Your SlideShare is downloading. ×
0
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Hydro Experiences
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Hydro Experiences

507

Published on

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
507
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
19
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. K&AR Mühendislik A.Ş . Experience s in Hydro Projects (1987 – 2005)
  • 2. Large Hydro <ul><li>Sır 3VF x 94.50 MW 1991 </li></ul><ul><li>New Tienlun 1VF x 100.00 MW 1992 </li></ul><ul><li>Berke 3VF x 170.00 MW 1993 </li></ul><ul><li>Birecik 6VF x 112.00 MW 1994 </li></ul><ul><li>Deriner 4VF x 170.00 MW 1998 </li></ul><ul><li>Borçka 2VF x 150.00 MW 1999 </li></ul><ul><li>Muratlı 2VF x 57.50 MW 1999 </li></ul><ul><li>Şanlıurfa 2HF x 25.00 MW 2001 </li></ul><ul><li>Torul 2VF x 57.50 MW 2002 </li></ul><ul><li>Ermenek 2VF x 150.00 MW 2003 </li></ul><ul><li>Yamula 2VF x 50.00 MW 2005 </li></ul>
  • 3. Compact Hydro <ul><li>Tohma 2VF x 7.10 MW 1997 </li></ul><ul><li>Fethiye 3HF x 5.50 MW 1997 </li></ul><ul><li>Mercan 2HF x 4.80 MW 1998 </li></ul><ul><li>Girlevik II 2HF x 1.50 MW 1998 </li></ul><ul><li>Çal 2HF x 1.30 MW 1999 </li></ul><ul><li>Pamuk 2HF x 9.10 MW 2001 </li></ul><ul><li>1HF x 5.20 MW </li></ul><ul><li>Süleymanlı 2HF x 2.40 MW 2002 </li></ul><ul><li>Y. Mercan 2HP x 7.40 MW 2003 </li></ul>
  • 4. Hydraulic Steel Structures <ul><li>Berke Fabrication and Erection 2,500 ton </li></ul><ul><li>Borçka Fabrication and Erection 4,000 ton </li></ul><ul><li>Muratlı Fabrication and Erection 2,645 ton </li></ul><ul><li>Houay Ho Fabrication 250 ton </li></ul><ul><li>Hammerschmied Penstock Supply 50 ton </li></ul><ul><li>Jebel Aulia Steel Structures 762 ton </li></ul><ul><li>Pamuk Fabrication and Erection 900 ton </li></ul><ul><li>Birecik Design 7,000 ton </li></ul><ul><li>Ermenek Fabrication 250 ton </li></ul><ul><li>Torul Fabrication and Erection 2,400 ton </li></ul><ul><li>Total 20,757 ton </li></ul>
  • 5. Turbine Parts <ul><li>New Tienlun LH Supervision of Fabrication </li></ul><ul><li>Tohma CH Draft Tube and Spiral Casing fabrication </li></ul><ul><li>Deriner LH Draft Tube, Spiral Casing and Pit Liner fabrication </li></ul><ul><li>Fethiye CH Draft Tube and Inlet Pipe fabrication </li></ul><ul><li>Mercan CH Spiral Casing fabrication </li></ul><ul><li>Girlevik II CH Spiral Casing fabrication </li></ul><ul><li>Pamuk CH Spiral Casing fabrication </li></ul><ul><li>Şanlıurfa LH Inlet Pipe, Draft Tube and Spiral Casing fabrication </li></ul>
  • 6. Generator Erection <ul><li>Muratlı LH Stacking at Site </li></ul><ul><li>Yamula LH Stacking at Site </li></ul><ul><li>Torul LH </li></ul><ul><li>Fethiye CH </li></ul><ul><li>Mercan CH </li></ul><ul><li>Girlevik II CH </li></ul><ul><li>Çal CH </li></ul><ul><li>Pamuk CH </li></ul><ul><li>Y. Mercan CH </li></ul>
  • 7. Electrical Equipment Supply <ul><li>Torul - Generator Leads and Neutral Cubicles </li></ul><ul><li>- Bus Duct System </li></ul><ul><li>- Complete Switchyard (154kV) </li></ul><ul><li>- Station Service System </li></ul><ul><li>- Station Service Transformers </li></ul><ul><li>- Control, Measuring and Protective System </li></ul><ul><li>Çal - Station Service System (34.5kV) </li></ul><ul><li>Mercan - Station Service System (34.5kV) </li></ul><ul><li>Girlevik II - Station Service System (34.5kV) </li></ul>
  • 8. Auxiliary Equipment Supply <ul><li>Sır HVAC, Lighting, Lifts, Water Supply </li></ul><ul><li>Borçka Cooling and Industrial Water, Pressurized Air </li></ul><ul><li>Muratlı HVAC, Lighting, Fire Protection, Telephone, </li></ul><ul><li>Cooling and Industrial Water, Pressurized Air </li></ul><ul><li>Torul Cooling, Drainage and Dewatering, </li></ul><ul><li>Pressurized Air, Powerhouse Gantry Crane, </li></ul><ul><li>Gantry Crane for Fabrication Yard </li></ul><ul><li>Berke Gantry Cranes; Surface Spillway Stoplogs, </li></ul><ul><li>Intake Trashrack, Tailrace Stoplogs </li></ul>
  • 9. SUMMARY <ul><li>Design, supply, fabrication and erection experiences: </li></ul><ul><li>- more than 20,000 tons of Hydraulic Steel Structures </li></ul><ul><li>- CH Turbines with runner diameter of Ø 500 to Ø 1400 mm </li></ul><ul><li>- LH Turbines with runner diameter of Ø 2400 to Ø 5000 mm </li></ul><ul><li>- CH and LH Generators, including stacking at Site </li></ul><ul><li>- Electrical Equipment from 33 to 380kV </li></ul><ul><li>Long term Cooperation Agreements: </li></ul><ul><li>- with VA TECH for CH and LH </li></ul><ul><li>- with ELIOP (Spain) for Control and Protection Equipment </li></ul><ul><li>Representation of Transformer manufacturer ZTR (Ukraine) </li></ul><ul><li>EPC experience for CH and LH Hydro Projects </li></ul>

×