Your SlideShare is downloading. ×
Flores Development Oct 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Flores Development Oct 2013

80
views

Published on

A presentation showing the 3 projects CBBI are involved in on the island of Flores. The presentation shows areas of education, water and health which are the main priorities for the isolated locations …

A presentation showing the 3 projects CBBI are involved in on the island of Flores. The presentation shows areas of education, water and health which are the main priorities for the isolated locations of Zeu, Wawa and Nio.

Published in: Education, Health & Medicine

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
80
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 1 INDONESIA 1
  • 2. - CBBI – Development of Zeu and Wawa
  • 3. 3 HISTORY
  • 4. 5 WHAT IS OUR PURPOSE? EDUCA TION
  • 5. WATER
  • 6. 8 HEALT H
  • 7. 9 EYE SURGE RY Eye surgery was carried out in October 2013.
  • 8. 10 Dawesville CPS Trips - School and Parish. 20122011 20102009
  • 9. 11 WHERE HAS OUR FUNDRAISING GONE? SCHOOL BUILDINGS, CLASSROOMS and TEACHER HOUSING Zeu
  • 10. 12
  • 11. ZEU TODAY
  • 12. Vegetable Gardens and Animals
  • 13. AREAS FOR THE STUDENTS - ZEU
  • 14. UNIFORMS
  • 15. THE CHURC H
  • 16. 18 CLEAN WATER AND HEALTH PROGRAM
  • 17. 19 HEALTHY FOOD PROGRAM
  • 18. 20 Wawa – The 2nd project
  • 19. 21
  • 20. 22 Nio – The 3rd project