Loco Shed Management System Process

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    1 Favorite

    Loco Shed Management System Process - Presentation Transcript

      • Low Level maintenance
      • Monthly / 3 Monthly period trips
      POH - Workshop
      Sub-Sheds
      Sub-Sheds
      Sub-Sheds
      • Collects Progress of Ongoing POH
      • Receive POH History Documentation
      Sheds
      • Periodic Over Hauling Workshop
      • Every 8 Years
      • Day-to-Day & Breakdown maintenance
      • Run out of course repairs
      • Fueling & Oiling
      • 24x7 Operation
      • About 40 Sheds
      • Interact & Seek Slot
    1. Repair Book, Crew Records
      • Key parameters periodically
      • Abnormalities experienced on the run
      Divisional Power Controller (PCR)
      Owner & Maintainers
      Sheds
      Sheds
      Sheds
      Diesel Crew
      • Closely Monitors Locomotives Utilization
      • Provides Technical Support
      • Constantly Monitors
      • Use Patterns
      • Unusual Reports
      • Time Loss Reports
      • Liaisons with the Diesel Crew on Locomotive
      LMS aims to make the work of PCR Paperless
    2. Maintains -
      • Repository of Drawing Specifications
      • Maintenance Instructions
      Chief Motive Power Engineer
      Chief Mechanical Engineer
      Sheds
      Daily Feedback
      • On Performance parameters
      Occurrence based reports
      Material Control Cell
      Drawing Office
      Foreign Railway PCR
      Home Railway PCR
      • Procurement of material required by Shed
      Diesel Power ControllersHead Quarter
    3. Feedback w.r.t.
      • Trial Components
      • Maintenance Instructions
      ZONE 1
      RDSO (Lucknow)
      • Technical Instructions
      Controlling Agency for –
      • Maintenance Instructions
      • Technical Design Matters
      • Trials & Vendor Approvals for Major Components & Assemblies
      • Maintains Central Repository of Drawings & Specifications
      ZONE 2
      • Daily Feedback
      • Performance Reports
      • Occurrence based Reports
      Railway Board
      EDME (Traction)
      . . .
      • Policy Directives
      • Allotment of New Locomotive manufacturers
      ZONE - n
      DME (Traction)
      EDME - Executive Director Mechanical Engineering
      DME – Director Mechanical Engineering
    4. Shed…
      500 – 1200 Staff incl. 100 Supervisors (floor managers)
      Each shed has specified # of locomotives
      Each identified by its own loco #
      Each shed has at least one fueling point
      Each loco is maintained acc. to “maintenance schedule” i.e. specified set of maintenance activities
      Usual maintenance schedules
      10 days,
      4 Months
      8 Months
      1 Year
      2 Year
      4 Year
    5. Benefits
      Shed Supervisor
      Reliable and quick daily record keeping,
      easy consultation of technical documents,
      watch on locos on movements, easy follow up of maintenance strategic decisions and
      technical campaigns/drives
      status of material supplies from vendors,
      Minimum paperwork and personal ease.
      Shed workers
      Easy access to personnel information,
      Easy channel for interacting with management,
      Minimum paper work on shed floor
      Shed management
      Information based maintenance decision taking,
      Efficient material monitoring,
      Cost monitoring,
      Instant monitoring of assets on move,
      Improved reaction time and shift to proactive maintenance management,
      Integrated view of asset utilization and performance,
      Quick warranty claims,
      Speedy document movement and easy retrieval,
      Economy of time and effort to achieve an economy in costs.
      Easy to use technical reference library.
    6. …Benefits
      Headquarters Management
      Instant information available on asset repair costing,
      Material availability & Shed performances,
      Reduced asset idling,
      Easy collation of multi-shed Information and easy collaboration with other zones,
      Pan-India visibility of loco operations & utilization patterns
      Easy document handling and retrieval
      Vendor performance appraisal.
      Easy to use technical reference library
      Ministry and RDSO
      Effortless feedback on maintenance performance,
      Easy collation of information for entire system,
      easy analysis,
      fast feed backs,
      instant availability to system health parameters for global decision taking.
      Decision impact analysis, quick & reliable vendor
      Performance appraisal,
      Quick and easy availability of vital material performance / modification
      performance information to improve decision taking,
      Ad-hoc information on demand.
      Easy document handling and traceability.
      Easy to use technical reference library.

    + Gagan BhallaGagan Bhalla, 2 months ago

    custom

    193 views, 1 favs, 0 embeds more stats

    Loco Shed Management System Process. + Benefits

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 193
      • 193 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 1
    • Downloads 0
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories