COCOMO Model
Basic
Introduction
COCOMO is one of the most widely used software
estimation models in the world
It was developed by Barry Boehm in 1981
COCOMO predicts the effort and schedule for a software
product development based on inputs relating to the size of
the software and a number of cost drivers that affect
productivity
COCOMO Models
COCOMO has three different models that reflect the
complexity:
the Basic Model
the Intermediate Model
and the Detailed Model
The Development Modes: Project
Characteristics
Organic Mode
• Relatively small, simple software projects
• Small teams with good application experience work to a
set of less than rigid requirements
• Similar to the previously developed projects
• relatively small and requires little innovation
Semidetached Mode
• Intermediate (in size and complexity) software projects in
which teams with mixed experience levels must meet a mix
of rigid and less than rigid requirements.
Contd…
Embedded Mode
• Software projects that must be developed within a set of tight
hardware, software, and operational constraints.
COCOMO:
Some Assumptions
Primary cost driver is the number of Delivered Source
Instructions (DSI) / Delivered Line Of Code
developed by the project
COCOMO estimates assume that the project will enjoy
good management by both the developer and the
customer
Assumes the requirements specification is not
substantially changed after the plans and requirements
phase
Basic COCOMO
Basic COCOMO is good for quick, early, rough order of
magnitude estimates of software costs
It does not account for differences in hardware
constraints, personnel quality and experience, use of
modern tools and techniques, and other project attributes
known to have a significant influence on software costs,
which limits its accuracy
Basic COCOMO Model: Formula
E=ab (KLOC or KDSI) b
b
D=cb(E) d
b
P=E/D
where E is the effort applied in person-months, D is the
development time in chronological months, KLOC / KDSI
is the estimated number of delivered lines of code for the
project (expressed in thousands), and P is the number of
people required. The coefficients ab, bb, cb and db are given in
next slide.
Contd…
Software project ab bb cb db
Organic 2.4 1.05 2.5 0.38
Semi-detached 3.0 1.12 2.5 0.35
Embedded 3.6 1.20 2.5 0.32
Basic COCOMO Model: Equation
Mode Effort Schedule
Organic E=2.4*(KDSI)
1.05
TDEV=2.5*(E)
0.38
Semidetached E=3.0*(KDSI)
1.12
TDEV=2.5*(E)
0.35
Embedded E=3.6*(KDSI)
1.20
TDEV=2.5*(E)
0.32
Basic COCOMO Model: Limitation
Its accuracy is necessarily limited because of its lack of
factors which have a significant influence on software costs
The Basic COCOMO estimates are within a factor of 1.3
only 29% of the time, and within a factor of 2 only 60% of
the time
Basic COCOMO Model: Example
 We have determined our project fits the characteristics of Semi-Detached
mode
 We estimate our project will have 32,000 Delivered Source Instructions.
Using the formulas, we can estimate:
 Effort = 3.0*(32) 1.12
= 146 man-months
 Schedule = 2.5*(146) 0.35
= 14 months
 Productivity = 32,000 DSI / 146 MM
= 219 DSI/MM
 Average Staffing = 146 MM /14 months
= 10 FSP
Function Point Analysis
What is Function Point Analysis (FPA)?
 It is designed to estimate and measure the time, and thereby the cost, of
developing new software applications and maintaining existing software
applications.
 It is also useful in comparing and highlighting opportunities for productivity
improvements in software development.
 It was developed by A.J. Albrecht of the IBM Corporation in the early 1980s.
 The main other approach used for measuring the size, and therefore the time
required, of software project is lines of code (LOC) – which has a number of
inherent problems.
Function Point Analysis
How is Function Point Analysis done?
Working from the project design specifications, the following
system functions are measured (counted):
 Inputs
 Outputs
 Files
 Inquires
 Interfaces
Function Point Analysis
These function-point counts are then weighed (multiplied) by
their degree of complexity:
Simple Average Complex
Inputs 2 4 6
Outputs 3 5 7
Files 5 10 15
Inquires 2 4 6
Interfaces 4 7 10
Function Point Analysis
A simple example:
inputs
3 simple X 2 = 6
4 average X 4 = 16
1 complex X 6 = 6
outputs
6 average X 5 = 30
2 complex X 7 = 14
files
5 complex X 15 = 75
inquiries
8 average X 4 = 32
interfaces
3 average X 7 = 21
4 complex X 10 = 40
Unadjusted function points 240
Function Point Analysis
In addition to these individually weighted function points, there are factors that affect
the project and/or system as a whole. There are a number (~35) of these factors
that affect the size of the project effort, and each is ranked from “0”- no influence to
“5”- essential.
The following are some examples of these factors:
 Is high performance critical?
 Is the internal processing complex?
 Is the system to be used in multiple sites and/or by multiple organizations?
 Is the code designed to be reusable?
 Is the processing to be distributed?
 and so forth . . .
Function Point Analysis
Continuing our example . . .
Complex internal processing = 3
Code to be reusable = 2
High performance = 4
Multiple sites = 3
Distributed processing = 5
Project adjustment factor = 17
Adjustment calculation:
Adjusted FP = Unadjusted FP X [0.65 + (adjustment factor X 0.01)]
= 240 X [0.65 + ( 17 X 0.01)]
= 240 X [0.82]
= 197 Adjusted function points
Function Point Analysis
But how long will the project take and how much will it cost?
As previously measured, programmers in our organization
average 18 function points per month. Thus . . .
197 FP divided by 18 = 11 man-months
If the average programmer is paid $5,200 per month
(including benefits), then the [labor] cost of the project will
be . . .
11 man-months X $5,200 = $57,200
Function Point Analysis
Because function point analysis is independent of language used,
development platform, etc. it can be used to identify the
productivity benefits of . . .
One programming language over another
One development platform over another
One development methodology over another
One programming department over another
Before-and-after gains in investing in programmer training
And so forth . . .
Function Point Analysis
But there are problems and criticisms:
 Function point counts are affected by project size
 Difficult to apply to massively distributed systems or to systems with very
complex internal processing
 Difficult to define logical files from physical files
 The validity of the weights that Albrecht established – and the consistency
of their application – has been challenged
 Different companies will calculate function points slightly different, making
intercompany comparisons questionable

More Related Content

What's hot

Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9koolkampus
 
Software Process Improvement
Software Process ImprovementSoftware Process Improvement
Software Process ImprovementBilal Shah
 
Software estimation
Software estimationSoftware estimation
Software estimationMd Shakir
 
Quality and productivity factors
Quality and productivity factorsQuality and productivity factors
Quality and productivity factorsNancyBeaulah_R
 
source code metrics and other maintenance tools and techniques
source code metrics and other maintenance tools and techniquessource code metrics and other maintenance tools and techniques
source code metrics and other maintenance tools and techniquesSiva Priya
 
Chapter 13 software testing strategies
Chapter 13 software testing strategiesChapter 13 software testing strategies
Chapter 13 software testing strategiesSHREEHARI WADAWADAGI
 
Software process and project metrics
Software process and project metricsSoftware process and project metrics
Software process and project metricsIndu Sharma Bhardwaj
 
Software Measurement and Metrics.pptx
Software Measurement and Metrics.pptxSoftware Measurement and Metrics.pptx
Software Measurement and Metrics.pptxubaidullah75790
 
COCOMO Model in software project management
COCOMO Model in software project managementCOCOMO Model in software project management
COCOMO Model in software project managementSyed Hassan Ali
 
Real time and distributed design
Real time and distributed designReal time and distributed design
Real time and distributed designpriyapavi96
 
software cost factor
software cost factorsoftware cost factor
software cost factorAbinaya B
 
Uml in software engineering
Uml in software engineeringUml in software engineering
Uml in software engineeringMubashir Jutt
 
Software requirements specification
Software requirements specificationSoftware requirements specification
Software requirements specificationlavanya marichamy
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assuranceAman Adhikari
 

What's hot (20)

Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9
 
Software Process Improvement
Software Process ImprovementSoftware Process Improvement
Software Process Improvement
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Quality and productivity factors
Quality and productivity factorsQuality and productivity factors
Quality and productivity factors
 
Software design
Software designSoftware design
Software design
 
source code metrics and other maintenance tools and techniques
source code metrics and other maintenance tools and techniquessource code metrics and other maintenance tools and techniques
source code metrics and other maintenance tools and techniques
 
Chapter 13 software testing strategies
Chapter 13 software testing strategiesChapter 13 software testing strategies
Chapter 13 software testing strategies
 
Design notation
Design notationDesign notation
Design notation
 
Software process and project metrics
Software process and project metricsSoftware process and project metrics
Software process and project metrics
 
Software Measurement and Metrics.pptx
Software Measurement and Metrics.pptxSoftware Measurement and Metrics.pptx
Software Measurement and Metrics.pptx
 
Software testing
Software testing Software testing
Software testing
 
COCOMO Model in software project management
COCOMO Model in software project managementCOCOMO Model in software project management
COCOMO Model in software project management
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Agile software development
Agile software developmentAgile software development
Agile software development
 
Black & White Box testing
Black & White Box testingBlack & White Box testing
Black & White Box testing
 
Real time and distributed design
Real time and distributed designReal time and distributed design
Real time and distributed design
 
software cost factor
software cost factorsoftware cost factor
software cost factor
 
Uml in software engineering
Uml in software engineeringUml in software engineering
Uml in software engineering
 
Software requirements specification
Software requirements specificationSoftware requirements specification
Software requirements specification
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 

Viewers also liked

Viewers also liked (13)

Zipf distribution
Zipf distributionZipf distribution
Zipf distribution
 
Cocomo
CocomoCocomo
Cocomo
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo model
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Cocomo
CocomoCocomo
Cocomo
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Cocomo II
Cocomo IICocomo II
Cocomo II
 
Cocomo II
Cocomo IICocomo II
Cocomo II
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
Introduction To Software Engineering
Introduction To Software EngineeringIntroduction To Software Engineering
Introduction To Software Engineering
 
Software engineering lecture notes
Software engineering lecture notesSoftware engineering lecture notes
Software engineering lecture notes
 

Similar to Cocomo model

Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxYagnaGummadi
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceArti Parab Academics
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsbabak danyal
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfDISHANTBALOTRA
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part IIsslovepk
 
Cocomo model
Cocomo modelCocomo model
Cocomo modelMZ5512
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)MuskanSony
 
OOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptOOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptitadmin33
 
COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimationPramod Parajuli
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5SIMONTHOMAS S
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxaditiibaghla16
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimationdeep sharma
 

Similar to Cocomo model (20)

Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptx
 
Metrics
MetricsMetrics
Metrics
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer Science
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
cost-estimation-tutorial
cost-estimation-tutorialcost-estimation-tutorial
cost-estimation-tutorial
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdf
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part II
 
LECT9.ppt
LECT9.pptLECT9.ppt
LECT9.ppt
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
5. COCOMO.pdf
5. COCOMO.pdf5. COCOMO.pdf
5. COCOMO.pdf
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)
 
OOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptOOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.ppt
 
COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimation
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5
 
COCOMO.pptx
COCOMO.pptxCOCOMO.pptx
COCOMO.pptx
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptx
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 

More from Bala Ganesh

Dbms chapter viii
Dbms chapter viiiDbms chapter viii
Dbms chapter viiiBala Ganesh
 
Dbms chapter vii
Dbms chapter viiDbms chapter vii
Dbms chapter viiBala Ganesh
 
Dbms chapter iii
Dbms chapter iiiDbms chapter iii
Dbms chapter iiiBala Ganesh
 
Flip flop& RAM ROM
Flip flop& RAM ROMFlip flop& RAM ROM
Flip flop& RAM ROMBala Ganesh
 
Chap iii-Logic Gates
Chap iii-Logic GatesChap iii-Logic Gates
Chap iii-Logic GatesBala Ganesh
 
Chap ii.BCD code,Gray code
Chap ii.BCD code,Gray codeChap ii.BCD code,Gray code
Chap ii.BCD code,Gray codeBala Ganesh
 
Software engineering Questions and Answers
Software engineering Questions and AnswersSoftware engineering Questions and Answers
Software engineering Questions and AnswersBala Ganesh
 
Software testing
Software testingSoftware testing
Software testingBala Ganesh
 

More from Bala Ganesh (20)

DDL,DML,1stNF
DDL,DML,1stNFDDL,DML,1stNF
DDL,DML,1stNF
 
sfdfds
sfdfdssfdfds
sfdfds
 
Dbms chapter viii
Dbms chapter viiiDbms chapter viii
Dbms chapter viii
 
Dbms chapter vii
Dbms chapter viiDbms chapter vii
Dbms chapter vii
 
Dbms chapter v
Dbms chapter vDbms chapter v
Dbms chapter v
 
Dbms chapter iv
Dbms chapter ivDbms chapter iv
Dbms chapter iv
 
Dbms chapter iii
Dbms chapter iiiDbms chapter iii
Dbms chapter iii
 
Dmbs chapter vi
Dmbs chapter viDmbs chapter vi
Dmbs chapter vi
 
Dbms chapter ii
Dbms chapter iiDbms chapter ii
Dbms chapter ii
 
Dbms chap i
Dbms chap iDbms chap i
Dbms chap i
 
Flip flop& RAM ROM
Flip flop& RAM ROMFlip flop& RAM ROM
Flip flop& RAM ROM
 
karnaugh maps
karnaugh mapskarnaugh maps
karnaugh maps
 
Chap iii-Logic Gates
Chap iii-Logic GatesChap iii-Logic Gates
Chap iii-Logic Gates
 
Chap ii.BCD code,Gray code
Chap ii.BCD code,Gray codeChap ii.BCD code,Gray code
Chap ii.BCD code,Gray code
 
DEL-244Chep i
DEL-244Chep iDEL-244Chep i
DEL-244Chep i
 
Software engineering Questions and Answers
Software engineering Questions and AnswersSoftware engineering Questions and Answers
Software engineering Questions and Answers
 
Software testing
Software testingSoftware testing
Software testing
 
Design
DesignDesign
Design
 
Comp 107 cep 8
Comp 107 cep 8Comp 107 cep 8
Comp 107 cep 8
 
Comp 107 cep 7
Comp 107 cep 7Comp 107 cep 7
Comp 107 cep 7
 

Recently uploaded

TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 

Recently uploaded (20)

TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

Cocomo model

  • 2. Introduction COCOMO is one of the most widely used software estimation models in the world It was developed by Barry Boehm in 1981 COCOMO predicts the effort and schedule for a software product development based on inputs relating to the size of the software and a number of cost drivers that affect productivity
  • 3. COCOMO Models COCOMO has three different models that reflect the complexity: the Basic Model the Intermediate Model and the Detailed Model
  • 4. The Development Modes: Project Characteristics Organic Mode • Relatively small, simple software projects • Small teams with good application experience work to a set of less than rigid requirements • Similar to the previously developed projects • relatively small and requires little innovation Semidetached Mode • Intermediate (in size and complexity) software projects in which teams with mixed experience levels must meet a mix of rigid and less than rigid requirements.
  • 5. Contd… Embedded Mode • Software projects that must be developed within a set of tight hardware, software, and operational constraints.
  • 6. COCOMO: Some Assumptions Primary cost driver is the number of Delivered Source Instructions (DSI) / Delivered Line Of Code developed by the project COCOMO estimates assume that the project will enjoy good management by both the developer and the customer Assumes the requirements specification is not substantially changed after the plans and requirements phase
  • 7. Basic COCOMO Basic COCOMO is good for quick, early, rough order of magnitude estimates of software costs It does not account for differences in hardware constraints, personnel quality and experience, use of modern tools and techniques, and other project attributes known to have a significant influence on software costs, which limits its accuracy
  • 8. Basic COCOMO Model: Formula E=ab (KLOC or KDSI) b b D=cb(E) d b P=E/D where E is the effort applied in person-months, D is the development time in chronological months, KLOC / KDSI is the estimated number of delivered lines of code for the project (expressed in thousands), and P is the number of people required. The coefficients ab, bb, cb and db are given in next slide.
  • 9. Contd… Software project ab bb cb db Organic 2.4 1.05 2.5 0.38 Semi-detached 3.0 1.12 2.5 0.35 Embedded 3.6 1.20 2.5 0.32
  • 10. Basic COCOMO Model: Equation Mode Effort Schedule Organic E=2.4*(KDSI) 1.05 TDEV=2.5*(E) 0.38 Semidetached E=3.0*(KDSI) 1.12 TDEV=2.5*(E) 0.35 Embedded E=3.6*(KDSI) 1.20 TDEV=2.5*(E) 0.32
  • 11. Basic COCOMO Model: Limitation Its accuracy is necessarily limited because of its lack of factors which have a significant influence on software costs The Basic COCOMO estimates are within a factor of 1.3 only 29% of the time, and within a factor of 2 only 60% of the time
  • 12. Basic COCOMO Model: Example  We have determined our project fits the characteristics of Semi-Detached mode  We estimate our project will have 32,000 Delivered Source Instructions. Using the formulas, we can estimate:  Effort = 3.0*(32) 1.12 = 146 man-months  Schedule = 2.5*(146) 0.35 = 14 months  Productivity = 32,000 DSI / 146 MM = 219 DSI/MM  Average Staffing = 146 MM /14 months = 10 FSP
  • 13. Function Point Analysis What is Function Point Analysis (FPA)?  It is designed to estimate and measure the time, and thereby the cost, of developing new software applications and maintaining existing software applications.  It is also useful in comparing and highlighting opportunities for productivity improvements in software development.  It was developed by A.J. Albrecht of the IBM Corporation in the early 1980s.  The main other approach used for measuring the size, and therefore the time required, of software project is lines of code (LOC) – which has a number of inherent problems.
  • 14. Function Point Analysis How is Function Point Analysis done? Working from the project design specifications, the following system functions are measured (counted):  Inputs  Outputs  Files  Inquires  Interfaces
  • 15. Function Point Analysis These function-point counts are then weighed (multiplied) by their degree of complexity: Simple Average Complex Inputs 2 4 6 Outputs 3 5 7 Files 5 10 15 Inquires 2 4 6 Interfaces 4 7 10
  • 16. Function Point Analysis A simple example: inputs 3 simple X 2 = 6 4 average X 4 = 16 1 complex X 6 = 6 outputs 6 average X 5 = 30 2 complex X 7 = 14 files 5 complex X 15 = 75 inquiries 8 average X 4 = 32 interfaces 3 average X 7 = 21 4 complex X 10 = 40 Unadjusted function points 240
  • 17. Function Point Analysis In addition to these individually weighted function points, there are factors that affect the project and/or system as a whole. There are a number (~35) of these factors that affect the size of the project effort, and each is ranked from “0”- no influence to “5”- essential. The following are some examples of these factors:  Is high performance critical?  Is the internal processing complex?  Is the system to be used in multiple sites and/or by multiple organizations?  Is the code designed to be reusable?  Is the processing to be distributed?  and so forth . . .
  • 18. Function Point Analysis Continuing our example . . . Complex internal processing = 3 Code to be reusable = 2 High performance = 4 Multiple sites = 3 Distributed processing = 5 Project adjustment factor = 17 Adjustment calculation: Adjusted FP = Unadjusted FP X [0.65 + (adjustment factor X 0.01)] = 240 X [0.65 + ( 17 X 0.01)] = 240 X [0.82] = 197 Adjusted function points
  • 19. Function Point Analysis But how long will the project take and how much will it cost? As previously measured, programmers in our organization average 18 function points per month. Thus . . . 197 FP divided by 18 = 11 man-months If the average programmer is paid $5,200 per month (including benefits), then the [labor] cost of the project will be . . . 11 man-months X $5,200 = $57,200
  • 20. Function Point Analysis Because function point analysis is independent of language used, development platform, etc. it can be used to identify the productivity benefits of . . . One programming language over another One development platform over another One development methodology over another One programming department over another Before-and-after gains in investing in programmer training And so forth . . .
  • 21. Function Point Analysis But there are problems and criticisms:  Function point counts are affected by project size  Difficult to apply to massively distributed systems or to systems with very complex internal processing  Difficult to define logical files from physical files  The validity of the weights that Albrecht established – and the consistency of their application – has been challenged  Different companies will calculate function points slightly different, making intercompany comparisons questionable