1.The Figure shows the schematic diagram of a radial transmission system. The ratings
and reactances of the various components are shown therein. A load of 60 MW at 0.9
power factor lagging is tapped from the 66 KV substation which is to be maintained at 60
kV . Calculate the terminal voltage of the synchronous machine . represent the
transmission line and the transformers by series reactances only.




 60 MW and not 60MV
2.Draw the pu impedance diagram for the power system shown in the figure . Neglect
resistance , and use a base of 100 MV A , 220 kV in 50 Ω line. The ratings of the
generator , motor and transformers are : Generator 40 MV A, 25 kV, X” = 20%
                      Motor 50 MV A, 11 kV, X” = 30%
                      Y-Y transformer, 40 MV A, 33 Y-220 Y kV, X = 15%
                      Y-Δ transformer, 30 MV A, 11 Δ-220 Y kV, X = 15%




3.A synchronous generator is rated 60 MVA , 11 kV. It has resistance R = 0.1 pu and X
                                                                          a              d


= 1.65 pu. It is feeding into an infinite bus bar at 11 kV delivering a current 3.15 kA at
0.9 pf lagging.
(a) Determine E and angle δ.
                f


(b) Draw a phasor diagram for this operation.
(c) Bus bar voltage falls to 10 kV while the mechanical power input generator and its
excitation remains unchanged. What is the value and pf of the current delivered to the
bus. In this case assume the generator resistance to be negligible.

4.A 250 MV A, 16 kV rated generator is feeding into an indefinite bus bar at 15 kV. The
generator has a synchronous reactance of 1.62 pu. It is found that the machine excitation
and mechanical power input are adjusted to give E = 24 kV and power angle δ = 30 .
                                                   f
                                                                                     0


(a) Determine the line current and active and reactive powers fed to the bus bars.
(b) The mechanical power input to the generator is increased by 20% from that in part (a)
but its excitation is not changed. Find the new line current and power factor.
(c) With reference to part (a) current is to be reduced by 20% at the same power factor by
adjusting mechanical power input to the generator and its excitation. Determine E , δ and
                                                                                  f

mechanical power input.
(d) With the reduced current as in part (c), the power is to be delivered to bus bars at
unity pf, what are the corresponding values of E and δ and also the mechanical power
                                                  f


input to the generator.

5.The generator of problem 4 is feeding 150 MV A at 0.85 pf lagging to infinite bus bar
at 15 kV.
(a) Determine E and δ for the above operation. What are P and Q fed to the bus bars ?
                  f


(b) Now E is reduced by 10% keeping mechanical input to generator same, find new δ
          f


and Q delivered.
(c) E is now maintained as in part (a) but mechanical power input to generator is adjusted
    f


till Q = 0. Find new δ and P.
(d) For the value of E in part (a) what is the maximum Q that can be delivered to bus bar.
                          f

What is the corresponding δ and I ? Sketch the phasor diagram for each part.
                                          a




Answers:
      1. 12kV
      3. (a) 26.8kV (line), 42.3 leading; (c) 1.13 (-28.8 ) ; 0.876 lag
                                              ◦           0


      4. (a) 0.511 (-25.6 ) kA ; 108 MW, 51.75 MVAR ; (b) 6.14 kA, 0.908 lagging ;
                      0           0


      (c) 1.578, 13.5 , 53.3 MW ; (d) 18.37 kV, 35.5 . 96 MW
                              0                       0


      5. (a) 25.28 kV, 20.2 , 127.5 MW, 79.05 MVAR ; (b) 33.9 , 54.14 MVAR ; (c)
                                      0                            0


      41.1 , 54.14 MVAR ; (d) 184.45 MVAR, 53.6 , -j0.787 pu
              0                                       0

More Related Content

What's hot

Chapter1 Questions
Chapter1 QuestionsChapter1 Questions
Chapter1 Questions
guest4ca222
 
Jawaban uts astl ganjil analisa sistem tenaga
Jawaban uts astl ganjil analisa sistem tenagaJawaban uts astl ganjil analisa sistem tenaga
Jawaban uts astl ganjil analisa sistem tenaga
suparman unkhair
 
Emec 1 question
Emec 1 questionEmec 1 question
Emec 1 question
Ravi Anand
 
EE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_QuestionsEE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_Questions
Santhosh Kumar
 

What's hot (20)

Unit 2 samplesolutions
Unit 2 samplesolutionsUnit 2 samplesolutions
Unit 2 samplesolutions
 
Unit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothariUnit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothari
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
 
Questions unit4
Questions unit4Questions unit4
Questions unit4
 
Unit 3 Part 1
Unit 3 Part 1Unit 3 Part 1
Unit 3 Part 1
 
Soln unit5
Soln unit5Soln unit5
Soln unit5
 
Questions unit3
Questions unit3Questions unit3
Questions unit3
 
Chapter1 Questions
Chapter1 QuestionsChapter1 Questions
Chapter1 Questions
 
Unsymmetrical Fault
Unsymmetrical FaultUnsymmetrical Fault
Unsymmetrical Fault
 
electrical objective
electrical objectiveelectrical objective
electrical objective
 
Eet3082 binod kumar sahu lecturer_23
Eet3082 binod kumar sahu lecturer_23Eet3082 binod kumar sahu lecturer_23
Eet3082 binod kumar sahu lecturer_23
 
Electrical machines solved objective
Electrical machines solved objectiveElectrical machines solved objective
Electrical machines solved objective
 
analisa sistem tenaga lanjut
analisa sistem tenaga lanjutanalisa sistem tenaga lanjut
analisa sistem tenaga lanjut
 
Jawaban uts astl ganjil analisa sistem tenaga
Jawaban uts astl ganjil analisa sistem tenagaJawaban uts astl ganjil analisa sistem tenaga
Jawaban uts astl ganjil analisa sistem tenaga
 
Emec 1 question
Emec 1 questionEmec 1 question
Emec 1 question
 
EE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_QuestionsEE6501 Power System Analysis Rejinpaul_Important_Questions
EE6501 Power System Analysis Rejinpaul_Important_Questions
 
power system analysis lecture 1
power system analysis lecture 1power system analysis lecture 1
power system analysis lecture 1
 
Per unit calculation
Per unit calculationPer unit calculation
Per unit calculation
 
Term question eee 305
Term question eee 305Term question eee 305
Term question eee 305
 
Lecture no 4 power system analysis elc353 et313
Lecture no 4 power system analysis elc353 et313Lecture no 4 power system analysis elc353 et313
Lecture no 4 power system analysis elc353 et313
 

Similar to Questions From 1st Unit Nagrath

Emec 1 bank nee 301
Emec 1 bank nee 301Emec 1 bank nee 301
Emec 1 bank nee 301
Ravi Anand
 
Objective Electrical Electronics Engineering Questions and Answers
Objective Electrical Electronics Engineering Questions and AnswersObjective Electrical Electronics Engineering Questions and Answers
Objective Electrical Electronics Engineering Questions and Answers
Mostafizur Rahman
 
Assignment & solution (selected)
Assignment & solution (selected)Assignment & solution (selected)
Assignment & solution (selected)
efrataderebe
 
questions on diode analysis: Assignment6
questions on diode analysis: Assignment6questions on diode analysis: Assignment6
questions on diode analysis: Assignment6
Akash Kumar Verma
 
Electrical Engineering - 2007 Unsolved Paper
Electrical Engineering - 2007 Unsolved PaperElectrical Engineering - 2007 Unsolved Paper
Electrical Engineering - 2007 Unsolved Paper
Vasista Vinuthan
 
Electrical Engineering - 2004 Unsolved Paper
Electrical Engineering - 2004 Unsolved PaperElectrical Engineering - 2004 Unsolved Paper
Electrical Engineering - 2004 Unsolved Paper
Vasista Vinuthan
 
ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation
Chandrabhan Sharma
 

Similar to Questions From 1st Unit Nagrath (20)

Chapter 5 solution
Chapter 5 solutionChapter 5 solution
Chapter 5 solution
 
Emec 1 bank nee 301
Emec 1 bank nee 301Emec 1 bank nee 301
Emec 1 bank nee 301
 
Objective Electrical Electronics Engineering Questions and Answers
Objective Electrical Electronics Engineering Questions and AnswersObjective Electrical Electronics Engineering Questions and Answers
Objective Electrical Electronics Engineering Questions and Answers
 
Assignment & solution (selected)
Assignment & solution (selected)Assignment & solution (selected)
Assignment & solution (selected)
 
PEQPAU.pdf
PEQPAU.pdfPEQPAU.pdf
PEQPAU.pdf
 
Gate question 2020
Gate question 2020Gate question 2020
Gate question 2020
 
L 3,t-1,eee, 2018-2019
L 3,t-1,eee, 2018-2019L 3,t-1,eee, 2018-2019
L 3,t-1,eee, 2018-2019
 
Ch29 ssm
Ch29 ssmCh29 ssm
Ch29 ssm
 
17415 d.c.machnes and transformer
17415   d.c.machnes and transformer17415   d.c.machnes and transformer
17415 d.c.machnes and transformer
 
questions on diode analysis: Assignment6
questions on diode analysis: Assignment6questions on diode analysis: Assignment6
questions on diode analysis: Assignment6
 
Pre engineering model question papers
Pre engineering model question papersPre engineering model question papers
Pre engineering model question papers
 
Power Factor
Power FactorPower Factor
Power Factor
 
Electrical Engineering - 2007 Unsolved Paper
Electrical Engineering - 2007 Unsolved PaperElectrical Engineering - 2007 Unsolved Paper
Electrical Engineering - 2007 Unsolved Paper
 
T8 1 ph-tr
T8 1 ph-trT8 1 ph-tr
T8 1 ph-tr
 
Three phase balanced load circuits and synchronous generators
Three phase balanced load circuits and synchronous generatorsThree phase balanced load circuits and synchronous generators
Three phase balanced load circuits and synchronous generators
 
147110756 march-2005
147110756 march-2005147110756 march-2005
147110756 march-2005
 
Electrical Engineering - 2004 Unsolved Paper
Electrical Engineering - 2004 Unsolved PaperElectrical Engineering - 2004 Unsolved Paper
Electrical Engineering - 2004 Unsolved Paper
 
ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation
 
L44095762
L44095762L44095762
L44095762
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 6
Principles of Power Systems V.K Mehta Complete Book - Chapter 6Principles of Power Systems V.K Mehta Complete Book - Chapter 6
Principles of Power Systems V.K Mehta Complete Book - Chapter 6
 

More from Abha Tripathi (16)

Power system Stability, Equal area criteria
Power system Stability, Equal area criteriaPower system Stability, Equal area criteria
Power system Stability, Equal area criteria
 
Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical components
 
Representation of power system components
Representation of power system componentsRepresentation of power system components
Representation of power system components
 
Questions unit2 ch3
Questions unit2 ch3Questions unit2 ch3
Questions unit2 ch3
 
Unit1questions
Unit1questionsUnit1questions
Unit1questions
 
Renewable Sor
Renewable SorRenewable Sor
Renewable Sor
 
Gas and diesel Plant
Gas and diesel PlantGas and diesel Plant
Gas and diesel Plant
 
NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant,
 
Hydro E
Hydro EHydro E
Hydro E
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Unit 3 Part 1
Unit 3 Part 1Unit 3 Part 1
Unit 3 Part 1
 
Grading The Insulator Problem
Grading The Insulator ProblemGrading The Insulator Problem
Grading The Insulator Problem
 
Dc Distribution
Dc DistributionDc Distribution
Dc Distribution
 
Dc Distributed Load
Dc Distributed LoadDc Distributed Load
Dc Distributed Load
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Recently uploaded (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 

Questions From 1st Unit Nagrath

  • 1. 1.The Figure shows the schematic diagram of a radial transmission system. The ratings and reactances of the various components are shown therein. A load of 60 MW at 0.9 power factor lagging is tapped from the 66 KV substation which is to be maintained at 60 kV . Calculate the terminal voltage of the synchronous machine . represent the transmission line and the transformers by series reactances only. 60 MW and not 60MV 2.Draw the pu impedance diagram for the power system shown in the figure . Neglect resistance , and use a base of 100 MV A , 220 kV in 50 Ω line. The ratings of the generator , motor and transformers are : Generator 40 MV A, 25 kV, X” = 20% Motor 50 MV A, 11 kV, X” = 30% Y-Y transformer, 40 MV A, 33 Y-220 Y kV, X = 15% Y-Δ transformer, 30 MV A, 11 Δ-220 Y kV, X = 15% 3.A synchronous generator is rated 60 MVA , 11 kV. It has resistance R = 0.1 pu and X a d = 1.65 pu. It is feeding into an infinite bus bar at 11 kV delivering a current 3.15 kA at 0.9 pf lagging. (a) Determine E and angle δ. f (b) Draw a phasor diagram for this operation. (c) Bus bar voltage falls to 10 kV while the mechanical power input generator and its excitation remains unchanged. What is the value and pf of the current delivered to the bus. In this case assume the generator resistance to be negligible. 4.A 250 MV A, 16 kV rated generator is feeding into an indefinite bus bar at 15 kV. The generator has a synchronous reactance of 1.62 pu. It is found that the machine excitation and mechanical power input are adjusted to give E = 24 kV and power angle δ = 30 . f 0 (a) Determine the line current and active and reactive powers fed to the bus bars. (b) The mechanical power input to the generator is increased by 20% from that in part (a) but its excitation is not changed. Find the new line current and power factor.
  • 2. (c) With reference to part (a) current is to be reduced by 20% at the same power factor by adjusting mechanical power input to the generator and its excitation. Determine E , δ and f mechanical power input. (d) With the reduced current as in part (c), the power is to be delivered to bus bars at unity pf, what are the corresponding values of E and δ and also the mechanical power f input to the generator. 5.The generator of problem 4 is feeding 150 MV A at 0.85 pf lagging to infinite bus bar at 15 kV. (a) Determine E and δ for the above operation. What are P and Q fed to the bus bars ? f (b) Now E is reduced by 10% keeping mechanical input to generator same, find new δ f and Q delivered. (c) E is now maintained as in part (a) but mechanical power input to generator is adjusted f till Q = 0. Find new δ and P. (d) For the value of E in part (a) what is the maximum Q that can be delivered to bus bar. f What is the corresponding δ and I ? Sketch the phasor diagram for each part. a Answers: 1. 12kV 3. (a) 26.8kV (line), 42.3 leading; (c) 1.13 (-28.8 ) ; 0.876 lag ◦ 0 4. (a) 0.511 (-25.6 ) kA ; 108 MW, 51.75 MVAR ; (b) 6.14 kA, 0.908 lagging ; 0 0 (c) 1.578, 13.5 , 53.3 MW ; (d) 18.37 kV, 35.5 . 96 MW 0 0 5. (a) 25.28 kV, 20.2 , 127.5 MW, 79.05 MVAR ; (b) 33.9 , 54.14 MVAR ; (c) 0 0 41.1 , 54.14 MVAR ; (d) 184.45 MVAR, 53.6 , -j0.787 pu 0 0