Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
HPB Presentation DFS 11 Sep 12
1. High Efficiency LED Lighting
David F. Shutler
President
Utility Systems Solutions, Inc. (US2)
2. Introduction to
Utility Systems Solutions and Genlyte
US2 performs energy audits and retrofit energy projects
• 57 Years of Federal experience, over 50 Federal contracts
• On GSA Schedule with Energy Audits at GS 21F-0159X
• On GSA Schedule with Philips lighting at GS 07F-0121T
• Small Business (SDVOSB, VOSB, SBA certified 8(a) & SDB)
Teamed with Philips Genlyte Thomas Group
• Largest Manufacturer of Lighting Products in the United States
• Addressable and digitally networked lighting and control systems.
• On GSA with lighting systems that are reliable and cost effective.
• Installed in Phillip Burton and Dellums Federal Building
A culture of customer service and a history of performance
3. Presentation Overview
Retrofit strategies to achieve energy savings of
50% - 70% on interior lighting and exterior lighting.
Main approaches – Key strategies to explore
• Lighting applications
• Lighting Controls
• Case studies
Putting it all together - How to get there
• Lighting Audits
• Turnkey Retrofit
• Commissioning / Maintaining
4. Lighting Applications – FEMP Guidance
In Oct 2011, FEMP identified 50 recommended projects
Eight lighting projects were sited in the top 20
Many are easily acquired lighting or controls solutions:
• Ballasts (Advance Ballasts)
• LED’s (Lumiled)
• LED Drivers (Advance Ballasts)
• Fixtures (Philips fixtures)
• Controls (Dynalite and Philips Controls)
The Philips Lighting EnduraLED A19 Lamp L-Prize
• Selected as the SSL product in the Lighting for Tomorrow
competition.
5. Lighting Controls - Phillip Burton Case Study
Workstation Specific Luminaires
Compared to GSA Base and the National Average
Study was sponsored by GSA and DOE
The fixtures, dimming equipment and installation were all furnished using
Philips Government Lighting Solutions products and expertise.
Study conducted by Lawrence Berkeley National Labs with these results.
Energy Savings Energy Savings from
Daily lighting Estimate
from WS WS Luminaires
Energy (Watt- Annual EUI
Luminaires Relative Relative to US Nat
hours/ft²/Day (kWh/ft²/yr)
to GSA Base Average
Workstation-Specific
Luminaires 5.34 (± 0.5) 1.39 59% 78%
GSA Base Case 13.2 (±0.8) 3.42 0% 53%
US Average National
Average for Offices 24.8(±1) 6.45 N/A 0%
6. Case Study:
Interior Control of Warehouse Lighting
• Problem Description
– 1.8 million square foot facility with high demand and
dim lighting
– Original lighting included low-bay areas equipped
with 1,370 400W HID systems and high bay areas
illuminated with 576 1000W HID systems
• Solution Used
– Instant on 4-lamp T5HO fixtures
– HBO400 Logistix Pro fixtures
– Motion sensors and electronic ballasts
• Outcome
– Reduced demand by 818kW and eliminated 4.3
million kWh in load
– Saved $450,000
– Improved light quality and visibility
7. Exterior Control Strategies - Dynadimmer
Dimming Schedule
System diagram
Modular and stand alone
Schedule-based dimming
Simple retrofit, no extra wiring and no commissioning
Sensor override
8. Exterior Control Strategies –
Light on Demand (LOD)
Local wireless control (zones) LOD
Unit
Sensing meaningful movement
• for optimized energy usage
Enhance surveillance for
• emergency response
9. Exterior Control Strategies - Starsense
Fully networked
Remote monitoring, control and metering
Sensor input
Enable preventive and prompt maintenance
10. Case Study: Outdoor – Parking and Area Light
Texas A&M Campus Retrofit
• Description
– 5000+ Existing Parking lot & Pedestrian
luminaires
– Existing system utilized 150 watt & 400 watt Before
high pressure sodium systems
• Solutions Used
– 90 & 140 watt CosmoPolis and 210 & 315 watt
MCE ceramic metal halide lighting system
• Outcome
– Reduced the Campus energy bill by over
$550,000 annually when campus retrofit
completed
– Changed to 3,000K “white light” from 2,200K
“yellow light” enhancing campus security &
student comfort
– 30,000 hour lifespan dramatically reduced
maintenance costs After
11. Putting It All Together – Key Steps
Lighting/Energy Audit
Solution Design
Turnkey Retrofit
System Commissioning
Service Contracts
12. Putting It All Together – Lighting Audit
Initial assessment
• Energy Reduction Goals / Available Budget
• Required Payback Period
• Utility Rates / Rebates available
Aesthetic Considerations
• Current IES Standards
• Fixture Types Desired
• Purpose of Space
Information Required
• Floor Plans / Existing Controls
• Existing Fixture Information
• Electrical Plans / Circuiting
13. Putting It All Together – Solution Design
Identify Lighting Issues
Experts recommend most efficient solution
Ensure lighting meets current IES standards, State / Local codes
Target: The right light for the tasks, people, and spaces at hand
Design the proposed solutions.
Evaluate lighting studies to determine best strategy
Meet the stated goals without sacrificing performance
Generate the ROI, energy and total cost of ownership studies
Prepare the Retrofit Construction Solution
Engineering Drawings
Generate Proposals
14. Putting It All Together – Turnkey Retrofit
Turnkey retrofit installation services are available
• using local expertise for touch labor to keep costs down
Factory engineer field commissioning of Control Systems
• is included in the retrofit solution
Service Agreements are available
• for maintenance, training or periodic re-commissioning
15. Putting It All Together – Some Scalable Projects
LED Site Lighting Fixtures – Includes
site survey, drawings, 400 fixtures,
disposal and labor.
• Budgetary Range $500,000
LED Parking Garage Fixtures –
Includes site survey, drawings, 200
fixtures, disposal and labor.
• Budgetary Range $250,000
Wireless Occupancy Sensor Packs –
Includes site survey, drawings, 400 packs,
labor and commissioning.
• Budgetary Range $100,000
Budgetary Prices based on simple retrofit
applications and do not include advanced
control options or site specific issues.
The actual cost of surveys is rolled into the
project – no out of pocket costs are required
to get started.
16. Putting It All Together – Some Routes
Energy audit services are available on GSA Schedule
• Lighting and control issues can be addressed (GS 21F-0159X)
Lighting and control applications on GSA Schedule
• Specific FEMP recommended solutions (GS 07F-0121T)
Turnkey installation services available thru SBA 8(a)/ SDB
• Federal agencies may use SBA routes to small business
17. Putting It All Together – Financing
Monthly finance costs
• Structured to match monthly energy savings
Cash Positive payment flow
• Available credit lines are conserved
100% financing
• Including lighting equipment, recycling and installation costs
Flexible terms
Asset ownership and control
Federal “Enable” structure
18. Questions?
Utility Systems Solutions, Inc
Dave Shutler, President
3030 LBJ Freeway, Suite 700
Dallas, TX 75234-7781
214.722.7508 Phone
214.722.7676 Fax
dshutler@us2inc.com Email
UTILITY SYSTEMS SOLUTIONS
A Service Disabled Veteran Owned Small Business (SDVOSB)
Editor's Notes
Select the amount of time each night and level of diming desired. Device is factory pre-programmed to these levels. On board computation reads the time on and time off for three nights and selects a midpoint. Dimming occurs evenly before and after this midpoint and is measured and adjusted by the on/off cycle as time goes on. Changes in programming in the field are possible if needs change. Uses standard photocell or relay panel controls for the on/off function. Savings based on system programming. Commercially available today.
Useful in areas that experience infrequent activity (example TEMF’s on military facilities or parking garage structures). Keeps the lights off or at a reduced output state until activity in the area triggers full output. Will save 50-90% projected. Studies currently underway at Ft Sill. Some versions are commercially available today like the VISOR II series parking garage fixture by WideLite.
Wireless system that allows full control, metering and monitoring capability. Also currently in ongoing DOE funded study at Ft Sill to determine actual energy savings. Not presently commercially available.