment profile and
revenue are seen as the economic justification for this novel and prototype project. It is easy to replicate.
Development of a green-field oil refinery is a capital-intensive venture; hence the execution of a proper feasibility study
is an imperative first step. A refinery feasibility study assesses the operational, technical and economic merits of the
proposed refinery development project: to assess crude oil production potential, refinery size; refinery configuration;
development framework – single stage, multi-stage; location; financing options; social and environment assessment;
market survey of refined products; petroleum products demand analysis; attendant infrastructure; financial analyses;
impact of refinery development on local economy and environment.
Revenue & Profitability
§ Capital Expenditure: US$ 65 million over 2 years.
§ Operating Expenditure: US$ 15 million per annum for the 1st five years, (and US$ 30 million par annum thereafter, if
capacity is doubled from revenues i.e. without external funding).
§ Annual sales of US$ 160 million are generated, based on the regulated prices of petroleum products.
§ Project Internal Rate of Return (IRR) is good, with a positive net cash flow from the 2nd year after plant start-up.
6	
Cash Flow Analysis – I
This scenario allows for plant availability at 95%; crude oil obtained at discounted rate i.e. at local rate, not
international crude benchmark price.
Year	0	 Year	1	 Year	2	 Year	3	 Year	4	 Year	5	 Year	6	 Year	7	 Year	8	 Year	9	
Series1	 -30	 -65	 6.5	 77.9	 149.4	 220.8	 292.3	 363.7	 435.2	 506.7	
-100	
0	
100	
200	
300	
400	
500	
600	
Cash	Flow	in	$	millions	
High through-put Case (discounted feedstock cost)
7	
Cash Flow Analysis – II
This scenario allows for plant availability at 85%; crude oil obtained at international crude benchmark price. This is
the worst-case scenario.
Year	0	 Year	1	 Year	2	 Year	3	 Year	4	 Year	5	 Year	6	 Year	7	 Year	8	 Year	9	
Series1	 -30	 -65	 -27.5	 10.0	 47.6	 85.1	 123	 160	 198	 235	
-100	
-50	
0	
50	
100	
150	
200	
250	
300	
Cash	Flow	in	$	millions	
Low through-put Case (high feedstock cost)
8	
In either case, the investment can be amortized in a relatively short time, through prudent financial management. Such
that expansion can be funded from within, and without loans. The ultimate target is to have a fully functional refinery of
about 40,000 barrels per day processing capacity within 10 years!
Assumptions
§ The refinery is to be sited close to an existing and producing oil flow station or a major crude oil delivery pipeline,
to keep infrastructure cost to the minimum.
§ Notwithstanding engagement with the owner of the identified crude oil flow station via the Oil Producers Trade
Section (OPTS); the main crude oil feedstock is to be obtained at a reasonable fixed period rate below the
international Bonny Light (or Forcados Blend) benchmark price.
§ Products are to be sold locally, at gate, with off-take via road tankers or river barges. Albeit water-borne
transportation is preferred, with minimal on-site storage facilities, to reduce capital expenditure.
§ Products prices will be unregulated, even as initial economics had been predicted on a regulated prices
environment.
Potential Risks & Mitigations
§ The key risks associated with the total project life cycle will be assessed in a specially organized Risk Workshop,
culminating in developing a Risk & Opportunity Register, a Risk Assessment Report and/or Matrix and a Major Risk
Summary. Notwithstanding, the key risk to this endeavor are:
9	
o Funding availability and timeliness
o Changes to government legislation with respect to securitization of investment
o Social issues (indigenous people’s involvement management)
o Security
§ The aforementioned are all surmountable, and mitigation means exist. For example, social issues can be tackled
by:
o Formulating an Indigenous Affairs Management Plan (IAMP), to encompass detailed measures to manage
indigenous affairs and achieve indigenous participation through employment, training and engagement in
subcontracted work;
o Instituting share holding scheme thereby enhancing a sense of part ownership of the enterprise; and
o Establishing processes for auditing, methods for identifying and reporting non-conformances and progress
reporting to inform all stakeholders of project development.
§ The IAMP is also a precursor for enhanced security. Funds are to be made available ahead of Final Investment
Decision (FID) by means of perfected Bank Guarantees, such that payment for goods and services would be
made in a timely manner.
§ By continuously scanning the project environment, government directives can be implemented without adverse
impact to project schedule, quality or cost.
10	
Implementation
A specialist Project Management Company is required to foster this idea. This entity has the idea, knows who can do
what, who needs the facility, how to arrange the fiancé (if Sponsor so wishes) and bring all to bear in establishing the
facility on the ground. And if required, establish the processes to run the facility. The company is paid according to its
involvement and efforts.
The outline implementation plan is thus:
§ Market the idea to potential Sponsors, and agree project implementation modalities, operating procedures, etc.
MiniRef & Energy Development has the capability, expertise and personnel to rum operations with inputs from key
specialist based in US, UK or Nigeria. Albeit its central operational address (for ease of administration) is in London,
UK.
§ The company has established a good system for ideas exchange and decision making process, and has set up
the management processes and procedures necessary for this level of undertaking. These can be further aligned
with Sponsor’s expectations upon contract agreement.
§ Upon initial (Sponsors statement of intent to procure services) agreement, streamlining operational modalities and
location, etc. MiniRef & Energy Development will undertake to prepare outline Project Proposal & Execution Plan,
as a guideline tool for action.
§ Perform initial local engagement while identifying local companies that can deliver envisaged local works at site,
viz. freight forwarding transportation of fabricated units to location, location acquisition and preparation, supply
of local labour, etc. Establish services supply agreements with these, to obtain locked-in price information.
§ Prepare formal Project Execution Plan documents, for Sponsor’s endorsement.
11	
§ Establish a formal contract agreement with Sponsor, and execute contract terms subsequently.
The aforementioned strategy is preferred because of its exposure to minimal financial risk. Furthermore, this strategy
offers phased investment, even as it could take longer to implement; a traditional project management approach can
be applied. Stage payment terms are open to negotiation.
* MiniRef & Energy Development is a company specially established to market and implement this unique venture and
developed by A. Theodore BRIGGS.
Prepared by:

More Related Content

What's hot

Aspen Plus - Physical Properties (1 of 2) (Slideshare)
Aspen Plus - Physical Properties (1 of 2) (Slideshare)Aspen Plus - Physical Properties (1 of 2) (Slideshare)
Aspen Plus - Physical Properties (1 of 2) (Slideshare)Chemical Engineering Guy
 
Simulation Modeling Upscaling Process
Simulation Modeling Upscaling ProcessSimulation Modeling Upscaling Process
Simulation Modeling Upscaling ProcessFaisal Al-Jenaibi
 
METHODOLOGY FOR SLUG CATCHER SIZING
METHODOLOGY FOR SLUG CATCHER SIZINGMETHODOLOGY FOR SLUG CATCHER SIZING
METHODOLOGY FOR SLUG CATCHER SIZINGVijay Sarathy
 
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)Vijay Sarathy
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)MichaelDang47
 
NATURAL GAS DEHYDRATION
NATURAL GAS DEHYDRATION NATURAL GAS DEHYDRATION
NATURAL GAS DEHYDRATION Ahmed Shoman
 
Q913 re1 w4 lec 13
Q913 re1 w4 lec 13Q913 re1 w4 lec 13
Q913 re1 w4 lec 13AFATous
 
Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Saurabh Girdhar
 
Produced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M RashidProduced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M RashidMahbubur Rashid
 
Petroleum production engineering
Petroleum production engineeringPetroleum production engineering
Petroleum production engineeringMaanik Gupta
 
Porosity by saturation method
Porosity by saturation methodPorosity by saturation method
Porosity by saturation methodKamal Abdurahman
 
Gas Plant Separator Design
Gas Plant Separator DesignGas Plant Separator Design
Gas Plant Separator Designiyaselex
 
Q921 rfp lec4
Q921 rfp lec4Q921 rfp lec4
Q921 rfp lec4AFATous
 

What's hot (20)

Aspen Plus - Physical Properties (1 of 2) (Slideshare)
Aspen Plus - Physical Properties (1 of 2) (Slideshare)Aspen Plus - Physical Properties (1 of 2) (Slideshare)
Aspen Plus - Physical Properties (1 of 2) (Slideshare)
 
Simulation Modeling Upscaling Process
Simulation Modeling Upscaling ProcessSimulation Modeling Upscaling Process
Simulation Modeling Upscaling Process
 
Nodal analysis
Nodal analysisNodal analysis
Nodal analysis
 
METHODOLOGY FOR SLUG CATCHER SIZING
METHODOLOGY FOR SLUG CATCHER SIZINGMETHODOLOGY FOR SLUG CATCHER SIZING
METHODOLOGY FOR SLUG CATCHER SIZING
 
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
PVTSim - Beginners Guide & Tutorial (Multi-Phase Calculations)
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)
 
NATURAL GAS DEHYDRATION
NATURAL GAS DEHYDRATION NATURAL GAS DEHYDRATION
NATURAL GAS DEHYDRATION
 
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
 
Q913 re1 w4 lec 13
Q913 re1 w4 lec 13Q913 re1 w4 lec 13
Q913 re1 w4 lec 13
 
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream DownstreamIntroduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
 
Waterflood Design and Operational Best Practices
Waterflood Design and Operational Best PracticesWaterflood Design and Operational Best Practices
Waterflood Design and Operational Best Practices
 
Lng carrier
Lng carrierLng carrier
Lng carrier
 
Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )
 
Petroleum refining (1 of 3)
Petroleum refining (1 of 3)Petroleum refining (1 of 3)
Petroleum refining (1 of 3)
 
Produced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M RashidProduced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M Rashid
 
Petroleum production engineering
Petroleum production engineeringPetroleum production engineering
Petroleum production engineering
 
Porosity by saturation method
Porosity by saturation methodPorosity by saturation method
Porosity by saturation method
 
Flowsheet ONGC
Flowsheet ONGCFlowsheet ONGC
Flowsheet ONGC
 
Gas Plant Separator Design
Gas Plant Separator DesignGas Plant Separator Design
Gas Plant Separator Design
 
Q921 rfp lec4
Q921 rfp lec4Q921 rfp lec4
Q921 rfp lec4
 

Viewers also liked

Kuai minirefineries
Kuai minirefineriesKuai minirefineries
Kuai minirefinerieslucerodiego
 
Complete case study of Modular Mini Petroleum Refineries
Complete case study of Modular Mini Petroleum RefineriesComplete case study of Modular Mini Petroleum Refineries
Complete case study of Modular Mini Petroleum Refineriesjoshijasmin2013
 
Refinery margin trend_analysis
Refinery margin trend_analysisRefinery margin trend_analysis
Refinery margin trend_analysisshahabemk
 
Kuai Energy Systems - Executive Summary
Kuai Energy Systems - Executive SummaryKuai Energy Systems - Executive Summary
Kuai Energy Systems - Executive SummaryRaul E. Arrondo
 
Feltwell Holding SA Profile
Feltwell Holding SA ProfileFeltwell Holding SA Profile
Feltwell Holding SA ProfileRaul E. Arrondo
 
Проект постанови (деякі питання НАЗЯВО)
Проект постанови (деякі питання НАЗЯВО)Проект постанови (деякі питання НАЗЯВО)
Проект постанови (деякі питання НАЗЯВО)vasyl petrov
 
Merchant Program True Money - Complete
Merchant Program True Money - CompleteMerchant Program True Money - Complete
Merchant Program True Money - CompleteNovita Anugrah
 
Motion in a straight line
Motion in a straight lineMotion in a straight line
Motion in a straight linePhysics Gurukul
 
Prefix re-
Prefix re-Prefix re-
Prefix re-kabsher
 
ELOCK2 - Die Welt der Schließzylinder
ELOCK2 - Die Welt der SchließzylinderELOCK2 - Die Welt der Schließzylinder
ELOCK2 - Die Welt der SchließzylinderAhmet Sancak
 

Viewers also liked (20)

Kuai minirefineries
Kuai minirefineriesKuai minirefineries
Kuai minirefineries
 
Complete case study of Modular Mini Petroleum Refineries
Complete case study of Modular Mini Petroleum RefineriesComplete case study of Modular Mini Petroleum Refineries
Complete case study of Modular Mini Petroleum Refineries
 
Refinery margin trend_analysis
Refinery margin trend_analysisRefinery margin trend_analysis
Refinery margin trend_analysis
 
Kuai Energy Systems - Executive Summary
Kuai Energy Systems - Executive SummaryKuai Energy Systems - Executive Summary
Kuai Energy Systems - Executive Summary
 
Feltwell Holding SA Profile
Feltwell Holding SA ProfileFeltwell Holding SA Profile
Feltwell Holding SA Profile
 
Trabajo
TrabajoTrabajo
Trabajo
 
Проект постанови (деякі питання НАЗЯВО)
Проект постанови (деякі питання НАЗЯВО)Проект постанови (деякі питання НАЗЯВО)
Проект постанови (деякі питання НАЗЯВО)
 
Arsany's Resume
Arsany's ResumeArsany's Resume
Arsany's Resume
 
MAHESH
MAHESHMAHESH
MAHESH
 
Collage guzmán
Collage guzmánCollage guzmán
Collage guzmán
 
Merchant Program True Money - Complete
Merchant Program True Money - CompleteMerchant Program True Money - Complete
Merchant Program True Money - Complete
 
Motion in a straight line
Motion in a straight lineMotion in a straight line
Motion in a straight line
 
MB-CV_2016
MB-CV_2016MB-CV_2016
MB-CV_2016
 
Seminary
Seminary Seminary
Seminary
 
Dt
DtDt
Dt
 
Prefix re-
Prefix re-Prefix re-
Prefix re-
 
Palabras sobre electricidad
Palabras sobre electricidadPalabras sobre electricidad
Palabras sobre electricidad
 
Manualcontabilidad empresas sistema financiero
Manualcontabilidad empresas sistema financieroManualcontabilidad empresas sistema financiero
Manualcontabilidad empresas sistema financiero
 
Aula virtual
Aula virtualAula virtual
Aula virtual
 
ELOCK2 - Die Welt der Schließzylinder
ELOCK2 - Die Welt der SchließzylinderELOCK2 - Die Welt der Schließzylinder
ELOCK2 - Die Welt der Schließzylinder
 

Similar to Project Synopsis - Modular Refineries

Brochure2 For Micro Refining
Brochure2 For Micro RefiningBrochure2 For Micro Refining
Brochure2 For Micro RefiningAlabo BRIGGS
 
Report of High Level Committee on Oil & Gas PSUs - Summary
Report of High Level Committee on Oil & Gas PSUs - SummaryReport of High Level Committee on Oil & Gas PSUs - Summary
Report of High Level Committee on Oil & Gas PSUs - Summaryanil_kakodkar
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsCurt Huber
 
Seven quick wins to lower costs and accelerate revenue
Seven quick wins to lower costs and accelerate revenueSeven quick wins to lower costs and accelerate revenue
Seven quick wins to lower costs and accelerate revenueGuy Barlow
 
New base 1059 special 07 august 2017 energy news
New base 1059 special 07 august 2017 energy newsNew base 1059 special 07 august 2017 energy news
New base 1059 special 07 august 2017 energy newsKhaled Al Awadi
 
Platinum Valley Special Economic Zone
Platinum Valley Special Economic ZonePlatinum Valley Special Economic Zone
Platinum Valley Special Economic ZoneThe Worldfolio
 
EcoStim Energy Solutions IR Presentation
EcoStim Energy Solutions IR PresentationEcoStim Energy Solutions IR Presentation
EcoStim Energy Solutions IR PresentationRedChip Companies, Inc.
 
Overview of the problem.pptx
Overview of the problem.pptxOverview of the problem.pptx
Overview of the problem.pptxSabiPurba
 
How oil and gas companies can respond to unprecedented disruption
How oil and gas companies can respond to unprecedented disruptionHow oil and gas companies can respond to unprecedented disruption
How oil and gas companies can respond to unprecedented disruptionaccenture
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsCurt Huber
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015Khaled Al Awadi
 
OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OECD Environment
 
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824Royal Daniel
 
Restructuring logistic systems for 2012 – 2020 to meet market demands
Restructuring logistic systems for 2012 – 2020 to meet market demandsRestructuring logistic systems for 2012 – 2020 to meet market demands
Restructuring logistic systems for 2012 – 2020 to meet market demandsAndres Suarez
 
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshop
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshopSession 01-01-financing-unconventional-gas-development-us-asia-regional-workshop
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshopVenty Maarif
 
New base 1049 special 06 july 2017 energy news
New base 1049 special 06 july 2017 energy newsNew base 1049 special 06 july 2017 energy news
New base 1049 special 06 july 2017 energy newsKhaled Al Awadi
 

Similar to Project Synopsis - Modular Refineries (20)

Brochure2 For Micro Refining
Brochure2 For Micro RefiningBrochure2 For Micro Refining
Brochure2 For Micro Refining
 
Report of High Level Committee on Oil & Gas PSUs - Summary
Report of High Level Committee on Oil & Gas PSUs - SummaryReport of High Level Committee on Oil & Gas PSUs - Summary
Report of High Level Committee on Oil & Gas PSUs - Summary
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
Seven quick wins to lower costs and accelerate revenue
Seven quick wins to lower costs and accelerate revenueSeven quick wins to lower costs and accelerate revenue
Seven quick wins to lower costs and accelerate revenue
 
New base 1059 special 07 august 2017 energy news
New base 1059 special 07 august 2017 energy newsNew base 1059 special 07 august 2017 energy news
New base 1059 special 07 august 2017 energy news
 
Platinum Valley Special Economic Zone
Platinum Valley Special Economic ZonePlatinum Valley Special Economic Zone
Platinum Valley Special Economic Zone
 
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
EcoStim Energy Solutions IR Presentation
EcoStim Energy Solutions IR PresentationEcoStim Energy Solutions IR Presentation
EcoStim Energy Solutions IR Presentation
 
Overview of the problem.pptx
Overview of the problem.pptxOverview of the problem.pptx
Overview of the problem.pptx
 
KNPC-CFP
KNPC-CFPKNPC-CFP
KNPC-CFP
 
How oil and gas companies can respond to unprecedented disruption
How oil and gas companies can respond to unprecedented disruptionHow oil and gas companies can respond to unprecedented disruption
How oil and gas companies can respond to unprecedented disruption
 
Bryce book notes
Bryce book notesBryce book notes
Bryce book notes
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015
 
OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...
 
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824
Royal Daniel IEL-ANADE Conf Financing Power 26 Aug 2nd Panel 160824
 
Restructuring logistic systems for 2012 – 2020 to meet market demands
Restructuring logistic systems for 2012 – 2020 to meet market demandsRestructuring logistic systems for 2012 – 2020 to meet market demands
Restructuring logistic systems for 2012 – 2020 to meet market demands
 
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshop
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshopSession 01-01-financing-unconventional-gas-development-us-asia-regional-workshop
Session 01-01-financing-unconventional-gas-development-us-asia-regional-workshop
 
Gemcom whittle brochure
Gemcom whittle brochureGemcom whittle brochure
Gemcom whittle brochure
 
New base 1049 special 06 july 2017 energy news
New base 1049 special 06 july 2017 energy newsNew base 1049 special 06 july 2017 energy news
New base 1049 special 06 july 2017 energy news
 

Project Synopsis - Modular Refineries

  • 1. Project Synopsis The Socio-Economic Case for Mini / Modular Refineries in the Niger Delta
  • 2. 2 Definition & Characteristics § Small capacity (+/- 6,000 to 10,000 barrels) crude oil processing capability. § Simple design, easy operation, and expandable by addition of more fractionating units. § Expected Output per day: +/- 530,000 – 880,000 litres of petrol; +/- 280,000 – 470,000 litres of diesel; +/- 70,000 – 120,000 litres of kerosene. * Lower values correspond to the minimum capacity, while higher values correspond to the higher capacity refinery. The higher case values represent 27 trucks of petrol, 14 trucks of diesel and 4 trucks of kerosene per day. One truck capacity being 33,000 litres. Purpose & Objectives § To deliver a ‘prototype modular mini refinery’ of an optimum capacity with supporting facilities and off-sites, integrating with existing adjacent crude oil production facilities. § Utilize and add value to the abundant crude oil resource of the State. Why? § Provide direct employment to +/- 300 skilled people, with employment inter-linkages to over 5000 persons via contractors and sub-contractors, solving other socio-economic problems.
  • 3. 3 § Reverse the imminent migration of jobs out of the Niger Delta by providing employment opportunities to youths who would otherwise be tempted to engage in militancy, thereby enhancing security and prosperity for all. Be a catalyst for development. § Guarantee profitability in a short time frame: a small initial investment pays out in just its second year. § Ensure availability of much needed petroleum products in the immediate vicinity. § Be a catalyst for prosperity, industrial growth and manpower development in the wide petroleum sector. § Possesses tremendous scope for replication in many places, as demand for petroleum products in region is high, which cannot be met by the existing ‘epileptic’ refineries, while reducing supply logistics and complexities. § Discourage establishment of illegal refining operations (plagued by inefficient, unsafe and environmental degradation issues) as its operations are legal, cheaper and safer. (The dangers of illegal and primitive refining operations)
  • 4. 4 § Foster cooperation between industry and communities as all stakeholders are to be consulted and able to part- take in its establishment and operation. § Be designed to be simple to operate, as to lay a good foundation for training indigenous manpower in technical and managerial skills required for more complex projects in the oil and gas sector. § Exploit synergies with improvement of local communities via provision of fire fighting capability, clinic, water and electric power supply and other community assistance projects. § Be politically expedient to establish a petroleum-based industry as a ‘quick-win’ investment vehicle, and exploit further synergies and increased demand for basic petroleum products. § The Sponsor’s profitability is guaranteed. In any case the State Government receives royalties and taxes plus employees’ and traders’ transactions taxes including VAT. Expansion can therefore be financed from within. Such revenues can also be used by the benefitting local government in off-setting educational, health and infrastructure project costs. Key Success Factors The main driver for this project is to monetize oil reserves in a selected area of the Niger Delta, involving implementation of a simple technology-based production project, with inter-linkages to local economic participation. Oil was discovered in the Niger Delta in 1958, but there are no facilities that encourage indigenous participation, majorly due to size, sophistication and other non-viable socio-economic factors. A modular mini petroleum refinery is a simple, short duration project with linkages to encourage local participation, with good payout even in the short term, and capable of ensuring availability of scarce basic petroleum products in the immediate vicinity.
  • 5. 5 Furthermore, phased development that would leverage on economics of scale, improved investment profile and revenue are seen as the economic justification for this novel and prototype project. It is easy to replicate. Development of a green-field oil refinery is a capital-intensive venture; hence the execution of a proper feasibility study is an imperative first step. A refinery feasibility study assesses the operational, technical and economic merits of the proposed refinery development project: to assess crude oil production potential, refinery size; refinery configuration; development framework – single stage, multi-stage; location; financing options; social and environment assessment; market survey of refined products; petroleum products demand analysis; attendant infrastructure; financial analyses; impact of refinery development on local economy and environment. Revenue & Profitability § Capital Expenditure: US$ 65 million over 2 years. § Operating Expenditure: US$ 15 million per annum for the 1st five years, (and US$ 30 million par annum thereafter, if capacity is doubled from revenues i.e. without external funding). § Annual sales of US$ 160 million are generated, based on the regulated prices of petroleum products. § Project Internal Rate of Return (IRR) is good, with a positive net cash flow from the 2nd year after plant start-up.
  • 6. 6 Cash Flow Analysis – I This scenario allows for plant availability at 95%; crude oil obtained at discounted rate i.e. at local rate, not international crude benchmark price. Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Series1 -30 -65 6.5 77.9 149.4 220.8 292.3 363.7 435.2 506.7 -100 0 100 200 300 400 500 600 Cash Flow in $ millions High through-put Case (discounted feedstock cost)
  • 7. 7 Cash Flow Analysis – II This scenario allows for plant availability at 85%; crude oil obtained at international crude benchmark price. This is the worst-case scenario. Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Series1 -30 -65 -27.5 10.0 47.6 85.1 123 160 198 235 -100 -50 0 50 100 150 200 250 300 Cash Flow in $ millions Low through-put Case (high feedstock cost)
  • 8. 8 In either case, the investment can be amortized in a relatively short time, through prudent financial management. Such that expansion can be funded from within, and without loans. The ultimate target is to have a fully functional refinery of about 40,000 barrels per day processing capacity within 10 years! Assumptions § The refinery is to be sited close to an existing and producing oil flow station or a major crude oil delivery pipeline, to keep infrastructure cost to the minimum. § Notwithstanding engagement with the owner of the identified crude oil flow station via the Oil Producers Trade Section (OPTS); the main crude oil feedstock is to be obtained at a reasonable fixed period rate below the international Bonny Light (or Forcados Blend) benchmark price. § Products are to be sold locally, at gate, with off-take via road tankers or river barges. Albeit water-borne transportation is preferred, with minimal on-site storage facilities, to reduce capital expenditure. § Products prices will be unregulated, even as initial economics had been predicted on a regulated prices environment. Potential Risks & Mitigations § The key risks associated with the total project life cycle will be assessed in a specially organized Risk Workshop, culminating in developing a Risk & Opportunity Register, a Risk Assessment Report and/or Matrix and a Major Risk Summary. Notwithstanding, the key risk to this endeavor are:
  • 9. 9 o Funding availability and timeliness o Changes to government legislation with respect to securitization of investment o Social issues (indigenous people’s involvement management) o Security § The aforementioned are all surmountable, and mitigation means exist. For example, social issues can be tackled by: o Formulating an Indigenous Affairs Management Plan (IAMP), to encompass detailed measures to manage indigenous affairs and achieve indigenous participation through employment, training and engagement in subcontracted work; o Instituting share holding scheme thereby enhancing a sense of part ownership of the enterprise; and o Establishing processes for auditing, methods for identifying and reporting non-conformances and progress reporting to inform all stakeholders of project development. § The IAMP is also a precursor for enhanced security. Funds are to be made available ahead of Final Investment Decision (FID) by means of perfected Bank Guarantees, such that payment for goods and services would be made in a timely manner. § By continuously scanning the project environment, government directives can be implemented without adverse impact to project schedule, quality or cost.
  • 10. 10 Implementation A specialist Project Management Company is required to foster this idea. This entity has the idea, knows who can do what, who needs the facility, how to arrange the fiancé (if Sponsor so wishes) and bring all to bear in establishing the facility on the ground. And if required, establish the processes to run the facility. The company is paid according to its involvement and efforts. The outline implementation plan is thus: § Market the idea to potential Sponsors, and agree project implementation modalities, operating procedures, etc. MiniRef & Energy Development has the capability, expertise and personnel to rum operations with inputs from key specialist based in US, UK or Nigeria. Albeit its central operational address (for ease of administration) is in London, UK. § The company has established a good system for ideas exchange and decision making process, and has set up the management processes and procedures necessary for this level of undertaking. These can be further aligned with Sponsor’s expectations upon contract agreement. § Upon initial (Sponsors statement of intent to procure services) agreement, streamlining operational modalities and location, etc. MiniRef & Energy Development will undertake to prepare outline Project Proposal & Execution Plan, as a guideline tool for action. § Perform initial local engagement while identifying local companies that can deliver envisaged local works at site, viz. freight forwarding transportation of fabricated units to location, location acquisition and preparation, supply of local labour, etc. Establish services supply agreements with these, to obtain locked-in price information. § Prepare formal Project Execution Plan documents, for Sponsor’s endorsement.
  • 11. 11 § Establish a formal contract agreement with Sponsor, and execute contract terms subsequently. The aforementioned strategy is preferred because of its exposure to minimal financial risk. Furthermore, this strategy offers phased investment, even as it could take longer to implement; a traditional project management approach can be applied. Stage payment terms are open to negotiation. * MiniRef & Energy Development is a company specially established to market and implement this unique venture and developed by A. Theodore BRIGGS. Prepared by: