SlideShare a Scribd company logo
1 of 19
Download to read offline
The Impacts of
Facility Downtime
and how to PREVENT them
@RLETechnologies
30%

23%

15%

8%

0%

Power Outage

Water Damage

Hardware Failure

Earthquake

Fire

Hurricane

Building Outage

Corrupt Data

Leading Causes of Business Downtime*
*Source: Contingency Planning Research, a division of Eagle Rock Alliance
@RLETechnologies
30%

23%

Alarm monitoring and direct notification
may circumvent
!

15%

8%

79% of the 

leading causes
!

0%

Power Outage

Water Damage

of business downtime.

Hardware Failure

Earthquake

Fire

Hurricane

Building Outage

Corrupt Data

Leading Causes of Business Downtime*
*Source: Contingency Planning Research, a division of Eagle Rock Alliance

@RLETechnologies
How Can You

MINIMIZE business downtime?

@RLETechnologies

image credit: http://www.flickr.com/photos/36106576@N05/3895590793/
Best Practices

for facility MONITORING
@RLETechnologies
Identify issues BEFORE they become critical
@RLETechnologies

image credit:http://www.stupid.com/cracked-up-mug.html
1) Snowballing effect
issues usually start small

@RLETechnologies

image credit: http://www.bobvila.com/articles/leaky-faucet/#.UvuYxUJdVNE
2) Localized alarms
are not enough

@RLETechnologies

image credit: http://www.flickr.com/photos/thesundaytimesmarket/4420223529/in/photostream/
3) Alerts should be sent
before critical conditions occur

@RLETechnologies

image credit: http://www.flickr.com/photos/josephleenovak/661986453/sizes/o/in/photostream/
4) Alarms should go



to the appropriate people

@RLETechnologies

image credit: http://www.pinterest.com/pin/26951297740498874/
5) Redundancy



ensures alarms are received

@RLETechnologies

image credit: http://www.pinterest.com/pin/22940279323891988/
DON’T WAIT for the damage to be done!
@RLETechnologies

image credit: http://www.etsy.com/listing/88175038/vintage-chronometer-from-russia-soviet?ref=v1_other_2
1) Reactionary Mentality



is not acceptable

@RLETechnologies

image credit:http://www.pinterest.com/pin/236720524135735383/
An Example of

reactive MENTALITY
- Facility lost one of three phases of utility power !

-

- Computer room A/C units continued to 

run until critical failure !

- Automatic thermal shutdown of the servers @RLETechnologies
The Proactive
SOLUTION

- Power meters installed on the utility feed !

- Intelligent information pulled from the CRAC units !

-

- Temperature sensors installed in strategic locations !

- Prevent future failures by providing proactive alarms @RLETechnologies
2) Downtime =



lost $$$

@RLETechnologies

image credit: http://www.lifehack.org/articles/money/8-ways-thinking-make-you-become-rich.html
The Impacts

of DOWNTIME
- Redirection of efforts towards recovery - Employee productivity & morale - Customer confidence -

@RLETechnologies
Health Care
$90,000.00
Retail
$1,100,000.00
Manufacturing
$1,610,654.00

Telecommunications
$2,066,245.00

Brokerage Operations
$6,480,000

Media
$90,000.00

Energy
$2,817,846.00

Estimated Industry Hourly Downtime Costs
@RLETechnologies
Want to continue the conversation?
Connect with RLE Technologies here:
!

website: rletech.com
twitter: @RLETechnologies
facebook: facebook.com/RLETech
linkedin: linkedin.com/company/rle-technologies
google plus: https://plus.google.com/+Rletech
!

@RLETechnologies

More Related Content

Similar to Visually Speaking: The Impact and Prevention of Facility Downtime

Functional safety by FMEA/FTA
Functional safety by FMEA/FTAFunctional safety by FMEA/FTA
Functional safety by FMEA/FTAmehmor
 
Condition Monitoring of DC Motor using Artificial Intelligence Technique
Condition Monitoring of DC Motor using Artificial Intelligence TechniqueCondition Monitoring of DC Motor using Artificial Intelligence Technique
Condition Monitoring of DC Motor using Artificial Intelligence Techniqueijsrd.com
 
Supply Chain Risk Procurecon - Deriving Economic Value
Supply Chain Risk Procurecon - Deriving Economic ValueSupply Chain Risk Procurecon - Deriving Economic Value
Supply Chain Risk Procurecon - Deriving Economic ValueThe Risk Project, LLC
 
UTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopUTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopDakx Turcotte
 
IRJET - Media-Processing for Structural Failure Assessment
IRJET - Media-Processing for Structural Failure AssessmentIRJET - Media-Processing for Structural Failure Assessment
IRJET - Media-Processing for Structural Failure AssessmentIRJET Journal
 
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIFORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIIRJET Journal
 
Arc flash hazard and its reduction
Arc flash hazard and its reductionArc flash hazard and its reduction
Arc flash hazard and its reductionSvtech Solutions
 
Internet of Things and Energy at SAP for Utilities
Internet of Things and Energy at SAP for UtilitiesInternet of Things and Energy at SAP for Utilities
Internet of Things and Energy at SAP for UtilitiesTom Raftery
 
Applied Materials Strategy Analysis Presentation
Applied Materials Strategy Analysis PresentationApplied Materials Strategy Analysis Presentation
Applied Materials Strategy Analysis PresentationUnited Business Media
 
Fault Tree Analysis in Maintenance Principles
Fault Tree Analysis in Maintenance PrinciplesFault Tree Analysis in Maintenance Principles
Fault Tree Analysis in Maintenance Principlessshoaib1
 
How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...Prem Baboo
 
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...IRJET Journal
 
Filling in the blanks: How what your energy data monitoring isn't telling you...
Filling in the blanks: How what your energy data monitoring isn't telling you...Filling in the blanks: How what your energy data monitoring isn't telling you...
Filling in the blanks: How what your energy data monitoring isn't telling you...Kate Trono
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Ariful Islam
 
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)Evandro Gama (Prof. Dr.)
 
DistribuTECH 2016: OMNETRIC next generation outage management
DistribuTECH 2016: OMNETRIC next generation outage managementDistribuTECH 2016: OMNETRIC next generation outage management
DistribuTECH 2016: OMNETRIC next generation outage managementOMNETRIC
 
RCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisRCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisAbdulrahman Alkhowaiter
 

Similar to Visually Speaking: The Impact and Prevention of Facility Downtime (20)

Functional safety by FMEA/FTA
Functional safety by FMEA/FTAFunctional safety by FMEA/FTA
Functional safety by FMEA/FTA
 
Condition Monitoring of DC Motor using Artificial Intelligence Technique
Condition Monitoring of DC Motor using Artificial Intelligence TechniqueCondition Monitoring of DC Motor using Artificial Intelligence Technique
Condition Monitoring of DC Motor using Artificial Intelligence Technique
 
Supply Chain Risk Procurecon - Deriving Economic Value
Supply Chain Risk Procurecon - Deriving Economic ValueSupply Chain Risk Procurecon - Deriving Economic Value
Supply Chain Risk Procurecon - Deriving Economic Value
 
UTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopUTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup Workshop
 
IRJET - Media-Processing for Structural Failure Assessment
IRJET - Media-Processing for Structural Failure AssessmentIRJET - Media-Processing for Structural Failure Assessment
IRJET - Media-Processing for Structural Failure Assessment
 
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIFORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
 
Arc flash hazard and its reduction
Arc flash hazard and its reductionArc flash hazard and its reduction
Arc flash hazard and its reduction
 
Internet of Things and Energy at SAP for Utilities
Internet of Things and Energy at SAP for UtilitiesInternet of Things and Energy at SAP for Utilities
Internet of Things and Energy at SAP for Utilities
 
Applied Materials Strategy Analysis Presentation
Applied Materials Strategy Analysis PresentationApplied Materials Strategy Analysis Presentation
Applied Materials Strategy Analysis Presentation
 
Fault Tree Analysis in Maintenance Principles
Fault Tree Analysis in Maintenance PrinciplesFault Tree Analysis in Maintenance Principles
Fault Tree Analysis in Maintenance Principles
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...
 
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...
DESIGN THINKING ON FAULT DIAGNOSIS OF FLOATING WIND TURBINE GENERATOR USING A...
 
Filling in the blanks: How what your energy data monitoring isn't telling you...
Filling in the blanks: How what your energy data monitoring isn't telling you...Filling in the blanks: How what your energy data monitoring isn't telling you...
Filling in the blanks: How what your energy data monitoring isn't telling you...
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
 
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)
PIF2019 - A01 - André Mainart Menezes - EY (Ernst & Young)
 
Amit Nath
Amit NathAmit Nath
Amit Nath
 
DistribuTECH 2016: OMNETRIC next generation outage management
DistribuTECH 2016: OMNETRIC next generation outage managementDistribuTECH 2016: OMNETRIC next generation outage management
DistribuTECH 2016: OMNETRIC next generation outage management
 
Company Presentation.pptx
Company Presentation.pptxCompany Presentation.pptx
Company Presentation.pptx
 
RCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisRCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure Analysis
 

Recently uploaded

Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 

Recently uploaded (20)

Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 

Visually Speaking: The Impact and Prevention of Facility Downtime

  • 1. The Impacts of Facility Downtime and how to PREVENT them @RLETechnologies
  • 2. 30% 23% 15% 8% 0% Power Outage Water Damage Hardware Failure Earthquake Fire Hurricane Building Outage Corrupt Data Leading Causes of Business Downtime* *Source: Contingency Planning Research, a division of Eagle Rock Alliance @RLETechnologies
  • 3. 30% 23% Alarm monitoring and direct notification may circumvent ! 15% 8% 79% of the 
 leading causes ! 0% Power Outage Water Damage of business downtime. Hardware Failure Earthquake Fire Hurricane Building Outage Corrupt Data Leading Causes of Business Downtime* *Source: Contingency Planning Research, a division of Eagle Rock Alliance @RLETechnologies
  • 4. How Can You MINIMIZE business downtime? @RLETechnologies image credit: http://www.flickr.com/photos/36106576@N05/3895590793/
  • 5. Best Practices for facility MONITORING @RLETechnologies
  • 6. Identify issues BEFORE they become critical @RLETechnologies image credit:http://www.stupid.com/cracked-up-mug.html
  • 7. 1) Snowballing effect issues usually start small @RLETechnologies image credit: http://www.bobvila.com/articles/leaky-faucet/#.UvuYxUJdVNE
  • 8. 2) Localized alarms are not enough @RLETechnologies image credit: http://www.flickr.com/photos/thesundaytimesmarket/4420223529/in/photostream/
  • 9. 3) Alerts should be sent before critical conditions occur @RLETechnologies image credit: http://www.flickr.com/photos/josephleenovak/661986453/sizes/o/in/photostream/
  • 10. 4) Alarms should go 
 to the appropriate people @RLETechnologies image credit: http://www.pinterest.com/pin/26951297740498874/
  • 11. 5) Redundancy 
 ensures alarms are received @RLETechnologies image credit: http://www.pinterest.com/pin/22940279323891988/
  • 12. DON’T WAIT for the damage to be done! @RLETechnologies image credit: http://www.etsy.com/listing/88175038/vintage-chronometer-from-russia-soviet?ref=v1_other_2
  • 13. 1) Reactionary Mentality 
 is not acceptable @RLETechnologies image credit:http://www.pinterest.com/pin/236720524135735383/
  • 14. An Example of reactive MENTALITY - Facility lost one of three phases of utility power ! - - Computer room A/C units continued to 
 run until critical failure ! - Automatic thermal shutdown of the servers @RLETechnologies
  • 15. The Proactive SOLUTION - Power meters installed on the utility feed ! - Intelligent information pulled from the CRAC units ! - - Temperature sensors installed in strategic locations ! - Prevent future failures by providing proactive alarms @RLETechnologies
  • 16. 2) Downtime = 
 lost $$$ @RLETechnologies image credit: http://www.lifehack.org/articles/money/8-ways-thinking-make-you-become-rich.html
  • 17. The Impacts of DOWNTIME - Redirection of efforts towards recovery - Employee productivity & morale - Customer confidence - @RLETechnologies
  • 19. Want to continue the conversation? Connect with RLE Technologies here: ! website: rletech.com twitter: @RLETechnologies facebook: facebook.com/RLETech linkedin: linkedin.com/company/rle-technologies google plus: https://plus.google.com/+Rletech ! @RLETechnologies