10. Modelling $226,097.12 TOTAL COST $8,000.00 Abutment Cost $92,000.00 Excavation Cost $20,000.00 Deck Cost $600.00 Product Cost (P) $3,300.00 Connection Cost (C) $102,197.12 Material Cost (M) Cost Type of Cost 11/7/2007 Designed By: I. M. Bridgemaster Cost Calculations Report (Design Iteration #1) Dennis H. Mahan Memorial Bridge