Defeat in negotiating the procurement plan and the purchase of goods / services to meet the needs of companies (organizations) and drafting of contracts, resulting in high operating costs and / or investments for the company, thereby reducing or burdening income (revenue), and will ultimately reduce profits of the business is run.
Weakness and inability to negotiate when preparing the contract, resulting in the company as the buyer can not control the price and quality of the goods / services purchased from a seller which resulted goods / services produced by the company can not compete on the global market
How to win negotitation for procurement and strategies contract drafting
1. HOW TO WIN NEGOTIATION ON PROCUREMENT
AND STRATEGIES CONTRACT DRAFTING
ISO 31000-2009 IN TODAY’S BUSINESS’S INSIGHT
Background
Kekalahan dalam melakukan negosiasi pada rencana pengadaan dan pembelian barang/jasa untuk
memenuhi kebutuhan perusahaan (organisasi) dan penyusunan kontrak, menyebabkan tingginya biaya
operasional dan/atau investasi bagi perusahaan sehingga mengurangi atau membebani pendapatan
(revenue), dan pada akhirnya akan memperkecil keuntungan yang diperoleh dari bisnis yang dijalankan.
Kelemahan untuk melakukan negosiasi dan ketidakmampuan pada saat menyusun kontrak, mengakibatkan
perusahaan sebagai pembeli tidak dapat melakukan control terhadap harga dan kualitas barang/jasa yang
dibeli dari penjual yang berakibat barang/jasa yang diproduksi oleh perusahaan tidak dapat bersaing pada
pasar global.
Overview
Program “How to win for procurement and strategies contract drafting” merupakan program untuk
memberikan ketrampilan yang unggul pada saat melakukan negosiasi atas harga barang/jasa yang
ditawarkan oleh vendor kepada perusahaan, termasuk menyusun kontrak sebagai pengikat atas hak dan
kewajiban pembeli dan penjual sesuai dengan Standard Service Level Agreement yang menjadi panduan
bagi perusahaan dalam mendukung keberhasilan bisnis pada saat bersaing dengan perusahaan sejenis.
Program ini diselenggarakan melalui transformasi pengetahuan, ketrampilan dan pengalaman melalui
kegiatan tutor, diskusi, umpan balik, studi kasus dan simulasi sehingga peserta memiliki wawasan yang luas
dan pengetahuan yang mendalam tentang teknik melakukan negosiasi, dan menguasai standard service level
agreement yang dituangkan di dalam contract drafting.
Understanding
Program ini adalah bertujuan untuk menguasai kualitas dan harga atas suatu produk barang/jasa yang
ditawarkan oleh vendor dalam rangka memenuhi kebutuhan perusahaan namun dapat mendukung
pertumbuhan bisnis yang kompetitive, sehingga perusahaan dapat memenangkan persaingan pada era
globalisasi.
Di dalam program, peserta akan diperkenalkan dengan berbagai strategi untuk melakukan evaluasi kinerja
vendor, produk standardization berdasarkan ketentuan local dan/atau internasional, teknik menentukan
harga, system delivery, mengetahui dan menguasai channel distribusi sampai dengan penyusunan kontrak
yang akan diimplementasikan.
Objective
1. Mendapatkan harga dan kualitas yang terbaik pada produk barang/jasa yang dibutuhkan oleh
perusahaan, dalam mendukung tujuan strategis perusahaan di dalam persaingan global.
2. 2. Menetapkan standard vendor performance yang tinggi, untuk dapat memberikan jaminan pertumbuhan
perusahaan secara berkelanjutan.
3. Mengelola dan menjalin hubungan yang baik dengan vendor yang dapat memberikan dukungan pada
keberhasilan tujuan strategis perusahaan yang ditetapkan.
4. Mengenal dan menguasai beberapa kunci penting pada ISO 31000-2009, sebagai keberhasilan pada
standardisasi ISO 31000-2009, dan juga dapat menjamin pertumbuhan bisnis yang berkelanjutan
Program Content
1. Pengertian Procurement and Negotiation
2. Pengertian produk barang/jasa “discontinue”
3. Product Knowledge pada barang/jasa yang dibutuhkan perusahaan
4. Strategy pricing yang dipergunakan pada vendor
5. Supply chain yang berkesinambungan
6. Prinsip dasar ISO 31000-2009 pada strategy negotiation for procurement
7. Risk Management (ISO 31000-2009) pada prosedur evaluasi kualitas produk barang/jasa
8. Pengertian, visi dan misi Contract Drafting
9. Strategy mempersiapkan kontrak dagang
10. Standardisasi produk barang/jasa berdasarkan hukum asing
11. Penyelarasan standard produk barang/jasa berdasarkan hukum asing dengan ISO 31000-2009
Method
1. Tutor
2. Diskusi
3. Simulasi
4. Studi kasus
Run Down
Program ini diselenggarakan selama 3 (tiga) hari, @ 6 (enam) jam, dengan run down sebagai berikut:
1. Pengertian dasar topic bahasan, selama 0.5 jam
2. Pendalaman topic bahasan, selama 1.5 jam
3. Relevansi topic bahasan dengan ISO 31000-2009, selama 1.5 jam
4. Studi kasus sebagai dasar membangun strategy, selama 1 jam
5. Simulasi sebagai pembekalan pengalaman, selama 1 jam
6. Evaluasi dan measurement, selama 0.5 jam
Who should attending
1. Supervisor, leader, manager dan director
2. Finance, Legal, Procurement, Logistics, and Quality Assurance
3. Setiap orang yang ingin mengetahui strategi negosiasi dan menyusun kontrak yang berkaitan dengan
ISO
3. Consultant Profile
Setiono Winardi, SH.,MBA
http://pt.linkedin.com/in/setionow dan http://uid.academia.edu/SetionoWinardi
Reference
1. Weele, Arjan J. van (2010). Purchasing and Supply Chain Management: Analysis, Strategy, Planning
and Practice (5th ed.). Andover: Cengage Learning. ISBN 978-1-4080-1896-5.
2. Lewis, M.A. and Roehrich, J.K. (2009). Contracts, relationships and integration: Towards a model of
the procurement of complex performance. International Journal of Procurement Management,
2(2):125-142.
3. Caldwell, N.D. Roehrich, J.K. and Davies, A.C. (2009). Procuring complex performance in
construction: London Heathrow Terminal 5 and a private finance initiative Hospital. Journal of
Purchasing and Supply Management15(3):178-186.
4. Shaw, Felecia N., 2010. "The Power to Procure: A Look inside the City of Austin Procurement
Program". Applied Research Projects, Texas State University-San Marcos
5. Benslimane, Y.; Plaisent, M.; Bernard, P.: Investigating Search Costs and Coordination Costs in
Electronic Markets: A Transaction Costs Economics Perspective, in: Electronic Markets, 15, 3, 2005,
pp. 213–224.
6. Against Gridlock: The Viability of Interest-Based Legislative Negotiation, Gregory Brazeal, Harvard
Law & Policy Review (Online), vol. 3, p. 1 (2009).
7. Saner, Raymond. The Expert Negotiator, The Netherlands: Kluwer Law International, 2000 (Page
40)
8. Churchman, David. 1993. Negotiation Tactics. Maryland: University Press of America. Pg 13.
9. Trotschel; Hufmeier; Loschelder; Schwartz; Collwitzer (2011). "Perspective taking as a means to
overcome motivational barriers in negotiations: When putting oneself in the opponents shoes helps to
walk towards agreements". Journal of personality and social psychology 101: 771–790.
doi:10.1037/a0023801.
10. "Conflict and conflict management: Reflections and update - Thomas - 2006 - Journal of
Organizational Behavior - Wiley Online Library". Onlinelibrary.wiley.com. 2006-11-21. Retrieved
2014-08-24.
11. Shell, R.G. (2006). Bargaining for advantage. New York, NY: Penguin Books.
12. Marks, M; Harold, C (2011). "Who Asks and Who Receives in Salary Negotiation". Journal of
Organizational Behavior 32: 371. doi:10.1002/job.671.
13. Sorenson, R; Morse, E; Savage, G (1999). "The Test of the Motivations Underlying Choice of
Conflict Strategies in the Dual-Concern Model". The International Journal of Conflict Management.
14. "negotiating in bad faith", example of use of "bad faith" from definition in Oxford Online Dictionary,
[1] Archived 13 May 2015 at the Wayback Machine
15. IBHS Union Voice (2008-12-03). ""Bad Faith Negotiation", Union Voice". Unitas.wordpress.com.
Retrieved 2014-08-24.
16. Mudrak, T., Wagenberg, A.V. and Wubben, E. (2004), “Assessing the innovative ability of FM teams:
a review”, Facilities, Vol. 22 Nos 11/12, pp. 290–5.
17. David Cotts; Kathy Roper; Richard Payant (2010). The Facility Management Handbook - Organizing
the Department. New York: AMACOM. p. Chapter 2.
18. Brian Atkins; Adrian Brooks (2009). Total Facilities Management (3rd ed.). Chichester UK: Wiley
Blackwell. p. 119 to 130.
4. 19. Gorden, Robert (2008). Start and Run a Successful Cleaning Business. Oxford: How to Books. p. 74.
ISBN 9781845282844.
20. Booty, Frank (2010). Facilities Management. Amsterdam: Elsevier. p. 295.
21. New, Paul. "Head in the Cloud: Lease Management in the Modern Era". FM Innovations. Retrieved
21 July 2015.
22. Alexi Marmot, Joanna Eley; “Office space planning: designing for tomorrow's workplace” McGraw
Hill P91
23. Technical Committee ISO/TC 154, Processes, data elements and documents in commerce, industry
and administration. (2004-12-01). "ISO 8601:2004(E)". ISO. Retrieved 2006-11-15. "Annex A …
Identification of a particular date by means of ordinal dates (ISO 2711) and by means of the week
numbering system (ISO 2015) were alternative methods that the basic concept of this International
Standard could also encompass; thus, ISO 2015 and ISO 2711 have now been superseded."
24. ISO 8601:2004 (E), ISO, 2004-12-01, "Annex A ... From that concept representations of all other
date and time values were logically derived; thus, ISO 2014, ISO 3307 and ISO 4031 have been
superseded.... Identification of a particular date by means of ordinal dates (ISO 2711) and by means of
the week numbering system (ISO 2015) were alternative methods that the basic concept of this
International Standard could also encompass; thus, ISO 2015 and ISO 2711 have now been
superseded."
25. TC 154 Processes, data elements and documents in commerce, industry and administration, Technical
committees – ISO
26. Doggett, L. E. (1992). "Calendars". In P. K. Seidelmann. Explanatory Supplement to the
Astronomical Almanac. Sausalito, California: University Science Books. p. 580. ISBN 0-935702-68-7.
"The Gregorian calendar today serves as an international standard for civil use."
27. "NIST TechBeat 2006-11-22". NIST. 2006-11-22. Retrieved 2012-05-06. "Decimals Score a Point
on International Standards ... It soon may be possible to write international standards documents with
decimal points in them."
28. Nilsson, M. (2000-11-01). "ID3 tag version 2.4.0 - Main Structure". id3.org. pp. §4. Retrieved
2009-09-27.
29. 2. Antunes, Ricardo; Gonzalez, Vicente (3 March 2015). "A Production Model for Construction: A
Theoretical Framework". Buildings 5 (1): 209–228. doi:10.3390/buildings5010209.
30. ISO/IEC Guide 73:2009 (2009). Risk management — Vocabulary. International Organization for
Standardization.
31. ISO/DIS 31000 (2009). Risk management — Principles and guidelines on implementation.
International Organization for Standardization.
32. Trevisani, Daniele (2007). Regie di Cambiamento (Translated Title: The Directions of Change),
Franco Angeli Publisher, Milan, ISBN 9788846483775
33. Bent Flyvbjerg and Alexander Budzier, 2011, "Why Your IT Project May Be Riskier Than You
Think", Harvard Business Review, vol. 89, no. 9, pp. 601-603
34. "Committee Draft of ISO 31000 Risk management" (PDF). International Organization for
Standardization. 2007-06-15.
35. CMU/SEI-93-TR-6 Taxonomy-based risk identification in software industry. Sei.cmu.edu. Retrieved
on 2012-04-17.