Your SlideShare is downloading. ×
0
File System 1
File System 1
File System 1
File System 1
File System 1
File System 1
File System 1
File System 1
File System 1
File System 1
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

File System 1

898

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
898
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
26
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • For today’s review, I would like to start with a Review of the Commercialization collateral available on the 16 new offerings that we discussed in August. This is quick list of new collateral, made available on those subjects in the past 6 weeks. Secondly, I will quickly discuss the criteria that we use to set the Available to Disclose Date, and how we determine the level of detail that can be provided. Also, we have received questions on how this differs from discussions with Customers about possible new developments that will help solve their problems – and so I will discuss how we can obtain that Voice of Customer. Thirdly, the relevant Commercialization Managers will discuss the 9 New Offerings for this Splash, and then with the Product Line Leaders answer any of the questions that have been sent in advance, or brought up on the phone.
  • For today’s review, I would like to start with a Review of the Commercialization collateral available on the 16 new offerings that we discussed in August. This is quick list of new collateral, made available on those subjects in the past 6 weeks. Secondly, I will quickly discuss the criteria that we use to set the Available to Disclose Date, and how we determine the level of detail that can be provided. Also, we have received questions on how this differs from discussions with Customers about possible new developments that will help solve their problems – and so I will discuss how we can obtain that Voice of Customer. Thirdly, the relevant Commercialization Managers will discuss the 9 New Offerings for this Splash, and then with the Product Line Leaders answer any of the questions that have been sent in advance, or brought up on the phone.
  • Transcript

    • 1. Condition Monitoring 101 Bently Nevada wireless solution Bently Nevada
    • 2. <ul><li>Asset Condition & Optimization </li></ul><ul><ul><li>Asset Condition Transducers </li></ul></ul><ul><ul><li>Continuous Protection Monitors </li></ul></ul><ul><ul><li>Scanning and Wireless Monitors </li></ul></ul><ul><ul><li>Equipment & Instrumentation Diagnostic Services </li></ul></ul>Cond.Monitoring Bently Nevada Optimization & Controls
    • 3. <ul><li>Plant Optimization Software </li></ul><ul><ul><li>Asset Condition Monitoring…All Rotating & BOP Equipment </li></ul></ul><ul><ul><li>Asset Diagnostics </li></ul></ul><ul><ul><li>Real-Time Plant Thermal Performance Optimization </li></ul></ul><ul><ul><li>Advanced Process Control </li></ul></ul><ul><ul><li>Closed Loop Optimal Control </li></ul></ul><ul><ul><li>Multi-Plant Dispatch Optimization </li></ul></ul>Cond. Monitoring Software Optimization & Controls
    • 4. Information ~ Reliability Based (Production) Reliability & Availability Maintenance Expenditure Preventive Reactive or Corrective Data ~ Condition Based Predictive Proactive Time Based Run to Fail <ul><li>Sources: </li></ul><ul><li>Society of Maintenance & Reliability Professionals Survey </li></ul><ul><li>The Business Case for Reliability, Management Resources Group, Inc. </li></ul>Enabling Predictive and Proactive Strategies Question: What happens when maintenance expenditure is reduced without strategy? Condition Monitoring & Pred. Maintenance Answer : Simply reducing maintenance expenditure also reduces Reliability & Availability levels B A
    • 5. <ul><li>Sources: </li></ul><ul><li>Society of Maintenance & Reliability Professionals Survey </li></ul><ul><li>The Business Case for Reliability, Management Resources Group, Inc. </li></ul>Enabling Predictive and Proactive Strategies Condition Monitoring & Pred. Maintenance Information ~ Reliability Based Preventive Reactive or Corrective Data ~ Condition Based Predictive Proactive Time Based Run to Fail Question: What is the potential results in maintenance costs and production when high level strategies are implemented? (Production) Reliability & Availability Maintenance Expenditure A B C D 40% cost reduction
    • 6. Predictive Maintenance ~ Value <ul><li>Unplanned vs planned outage cost ratio typically 10:1 </li></ul><ul><li>Plant, Fleet, Remote Asset Condition Monitoring </li></ul><ul><li>Sensor, Machine, Process Condition Monitoring </li></ul><ul><li>Enables Reliability Program </li></ul><ul><li>Model Based – Machine Dynamics, Thermodynamics, Process Dynamics. </li></ul><ul><li>Wireless solutions </li></ul>http://www.hydro.com/en/press_room/news/archive/2007_02/e_operations_en.html Courtesy of Norsk Hydro, Bergen, Norway
    • 7. System 1 Condition Monitoring Portable Data Collector MESH Wireless Network Scanning Online Data Acquisition Electric Machine Monitoring and Protection Continuous On-line Protection and Monitoring DCS Machine Control System Process Data Historian
    • 8. Notificação Email / OS SAP / Celular / etc . GE System1 Display. Thin Client. WEB Display. GE System1 Plant Intelligence . DS Studio. Rule Paks. Engenharia Manutenção Gerência Operação GE System1™ Data Acquisition On-Line Contínuo Wireless Eficiência Maximo Eletric Assets NDT Off-Line PDC/PDA On-Line Multiplex. Gestão Instrum. Historian SDCD PLC
    • 9. Engineering Plant Manager Operations Maintenance Asset Monitoring & Measurement Data Correlation – Turning data into Information Actionable Information ® For Each Person DCS CMMS ERP Reliability System1™ Data Acquisition System1™ Decision Support System1™ Actionable Information Notifier
    • 10. System 1 – Supporting Services Agreement Project Justification Project Management Program Implementation Program Execution ( BOO ) Program Optimization Turn-Key Installation System Specification

    ×