Benchmarking solar PV plants on the Basis of EN61724 and methods to maintain the Performance Ratio & Availability Intersolar Mumbai  15 Dec 2011 iPLON GmbH ( Germany) Victor Thamburaj ( CEO)
Overview ,[object Object],[object Object],[object Object],[object Object]
EN 61724 and  O&M view of PV plant ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
EN 61724 Standard ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PR = Yield final / Yield reference This  final yield  represents the number of  hours per day that the array would need to operate at its rated output  power   P 0 to equal its monitored contribution to the net daily  load . This  reference yield  represents the number of  hours per day during which the solar radiation would need to be at reference irradiance levels in order to contribute the same incident energy  as was monitored
where P N is the nominal peak power of the plant (in kWp) H is the irradiation (in kWh/m 2 ) on the  panels’  plane I stc is the irradiance value (1.00 kW/m 2 ) in  standard test conditions Reference Energy The reference energy E ref  (in kWh) of the plant is expressed as:
T m is the average temperature of modules (in °C) measured during the test period   during daytime (meanwhile irradiation > 200W/m 2 )   is the Power Temperature coefficient of the panels (in absolute value %/°C)
MEASUREMENT ,[object Object],[object Object],[object Object]
 
 
 
 
 
 
 
 
Availability ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
Methods for Maintaining PR and Availibility ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
OVERALL TESTING STRATEGY Provisional Acceptance Test (PAT) : after this test has been positively passed, a “Provisional Acceptance Certificate” (PAC) is issued and the O&M phase is entered Intermediate/Mid Test (MT) :  this test shall be carried out 12 months after PAC date; Final Acceptance Test (FAT) :  this test shall be carried out 24 months after PAC date; after this test has been positively passed, a “Final Acceptance Certificate” (FAC) is issued .  
Maintenance Stratgies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
O&M Model ,[object Object],[object Object],[object Object],[object Object]
System Failure domains Energy Loss  Relative share in % AC Sub systems 30 Inverters 35 DC Subsystems 15 Rest 20 Relative frequency  Events AC Sub systems 10 Inverters 60 DC Subsystems 15 Rest 15
O&M Costs O&M Costs ( €/MWp/year Euros Scheduled Maintenance/Cleaning 19,000 Unschedules Maintenance 1,500 Inverter Issues 7,500 O&M (without Insurance etc) 28,000
 
 
Products of iPLON EPC Solar Infranet (iAT, iMT, Internet connectivity) String Monitoring Inverter Monitoring Environ-mental Sensors Monitoring AC Power Metering (Evc. Point) Trans-former / Grid connected comp. Monitoring System Engineering Reviews Document. Project Mgmt. Services O&M Comissioning Training & Workshops Application and Application Support
 
Challenges in India ,[object Object],[object Object],[object Object],[object Object]
Thank You! www.iplon.de www.youtube.com/user/iPLONChannel
Benchmarking with real data ,[object Object],[object Object],[object Object]
iPLON „Experience“ Decentral Control Network ( tcp_IP and LONworks ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
Solar Project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot

performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
Ashish Verma
 
Solar pv – balance of systems
Solar pv – balance of systemsSolar pv – balance of systems
Solar pv – balance of systems
iplon
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
Vijay Kannan
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
Eli Israeli
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
Nageswar Rao
 

What's hot (20)

Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
 
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst Software
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modules
 
Solar pv – balance of systems
Solar pv – balance of systemsSolar pv – balance of systems
Solar pv – balance of systems
 
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
 
Solar PV DC Concepts
Solar PV DC ConceptsSolar PV DC Concepts
Solar PV DC Concepts
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overview
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation software
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
 
Rooftop Solar System
Rooftop Solar SystemRooftop Solar System
Rooftop Solar System
 
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsystModeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
Modeling the Irradiance and Temperature Dependence of PV Modules in PVsyst
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
 

Similar to iPLON presentation at Intersolar Mumbai 15 Dec 2011

3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4
guestec6b92bb
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Leonardo ENERGY
 
Victor ppt
Victor pptVictor ppt
Victor ppt
EAI
 
Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 Do
Legend Power
 
European Power Quality Survey
European Power Quality SurveyEuropean Power Quality Survey
European Power Quality Survey
Leonardo ENERGY
 

Similar to iPLON presentation at Intersolar Mumbai 15 Dec 2011 (20)

OPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim WebinarOPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim Webinar
 
65 sutterlueti using_advanced_pv_and_bo_s_modelling_and_algorithms_to_optimiz...
65 sutterlueti using_advanced_pv_and_bo_s_modelling_and_algorithms_to_optimiz...65 sutterlueti using_advanced_pv_and_bo_s_modelling_and_algorithms_to_optimiz...
65 sutterlueti using_advanced_pv_and_bo_s_modelling_and_algorithms_to_optimiz...
 
Short Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptxShort Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptx
 
3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4
 
MECHATRONICS Part-2.pdf
MECHATRONICS Part-2.pdfMECHATRONICS Part-2.pdf
MECHATRONICS Part-2.pdf
 
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
 
HYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection WebinarHYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection Webinar
 
Energy efficiency in data processing centres
Energy efficiency in data processing centresEnergy efficiency in data processing centres
Energy efficiency in data processing centres
 
Thesis
ThesisThesis
Thesis
 
Victor ppt
Victor pptVictor ppt
Victor ppt
 
Xtreme Power UPS Presentation
Xtreme Power UPS Presentation Xtreme Power UPS Presentation
Xtreme Power UPS Presentation
 
Energy Efficient Data Center
Energy Efficient Data CenterEnergy Efficient Data Center
Energy Efficient Data Center
 
Iskra Medium Voltage Automation and Protection (Protection relays)
Iskra Medium Voltage Automation and Protection (Protection relays)Iskra Medium Voltage Automation and Protection (Protection relays)
Iskra Medium Voltage Automation and Protection (Protection relays)
 
classic control and PLC training report
classic control and PLC training reportclassic control and PLC training report
classic control and PLC training report
 
Energy Efficiency in Huawei solutions
Energy Efficiency in Huawei solutionsEnergy Efficiency in Huawei solutions
Energy Efficiency in Huawei solutions
 
Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 Do
 
Mangal instrumentation 09
Mangal instrumentation 09Mangal instrumentation 09
Mangal instrumentation 09
 
European Power Quality Survey
European Power Quality SurveyEuropean Power Quality Survey
European Power Quality Survey
 
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systemsPhotovoltaic Training Course - Module 3.1 - Control and telecom systems
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

iPLON presentation at Intersolar Mumbai 15 Dec 2011

  • 1. Benchmarking solar PV plants on the Basis of EN61724 and methods to maintain the Performance Ratio & Availability Intersolar Mumbai 15 Dec 2011 iPLON GmbH ( Germany) Victor Thamburaj ( CEO)
  • 2.
  • 3.
  • 4.  
  • 5.
  • 6. PR = Yield final / Yield reference This final yield represents the number of hours per day that the array would need to operate at its rated output power P 0 to equal its monitored contribution to the net daily load . This reference yield represents the number of hours per day during which the solar radiation would need to be at reference irradiance levels in order to contribute the same incident energy as was monitored
  • 7. where P N is the nominal peak power of the plant (in kWp) H is the irradiation (in kWh/m 2 ) on the panels’ plane I stc is the irradiance value (1.00 kW/m 2 ) in standard test conditions Reference Energy The reference energy E ref (in kWh) of the plant is expressed as:
  • 8. T m is the average temperature of modules (in °C) measured during the test period during daytime (meanwhile irradiation > 200W/m 2 )  is the Power Temperature coefficient of the panels (in absolute value %/°C)
  • 9.
  • 10.  
  • 11.  
  • 12.  
  • 13.  
  • 14.  
  • 15.  
  • 16.  
  • 17.  
  • 18.
  • 19.  
  • 20.
  • 21.  
  • 22.  
  • 23.  
  • 24. OVERALL TESTING STRATEGY Provisional Acceptance Test (PAT) : after this test has been positively passed, a “Provisional Acceptance Certificate” (PAC) is issued and the O&M phase is entered Intermediate/Mid Test (MT) : this test shall be carried out 12 months after PAC date; Final Acceptance Test (FAT) : this test shall be carried out 24 months after PAC date; after this test has been positively passed, a “Final Acceptance Certificate” (FAC) is issued .  
  • 25.
  • 26.
  • 27. System Failure domains Energy Loss Relative share in % AC Sub systems 30 Inverters 35 DC Subsystems 15 Rest 20 Relative frequency Events AC Sub systems 10 Inverters 60 DC Subsystems 15 Rest 15
  • 28. O&M Costs O&M Costs ( €/MWp/year Euros Scheduled Maintenance/Cleaning 19,000 Unschedules Maintenance 1,500 Inverter Issues 7,500 O&M (without Insurance etc) 28,000
  • 29.  
  • 30.  
  • 31. Products of iPLON EPC Solar Infranet (iAT, iMT, Internet connectivity) String Monitoring Inverter Monitoring Environ-mental Sensors Monitoring AC Power Metering (Evc. Point) Trans-former / Grid connected comp. Monitoring System Engineering Reviews Document. Project Mgmt. Services O&M Comissioning Training & Workshops Application and Application Support
  • 32.  
  • 33.
  • 34. Thank You! www.iplon.de www.youtube.com/user/iPLONChannel