• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Pola Operasi Peti Kemas di Pelabuhan Dwikora Pontianak
 

Pola Operasi Peti Kemas di Pelabuhan Dwikora Pontianak

on

  • 1,752 views

 

Statistics

Views

Total Views
1,752
Views on SlideShare
1,737
Embed Views
15

Actions

Likes
0
Downloads
17
Comments
0

2 Embeds 15

http://bsin68.blogspot.com 14
http://us-w1.rockmelt.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

CC Attribution-NonCommercial-NoDerivs LicenseCC Attribution-NonCommercial-NoDerivs LicenseCC Attribution-NonCommercial-NoDerivs License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Pola Operasi Peti Kemas di Pelabuhan Dwikora Pontianak Pola Operasi Peti Kemas di Pelabuhan Dwikora Pontianak Presentation Transcript

    • `
    • LAY OUT LAPANGAN PETIKEMAS ` LOADING AREA 06 DISCHARGING AREA 06 STUFFING AREA 05 STRIPPING AREA 05 4 R X 12 S X 3 T = 144 TEUS 3 R X 12 S X 3 T = 108 TEUS CAPACITY: 4 R X 12 S X 3 T = 144 TEUS 3 R X 12 S X 3 T = 108 TEUS CAPACITY: 18 R X 10S X 2 T = 360 TEUS 2 R X 16 S X 3 T = 96 TEUS 15 R X 3S X 1 T = 45 TEUS CAPACITY: TOTAL 252 TEUS 1 R X 7 S X 3 T = 21 TEUS CAPACITY: TOTAL 333 TEUS
    • LAY OUT LAPANGAN PETIKEMAS ` STUFFING AREA 04 STRIPPING AREA 04 STRIPPING AREA 03 EMPTY AREA 02 CAPACITY: CAPACITY: CAPACITY: CAPACITY: 25 R X 1S X 1 T = 25 TEUS 25 R X 2S X 2 T = 100 TEUS 35 R X 2S X 2 T = 140 TEUS 15 R X 10S X 5 T = 750 TEUS 25 R X 1S X 2 T = 50 TEUS
    • ALUR LALU LINTAS PETIKEMAS Discharge Delivery Receiving Loading