PAYBACK ASSESSMENT OF ALTERNATIVE SYSTEM OF
ELECTRICAL POWER TRANSMISSION IN GOLIATH CRANE
P.S.Barve Y.V.Deshpande
Asst.Professor Asst.Professor
Yashwantrao chavan Ramdeobaba Kamala Neharu
Engg.College Nagpur (M.S) Engg.College Nagpur (M.S)
Purubarve5@yahoo.co.in Purubarve5@yahoo.co.in
Abstract :-
Transmission tower manufacturing industry is engaged in the design,
development, manufacturing, supply and construction of overhead transmission lines for
Turnkey projects including manufacture of substation structures microwave tower and
similar structure. There are different types of cranes used in transmission tower
company Such as goliath crane, EOT crane and mobile crane to transfer raw materials
,semi-finish and finish products from one place to another place. The installation of
goliath cranes are in raw and dispatch yard and it is used to transfer raw materials from
raw yard to different machine in fabrication shop also it transfer finish good from
dispatch yard to different transport vehicles like container, trailor or truck etc. Draw
back in the existing system of goliath crane means high breakdown occurs due to
damages of supply current trolley cable therefore high maintenance and production cost
is involved and after every two years supply current trolley cable is replaced by new one.
In this investigation a complete though is given as regards how to minimize breakdown
and production loss by implementing bus-bar system in place of existing system of
goliath crane .Bus-bar system is used to supply 3-phase current to different motors of
goliath crane instead of cable trolley system .A typical arrangements are depicted in this
paper.
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
25
This paper presents evolving a payback assessment of alternative system of
electrical power transmission in goliath crane for transmission tower manufacturing
company.
Keywords: Transmission Tower Company, goliath crane, cable trolley system,
bus-bar system.
I. Present Status Of Operation : -
Following are the different types of crane used in transmission tower company to
transfer materials from one station to another station.
1. Goliath Crane.
2. EOT Crane (Electrical Overhead Travelling)
3. Mobile Crane (Hydra 12MT)
1. Goliath Crane: The goliath crane are used to transfer raw materials from raw
yard to different machines such as CNC ,plate shearing, stamping, band saw, power
press punching and universal punching and cutting machine etc. It is also used to
transfer finish good from dispatch yard to different transport vehicles like truck,
containers etc. In existing system of goliath crane cable trolley is used to supply
current from main panel to goliath crane panel or motors. The installation of goliath
crane in raw yard and dispatch yard (steel yard) and 10 sq.mm cable 4 core 60m
length is mounted on cable trolley if goliath crane is major breakdown then high
production loss occurs.
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
26
Fig. 1.1
2. EOT Crane: The installation of EOT crane in fabrication and galvanizing shop to
transfer raw materials, semi-finish and finish products from one machine to another
machine.
3. Mobile Crane: It is used in raw yard and steel yard to transfer raw materials,finish
good from one place to another.
II Plant Layout Details: .
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
27
Fig.1.2.
1. Raw material section (raw yard)
Goliath crane is used for shifting raw materials from raw yard to different machine
in fabrication shops.
2. Fabrication section:
Different machining operations are performed on raw materials and it is converted
into semi-finish good.
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
28
3. Galvanizing section:
The semi-finish good are converted to finish products by galvanizing furnace.
(Protherm furnace)
4. Dispatch section: (dispatch yard)
Goliath crane are used to shift finished product from dispatch yard to different
transportation of vehicles like container, trailor, truck etc
III. Flaws in current system:
1. Breakdown in existing system
Due to number of revolution goliath crane cable trolley, cable is stretch and crane
break down occur due to disturbances of current supply or damages of cable. Every two
years, cable was replaced due to damages of cable or high break down occurs in goliath
crane. The cost of cable (10sq-mm 4 core) is one lakh rupees. When new cable is fitted
then break down of crane is minimum for next six months. After six months breakdown is
increased in every month and high production loss occurs.
0
4
8
12
16
20
24
Breakdownhrs
month
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
29
Fig1.3.shows monthly breakdown in goliath crane (2008 years)
2. Effect on production rate:
Suppose an example of associated transmission tower manufacturing company,
plant capacity – 100MT in 24 hours and net working hours is 22hr.
Production per hour = Plant capacity / Net working hours
= 100/22
= 4.55 tone /hour
This example shows that if goliath crane breakdown in 01hr from 3 shifts then 4.55
tone production loss in one day. Fig-1.3 shows if goliath crane is major breakdown then
production loss is also high, it is calculated by 2008 year breakdown of goliath crane.
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
30
Fig-1.4 shows production loss in tone (2008 year)
0
10
20
30
40
50
60
70
80
90
100
Productionlossintone
month
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
31
Fig. 1.5 production loss in lakh (2008)
It is assumed that production cost is 50,000 rupees for one tone
production. Fig 1.3, 1.4 and 1.5 is calculated by goliath crane
breakdown in year 2008.
III. Clue to design task:
By implementing of existing system new supply current bus-bar system
will be applied on goliath crane, the breakdown is negligible and improvement in
production system. Bus-bar is used to supply 3-phase current to different motors of
goliath crane instead of cable trolley supply current system.
IV. Alternative design:
1. System design through bus-bar:
0
10
20
30
40
50
Productionlossinlakh
month
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
32
Bus-bar systems for overhead travelling cranes are designed to ensure
efficient, flexible and rapid mounting of components at any site. Mounting height can be
mechanically and electrically connected to the bus bar system. The supply current to bus-
bar is done normally through incoming terminal box. This allows both feeding and
protection of the bus-bar system simultaneously. These easy to maintain bus-bar systems
have enough flexibility for system extension. The bus-bar system can suitably work in
numerous environments. Following are the components used in bus-bar system.
1. L-Type angle section size- 60x60x5mm
2. C-Channel section size- 50x100x8mm
3. Insulator
4. Current collector
5. Cable 4sq-mm 4 core.
Fig.1.6 Bus-bar system
V. System design through RCM:
Reliability centered maintenance (RCM) is a new strategic framework for
ensuring that any asset continues to perform, as its users want it to perform. RCM process
entails asking seven questions about each of the selected assets. It makes use of two
documents namely, RCM information work sheet and RCM decision worksheet. RCM
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
33
concept developed by the U.S. commercial airlines industry has been successes fully
implemented by military, Navy, Nuclear power plants, Electric power generation and
distribution undertakings and several other sectors. The fact that people has
enthusiastically received RCM at all level and has enabled users to achieve some
remarkable successes in all of these countries. This approach if implemented in totally will
increase the production cost to a large degree and make production uneconomical.RCM
approach is a compromise between PDM and BDM approach for optimizing the cost and
ensuring the availability of machine.
RCM approach has been applied to the goliath crane system of transmission
tower industry for research work reported in this paper.RCM methodology can be applied
to Indian industry for reduction of breakdowns as well as optimization of preventive
maintenance cost.
Reliability-centered maintenance, often known as RCM, is an industrial
improvement approach focused on identifying and establishing the operational,
maintenance, and capital improvement policies that will manage the risks of equipment
failure most effectively. It is defined by the technical standard SAE JA1011, Evaluation
Criteria for RCM Processes, which specifies that RCM address, at a minimum, the seven
questions:
1. What is the item supposed to do and its associated performance standards?
2. In what ways can it fail to provide the required functions?
3. What are the events that cause each failure?
4. What happens when each failure occurs?
5. In what way does each failure matter?
6. What systematic task can be performed proactively to prevent, or to diminish to a
satisfactory degree, the consequences of the failure?
7. What must be done if a suitable preventive task cannot be found?
VI. Identification and formulation of proposed work
Analysis of machine break down and shut down list for span of about 1 year has
revealed that most of the failure, which have occurred, are due to failure of Goliath crane
wheel and damages of cable 10mm sq. hence, it has been decided to focus attention on
maintenance aspect of Goliath Crane system.
VII. Approach
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
34
RCM concept has been applied to Goliath Crane system as illustrated
herein. Goliath crane system has been categorise into three sub system.
 Power transmission sub system
 Guiding and transportation sub system and
 hydraulic sub system
VIII. The pay – back analysis:
This method means that the pay – off period is calculated .In its simplest version,
Basic investment (B) is put against average annual yield (Y ) , i.e., the difference between
cash inflow and outflow . The pay off period (T) thus is the time it takes for B to be paid
off.
T (years) = B (SEK)/ Y (SEK) --------- ( I )
Example:-
It is propose that a tower manufacturing industry is thinking of changing existing
supply current cable trolley system for goliath crane because it is found that high
breakdown and production loss .A study of delays show that company wants to minimize
breakdown and improvement in production by implementing supply current bus-bar
system in goliath crane .
Basic investment (B) SEK
Purchase price after discount 1,00,000
Training (01 operator @ SEK 5000 5,000
Installation 20,000
Miscellaneous 1,00,000
Total B = 2,25,000
Cash Inflow ( I)
1cable trolley operator @ SEK 48,000
10sq-mm cable 4 core 50,000
Maintenance and repair including cost 2,00,000
Of down time -------------------
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
35
Total 2,98,000
Cash outflow (O), SEK / Year
Operating costs
(1) Fixed: One operator @ SEK 60,000
Insurance 5,000
(2) Variable:
Replacement of parts 30,000
Maintenance & repairs
Including cost of downtime 30,000
Miscellaneous 10,000
Total 1, 35,000
Results:-
I. Pay-back method:-
The pay of period (T) is calculated according to T=B/Y. The yield (Y) equals the annual
cash inflow less the cash out flow (I - O).
T=22.5/29.8-13.5
=1.38 ≈ 1.5 Years.
It indicates that the Investment is profitable after 1.5 years.
Conclusion:
ISSN:2348 9510
International Journal Of Core Engineering & Management(IJCEM)
Volume 1, Issue 1, April 2014
36
High breakdown in existing goliath crane involved low production rate by
implementing bus-bar system in goliath crane shows minimize breakdown and high
production rate. It also indicates that the investment of new system is profitable after
1.5 years which is proved through pay-back analysis. By improving arrangement of
transmission system, guiding and transportation system, hydraulic system through
RCM approach for reducing breakdown and to improve availability of asset which will
be proved in the next development.
References:-
1. Lindkvist, R.G.T. (1985)Handbook of material handling. Chichester ELLIS
Horwood Ltd.p.31-40.
2. EOT Crane company manual of ATSL.
3. Sharma S.C. (2004) material management and material handling khanna publishers
Delhi.
4. Deshpande V.S. & Modak J.P. & Reliability engineering and system
safety80(2003)

More Related Content

What's hot

IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...IRJET Journal
 
IRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing FixtureIRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing FixtureIRJET Journal
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
 
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...Design of Starting Resistance for AC and DC Machines using Computer Analysis ...
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...IRJET Journal
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training reportshubham chaurasiya
 
Anish report
Anish reportAnish report
Anish reportrboy001
 
Summertraining dlw harshit irwri
Summertraining dlw harshit irwriSummertraining dlw harshit irwri
Summertraining dlw harshit irwriHarshit Mishra
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH SUBHAM SINGH
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Devendra Kumar
 

What's hot (11)

IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
 
IRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing FixtureIRJET- Design and Analysis of an Indexing Fixture
IRJET- Design and Analysis of an Indexing Fixture
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
DLW training report
DLW  training reportDLW  training report
DLW training report
 
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...Design of Starting Resistance for AC and DC Machines using Computer Analysis ...
Design of Starting Resistance for AC and DC Machines using Computer Analysis ...
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
 
Anish report
Anish reportAnish report
Anish report
 
introuduction DLW varanaesi
introuduction DLW varanaesiintrouduction DLW varanaesi
introuduction DLW varanaesi
 
Summertraining dlw harshit irwri
Summertraining dlw harshit irwriSummertraining dlw harshit irwri
Summertraining dlw harshit irwri
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 

Viewers also liked

Ellendale elementary school board presentation 2014
Ellendale elementary school board presentation 2014Ellendale elementary school board presentation 2014
Ellendale elementary school board presentation 2014JessicaMays1
 
Energy sustainable-rural-india-final
Energy sustainable-rural-india-finalEnergy sustainable-rural-india-final
Energy sustainable-rural-india-finalIjcem Journal
 
Ug 205-image-retrieval-using-re-ranking-algorithm-11
Ug 205-image-retrieval-using-re-ranking-algorithm-11Ug 205-image-retrieval-using-re-ranking-algorithm-11
Ug 205-image-retrieval-using-re-ranking-algorithm-11Ijcem Journal
 
Aula 04 balanço patrimonial - uma introdução
Aula 04   balanço patrimonial - uma introduçãoAula 04   balanço patrimonial - uma introdução
Aula 04 balanço patrimonial - uma introduçãoRaul Alberto
 
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1Ijcem Journal
 
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Ijcem Journal
 
(Hermetismo) - O Caibalion
(Hermetismo) - O Caibalion(Hermetismo) - O Caibalion
(Hermetismo) - O CaibalionMercurium
 
A review-effect-of-geo-grid-reinforcement-on-soil
A review-effect-of-geo-grid-reinforcement-on-soilA review-effect-of-geo-grid-reinforcement-on-soil
A review-effect-of-geo-grid-reinforcement-on-soilIjcem Journal
 
Iemiot tipoftheicebergver1-140826100738-phpapp01
Iemiot tipoftheicebergver1-140826100738-phpapp01Iemiot tipoftheicebergver1-140826100738-phpapp01
Iemiot tipoftheicebergver1-140826100738-phpapp01Kristin Russell
 
Image–based face-detection-and-recognition-using-matlab
Image–based face-detection-and-recognition-using-matlabImage–based face-detection-and-recognition-using-matlab
Image–based face-detection-and-recognition-using-matlabIjcem Journal
 

Viewers also liked (15)

Remya
RemyaRemya
Remya
 
Remya
RemyaRemya
Remya
 
Ellendale elementary school board presentation 2014
Ellendale elementary school board presentation 2014Ellendale elementary school board presentation 2014
Ellendale elementary school board presentation 2014
 
Scope book (1)
Scope book (1)Scope book (1)
Scope book (1)
 
Energy sustainable-rural-india-final
Energy sustainable-rural-india-finalEnergy sustainable-rural-india-final
Energy sustainable-rural-india-final
 
Ug 205-image-retrieval-using-re-ranking-algorithm-11
Ug 205-image-retrieval-using-re-ranking-algorithm-11Ug 205-image-retrieval-using-re-ranking-algorithm-11
Ug 205-image-retrieval-using-re-ranking-algorithm-11
 
Aula 04 balanço patrimonial - uma introdução
Aula 04   balanço patrimonial - uma introduçãoAula 04   balanço patrimonial - uma introdução
Aula 04 balanço patrimonial - uma introdução
 
Veena
VeenaVeena
Veena
 
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1
Role of-financial-inclusion-in-restraining-entrepreneurial-breakdown-in-india1
 
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
 
Tqm sampling 3
Tqm   sampling 3Tqm   sampling 3
Tqm sampling 3
 
(Hermetismo) - O Caibalion
(Hermetismo) - O Caibalion(Hermetismo) - O Caibalion
(Hermetismo) - O Caibalion
 
A review-effect-of-geo-grid-reinforcement-on-soil
A review-effect-of-geo-grid-reinforcement-on-soilA review-effect-of-geo-grid-reinforcement-on-soil
A review-effect-of-geo-grid-reinforcement-on-soil
 
Iemiot tipoftheicebergver1-140826100738-phpapp01
Iemiot tipoftheicebergver1-140826100738-phpapp01Iemiot tipoftheicebergver1-140826100738-phpapp01
Iemiot tipoftheicebergver1-140826100738-phpapp01
 
Image–based face-detection-and-recognition-using-matlab
Image–based face-detection-and-recognition-using-matlabImage–based face-detection-and-recognition-using-matlab
Image–based face-detection-and-recognition-using-matlab
 

Similar to Payback assessment-of-alternative-system-of-electrical-power-transmission-in-goliath-crane1

IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET Journal
 
IRJET- Numerical Analysis of Hyperloop Transportation Structure
IRJET-  	  Numerical Analysis of Hyperloop Transportation StructureIRJET-  	  Numerical Analysis of Hyperloop Transportation Structure
IRJET- Numerical Analysis of Hyperloop Transportation StructureIRJET Journal
 
IRJET- Material Dimension Analyzing in Conveyor
IRJET- Material Dimension Analyzing in ConveyorIRJET- Material Dimension Analyzing in Conveyor
IRJET- Material Dimension Analyzing in ConveyorIRJET Journal
 
Development of Semi-Autonomous Sheet Bending Machine
Development of Semi-Autonomous Sheet Bending MachineDevelopment of Semi-Autonomous Sheet Bending Machine
Development of Semi-Autonomous Sheet Bending MachineIRJET Journal
 
Power Line Fault Detection and Rectification using Robot
Power Line Fault Detection and Rectification using  RobotPower Line Fault Detection and Rectification using  Robot
Power Line Fault Detection and Rectification using RobotIRJET Journal
 
Automation of Fixtures Using Hydraulic Power Pack for a Bogie Underframe
Automation of Fixtures Using Hydraulic Power Pack for a Bogie UnderframeAutomation of Fixtures Using Hydraulic Power Pack for a Bogie Underframe
Automation of Fixtures Using Hydraulic Power Pack for a Bogie UnderframeIOSR Journals
 
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLCIRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLCIRJET Journal
 
Development of Bottle Unscramble Machine
Development of Bottle Unscramble MachineDevelopment of Bottle Unscramble Machine
Development of Bottle Unscramble MachineIRJET Journal
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1dashdeepak33
 
Vertical material handling system
Vertical material handling systemVertical material handling system
Vertical material handling systemIAEME Publication
 
Vertical material handling system
Vertical material handling systemVertical material handling system
Vertical material handling systemIAEME Publication
 
A Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick MachineA Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick MachineIRJET Journal
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET Journal
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineIRJET Journal
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET Journal
 
Fabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineFabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineIRJET Journal
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...IRJET Journal
 
Cpoh report POWER TRANSMISSION SYSTEM 2018
Cpoh report  POWER TRANSMISSION SYSTEM 2018 Cpoh report  POWER TRANSMISSION SYSTEM 2018
Cpoh report POWER TRANSMISSION SYSTEM 2018 Vanchhitrawat
 
IRJET- Multilevel Object Sorting System using PLC Controller
IRJET-  	  Multilevel Object Sorting System using PLC ControllerIRJET-  	  Multilevel Object Sorting System using PLC Controller
IRJET- Multilevel Object Sorting System using PLC ControllerIRJET Journal
 

Similar to Payback assessment-of-alternative-system-of-electrical-power-transmission-in-goliath-crane1 (20)

IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
 
4.resource management
4.resource management4.resource management
4.resource management
 
IRJET- Numerical Analysis of Hyperloop Transportation Structure
IRJET-  	  Numerical Analysis of Hyperloop Transportation StructureIRJET-  	  Numerical Analysis of Hyperloop Transportation Structure
IRJET- Numerical Analysis of Hyperloop Transportation Structure
 
IRJET- Material Dimension Analyzing in Conveyor
IRJET- Material Dimension Analyzing in ConveyorIRJET- Material Dimension Analyzing in Conveyor
IRJET- Material Dimension Analyzing in Conveyor
 
Development of Semi-Autonomous Sheet Bending Machine
Development of Semi-Autonomous Sheet Bending MachineDevelopment of Semi-Autonomous Sheet Bending Machine
Development of Semi-Autonomous Sheet Bending Machine
 
Power Line Fault Detection and Rectification using Robot
Power Line Fault Detection and Rectification using  RobotPower Line Fault Detection and Rectification using  Robot
Power Line Fault Detection and Rectification using Robot
 
Automation of Fixtures Using Hydraulic Power Pack for a Bogie Underframe
Automation of Fixtures Using Hydraulic Power Pack for a Bogie UnderframeAutomation of Fixtures Using Hydraulic Power Pack for a Bogie Underframe
Automation of Fixtures Using Hydraulic Power Pack for a Bogie Underframe
 
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLCIRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
 
Development of Bottle Unscramble Machine
Development of Bottle Unscramble MachineDevelopment of Bottle Unscramble Machine
Development of Bottle Unscramble Machine
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
 
Vertical material handling system
Vertical material handling systemVertical material handling system
Vertical material handling system
 
Vertical material handling system
Vertical material handling systemVertical material handling system
Vertical material handling system
 
A Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick MachineA Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick Machine
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling Machine
 
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
IRJET- Design and Implementation of Kitting Trolley for Just in Time Producti...
 
Fabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineFabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machine
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
Cpoh report POWER TRANSMISSION SYSTEM 2018
Cpoh report  POWER TRANSMISSION SYSTEM 2018 Cpoh report  POWER TRANSMISSION SYSTEM 2018
Cpoh report POWER TRANSMISSION SYSTEM 2018
 
IRJET- Multilevel Object Sorting System using PLC Controller
IRJET-  	  Multilevel Object Sorting System using PLC ControllerIRJET-  	  Multilevel Object Sorting System using PLC Controller
IRJET- Multilevel Object Sorting System using PLC Controller
 

More from Ijcem Journal

Selection of-car-using-topsis-fuzzy-logic
Selection of-car-using-topsis-fuzzy-logicSelection of-car-using-topsis-fuzzy-logic
Selection of-car-using-topsis-fuzzy-logicIjcem Journal
 
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Ijcem Journal
 
Paper on-balance-scorecard1
Paper on-balance-scorecard1Paper on-balance-scorecard1
Paper on-balance-scorecard1Ijcem Journal
 
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11Ijcem Journal
 
Mining web-logs-to-improve-website-organization1
Mining web-logs-to-improve-website-organization1Mining web-logs-to-improve-website-organization1
Mining web-logs-to-improve-website-organization1Ijcem Journal
 
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...Ijcem Journal
 
Implementation of-hybrid-cryptography-algorithm
Implementation of-hybrid-cryptography-algorithmImplementation of-hybrid-cryptography-algorithm
Implementation of-hybrid-cryptography-algorithmIjcem Journal
 
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...Ijcem Journal
 
Framework of-knowledge-management-study
Framework of-knowledge-management-studyFramework of-knowledge-management-study
Framework of-knowledge-management-studyIjcem Journal
 
Foreign direct-investment-in-india-a-critical-analysis-on-fdi
Foreign direct-investment-in-india-a-critical-analysis-on-fdiForeign direct-investment-in-india-a-critical-analysis-on-fdi
Foreign direct-investment-in-india-a-critical-analysis-on-fdiIjcem Journal
 
Ethics the-progressive-development-of-corporate-leadership
Ethics the-progressive-development-of-corporate-leadershipEthics the-progressive-development-of-corporate-leadership
Ethics the-progressive-development-of-corporate-leadershipIjcem Journal
 
Enterprise resource-planning
Enterprise resource-planningEnterprise resource-planning
Enterprise resource-planningIjcem Journal
 
E marketing-in-emerging-countries
E marketing-in-emerging-countriesE marketing-in-emerging-countries
E marketing-in-emerging-countriesIjcem Journal
 
E marketing-in-emerging-countries (1)
E marketing-in-emerging-countries (1)E marketing-in-emerging-countries (1)
E marketing-in-emerging-countries (1)Ijcem Journal
 
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...Ijcem Journal
 
A study-of-vertex-edge-coloring-techniques-with-application
A study-of-vertex-edge-coloring-techniques-with-applicationA study-of-vertex-edge-coloring-techniques-with-application
A study-of-vertex-edge-coloring-techniques-with-applicationIjcem Journal
 
Article for-river-culture
Article for-river-cultureArticle for-river-culture
Article for-river-cultureIjcem Journal
 
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...A comparative-statistical-analysis-on-the-educational-system-in-european-coun...
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...Ijcem Journal
 

More from Ijcem Journal (20)

Selection of-car-using-topsis-fuzzy-logic
Selection of-car-using-topsis-fuzzy-logicSelection of-car-using-topsis-fuzzy-logic
Selection of-car-using-topsis-fuzzy-logic
 
Scope book
Scope bookScope book
Scope book
 
Reverse logistics
Reverse logisticsReverse logistics
Reverse logistics
 
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
Reliability and-efficient-protocol-for-position-based-routing-in-vehicular-ad...
 
Paper on-balance-scorecard1
Paper on-balance-scorecard1Paper on-balance-scorecard1
Paper on-balance-scorecard1
 
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
 
Mining web-logs-to-improve-website-organization1
Mining web-logs-to-improve-website-organization1Mining web-logs-to-improve-website-organization1
Mining web-logs-to-improve-website-organization1
 
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...
Measurement and-comparative-analysis-of-system-scintillation-camera-dead-time...
 
Implementation of-hybrid-cryptography-algorithm
Implementation of-hybrid-cryptography-algorithmImplementation of-hybrid-cryptography-algorithm
Implementation of-hybrid-cryptography-algorithm
 
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...
Heavy metal-contamination-in-solid-aerosols-and-top-soils-of-faisalabad-envio...
 
Framework of-knowledge-management-study
Framework of-knowledge-management-studyFramework of-knowledge-management-study
Framework of-knowledge-management-study
 
Foreign direct-investment-in-india-a-critical-analysis-on-fdi
Foreign direct-investment-in-india-a-critical-analysis-on-fdiForeign direct-investment-in-india-a-critical-analysis-on-fdi
Foreign direct-investment-in-india-a-critical-analysis-on-fdi
 
Ethics the-progressive-development-of-corporate-leadership
Ethics the-progressive-development-of-corporate-leadershipEthics the-progressive-development-of-corporate-leadership
Ethics the-progressive-development-of-corporate-leadership
 
Enterprise resource-planning
Enterprise resource-planningEnterprise resource-planning
Enterprise resource-planning
 
E marketing-in-emerging-countries
E marketing-in-emerging-countriesE marketing-in-emerging-countries
E marketing-in-emerging-countries
 
E marketing-in-emerging-countries (1)
E marketing-in-emerging-countries (1)E marketing-in-emerging-countries (1)
E marketing-in-emerging-countries (1)
 
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...
Diverse distribution-study-of-c-14-through-out-the-major-crops-of-punjab-paki...
 
A study-of-vertex-edge-coloring-techniques-with-application
A study-of-vertex-edge-coloring-techniques-with-applicationA study-of-vertex-edge-coloring-techniques-with-application
A study-of-vertex-edge-coloring-techniques-with-application
 
Article for-river-culture
Article for-river-cultureArticle for-river-culture
Article for-river-culture
 
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...A comparative-statistical-analysis-on-the-educational-system-in-european-coun...
A comparative-statistical-analysis-on-the-educational-system-in-european-coun...
 

Recently uploaded

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Recently uploaded (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Payback assessment-of-alternative-system-of-electrical-power-transmission-in-goliath-crane1

  • 1. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 24 PAYBACK ASSESSMENT OF ALTERNATIVE SYSTEM OF ELECTRICAL POWER TRANSMISSION IN GOLIATH CRANE P.S.Barve Y.V.Deshpande Asst.Professor Asst.Professor Yashwantrao chavan Ramdeobaba Kamala Neharu Engg.College Nagpur (M.S) Engg.College Nagpur (M.S) Purubarve5@yahoo.co.in Purubarve5@yahoo.co.in Abstract :- Transmission tower manufacturing industry is engaged in the design, development, manufacturing, supply and construction of overhead transmission lines for Turnkey projects including manufacture of substation structures microwave tower and similar structure. There are different types of cranes used in transmission tower company Such as goliath crane, EOT crane and mobile crane to transfer raw materials ,semi-finish and finish products from one place to another place. The installation of goliath cranes are in raw and dispatch yard and it is used to transfer raw materials from raw yard to different machine in fabrication shop also it transfer finish good from dispatch yard to different transport vehicles like container, trailor or truck etc. Draw back in the existing system of goliath crane means high breakdown occurs due to damages of supply current trolley cable therefore high maintenance and production cost is involved and after every two years supply current trolley cable is replaced by new one. In this investigation a complete though is given as regards how to minimize breakdown and production loss by implementing bus-bar system in place of existing system of goliath crane .Bus-bar system is used to supply 3-phase current to different motors of goliath crane instead of cable trolley system .A typical arrangements are depicted in this paper.
  • 2. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 25 This paper presents evolving a payback assessment of alternative system of electrical power transmission in goliath crane for transmission tower manufacturing company. Keywords: Transmission Tower Company, goliath crane, cable trolley system, bus-bar system. I. Present Status Of Operation : - Following are the different types of crane used in transmission tower company to transfer materials from one station to another station. 1. Goliath Crane. 2. EOT Crane (Electrical Overhead Travelling) 3. Mobile Crane (Hydra 12MT) 1. Goliath Crane: The goliath crane are used to transfer raw materials from raw yard to different machines such as CNC ,plate shearing, stamping, band saw, power press punching and universal punching and cutting machine etc. It is also used to transfer finish good from dispatch yard to different transport vehicles like truck, containers etc. In existing system of goliath crane cable trolley is used to supply current from main panel to goliath crane panel or motors. The installation of goliath crane in raw yard and dispatch yard (steel yard) and 10 sq.mm cable 4 core 60m length is mounted on cable trolley if goliath crane is major breakdown then high production loss occurs.
  • 3. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 26 Fig. 1.1 2. EOT Crane: The installation of EOT crane in fabrication and galvanizing shop to transfer raw materials, semi-finish and finish products from one machine to another machine. 3. Mobile Crane: It is used in raw yard and steel yard to transfer raw materials,finish good from one place to another. II Plant Layout Details: .
  • 4. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 27 Fig.1.2. 1. Raw material section (raw yard) Goliath crane is used for shifting raw materials from raw yard to different machine in fabrication shops. 2. Fabrication section: Different machining operations are performed on raw materials and it is converted into semi-finish good.
  • 5. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 28 3. Galvanizing section: The semi-finish good are converted to finish products by galvanizing furnace. (Protherm furnace) 4. Dispatch section: (dispatch yard) Goliath crane are used to shift finished product from dispatch yard to different transportation of vehicles like container, trailor, truck etc III. Flaws in current system: 1. Breakdown in existing system Due to number of revolution goliath crane cable trolley, cable is stretch and crane break down occur due to disturbances of current supply or damages of cable. Every two years, cable was replaced due to damages of cable or high break down occurs in goliath crane. The cost of cable (10sq-mm 4 core) is one lakh rupees. When new cable is fitted then break down of crane is minimum for next six months. After six months breakdown is increased in every month and high production loss occurs. 0 4 8 12 16 20 24 Breakdownhrs month
  • 6. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 29 Fig1.3.shows monthly breakdown in goliath crane (2008 years) 2. Effect on production rate: Suppose an example of associated transmission tower manufacturing company, plant capacity – 100MT in 24 hours and net working hours is 22hr. Production per hour = Plant capacity / Net working hours = 100/22 = 4.55 tone /hour This example shows that if goliath crane breakdown in 01hr from 3 shifts then 4.55 tone production loss in one day. Fig-1.3 shows if goliath crane is major breakdown then production loss is also high, it is calculated by 2008 year breakdown of goliath crane.
  • 7. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 30 Fig-1.4 shows production loss in tone (2008 year) 0 10 20 30 40 50 60 70 80 90 100 Productionlossintone month
  • 8. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 31 Fig. 1.5 production loss in lakh (2008) It is assumed that production cost is 50,000 rupees for one tone production. Fig 1.3, 1.4 and 1.5 is calculated by goliath crane breakdown in year 2008. III. Clue to design task: By implementing of existing system new supply current bus-bar system will be applied on goliath crane, the breakdown is negligible and improvement in production system. Bus-bar is used to supply 3-phase current to different motors of goliath crane instead of cable trolley supply current system. IV. Alternative design: 1. System design through bus-bar: 0 10 20 30 40 50 Productionlossinlakh month
  • 9. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 32 Bus-bar systems for overhead travelling cranes are designed to ensure efficient, flexible and rapid mounting of components at any site. Mounting height can be mechanically and electrically connected to the bus bar system. The supply current to bus- bar is done normally through incoming terminal box. This allows both feeding and protection of the bus-bar system simultaneously. These easy to maintain bus-bar systems have enough flexibility for system extension. The bus-bar system can suitably work in numerous environments. Following are the components used in bus-bar system. 1. L-Type angle section size- 60x60x5mm 2. C-Channel section size- 50x100x8mm 3. Insulator 4. Current collector 5. Cable 4sq-mm 4 core. Fig.1.6 Bus-bar system V. System design through RCM: Reliability centered maintenance (RCM) is a new strategic framework for ensuring that any asset continues to perform, as its users want it to perform. RCM process entails asking seven questions about each of the selected assets. It makes use of two documents namely, RCM information work sheet and RCM decision worksheet. RCM
  • 10. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 33 concept developed by the U.S. commercial airlines industry has been successes fully implemented by military, Navy, Nuclear power plants, Electric power generation and distribution undertakings and several other sectors. The fact that people has enthusiastically received RCM at all level and has enabled users to achieve some remarkable successes in all of these countries. This approach if implemented in totally will increase the production cost to a large degree and make production uneconomical.RCM approach is a compromise between PDM and BDM approach for optimizing the cost and ensuring the availability of machine. RCM approach has been applied to the goliath crane system of transmission tower industry for research work reported in this paper.RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimization of preventive maintenance cost. Reliability-centered maintenance, often known as RCM, is an industrial improvement approach focused on identifying and establishing the operational, maintenance, and capital improvement policies that will manage the risks of equipment failure most effectively. It is defined by the technical standard SAE JA1011, Evaluation Criteria for RCM Processes, which specifies that RCM address, at a minimum, the seven questions: 1. What is the item supposed to do and its associated performance standards? 2. In what ways can it fail to provide the required functions? 3. What are the events that cause each failure? 4. What happens when each failure occurs? 5. In what way does each failure matter? 6. What systematic task can be performed proactively to prevent, or to diminish to a satisfactory degree, the consequences of the failure? 7. What must be done if a suitable preventive task cannot be found? VI. Identification and formulation of proposed work Analysis of machine break down and shut down list for span of about 1 year has revealed that most of the failure, which have occurred, are due to failure of Goliath crane wheel and damages of cable 10mm sq. hence, it has been decided to focus attention on maintenance aspect of Goliath Crane system. VII. Approach
  • 11. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 34 RCM concept has been applied to Goliath Crane system as illustrated herein. Goliath crane system has been categorise into three sub system.  Power transmission sub system  Guiding and transportation sub system and  hydraulic sub system VIII. The pay – back analysis: This method means that the pay – off period is calculated .In its simplest version, Basic investment (B) is put against average annual yield (Y ) , i.e., the difference between cash inflow and outflow . The pay off period (T) thus is the time it takes for B to be paid off. T (years) = B (SEK)/ Y (SEK) --------- ( I ) Example:- It is propose that a tower manufacturing industry is thinking of changing existing supply current cable trolley system for goliath crane because it is found that high breakdown and production loss .A study of delays show that company wants to minimize breakdown and improvement in production by implementing supply current bus-bar system in goliath crane . Basic investment (B) SEK Purchase price after discount 1,00,000 Training (01 operator @ SEK 5000 5,000 Installation 20,000 Miscellaneous 1,00,000 Total B = 2,25,000 Cash Inflow ( I) 1cable trolley operator @ SEK 48,000 10sq-mm cable 4 core 50,000 Maintenance and repair including cost 2,00,000 Of down time -------------------
  • 12. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 35 Total 2,98,000 Cash outflow (O), SEK / Year Operating costs (1) Fixed: One operator @ SEK 60,000 Insurance 5,000 (2) Variable: Replacement of parts 30,000 Maintenance & repairs Including cost of downtime 30,000 Miscellaneous 10,000 Total 1, 35,000 Results:- I. Pay-back method:- The pay of period (T) is calculated according to T=B/Y. The yield (Y) equals the annual cash inflow less the cash out flow (I - O). T=22.5/29.8-13.5 =1.38 ≈ 1.5 Years. It indicates that the Investment is profitable after 1.5 years. Conclusion:
  • 13. ISSN:2348 9510 International Journal Of Core Engineering & Management(IJCEM) Volume 1, Issue 1, April 2014 36 High breakdown in existing goliath crane involved low production rate by implementing bus-bar system in goliath crane shows minimize breakdown and high production rate. It also indicates that the investment of new system is profitable after 1.5 years which is proved through pay-back analysis. By improving arrangement of transmission system, guiding and transportation system, hydraulic system through RCM approach for reducing breakdown and to improve availability of asset which will be proved in the next development. References:- 1. Lindkvist, R.G.T. (1985)Handbook of material handling. Chichester ELLIS Horwood Ltd.p.31-40. 2. EOT Crane company manual of ATSL. 3. Sharma S.C. (2004) material management and material handling khanna publishers Delhi. 4. Deshpande V.S. & Modak J.P. & Reliability engineering and system safety80(2003)