Lecture 1
Diploma in Project Management
Project Management
Part Two
Professional Diploma in
Project Managementā€
By
Dr Ali Sajid, PhD, TI
October 15, 2009
Lecture 1
Diploma in Project Management
PROJECT Conception &PROJECT Conception &
FEASIBILITYFEASIBILITY
Organizational ImportanceOrganizational Importance
&&
Analysis TechniquesAnalysis Techniques
By Dr. Ali Sajid
By Dr. Ali Sajid
Lecture 1
Diploma in Project Management
Identify
problem or
opportunity
Set up
feasibility
study
Define scope
and
objectives
Carry out
different
aspects
of the study
Recommend ā€“
proceed
/shelve
Evaluate
alternatives ā€“
develop/buy
Process of Project Analysis
Lecture 1
Diploma in Project Management
1. Viability of Idea
2. Analyzing Feasibility -( Possibility) of Proj-
ā€¢ Possibility of Completion ?
ā€¢ Will it be Successful
3. Reasonable likelihood - constraints
Will Not prevent as from meeting key Objective
4. Synonym: Achievability
5. ā€œPlng & Orgzg Procedureā€
-To Ensure Proj is Effective
-It will workā€.
Feasibility
Lecture 1
Diploma in Project Management
What is Feasibility Assessment?
Disciplined & documented Process of
ā€œThinking through an ideaā€
from its
ā€œLogical beginning to its Logical endā€.
- This is to determine its
ā€œPotential to be a viable businessā€
given realities of the
ā€œEconomic & social environmentā€
in which it will operateā€
Lecture 1
Diploma in Project Management
WHAT IS A FEASIBILITY STUDY?
ā€¢ Essentially A Process for:
Determining viability of a
proposed initiative or
Service & Providing a framework
& direction for its Development
& Delivery.
Lecture 1
Diploma in Project Management
WHAT IS A FEASIBILITY STUDY?
A Process for making ā€œSound Decisions & Setting
Directionā€ which is:
Driven by ā€œResearch & Analysisā€
ā€¢ Involves some consultation with S/h, community,
users, etc.
ā€¢ Focuses on: ā€œAnalyzing, clarifying & resolving key
issuesā€ & ā€œareas of concern or uncertaintyā€
ā€¢ Very often involves:
ā€œBasic Testing of Alternative Concepts & Approachesā€
Lecture 1
Diploma in Project Management
Purpose of a Feasibility Study
What is Feasibility?
Capable of being done,
with ā€œMeans at Hand &
Circumstances, as they areā€.
To help assess
ā€œViability of a business idea -
Technically, Operationally & Economicallyā€
Lecture 1
Diploma in Project Management
What FS Provides to Client:
ā€¢ A) Solid Foundation for Proj-
ā€¢ B) Concept identifications,
ā€¢ C) Estimate of Supportable Mkt
ā€¢ D) Design p/m,
ā€¢ E) Revenue Projections,
ā€¢ F) Net Warranted Investment.
ā€¢ Road map for your Proj
Lecture 1
Diploma in Project Management
ā€¢ Cost of FS Hi Yet, Minor Vs Proj-Cost.
ā€¢ FS Small Expanditure. Yet Protect Huge
Capital
ā€¢ FS objective Evaluation of Proj - Chance for
success.
ā€¢ Negative Results useful as Positive
ā€¢ Perceived Objectivity of Evaluation ā€“
ā€¢ Credibile document for Investors.
Lecture 1
Diploma in Project Management
Feasibility Check List
ā€¢ In feasibility study phase, it is necessary to define P-
basic ā€œapproaches, boundaries or scopeā€.
A typical feasibility study checklist might include:
ā€¢ Summary level
ā€¢ Evaluate alternatives
ā€¢ Evaluate market potential
ā€¢ Evaluate cost effectiveness
ā€¢ Evaluate producibility
ā€¢ Evaluate technical base
Lecture 1
Diploma in Project Management
Feasibility Check List
ā€¢ A more specific determination of the Problem
ā€¢ Analysis of ā€œstate-of-the-art technologyā€
ā€¢ Assessment of in-house technical capabilities
ā€¢ Test validity of alternatives
ā€¢ Quantify weaknesses and unknowns
ā€¢ Conduct trade-off analysis on time, cost, and
performance
ā€¢ Prepare initial P- Goals & Objectives
ā€¢ Prepare preliminary cost estimates and development
plan
Lecture 1
Diploma in Project Management
What a FS is Not
ā€¢ FS -Conducted on ā€œReal-World" Proj.
ā€¢ Not Academic or Research/Papers.
ā€¢ Simulations or Projection Models, Useful
on some Proj- but Not Replace F/S.
ā€¢ No "Cookie cutter" Approach to Proj.
ā€¢ No ā€œGeneric Source of Infoā€.
ā€¢ Not a Business Plan.
Lecture 1
Diploma in Project Management
ā€¢ Require ā€œStudy of Elements impacted by Proposed Solutionā€.
ā€¢ Guidelines for FA
-Address Regulatory Constraints -
Know Industry or Govt Regulations
-Cultural Impact of Proposed Change.
-Consult ā€“S/Holders - Orgl Changes for Proj- Realistic?
-Experts to Ensure - Sys impacted by Proj - Catalogued
-Stability of Technology.
-Technical Reqt Based Upon Technology ā€“
-Operationally stable
-Available
-Affordable.
FS- Determines Likelihood of Proj Success.
Lecture 1
Diploma in Project Management
Feasibility Study involves
ā€¢ -Appraisal of Existing Sys
ā€¢ Risk Analysis & Assessment.
ā€¢ Risk Mgt.
ā€¢ C/B Analysis.
ā€¢ Impact Analysis.
ā€¢ Sys Integration (Existing & New).
ā€¢ Resource Requirement, Planning & Timings.
ā€¢ Implementation Strategy.
ā€¢ Infrastructure Assessment & Reqmt.
ā€¢ Dependencies & Req.
ā€¢ Support Requirements & Logistical Analysis
Lecture 1
Diploma in Project Management
Types of Feasibility
Technical Feasibility
Managerial Feasibility
Economic Feasibility
Financial Feasibility
Cultural Feasibility
Social Feasibility
Safety Feasibility
Political Feasibility
Environmental Feasibility
Market Feasibility
Schedule Feasibility
Lecture 1
Diploma in Project Management
THE FEASIBILITY ASSESSMENT PROCESS:
It is often suggested: feasibility studies should encompass at least
two assessments:
ā€¢ Technical feasibility
ā€¢ Economic feasibility
ā€¢ ā€œTechnical feasibilityā€ embodies an assessment of :
Physical, technical and technological dimensions of the proj
ā€¢ While ā€œEconomic feasibility assessesā€:
Projectā€™s economic viability within its defined domain.
Lecture 1
Diploma in Project Management
The Value Chain Approach to Feasibility Assessment
Lecture 1
Diploma in Project Management
Value Chain Approach
ā€¢ Allows two assessments to be embedded into a single
initiative, which facilitate:
An increased ā€œUnderstanding & appreciation of
domainā€™s effectsā€ on different stages from:
Input sourcing & procurement to customer service &
support.
It also facilitates an appreciation of:
ā€œResources, technology, customer expectations &
Infrastructure required for initiative to succeed,
Allowing an assessment of their level depth at each
subsequent stage in Value Chain.
Lecture 1
Diploma in Project Management
ā€¢ Business Plan -Elaborated Later in Proj-
Development Process
ā€¢ F-S leads to BP
ā€¢ BP -Blueprint for Business Operations.
BP Respond to Critical issues raised in F-S
FS Not for New ideas
ā€¢ Not for New Concept for Proj
ā€¢ Ideas identified before FS -Initiated.
ā€¢ IMP-Not to Support for Success of ā€“Proj .
Lecture 1
Diploma in Project Management
Initial Feasibility Report
ā€¢ Prepare feasibility report
ā€“ Current situation
ā€“ Future expectations
ā€“ Favourable plan(s) of action
ā€“ Underlying rationale for management decision
Selected Plan, Prepare System Proposal
ā€“ Project description
ā€“ Resource requirements
ā€“ Development schedule
ā€“ Acceptance criteria
Lecture 1
Diploma in Project Management
Environment Plays -Critical in FS
External Factors Influence F-S
An initiative feasible in community A
with a rail line infeasible in B w/o Rail Line
Lecture 1
Diploma in Project Management
Possible Outcomes of FS:
1.Feasible within Defined domain
( assumptions abt technology, location, mkt,
financing, industry analysis, etc);
2. Feasible with changes to certain Domain
Factors
3. Infeasible within the defined domain.
Lecture 1
Diploma in Project Management
ā€¦
Tech Feasibility- First systematic
investigation of Proj Design Viability.
Foundation of all other FS .
- Assessment of a Prj- Capabilities.
-Investigation of Technical & Physical P/mter
TF Reviews:
-Technical Capability of HR
-Capability of Available Technology
Foreign consultants Role -LDCs
-ā€Too rigid, & Advanced Tech Specā€
- Cannot be met by Country.
Question is ā€œCan it be built?ā€
Lecture 1
Diploma in Project Management
Technical Feasibility (TF)
Anticipate Broader Problems with Questions:
1. Adequate ā€œChoice of Available Technologies for Alternative
Designā€ & purposes, considering:
a. Physical layout
b. Engineering design
c. Availability of raw materials?
2. Costs of Constructing & Operating Proj-Facilities/Service
a) Machinery, b ) Equipment, c) Spare Parts ?
3. Manpower Req:
a) From professional to labor
b) locally available?
c) Responses vary ā€“ sector to sector
Lecture 1
Diploma in Project Management
Technical Feasibility (TF)Contd..
Primary Task of TF is Blueprinting:
a) Manpower Needs
b) Resources, & Design
c) Provide Design Alternatives
d) Choice of:
ā€œAvailable Technologies,
& Cost estimatesā€ for each alternative.
Lecture 1
Diploma in Project Management
Technical FeasibilityTechnical Feasibility
ā€¢ Does System Stretch ā€œState-of-the-Art Technologyā€?
ā€¢ Does in-House expertise presently exist for development?
ā€¢ Does an outside vendor need to be involved?
ā€¢ Solutions include
Training or hiring more experienced employees
Hiring consultants
Changing scope and project approach
Lecture 1
Diploma in Project Management
Admin/Managerial Study (AM S)
Evaluates Strategy of Org in Crying/ Out Proj Activities.
Providing info & Guidelines -
Used to improve overall Proj. Admn.
Project mgr in investigating team.
Examines for Components:
A. External Linkages,
b. Internal org,
c. Personnel, and
d. Mgt plan
Lecture 1
Diploma in Project Management
How Individuals Work, Live,
and Achieve Together
Project Organizational Culture
Lecture 1
Diploma in Project Management
Precursor to Culture
ā€¢ Until recently say, since the 1980s organizationsUntil recently say, since the 1980s organizations
were simply thought of as:were simply thought of as:
ā€œā€œRational means by which to coordinate & control aRational means by which to coordinate & control a
group of peopleā€group of peopleā€
ā€¢ In essence they were:In essence they were:
ā€œā€œNo more than an organizational chart with verticalNo more than an organizational chart with vertical
relationshipsā€relationshipsā€
ā€¢ But organizations are more than thatBut organizations are more than that
ā€¢ They have a personality of their ownThey have a personality of their own
ā€¢ Until recently say, since the 1980s organizationsUntil recently say, since the 1980s organizations
were simply thought of as:were simply thought of as:
ā€œā€œRational means by which to coordinate & control aRational means by which to coordinate & control a
group of peopleā€group of peopleā€
ā€¢ In essence they were:In essence they were:
ā€œā€œNo more than an organizational chart with verticalNo more than an organizational chart with vertical
relationshipsā€relationshipsā€
ā€¢ But organizations are more than thatBut organizations are more than that
ā€¢ They have a personality of their ownThey have a personality of their own
Lecture 1
Diploma in Project Management
What is Culture?
ā€œ Way we do things around
here,ā€ or
System of shared meaning
held by members of org.
Lecture 1
Diploma in Project Management
What is Organizational Culture?
ā€“The system of shared actions, values,
and beliefs that:
ā€“develops within an org & guides
ā€“The behavior of
its members
Lecture 1
Diploma in Project Management
Project Culture
ā€¢ Common behavior & internalized codes
of conduct that guide:
ā€œPeopleā€™s daily actionsā€.
People in Projects
Quickly learn which
actions are
ā€œAllowed &
Which are notā€.
Lecture 1
Diploma in Project Management
Cultural Feasibility.
Compatibility of
ā€œProposed Proj vs Cultural Setupā€
of Proj environment
Labor-intensive Proj-
Integrated with
Local Cultural Practices & Beliefs.
Religious Beliefs ā€“
Influence-
individual willingness
Lecture 1
Diploma in Project Management
Cultural FeasibilityCultural Feasibility
ā€¢ Each Project has own culture
New system must fit into culture
ā€¢ Evaluate related issues for potential risks
Low level of computer competency
Computer & Field Phobia
Perceived loss of control
Shift in power
Fear of job/Assignment change or employment loss
Reversal of established work procedures
ā€¢ Positive steps should be undertaken to reduce the risks
ā€¢ E.g.: additional training can be held to teach new procedures & provide
increased computer skills
Lecture 1
Diploma in Project Management
Examines a Proposed P-in terms of:
Net Contribution to:
Industry
Economy
To societyā€.
Address 3 Related Questions:
1. P-Responsive to ā€œUrgent Present or Anticipated Econ/Socialā€
need?
2. P-Planned Economic o/put Serve Intended Purpose?
3. Service Proposed to be Performed by P- Benefits - Justify P -
Cost? (Mono Rail by CDA, Sub Way, Clean Drinking Water, Steel
Mill, Suzuki Car
Economic Study (Econ S)
Lecture 1
Diploma in Project Management
Economic FeasibilityEconomic Feasibility
ā€¢ Cost/Benefit Analysis
Estimate Proj Development Costs
Estimate operational costs after proj
Estimate financial benefits based on:
ā€œAnnual savings & Increased revenuesā€
Calculate Costs & Benefits
ā€¢ Uses net present value (NPV), payback period, return on
investment (ROI) techniques
Lecture 1
Diploma in Project Management
Reqs: Study of all of Economic Implications of Proj:
a) Demand & Supply of All Proj- O/P.
b) P- Ability to Increase employment
c) P- ā€œMultiplier" Effects (-Inc Purchase of goods Effect)
d) Effect on increase Govt Revenue (income tax, sales tax),
e) Use of Locally Available Resources.
Assess P- Net Contribution to Econ/social welfare of community.
Comparison of Econ & Social Benefits-generated
From P-Vs Costs of Construction & Operations.
B > C Proj- Economically feasible.
Profitability analysis is conducted.
Economic Study (Econ S)
Lecture 1
Diploma in Project Management
Social Feasibility
ā€¢ Addresses influences ā€“Prj- May hv on
ā€ Social Sys in Proj Environmentā€
ā€¢ Social Structure- Certain type of HR:
In short supply or non-existent. (weekend worker in USA, in Pakistan
HR mgr, PhD faculty in Mmgt, Nurses)
ā€¢ You need to Evaluate its Effect on Project and ensure ā€œSocial Status
of HR to Ensure Compatibilityā€.
Certain Industry- hv Status Symbols within Society
Lecture 1
Diploma in Project Management
Financial Feasibility-
Capability of Proj Org ā€“
To Raise Funds to:
implement Proposed Proj
(different from economic
feasibility)
Lecture 1
Diploma in Project Management
Financial Study (Fin S) Questions.
ā€¢ 1. Capital & Operating Costs ?
ā€¢ 2. Sources of Funds & Draw-down schedules- sufficient to
Cover costs of activities/implementation?(shoukat
Tareen case of IMF)
ā€¢ Any alternative Financing Schemes
ā€¢ 3. Projected Cash flow (CF)?
ā€¢ Extent of necessary borrowings (L of Cr)?
ā€¢ When P- Revenues Paying back /cover Operating Costs?
ā€¢ 4. Formation of Acctg system:
ā€“ Balance Sheets
ā€“ CF Statements
ā€“ Debt Servicing Schedules
ā€“ Other Financial Reports?
ā€¢ 5. Source pf Proj Investment
ā€¢ 6. Means of Recovery investment
ā€“
Lecture 1
Diploma in Project Management
ā€¢ 6. Financial FS: Total- Costs of Project (Implementation
& design, Broken down separately).
ā€¢ Chk (a)-Prj-Success with Amount of Money?
ā€¢ (b) Any Profit?
ā€¢ Financial Analysis To Determine R o I
ā€¢ 7. Chk (a) P-Financial Stability (mali Isstakaam)
ā€“ B) Debt Service Capacity
ā€¢ 8. Assessing Financial Profit
ā€¢ 9. Projection of Revenues & Expenses:
a. Revenues. & - Transactions - Generate incom &
Receipts Cash Inflows
b. Expenses. Transactions Reduce income &
Expenditures: Cash Out Flows
Lecture 1
Diploma in Project Management
ā€¢ Revenues/Expenses Affect P- Income,
ā€“ so determine P- Profit
ā€¢ Receipts/Expenditures affect Cash Position.
ā€“ So determine Debt-Servicing Capacity
ā€¢ For a/m following Financial Statements made:
ā€¢ 1. PLS Statement (income statement)
ā€¢ 2. Balance Sheet
ā€¢ 3. Cash Flow Statement.
ā€¢ Periods of P-Statements: From Few yrs Life of P-
Lecture 1
Diploma in Project Management
Financial CalculationsFinancial Calculations
Companies use a combination of methods:
First approach, called the net present value (NPV), has two
concepts:
(1) all benefits and costs are calculated in terms of todayā€™s Rupees
(present value)
(2) Future streams of benefits /costs is netted together & then
discounted by a certain factor for each year in future
Payback Period to determine whether investments will be
beneficial also breakeven point. Point in time at which
ā€œBenefits becomes equalā€ to ā€œCost of development & operationā€
Third Economic Measure ā€œReturn on investment (ROI).
Shows a ā€œPercentage return needed so that the costs & benefits
exactly equal over specified time periodā€.
Lecture 1
Diploma in Project Management
Safety Feasibility.
ā€¢ At Project Planning stage.
ā€¢ NIMBY Syndrome
ā€¢ Analysis of whether:
ā€“ P- Capable of implementation
ā€“ Operated safely with minimal adverse effects on environment.
Amonia Cylider ;Leakage
ā€“ Finis Fatory Lahore 1996, kala Shah Kaku Chemical
ā€“ Union Carbide Bohapal 1984, Kala Bagh
ā€“ Chernoybal USSR- Nuclear Powr Plant 1986
- Inadequate EIS-in Complex Proj
ā€¢ NAFTA ā€“1993- Due to Legal issue of Potential EIS of P- Under
agreement.
Lecture 1
Diploma in Project Management
Political Feasibility
Referred - ā€œPolitically Correct Proj."
Political considerations
often dictate direction
for a proposed proj
ā€¢ More common in LDC
Lecture 1
Diploma in Project Management
Political Feasibility. PF
ā€¢ Politically Feasible P -ā€œPolitically Correct P."
ā€¢ PF Analysis:
ā€¢ An Evaluation of Compatibility of P-Goals with
Prevailing Goals of Political System.
ā€¢ Pol considerations dictate Direction of P-.
ā€¢ Political Necessity -Source of Support,
ā€¢ Regardless of P- Merits.
ā€¢ Pol Opposition Scarp Good P-
ā€“ Q1.Who Resist Migration to New System?
ā€“ Q2.Measures To overcome this Inertia?
ā€¢ P- with ā€œNational Visibilityā€ Political Implications.ā€“get
Significant Govt I/Put
ā€¢ Kala Bagh, Thar, Swat Girls School today
ā€¢
Lecture 1
Diploma in Project Management
Environmental Feasibility.
Killer of P- Due to:
ā€¢ A) Long Approval Processes
ā€¢ B) Green /Earth lover/nature Groups.
C) Attention - Early stages of P.
Concern & action to address all envir concerns.
ā€¢ 1.Environment suitability for P?
ā€¢ 2. P- Impact on Environment?
ā€¢ 3. Whether or not a Given Environment can Support a
Disney Theme park in Va, adverse ā€œEIā€ Issue
Aswan Dam, New Murree Proj
Tarbella affectees
Lecture 1
Diploma in Project Management
Environmental Feasibility
Agricultural Project, Question as:
a) Soil Quality appropriate for Proposed crops?
b) Sufficient water?
c) Adequate drainage?
d) Adequate sunlight?
e) Climate right?
-Concern must be shown
-Action must be taken to address any &
all environmental concerns raised or
anticipated
Lecture 1
Diploma in Project Management
Resource Feasibility
ā€¢ Project Leaders
ā€¢ Team Members
ā€¢ Team Skill Levels
ā€¢ Equipment
ā€¢ Support staff
ā€¢ Allied Physical Facilities
ā€¢ Communication & Collaboration
facilities
Lecture 1
Diploma in Project Management
Resource FeasibilityResource Feasibility
ā€¢ Team member availability
ā€¢ Team skill levels
ā€¢ Computers, equipment, and supplies
ā€¢ Support staff time and availability
ā€¢ Physical facilities
Lecture 1
Diploma in Project Management
Human-Factors Feasibility
ā€¢ Ease of Use
ā€“ System friendliness to use within
context of Daily Ops of Intended End-
user?
ā€¢ Perceived Usefulness
System support -Job of End-user needs?s
ā€¢ Overall Satisfaction
ā€¢ End User Like Using System?
Lecture 1
Diploma in Project Management
Legal Feasibility
Solution Violate:
ā€¢ Contracts,
ā€¢ Licenses,
ā€¢ Copyrights,
ā€¢ Non-disclosures,
ā€¢ Laws or Regulations?
Policy & Procedures
ā€“ Solution violate Corporate Policies or
Procedures?
Lecture 1
Diploma in Project Management
Schedule FeasibilitySchedule Feasibility
ā€¢ Estimates needed complete info
ā€¢ Management deadlines may not be realistic
ā€¢ Project managers must:
Drive realistic assumptions and estimates
Recommend completion date flexibility
Assign ā€œInterim Milestones to Periodically Reassessā€
completion dates
Involve experienced personnel
Manage proper allocation of resources
Lecture 1
Diploma in Project Management
Market Feasibility-
Market Variability &
impact on Proj
. Not confused with
Econ/ F
Lecture 1
Diploma in Project Management
ā€¢ Market Feasibility.
ā€¢ Concerns Mkt Variability & Impact on P-.
Purpose: To view Potential impacts of :
- A). Mkt demand,
- B) Competitive Activities, etc. Nestle Yogurt
- C) ā€œDivertible" mkt share ?
- Price War by Competitors, & China Factor
- Local, Regional, National or Intl- Analyzed:
Lecture 1
Diploma in Project Management
Elements of FA of a Proj
Need Analysis
Process Work
Engineering & Design
Cost Estimate
Financial Analysis
Market for Product & Svc
Project Impacts
Conclusions & Recommendations
Lecture 1
Diploma in Project Management
Final Caveats
ā€¢ Little Experience for
Estimates
ā€¢ Bias toward
underestimation
ā€¢ No For a Bid, Not a Real
Estimate

More Related Content

What's hot

Feasibility analysis, project
Feasibility analysis, projectFeasibility analysis, project
Feasibility analysis, project
Aliga Raju
Ā 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
haroldtaylor1113
Ā 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
Ā 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
TecnicoItca
Ā 

What's hot (20)

A History of Project Management
A History of Project ManagementA History of Project Management
A History of Project Management
Ā 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
Ā 
Feasibility analysis, project
Feasibility analysis, projectFeasibility analysis, project
Feasibility analysis, project
Ā 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
Ā 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
Ā 
FEASIBILITY STUDY
FEASIBILITY STUDYFEASIBILITY STUDY
FEASIBILITY STUDY
Ā 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
Ā 
Project integration management
Project integration managementProject integration management
Project integration management
Ā 
Project life cycle
Project life cycleProject life cycle
Project life cycle
Ā 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
Ā 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Ā 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
Ā 
Chapter 3 Project Identification BnFn.pptx
Chapter 3  Project Identification BnFn.pptxChapter 3  Project Identification BnFn.pptx
Chapter 3 Project Identification BnFn.pptx
Ā 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
Ā 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
Ā 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
Ā 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
Ā 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
Ā 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
Ā 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement Management
Ā 

Viewers also liked

Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
Abhijeet Bhosale
Ā 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
Mars Mfyam
Ā 
Php(report)
Php(report)Php(report)
Php(report)
Yhannah
Ā 
Industrial attachment of m. m. knitwear ltd
Industrial  attachment  of m. m. knitwear ltdIndustrial  attachment  of m. m. knitwear ltd
Industrial attachment of m. m. knitwear ltd
Md. Mazadul Hasan Shishir
Ā 
Controlling points, Faults, Causes and Remedies Involved in Different Fi...
     Controlling points, Faults, Causes and Remedies Involved in Different Fi...     Controlling points, Faults, Causes and Remedies Involved in Different Fi...
Controlling points, Faults, Causes and Remedies Involved in Different Fi...
Md. Mazadul Hasan Shishir
Ā 

Viewers also liked (20)

Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
Ā 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
Ā 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
Ā 
Feasibility Study Product Proposals
Feasibility Study Product ProposalsFeasibility Study Product Proposals
Feasibility Study Product Proposals
Ā 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management Aspect
Ā 
Php(report)
Php(report)Php(report)
Php(report)
Ā 
Bonian Knit Fashions Ltd.
Bonian Knit Fashions Ltd.Bonian Knit Fashions Ltd.
Bonian Knit Fashions Ltd.
Ā 
Santex Capabilities
Santex CapabilitiesSantex Capabilities
Santex Capabilities
Ā 
Santex rimar
Santex rimarSantex rimar
Santex rimar
Ā 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Ā 
Industrial attachment of m. m. knitwear ltd
Industrial  attachment  of m. m. knitwear ltdIndustrial  attachment  of m. m. knitwear ltd
Industrial attachment of m. m. knitwear ltd
Ā 
Guide to practical project appraisal en
Guide to practical project appraisal enGuide to practical project appraisal en
Guide to practical project appraisal en
Ā 
Guide to practical project appraisal en (1)
Guide to practical project appraisal en (1)Guide to practical project appraisal en (1)
Guide to practical project appraisal en (1)
Ā 
Industrial project
Industrial projectIndustrial project
Industrial project
Ā 
Technical development of wet processing
Technical development of wet processingTechnical development of wet processing
Technical development of wet processing
Ā 
Dryer Machine For Knit Fabrics
Dryer Machine For Knit FabricsDryer Machine For Knit Fabrics
Dryer Machine For Knit Fabrics
Ā 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
Ā 
Native Learning Center webinar by Upspring 2016 Feasibility Studies June-2016
Native Learning Center webinar by Upspring 2016 Feasibility Studies June-2016Native Learning Center webinar by Upspring 2016 Feasibility Studies June-2016
Native Learning Center webinar by Upspring 2016 Feasibility Studies June-2016
Ā 
Controlling points, Faults, Causes and Remedies Involved in Different Fi...
     Controlling points, Faults, Causes and Remedies Involved in Different Fi...     Controlling points, Faults, Causes and Remedies Involved in Different Fi...
Controlling points, Faults, Causes and Remedies Involved in Different Fi...
Ā 
Textile dryer for knit fabric finishing
Textile dryer for knit fabric finishingTextile dryer for knit fabric finishing
Textile dryer for knit fabric finishing
Ā 

Similar to Feasibilty Study And Report

Advanced project management ppts
Advanced project management pptsAdvanced project management ppts
Advanced project management ppts
Ali Ishaqi
Ā 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
chikuverma1
Ā 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
AMIT PAYAL
Ā 
Defining organizational project management 2012
Defining organizational project management 2012Defining organizational project management 2012
Defining organizational project management 2012
Nigel Williams
Ā 

Similar to Feasibilty Study And Report (20)

Advanced project management ppts
Advanced project management pptsAdvanced project management ppts
Advanced project management ppts
Ā 
1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework
Ā 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
Ā 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
Ā 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
Ā 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
Ā 
PMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope ManagementPMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope Management
Ā 
Project management
Project managementProject management
Project management
Ā 
project management
project managementproject management
project management
Ā 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
Ā 
Lecture 05:Advanced Project Management PM Processes and Framework
Lecture 05:Advanced Project Management   PM Processes and FrameworkLecture 05:Advanced Project Management   PM Processes and Framework
Lecture 05:Advanced Project Management PM Processes and Framework
Ā 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
Ā 
Ibm projectmgmt-1
Ibm  projectmgmt-1Ibm  projectmgmt-1
Ibm projectmgmt-1
Ā 
Industrial.projects.Student.Level
Industrial.projects.Student.LevelIndustrial.projects.Student.Level
Industrial.projects.Student.Level
Ā 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
Ā 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
Ā 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
Ā 
Defining organizational project management 2012
Defining organizational project management 2012Defining organizational project management 2012
Defining organizational project management 2012
Ā 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
Ā 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
Ā 

More from Ejaz Bhatti (8)

Security League Swztland
Security League SwztlandSecurity League Swztland
Security League Swztland
Ā 
China Controlled Economy
China  Controlled EconomyChina  Controlled Economy
China Controlled Economy
Ā 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
Ā 
INCOTERMS
INCOTERMSINCOTERMS
INCOTERMS
Ā 
ERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhattiERP a research & study paper by ejaz ahmed bhatti
ERP a research & study paper by ejaz ahmed bhatti
Ā 
ERP presentation ejaz ahmed bhatti
ERP  presentation  ejaz ahmed bhattiERP  presentation  ejaz ahmed bhatti
ERP presentation ejaz ahmed bhatti
Ā 
1 800-got-junk
1 800-got-junk1 800-got-junk
1 800-got-junk
Ā 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)
Ā 

Recently uploaded

Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Sheetaleventcompany
Ā 
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
amitlee9823
Ā 
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
amitlee9823
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
lizamodels9
Ā 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
Ā 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
Ā 
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚EscortCall Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
dlhescort
Ā 

Recently uploaded (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
Ā 
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Ā 
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Gir...
Ā 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
Ā 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
Ā 
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Ā 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
Ā 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Ā 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Ā 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
Ā 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Ā 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
Ā 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
Ā 
Eluru Call Girls Service ā˜Ž ļø93326-06886 ā¤ļøā€šŸ”„ Enjoy 24/7 EscortĀ Service
Eluru Call Girls Service ā˜Ž ļø93326-06886 ā¤ļøā€šŸ”„ Enjoy 24/7 EscortĀ ServiceEluru Call Girls Service ā˜Ž ļø93326-06886 ā¤ļøā€šŸ”„ Enjoy 24/7 EscortĀ Service
Eluru Call Girls Service ā˜Ž ļø93326-06886 ā¤ļøā€šŸ”„ Enjoy 24/7 EscortĀ Service
Ā 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Ā 
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚EscortCall Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Ā 

Feasibilty Study And Report

  • 1. Lecture 1 Diploma in Project Management Project Management Part Two Professional Diploma in Project Managementā€ By Dr Ali Sajid, PhD, TI October 15, 2009
  • 2. Lecture 1 Diploma in Project Management PROJECT Conception &PROJECT Conception & FEASIBILITYFEASIBILITY Organizational ImportanceOrganizational Importance && Analysis TechniquesAnalysis Techniques By Dr. Ali Sajid By Dr. Ali Sajid
  • 3. Lecture 1 Diploma in Project Management Identify problem or opportunity Set up feasibility study Define scope and objectives Carry out different aspects of the study Recommend ā€“ proceed /shelve Evaluate alternatives ā€“ develop/buy Process of Project Analysis
  • 4. Lecture 1 Diploma in Project Management 1. Viability of Idea 2. Analyzing Feasibility -( Possibility) of Proj- ā€¢ Possibility of Completion ? ā€¢ Will it be Successful 3. Reasonable likelihood - constraints Will Not prevent as from meeting key Objective 4. Synonym: Achievability 5. ā€œPlng & Orgzg Procedureā€ -To Ensure Proj is Effective -It will workā€. Feasibility
  • 5. Lecture 1 Diploma in Project Management What is Feasibility Assessment? Disciplined & documented Process of ā€œThinking through an ideaā€ from its ā€œLogical beginning to its Logical endā€. - This is to determine its ā€œPotential to be a viable businessā€ given realities of the ā€œEconomic & social environmentā€ in which it will operateā€
  • 6. Lecture 1 Diploma in Project Management WHAT IS A FEASIBILITY STUDY? ā€¢ Essentially A Process for: Determining viability of a proposed initiative or Service & Providing a framework & direction for its Development & Delivery.
  • 7. Lecture 1 Diploma in Project Management WHAT IS A FEASIBILITY STUDY? A Process for making ā€œSound Decisions & Setting Directionā€ which is: Driven by ā€œResearch & Analysisā€ ā€¢ Involves some consultation with S/h, community, users, etc. ā€¢ Focuses on: ā€œAnalyzing, clarifying & resolving key issuesā€ & ā€œareas of concern or uncertaintyā€ ā€¢ Very often involves: ā€œBasic Testing of Alternative Concepts & Approachesā€
  • 8. Lecture 1 Diploma in Project Management Purpose of a Feasibility Study What is Feasibility? Capable of being done, with ā€œMeans at Hand & Circumstances, as they areā€. To help assess ā€œViability of a business idea - Technically, Operationally & Economicallyā€
  • 9. Lecture 1 Diploma in Project Management What FS Provides to Client: ā€¢ A) Solid Foundation for Proj- ā€¢ B) Concept identifications, ā€¢ C) Estimate of Supportable Mkt ā€¢ D) Design p/m, ā€¢ E) Revenue Projections, ā€¢ F) Net Warranted Investment. ā€¢ Road map for your Proj
  • 10. Lecture 1 Diploma in Project Management ā€¢ Cost of FS Hi Yet, Minor Vs Proj-Cost. ā€¢ FS Small Expanditure. Yet Protect Huge Capital ā€¢ FS objective Evaluation of Proj - Chance for success. ā€¢ Negative Results useful as Positive ā€¢ Perceived Objectivity of Evaluation ā€“ ā€¢ Credibile document for Investors.
  • 11. Lecture 1 Diploma in Project Management Feasibility Check List ā€¢ In feasibility study phase, it is necessary to define P- basic ā€œapproaches, boundaries or scopeā€. A typical feasibility study checklist might include: ā€¢ Summary level ā€¢ Evaluate alternatives ā€¢ Evaluate market potential ā€¢ Evaluate cost effectiveness ā€¢ Evaluate producibility ā€¢ Evaluate technical base
  • 12. Lecture 1 Diploma in Project Management Feasibility Check List ā€¢ A more specific determination of the Problem ā€¢ Analysis of ā€œstate-of-the-art technologyā€ ā€¢ Assessment of in-house technical capabilities ā€¢ Test validity of alternatives ā€¢ Quantify weaknesses and unknowns ā€¢ Conduct trade-off analysis on time, cost, and performance ā€¢ Prepare initial P- Goals & Objectives ā€¢ Prepare preliminary cost estimates and development plan
  • 13. Lecture 1 Diploma in Project Management What a FS is Not ā€¢ FS -Conducted on ā€œReal-World" Proj. ā€¢ Not Academic or Research/Papers. ā€¢ Simulations or Projection Models, Useful on some Proj- but Not Replace F/S. ā€¢ No "Cookie cutter" Approach to Proj. ā€¢ No ā€œGeneric Source of Infoā€. ā€¢ Not a Business Plan.
  • 14. Lecture 1 Diploma in Project Management ā€¢ Require ā€œStudy of Elements impacted by Proposed Solutionā€. ā€¢ Guidelines for FA -Address Regulatory Constraints - Know Industry or Govt Regulations -Cultural Impact of Proposed Change. -Consult ā€“S/Holders - Orgl Changes for Proj- Realistic? -Experts to Ensure - Sys impacted by Proj - Catalogued -Stability of Technology. -Technical Reqt Based Upon Technology ā€“ -Operationally stable -Available -Affordable. FS- Determines Likelihood of Proj Success.
  • 15. Lecture 1 Diploma in Project Management Feasibility Study involves ā€¢ -Appraisal of Existing Sys ā€¢ Risk Analysis & Assessment. ā€¢ Risk Mgt. ā€¢ C/B Analysis. ā€¢ Impact Analysis. ā€¢ Sys Integration (Existing & New). ā€¢ Resource Requirement, Planning & Timings. ā€¢ Implementation Strategy. ā€¢ Infrastructure Assessment & Reqmt. ā€¢ Dependencies & Req. ā€¢ Support Requirements & Logistical Analysis
  • 16. Lecture 1 Diploma in Project Management Types of Feasibility Technical Feasibility Managerial Feasibility Economic Feasibility Financial Feasibility Cultural Feasibility Social Feasibility Safety Feasibility Political Feasibility Environmental Feasibility Market Feasibility Schedule Feasibility
  • 17. Lecture 1 Diploma in Project Management THE FEASIBILITY ASSESSMENT PROCESS: It is often suggested: feasibility studies should encompass at least two assessments: ā€¢ Technical feasibility ā€¢ Economic feasibility ā€¢ ā€œTechnical feasibilityā€ embodies an assessment of : Physical, technical and technological dimensions of the proj ā€¢ While ā€œEconomic feasibility assessesā€: Projectā€™s economic viability within its defined domain.
  • 18. Lecture 1 Diploma in Project Management The Value Chain Approach to Feasibility Assessment
  • 19. Lecture 1 Diploma in Project Management Value Chain Approach ā€¢ Allows two assessments to be embedded into a single initiative, which facilitate: An increased ā€œUnderstanding & appreciation of domainā€™s effectsā€ on different stages from: Input sourcing & procurement to customer service & support. It also facilitates an appreciation of: ā€œResources, technology, customer expectations & Infrastructure required for initiative to succeed, Allowing an assessment of their level depth at each subsequent stage in Value Chain.
  • 20. Lecture 1 Diploma in Project Management ā€¢ Business Plan -Elaborated Later in Proj- Development Process ā€¢ F-S leads to BP ā€¢ BP -Blueprint for Business Operations. BP Respond to Critical issues raised in F-S FS Not for New ideas ā€¢ Not for New Concept for Proj ā€¢ Ideas identified before FS -Initiated. ā€¢ IMP-Not to Support for Success of ā€“Proj .
  • 21. Lecture 1 Diploma in Project Management Initial Feasibility Report ā€¢ Prepare feasibility report ā€“ Current situation ā€“ Future expectations ā€“ Favourable plan(s) of action ā€“ Underlying rationale for management decision Selected Plan, Prepare System Proposal ā€“ Project description ā€“ Resource requirements ā€“ Development schedule ā€“ Acceptance criteria
  • 22. Lecture 1 Diploma in Project Management Environment Plays -Critical in FS External Factors Influence F-S An initiative feasible in community A with a rail line infeasible in B w/o Rail Line
  • 23. Lecture 1 Diploma in Project Management Possible Outcomes of FS: 1.Feasible within Defined domain ( assumptions abt technology, location, mkt, financing, industry analysis, etc); 2. Feasible with changes to certain Domain Factors 3. Infeasible within the defined domain.
  • 24. Lecture 1 Diploma in Project Management ā€¦ Tech Feasibility- First systematic investigation of Proj Design Viability. Foundation of all other FS . - Assessment of a Prj- Capabilities. -Investigation of Technical & Physical P/mter TF Reviews: -Technical Capability of HR -Capability of Available Technology Foreign consultants Role -LDCs -ā€Too rigid, & Advanced Tech Specā€ - Cannot be met by Country. Question is ā€œCan it be built?ā€
  • 25. Lecture 1 Diploma in Project Management Technical Feasibility (TF) Anticipate Broader Problems with Questions: 1. Adequate ā€œChoice of Available Technologies for Alternative Designā€ & purposes, considering: a. Physical layout b. Engineering design c. Availability of raw materials? 2. Costs of Constructing & Operating Proj-Facilities/Service a) Machinery, b ) Equipment, c) Spare Parts ? 3. Manpower Req: a) From professional to labor b) locally available? c) Responses vary ā€“ sector to sector
  • 26. Lecture 1 Diploma in Project Management Technical Feasibility (TF)Contd.. Primary Task of TF is Blueprinting: a) Manpower Needs b) Resources, & Design c) Provide Design Alternatives d) Choice of: ā€œAvailable Technologies, & Cost estimatesā€ for each alternative.
  • 27. Lecture 1 Diploma in Project Management Technical FeasibilityTechnical Feasibility ā€¢ Does System Stretch ā€œState-of-the-Art Technologyā€? ā€¢ Does in-House expertise presently exist for development? ā€¢ Does an outside vendor need to be involved? ā€¢ Solutions include Training or hiring more experienced employees Hiring consultants Changing scope and project approach
  • 28. Lecture 1 Diploma in Project Management Admin/Managerial Study (AM S) Evaluates Strategy of Org in Crying/ Out Proj Activities. Providing info & Guidelines - Used to improve overall Proj. Admn. Project mgr in investigating team. Examines for Components: A. External Linkages, b. Internal org, c. Personnel, and d. Mgt plan
  • 29. Lecture 1 Diploma in Project Management How Individuals Work, Live, and Achieve Together Project Organizational Culture
  • 30. Lecture 1 Diploma in Project Management Precursor to Culture ā€¢ Until recently say, since the 1980s organizationsUntil recently say, since the 1980s organizations were simply thought of as:were simply thought of as: ā€œā€œRational means by which to coordinate & control aRational means by which to coordinate & control a group of peopleā€group of peopleā€ ā€¢ In essence they were:In essence they were: ā€œā€œNo more than an organizational chart with verticalNo more than an organizational chart with vertical relationshipsā€relationshipsā€ ā€¢ But organizations are more than thatBut organizations are more than that ā€¢ They have a personality of their ownThey have a personality of their own ā€¢ Until recently say, since the 1980s organizationsUntil recently say, since the 1980s organizations were simply thought of as:were simply thought of as: ā€œā€œRational means by which to coordinate & control aRational means by which to coordinate & control a group of peopleā€group of peopleā€ ā€¢ In essence they were:In essence they were: ā€œā€œNo more than an organizational chart with verticalNo more than an organizational chart with vertical relationshipsā€relationshipsā€ ā€¢ But organizations are more than thatBut organizations are more than that ā€¢ They have a personality of their ownThey have a personality of their own
  • 31. Lecture 1 Diploma in Project Management What is Culture? ā€œ Way we do things around here,ā€ or System of shared meaning held by members of org.
  • 32. Lecture 1 Diploma in Project Management What is Organizational Culture? ā€“The system of shared actions, values, and beliefs that: ā€“develops within an org & guides ā€“The behavior of its members
  • 33. Lecture 1 Diploma in Project Management Project Culture ā€¢ Common behavior & internalized codes of conduct that guide: ā€œPeopleā€™s daily actionsā€. People in Projects Quickly learn which actions are ā€œAllowed & Which are notā€.
  • 34. Lecture 1 Diploma in Project Management Cultural Feasibility. Compatibility of ā€œProposed Proj vs Cultural Setupā€ of Proj environment Labor-intensive Proj- Integrated with Local Cultural Practices & Beliefs. Religious Beliefs ā€“ Influence- individual willingness
  • 35. Lecture 1 Diploma in Project Management Cultural FeasibilityCultural Feasibility ā€¢ Each Project has own culture New system must fit into culture ā€¢ Evaluate related issues for potential risks Low level of computer competency Computer & Field Phobia Perceived loss of control Shift in power Fear of job/Assignment change or employment loss Reversal of established work procedures ā€¢ Positive steps should be undertaken to reduce the risks ā€¢ E.g.: additional training can be held to teach new procedures & provide increased computer skills
  • 36. Lecture 1 Diploma in Project Management Examines a Proposed P-in terms of: Net Contribution to: Industry Economy To societyā€. Address 3 Related Questions: 1. P-Responsive to ā€œUrgent Present or Anticipated Econ/Socialā€ need? 2. P-Planned Economic o/put Serve Intended Purpose? 3. Service Proposed to be Performed by P- Benefits - Justify P - Cost? (Mono Rail by CDA, Sub Way, Clean Drinking Water, Steel Mill, Suzuki Car Economic Study (Econ S)
  • 37. Lecture 1 Diploma in Project Management Economic FeasibilityEconomic Feasibility ā€¢ Cost/Benefit Analysis Estimate Proj Development Costs Estimate operational costs after proj Estimate financial benefits based on: ā€œAnnual savings & Increased revenuesā€ Calculate Costs & Benefits ā€¢ Uses net present value (NPV), payback period, return on investment (ROI) techniques
  • 38. Lecture 1 Diploma in Project Management Reqs: Study of all of Economic Implications of Proj: a) Demand & Supply of All Proj- O/P. b) P- Ability to Increase employment c) P- ā€œMultiplier" Effects (-Inc Purchase of goods Effect) d) Effect on increase Govt Revenue (income tax, sales tax), e) Use of Locally Available Resources. Assess P- Net Contribution to Econ/social welfare of community. Comparison of Econ & Social Benefits-generated From P-Vs Costs of Construction & Operations. B > C Proj- Economically feasible. Profitability analysis is conducted. Economic Study (Econ S)
  • 39. Lecture 1 Diploma in Project Management Social Feasibility ā€¢ Addresses influences ā€“Prj- May hv on ā€ Social Sys in Proj Environmentā€ ā€¢ Social Structure- Certain type of HR: In short supply or non-existent. (weekend worker in USA, in Pakistan HR mgr, PhD faculty in Mmgt, Nurses) ā€¢ You need to Evaluate its Effect on Project and ensure ā€œSocial Status of HR to Ensure Compatibilityā€. Certain Industry- hv Status Symbols within Society
  • 40. Lecture 1 Diploma in Project Management Financial Feasibility- Capability of Proj Org ā€“ To Raise Funds to: implement Proposed Proj (different from economic feasibility)
  • 41. Lecture 1 Diploma in Project Management Financial Study (Fin S) Questions. ā€¢ 1. Capital & Operating Costs ? ā€¢ 2. Sources of Funds & Draw-down schedules- sufficient to Cover costs of activities/implementation?(shoukat Tareen case of IMF) ā€¢ Any alternative Financing Schemes ā€¢ 3. Projected Cash flow (CF)? ā€¢ Extent of necessary borrowings (L of Cr)? ā€¢ When P- Revenues Paying back /cover Operating Costs? ā€¢ 4. Formation of Acctg system: ā€“ Balance Sheets ā€“ CF Statements ā€“ Debt Servicing Schedules ā€“ Other Financial Reports? ā€¢ 5. Source pf Proj Investment ā€¢ 6. Means of Recovery investment ā€“
  • 42. Lecture 1 Diploma in Project Management ā€¢ 6. Financial FS: Total- Costs of Project (Implementation & design, Broken down separately). ā€¢ Chk (a)-Prj-Success with Amount of Money? ā€¢ (b) Any Profit? ā€¢ Financial Analysis To Determine R o I ā€¢ 7. Chk (a) P-Financial Stability (mali Isstakaam) ā€“ B) Debt Service Capacity ā€¢ 8. Assessing Financial Profit ā€¢ 9. Projection of Revenues & Expenses: a. Revenues. & - Transactions - Generate incom & Receipts Cash Inflows b. Expenses. Transactions Reduce income & Expenditures: Cash Out Flows
  • 43. Lecture 1 Diploma in Project Management ā€¢ Revenues/Expenses Affect P- Income, ā€“ so determine P- Profit ā€¢ Receipts/Expenditures affect Cash Position. ā€“ So determine Debt-Servicing Capacity ā€¢ For a/m following Financial Statements made: ā€¢ 1. PLS Statement (income statement) ā€¢ 2. Balance Sheet ā€¢ 3. Cash Flow Statement. ā€¢ Periods of P-Statements: From Few yrs Life of P-
  • 44. Lecture 1 Diploma in Project Management Financial CalculationsFinancial Calculations Companies use a combination of methods: First approach, called the net present value (NPV), has two concepts: (1) all benefits and costs are calculated in terms of todayā€™s Rupees (present value) (2) Future streams of benefits /costs is netted together & then discounted by a certain factor for each year in future Payback Period to determine whether investments will be beneficial also breakeven point. Point in time at which ā€œBenefits becomes equalā€ to ā€œCost of development & operationā€ Third Economic Measure ā€œReturn on investment (ROI). Shows a ā€œPercentage return needed so that the costs & benefits exactly equal over specified time periodā€.
  • 45. Lecture 1 Diploma in Project Management Safety Feasibility. ā€¢ At Project Planning stage. ā€¢ NIMBY Syndrome ā€¢ Analysis of whether: ā€“ P- Capable of implementation ā€“ Operated safely with minimal adverse effects on environment. Amonia Cylider ;Leakage ā€“ Finis Fatory Lahore 1996, kala Shah Kaku Chemical ā€“ Union Carbide Bohapal 1984, Kala Bagh ā€“ Chernoybal USSR- Nuclear Powr Plant 1986 - Inadequate EIS-in Complex Proj ā€¢ NAFTA ā€“1993- Due to Legal issue of Potential EIS of P- Under agreement.
  • 46. Lecture 1 Diploma in Project Management Political Feasibility Referred - ā€œPolitically Correct Proj." Political considerations often dictate direction for a proposed proj ā€¢ More common in LDC
  • 47. Lecture 1 Diploma in Project Management Political Feasibility. PF ā€¢ Politically Feasible P -ā€œPolitically Correct P." ā€¢ PF Analysis: ā€¢ An Evaluation of Compatibility of P-Goals with Prevailing Goals of Political System. ā€¢ Pol considerations dictate Direction of P-. ā€¢ Political Necessity -Source of Support, ā€¢ Regardless of P- Merits. ā€¢ Pol Opposition Scarp Good P- ā€“ Q1.Who Resist Migration to New System? ā€“ Q2.Measures To overcome this Inertia? ā€¢ P- with ā€œNational Visibilityā€ Political Implications.ā€“get Significant Govt I/Put ā€¢ Kala Bagh, Thar, Swat Girls School today ā€¢
  • 48. Lecture 1 Diploma in Project Management Environmental Feasibility. Killer of P- Due to: ā€¢ A) Long Approval Processes ā€¢ B) Green /Earth lover/nature Groups. C) Attention - Early stages of P. Concern & action to address all envir concerns. ā€¢ 1.Environment suitability for P? ā€¢ 2. P- Impact on Environment? ā€¢ 3. Whether or not a Given Environment can Support a Disney Theme park in Va, adverse ā€œEIā€ Issue Aswan Dam, New Murree Proj Tarbella affectees
  • 49. Lecture 1 Diploma in Project Management Environmental Feasibility Agricultural Project, Question as: a) Soil Quality appropriate for Proposed crops? b) Sufficient water? c) Adequate drainage? d) Adequate sunlight? e) Climate right? -Concern must be shown -Action must be taken to address any & all environmental concerns raised or anticipated
  • 50. Lecture 1 Diploma in Project Management Resource Feasibility ā€¢ Project Leaders ā€¢ Team Members ā€¢ Team Skill Levels ā€¢ Equipment ā€¢ Support staff ā€¢ Allied Physical Facilities ā€¢ Communication & Collaboration facilities
  • 51. Lecture 1 Diploma in Project Management Resource FeasibilityResource Feasibility ā€¢ Team member availability ā€¢ Team skill levels ā€¢ Computers, equipment, and supplies ā€¢ Support staff time and availability ā€¢ Physical facilities
  • 52. Lecture 1 Diploma in Project Management Human-Factors Feasibility ā€¢ Ease of Use ā€“ System friendliness to use within context of Daily Ops of Intended End- user? ā€¢ Perceived Usefulness System support -Job of End-user needs?s ā€¢ Overall Satisfaction ā€¢ End User Like Using System?
  • 53. Lecture 1 Diploma in Project Management Legal Feasibility Solution Violate: ā€¢ Contracts, ā€¢ Licenses, ā€¢ Copyrights, ā€¢ Non-disclosures, ā€¢ Laws or Regulations? Policy & Procedures ā€“ Solution violate Corporate Policies or Procedures?
  • 54. Lecture 1 Diploma in Project Management Schedule FeasibilitySchedule Feasibility ā€¢ Estimates needed complete info ā€¢ Management deadlines may not be realistic ā€¢ Project managers must: Drive realistic assumptions and estimates Recommend completion date flexibility Assign ā€œInterim Milestones to Periodically Reassessā€ completion dates Involve experienced personnel Manage proper allocation of resources
  • 55. Lecture 1 Diploma in Project Management Market Feasibility- Market Variability & impact on Proj . Not confused with Econ/ F
  • 56. Lecture 1 Diploma in Project Management ā€¢ Market Feasibility. ā€¢ Concerns Mkt Variability & Impact on P-. Purpose: To view Potential impacts of : - A). Mkt demand, - B) Competitive Activities, etc. Nestle Yogurt - C) ā€œDivertible" mkt share ? - Price War by Competitors, & China Factor - Local, Regional, National or Intl- Analyzed:
  • 57. Lecture 1 Diploma in Project Management Elements of FA of a Proj Need Analysis Process Work Engineering & Design Cost Estimate Financial Analysis Market for Product & Svc Project Impacts Conclusions & Recommendations
  • 58. Lecture 1 Diploma in Project Management Final Caveats ā€¢ Little Experience for Estimates ā€¢ Bias toward underestimation ā€¢ No For a Bid, Not a Real Estimate