SlideShare a Scribd company logo
1 of 6
Download to read offline
QUALITY
General Information 1/2
WHY of the strategy Strategic Initiative Key Results in 1314 GCP
- Drive behavior in the entity to plan and
execute processes that ensure Quality
experiences
- Enable co-delivery planning between
partner entities
- Customize processes based on key
detractors and ensure Satisfaction
NPS MoS goal-
setting
• Entities have national goals for
NPS in programs
• HR Structures implemented to
ensure quality and handle
delivery
• Processes customized from
detractor issue analysis from
Waterfall Report
Moc (Zero Bad Case
Challenge); India
(Firefighting
structures and
customer support
tool), Brazil (Process
customization to
reduce detractors)
- Co-deliver high quality experiences
- Align Expectations of participants with
what AIESEC promises to deliver
- Define clear responsibilities between
the Host and the Home Entities
Global Standards
• Culture and behavior between
some partner entities to plan
experience delivery together
• Improved JD across programs in
a lot of entities
• Results awaited from fruit peak
Serbia (iGCDP)
• Reduce detractor issues with the JD by
enabling clarity in JD and alignment
between the TN and EP sides.
• Improve integration of iGIP Eps in the
country and work environment
• Minimize logistical issues
GIP Quality
Startegies
To be implemented
Check Quality wiki for detailed
resources
General Information 2/2
WHY of the strategy Strategic Initiative Key Results in 1314
• Reduce detractor issues by ensuring
proper implementation of JD from the
very first day of work.
• Integrating impactful team experiences
as a part of GCDP for Eps
• Ensure reduction of detractor issues by
meeting accommodation standards
and pick up management
GCDP Quality
Strategies
To be Implemented
• To ensure safety of our stakeholders on
international internships
• To involve experts in the same
Safety
• 19entities signed partnership with International
SoS with 3080 Eps covered
• Mandatory according to Standards to have
insurance done for EPs
• Building Capacity for quality delivery
in each programme
• LnD for Quality Delivery
• Balance GCDP and GIP for summer
peak delivery
Talent Capacity for
Delivery`
Results awaited
S1: NPS Goal Planning and Achievement
TIER KEY RECOMMENDATIONS
Tier 1&2
• Engage and co-create with LCs the development in
processes based on waterfall analysis/detractor issues.
• Outline key detractor issues with top partner entities
and actively work to solve them for fruit peak
• National Control Board for firefighting
Tier 3 & 4
• Educate and Align LC delivery with National goals for
fruit peak
• Run National consultancies to assist delivery preparation
• Capitalize on ICB for additional support in education
• Outline key detractor issues with top partner entities
and actively work to solve them for fruit peak
All Tiers
• Country preparation seminars/webinars for ICX Eps (by
Host Entity) and OGX Eps (by Home Entity) before
realization
• Have firefighting communication channel in place for
fruit peak: email/podio form/telephone hotline
(depending on entity scale and feasibility)
POTENTIAL RESULTS
• Connected operational plan to increase
NPS
• Increased Education and Awareness of
the entity
• Business Intelligence enabling co-
delivery and reduced detractor issues
(waterfall analysis)
S2; Standards
TIER KEY RECOMMENDATIONS
Tier 1&2
• LC Certification: Certify LCs who have planned
standards and have quality measures and structures in
place
• Run LC Audits and release output to the whole National
Entity with recommendations for fruit peak
• Release Checklist derived from Standards to LCs to
prepare for Fruit peak
• Prepare resource hub/website for ICX EP assistance and
integration ( match.aiesec.vn & discover.aiesec.in )
Tier 3 & 4
• Release Checklist derived from Standards to LCs to
prepare for Fruit peak
• Run educational and consultation activities for LCs to
meet quality standards before realization peak
POTENTIAL RESULTS
• Enables MCs to track LC alignment to
quality standards and delivery
processes
• Motivation and awareness to LCs
around delivery preparation for fruit
peak
• Aligned expectations between home
and host entities
MORE RESOURCES
Match.Vietnam
Discover India
Safety, Talent Capacity for Delivery, & GCDP/GIP Strategies
TIER KEY RECOMMENDATIONS
Safety
Find National Insurance partner and work on OGX Pricing
model (if your entity does not have one already)
Talent Capacity
for Delivery
Integrate Leadership Development Model in GCDP and GIP on
priority basis
GIP Strategies
• Ensure JDs of TNs align with reality eg salary amount and
timelines of payment
• Creating a checklist of activities to run for the integration of
Eps
• Create and release accommodation standards for LCs to
adhere to
GCDP
Strategies
• Create and release checklist for first day of work including
purpose of project, JD explanation, timeline of activities,
working conditions and work delivery
• Project team leaders to be educated to ensure
implementation of Team Minimums in EP teams
• Have structures for ensuring accommodation standards,
management and pick ups
POTENTIAL RESULTS
• Safety standards for all our
exchange experiences
• Every entity having adequate
structures and HR to support fruit
peak delivery
• Reduced detractors by modifying
processes both in GCDP and GIP
MORE RESOURCES
Deliver Quality Experiences: http://www.myaiesec.net/content/viewwiki.do?contentid=10302771
Internal Control Board: http://www.myaiesec.net/content/viewwiki.do?contentid=10004546
Husqvarna Global Quality Award: http://www.myaiesec.net/content/viewwiki.do?contentid=10280991

More Related Content

Viewers also liked (7)

CK Presentation -
CK Presentation - CK Presentation -
CK Presentation -
 
Dennis Cunanan JCI
Dennis Cunanan JCIDennis Cunanan JCI
Dennis Cunanan JCI
 
Безценни цитати от "Малкият принц"
Безценни цитати от "Малкият принц"Безценни цитати от "Малкият принц"
Безценни цитати от "Малкият принц"
 
Diag..flujo
Diag..flujoDiag..flujo
Diag..flujo
 
Tutorial Virtual Box
Tutorial Virtual BoxTutorial Virtual Box
Tutorial Virtual Box
 
Skinheads
SkinheadsSkinheads
Skinheads
 
URBAN ART IS ART
URBAN ART IS ARTURBAN ART IS ART
URBAN ART IS ART
 

Similar to Quality for the network

Pamela a.loweresume12282015director
Pamela a.loweresume12282015directorPamela a.loweresume12282015director
Pamela a.loweresume12282015directorPamela Lowe
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklistSophia Fan
 
AIESEC in Namibia NST Application
AIESEC in Namibia NST ApplicationAIESEC in Namibia NST Application
AIESEC in Namibia NST Applicationkleophas johannes
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement maggie4667
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3AIESEC
 
محطات المعرفة الأردنية
محطات المعرفة الأردنيةمحطات المعرفة الأردنية
محطات المعرفة الأردنيةks2012
 
Capacity development and scaling for the Livestock CRP: Past, present and future
Capacity development and scaling for the Livestock CRP: Past, present and futureCapacity development and scaling for the Livestock CRP: Past, present and future
Capacity development and scaling for the Livestock CRP: Past, present and futureILRI
 
Aligning National M&E systems and Global Results Frameworks: Towards Better A...
Aligning National M&E systems and Global Results Frameworks: Towards Better A...Aligning National M&E systems and Global Results Frameworks: Towards Better A...
Aligning National M&E systems and Global Results Frameworks: Towards Better A...World Resources Institute (WRI)
 
AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014Soumil Kar
 
oGCDP Strategic Meeting IGN Output
oGCDP Strategic Meeting IGN OutputoGCDP Strategic Meeting IGN Output
oGCDP Strategic Meeting IGN OutputAIESEC
 
Portfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptPortfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptp6academy
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueFirnando Buenayre
 

Similar to Quality for the network (20)

Pamela a.loweresume12282015director
Pamela a.loweresume12282015directorPamela a.loweresume12282015director
Pamela a.loweresume12282015director
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklist
 
AIESEC in Namibia NST Application
AIESEC in Namibia NST ApplicationAIESEC in Namibia NST Application
AIESEC in Namibia NST Application
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3
 
محطات المعرفة الأردنية
محطات المعرفة الأردنيةمحطات المعرفة الأردنية
محطات المعرفة الأردنية
 
TD Area Plan
TD Area PlanTD Area Plan
TD Area Plan
 
Sector Partnership NEG
Sector Partnership NEGSector Partnership NEG
Sector Partnership NEG
 
Capacity development and scaling for the Livestock CRP: Past, present and future
Capacity development and scaling for the Livestock CRP: Past, present and futureCapacity development and scaling for the Livestock CRP: Past, present and future
Capacity development and scaling for the Livestock CRP: Past, present and future
 
Aligning National M&E systems and Global Results Frameworks: Towards Better A...
Aligning National M&E systems and Global Results Frameworks: Towards Better A...Aligning National M&E systems and Global Results Frameworks: Towards Better A...
Aligning National M&E systems and Global Results Frameworks: Towards Better A...
 
AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014
 
Nst j ds
Nst j dsNst j ds
Nst j ds
 
OD Model
OD Model OD Model
OD Model
 
oGCDP Strategic Meeting IGN Output
oGCDP Strategic Meeting IGN OutputoGCDP Strategic Meeting IGN Output
oGCDP Strategic Meeting IGN Output
 
Portfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptPortfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy ppt
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issue
 
Educational Planning (QAAD Session)
Educational Planning (QAAD Session)Educational Planning (QAAD Session)
Educational Planning (QAAD Session)
 
IPDC Training - Cost Reduction Program
IPDC Training - Cost Reduction ProgramIPDC Training - Cost Reduction Program
IPDC Training - Cost Reduction Program
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
Career Evolution
Career EvolutionCareer Evolution
Career Evolution
 

More from Guillermo Nevado Delgado (7)

Planning Flow MC 14.15 PERU
Planning Flow MC 14.15 PERUPlanning Flow MC 14.15 PERU
Planning Flow MC 14.15 PERU
 
Gis for the network
Gis for the networkGis for the network
Gis for the network
 
Gip for the network
Gip for the networkGip for the network
Gip for the network
 
TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15
 
GCDP FOR NETWORK
GCDP FOR NETWORKGCDP FOR NETWORK
GCDP FOR NETWORK
 
AIESEC PERU ING AWARD
AIESEC PERU ING AWARDAIESEC PERU ING AWARD
AIESEC PERU ING AWARD
 
AIESEC in PERU - ING Award presentation
AIESEC in PERU -  ING Award presentationAIESEC in PERU -  ING Award presentation
AIESEC in PERU - ING Award presentation
 

Quality for the network

  • 2. General Information 1/2 WHY of the strategy Strategic Initiative Key Results in 1314 GCP - Drive behavior in the entity to plan and execute processes that ensure Quality experiences - Enable co-delivery planning between partner entities - Customize processes based on key detractors and ensure Satisfaction NPS MoS goal- setting • Entities have national goals for NPS in programs • HR Structures implemented to ensure quality and handle delivery • Processes customized from detractor issue analysis from Waterfall Report Moc (Zero Bad Case Challenge); India (Firefighting structures and customer support tool), Brazil (Process customization to reduce detractors) - Co-deliver high quality experiences - Align Expectations of participants with what AIESEC promises to deliver - Define clear responsibilities between the Host and the Home Entities Global Standards • Culture and behavior between some partner entities to plan experience delivery together • Improved JD across programs in a lot of entities • Results awaited from fruit peak Serbia (iGCDP) • Reduce detractor issues with the JD by enabling clarity in JD and alignment between the TN and EP sides. • Improve integration of iGIP Eps in the country and work environment • Minimize logistical issues GIP Quality Startegies To be implemented Check Quality wiki for detailed resources
  • 3. General Information 2/2 WHY of the strategy Strategic Initiative Key Results in 1314 • Reduce detractor issues by ensuring proper implementation of JD from the very first day of work. • Integrating impactful team experiences as a part of GCDP for Eps • Ensure reduction of detractor issues by meeting accommodation standards and pick up management GCDP Quality Strategies To be Implemented • To ensure safety of our stakeholders on international internships • To involve experts in the same Safety • 19entities signed partnership with International SoS with 3080 Eps covered • Mandatory according to Standards to have insurance done for EPs • Building Capacity for quality delivery in each programme • LnD for Quality Delivery • Balance GCDP and GIP for summer peak delivery Talent Capacity for Delivery` Results awaited
  • 4. S1: NPS Goal Planning and Achievement TIER KEY RECOMMENDATIONS Tier 1&2 • Engage and co-create with LCs the development in processes based on waterfall analysis/detractor issues. • Outline key detractor issues with top partner entities and actively work to solve them for fruit peak • National Control Board for firefighting Tier 3 & 4 • Educate and Align LC delivery with National goals for fruit peak • Run National consultancies to assist delivery preparation • Capitalize on ICB for additional support in education • Outline key detractor issues with top partner entities and actively work to solve them for fruit peak All Tiers • Country preparation seminars/webinars for ICX Eps (by Host Entity) and OGX Eps (by Home Entity) before realization • Have firefighting communication channel in place for fruit peak: email/podio form/telephone hotline (depending on entity scale and feasibility) POTENTIAL RESULTS • Connected operational plan to increase NPS • Increased Education and Awareness of the entity • Business Intelligence enabling co- delivery and reduced detractor issues (waterfall analysis)
  • 5. S2; Standards TIER KEY RECOMMENDATIONS Tier 1&2 • LC Certification: Certify LCs who have planned standards and have quality measures and structures in place • Run LC Audits and release output to the whole National Entity with recommendations for fruit peak • Release Checklist derived from Standards to LCs to prepare for Fruit peak • Prepare resource hub/website for ICX EP assistance and integration ( match.aiesec.vn & discover.aiesec.in ) Tier 3 & 4 • Release Checklist derived from Standards to LCs to prepare for Fruit peak • Run educational and consultation activities for LCs to meet quality standards before realization peak POTENTIAL RESULTS • Enables MCs to track LC alignment to quality standards and delivery processes • Motivation and awareness to LCs around delivery preparation for fruit peak • Aligned expectations between home and host entities MORE RESOURCES Match.Vietnam Discover India
  • 6. Safety, Talent Capacity for Delivery, & GCDP/GIP Strategies TIER KEY RECOMMENDATIONS Safety Find National Insurance partner and work on OGX Pricing model (if your entity does not have one already) Talent Capacity for Delivery Integrate Leadership Development Model in GCDP and GIP on priority basis GIP Strategies • Ensure JDs of TNs align with reality eg salary amount and timelines of payment • Creating a checklist of activities to run for the integration of Eps • Create and release accommodation standards for LCs to adhere to GCDP Strategies • Create and release checklist for first day of work including purpose of project, JD explanation, timeline of activities, working conditions and work delivery • Project team leaders to be educated to ensure implementation of Team Minimums in EP teams • Have structures for ensuring accommodation standards, management and pick ups POTENTIAL RESULTS • Safety standards for all our exchange experiences • Every entity having adequate structures and HR to support fruit peak delivery • Reduced detractors by modifying processes both in GCDP and GIP MORE RESOURCES Deliver Quality Experiences: http://www.myaiesec.net/content/viewwiki.do?contentid=10302771 Internal Control Board: http://www.myaiesec.net/content/viewwiki.do?contentid=10004546 Husqvarna Global Quality Award: http://www.myaiesec.net/content/viewwiki.do?contentid=10280991