SlideShare a Scribd company logo
1 of 5
Download to read offline
Supply Manual




                               VERSION 08-02
                            December 12, 2008
                                  Prepared by:
     Acquisition Policy and Process Directorate
Public Works and Government Services Canada
Requisition Receipt


Annex 3.7:       Matrix of Responsibilities between PWGSC and Client Departments for the
                 Procurement of Goods and Services (Generic)
(2008-12-12)


Introduction

1.       The following matrix provides a generic division of anticipated types of responsibilities
         between Public Works and Government Services Canada (PWGSC) and client
         departments. It forms the basis for an effective and efficient partnering relationship for
         those who are responsible for activities within the contracting process.

2.       The division of responsibilities as shown in the matrix represents a standard way of doing
         business. However, as every procurement and associated contract differs, alternate
         divisions of roles and responsibilities can be established in advance by way of a written
         agreement between PWGSC and the client department. Such client department or
         procurement-specific arrangements or matrices will take precedence over this generic
         matrix. Legislation, regulations and policy will also take precedence over this matrix.

3.       Regular communication between PWGSC and the client department is considered
         essential to success in all activities, even for those activities where no contributing role is
         indicated within the matrix.

NOTE: The matrix does not represent a delegation of procurement authority by the Minister of
      PWGSC, and does not remove from contracting officers their overall contracting
      responsibilities.




Supply Manual                                                                              Annex 3.7-1
Version 08-2
Requisition Receipt


            FOR CLIENT DEPARTMENTS NOT COVERED IN ANNEX 3.1 TO ANNEX 3.6
                            Matrix of Responsibilities between
                     PWGSC and Client Departments for the Procurement
                             of Goods and Services (Generic)

L: Lead
C: Contributing
S: Shared

    No.                                         Activities                                       Responsibility

                                                                                                Client    PWGSC

1              Requirements Definition

1.1            Define client’s operational requirements:

    1.1.1      Define essential characteristics (i.e., Statement of Requirements)                 L          C

    1.1.2      Consider all feasible solutions to meet client’s operational needs                 L          C

    1.1.3      Develop preliminary project cost estimates and schedule                            L

    1.1.4      Conduct cost benefit analysis of alternatives (including life cycle costing        L          C
               analysis)

    1.1.5      Determine total resource requirements and implications (e.g., training,            L
               priority of allocation amongst operational needs, security requirements)

    1.1.6      Obtain approval-in-principle to continue with project                              L

    1.1.7      Develop Total Project Plan, including substantive cost estimates and               L
               schedule, special project management needs, project phasing,
               maintenance support requirements, etc.



1.2            Define client’s technical requirements:

    1.2.1      Develop Statement of Work (SOW) and/or performance specifications or               L
               standards as appropriate for the goods/services required to meet the
               operational need

    1.2.2      Define technical requirements for quality assurance, acceptance,                   L
               warranty, training, documentation, packaging, transportation, initial
               provisioning, etc.



1.3            Raise the requisition (form PWGSC-TPSGC 9200):

    1.3.1      Prepare funded requisition for goods/services to be forwarded to                   L          C
               PWGSC (include Security Requirements Checklist (SRCL) if applicable)



2              PWGSC Procurement Plan

2.1            Assess potential sources of supply (Canadian vs. offshore, etc.)                   C          L

2.2            Identify applicable major contracting policy issues/ considerations which          C          L
               must be resolved to accomplish the procurement

2.3            Examine potential problems in relation to patents, licencing, royalties            C          L
               and technology transfer


Supply Manual                                                                                         Annex 3.7-2
Version 08-2
Requisition Receipt


    No.                                         Activities                                 Responsibility

                                                                                          Client    PWGSC

2.4            Develop Procurement Plan including:

    2.4.1      Delivery schedule and acceptance requirement                                 L          C

    2.4.2      Contracting approach (including sourcing strategy)                           C          L

    2.4.3      Target cost and cash flow plan                                               C          L

    2.4.4      Statement of appropriate quality and inspection system standards and         L          C
               qualification approvals

    2.4.5      Communications strategy                                                      C          L

    2.4.6      Contractual risk management                                                  C          L

    2.4.7      Evaluation methodology and selection method                                  C          L

    2.4.8      Industrial Benefits (IBs), where appropriate                                 C          L

    2.4.9      Interdepartmental and international agreements related to procurement        L          C
               plan

2.5            Obtain Procurement Plan approval                                                        L



3              Contracting Process

3.1            Translation of procurement documents                                         C          L

3.2            Prepare and distribute/post procurement notice on GETS (Government                      L
               Electronic Tendering Service) and bid solicitation package

3.3            Prepare and distribute technical data packages, as required                  L          C

3.4            Receipt of bids on bid closing                                                          L

3.5            Evaluate technical elements of bids                                          L          C

3.6            Evaluate time, cost and other contractual elements of bids                              L

3.7            Prepare consolidated evaluation and selection of supplier                    C          L

3.8            Negotiate contract where applicable                                          C          L

3.9            Obtain contract approval                                                     C          L

3.10           Prepare and issue contract                                                              L

3.11           Debrief unsuccessful suppliers                                               C          L



4              Contract Administration

4.1            General:

    4.1.1      Monitor work of contractor; receive contract deliverables                    L          C

    4.1.2      Monitor cash flow                                                            L          C

    4.1.3      Report problems to contracting authority                                     L

    4.1.4      Resolve contractual problems                                                 C          L


Supply Manual                                                                                   Annex 3.7-3
Version 08-2
Requisition Receipt


    No.                                        Activities                                  Responsibility

                                                                                          Client    PWGSC

    4.1.5      Monitor compliance with terms and conditions of contract                     S          S

    4.1.6      Determine that goods and services received are in accordance with the        L          C
               requirement

    4.1.7      Determine that goods and services received are in accordance with the        C          L
               contract

    4.1.8      Process claims for payment                                                   L          C

4.2            Contract Amendments:

    4.2.1      Identify need for additional work or revisions; confirm funding              L

    4.2.2      Confirm that contract amendment is the appropriate vehicle                              L

    4.2.3      Negotiate contract amendment                                                 C          L

    4.2.4      Obtain approval for amendment/change order                                              L

    4.2.5      Prepare and issue contract amendment                                                    L



5              Contract Close-out

5.1            Settle outstanding claims for payment                                        C          L

5.2            Issue contract closing amendment                                                        L

5.3            Finalize disposition of Crown assets                                                    L




Supply Manual                                                                                   Annex 3.7-4
Version 08-2

More Related Content

What's hot

0569 project management-beenish
0569 project management-beenish0569 project management-beenish
0569 project management-beenishdfhf hfghf
 
IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Vietnam
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreementabdmuhaiminyunus
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩ykscnm
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 

What's hot (6)

0569 project management-beenish
0569 project management-beenish0569 project management-beenish
0569 project management-beenish
 
IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreement
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 

Similar to Matrix of responsibility

CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3 Rae Davies
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Rae Davies
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...Rae Davies
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxMy own
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsGalala University
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Project Controls Expo
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver bookmoodlyd
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementakashdhewale87
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsClydeCoOffshore
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contractVance Ang
 

Similar to Matrix of responsibility (20)

NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver book
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Tiffany
TiffanyTiffany
Tiffany
 
projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project management
 
TOPIC7.pdf
TOPIC7.pdfTOPIC7.pdf
TOPIC7.pdf
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projects
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 

Recently uploaded (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 

Matrix of responsibility

  • 1. Supply Manual VERSION 08-02 December 12, 2008 Prepared by: Acquisition Policy and Process Directorate Public Works and Government Services Canada
  • 2. Requisition Receipt Annex 3.7: Matrix of Responsibilities between PWGSC and Client Departments for the Procurement of Goods and Services (Generic) (2008-12-12) Introduction 1. The following matrix provides a generic division of anticipated types of responsibilities between Public Works and Government Services Canada (PWGSC) and client departments. It forms the basis for an effective and efficient partnering relationship for those who are responsible for activities within the contracting process. 2. The division of responsibilities as shown in the matrix represents a standard way of doing business. However, as every procurement and associated contract differs, alternate divisions of roles and responsibilities can be established in advance by way of a written agreement between PWGSC and the client department. Such client department or procurement-specific arrangements or matrices will take precedence over this generic matrix. Legislation, regulations and policy will also take precedence over this matrix. 3. Regular communication between PWGSC and the client department is considered essential to success in all activities, even for those activities where no contributing role is indicated within the matrix. NOTE: The matrix does not represent a delegation of procurement authority by the Minister of PWGSC, and does not remove from contracting officers their overall contracting responsibilities. Supply Manual Annex 3.7-1 Version 08-2
  • 3. Requisition Receipt FOR CLIENT DEPARTMENTS NOT COVERED IN ANNEX 3.1 TO ANNEX 3.6 Matrix of Responsibilities between PWGSC and Client Departments for the Procurement of Goods and Services (Generic) L: Lead C: Contributing S: Shared No. Activities Responsibility Client PWGSC 1 Requirements Definition 1.1 Define client’s operational requirements: 1.1.1 Define essential characteristics (i.e., Statement of Requirements) L C 1.1.2 Consider all feasible solutions to meet client’s operational needs L C 1.1.3 Develop preliminary project cost estimates and schedule L 1.1.4 Conduct cost benefit analysis of alternatives (including life cycle costing L C analysis) 1.1.5 Determine total resource requirements and implications (e.g., training, L priority of allocation amongst operational needs, security requirements) 1.1.6 Obtain approval-in-principle to continue with project L 1.1.7 Develop Total Project Plan, including substantive cost estimates and L schedule, special project management needs, project phasing, maintenance support requirements, etc. 1.2 Define client’s technical requirements: 1.2.1 Develop Statement of Work (SOW) and/or performance specifications or L standards as appropriate for the goods/services required to meet the operational need 1.2.2 Define technical requirements for quality assurance, acceptance, L warranty, training, documentation, packaging, transportation, initial provisioning, etc. 1.3 Raise the requisition (form PWGSC-TPSGC 9200): 1.3.1 Prepare funded requisition for goods/services to be forwarded to L C PWGSC (include Security Requirements Checklist (SRCL) if applicable) 2 PWGSC Procurement Plan 2.1 Assess potential sources of supply (Canadian vs. offshore, etc.) C L 2.2 Identify applicable major contracting policy issues/ considerations which C L must be resolved to accomplish the procurement 2.3 Examine potential problems in relation to patents, licencing, royalties C L and technology transfer Supply Manual Annex 3.7-2 Version 08-2
  • 4. Requisition Receipt No. Activities Responsibility Client PWGSC 2.4 Develop Procurement Plan including: 2.4.1 Delivery schedule and acceptance requirement L C 2.4.2 Contracting approach (including sourcing strategy) C L 2.4.3 Target cost and cash flow plan C L 2.4.4 Statement of appropriate quality and inspection system standards and L C qualification approvals 2.4.5 Communications strategy C L 2.4.6 Contractual risk management C L 2.4.7 Evaluation methodology and selection method C L 2.4.8 Industrial Benefits (IBs), where appropriate C L 2.4.9 Interdepartmental and international agreements related to procurement L C plan 2.5 Obtain Procurement Plan approval L 3 Contracting Process 3.1 Translation of procurement documents C L 3.2 Prepare and distribute/post procurement notice on GETS (Government L Electronic Tendering Service) and bid solicitation package 3.3 Prepare and distribute technical data packages, as required L C 3.4 Receipt of bids on bid closing L 3.5 Evaluate technical elements of bids L C 3.6 Evaluate time, cost and other contractual elements of bids L 3.7 Prepare consolidated evaluation and selection of supplier C L 3.8 Negotiate contract where applicable C L 3.9 Obtain contract approval C L 3.10 Prepare and issue contract L 3.11 Debrief unsuccessful suppliers C L 4 Contract Administration 4.1 General: 4.1.1 Monitor work of contractor; receive contract deliverables L C 4.1.2 Monitor cash flow L C 4.1.3 Report problems to contracting authority L 4.1.4 Resolve contractual problems C L Supply Manual Annex 3.7-3 Version 08-2
  • 5. Requisition Receipt No. Activities Responsibility Client PWGSC 4.1.5 Monitor compliance with terms and conditions of contract S S 4.1.6 Determine that goods and services received are in accordance with the L C requirement 4.1.7 Determine that goods and services received are in accordance with the C L contract 4.1.8 Process claims for payment L C 4.2 Contract Amendments: 4.2.1 Identify need for additional work or revisions; confirm funding L 4.2.2 Confirm that contract amendment is the appropriate vehicle L 4.2.3 Negotiate contract amendment C L 4.2.4 Obtain approval for amendment/change order L 4.2.5 Prepare and issue contract amendment L 5 Contract Close-out 5.1 Settle outstanding claims for payment C L 5.2 Issue contract closing amendment L 5.3 Finalize disposition of Crown assets L Supply Manual Annex 3.7-4 Version 08-2