Comprehensive Enterprise
Reporting at STIB-MIVB
Omar Akabi
Domain Manager BI – FI
Rob Roemers
Partner Taurus-i



June 21, 2011
Syntra Tour&Taxis, Brussels
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
MIVB-STIB   Regional Public Transportation for the
            Brussels Area founded in 1954

            Employees: 6500
            Operating Budget: 207.150.040,8 EUR

            Kilometers serviced to passengers:
                 Metro: 3.636,1 Millions
                 Tram: 1.669,5 Millions
                 Bus: 1.466,9 Millions




                         Customers:
                         1.100.000 Inhabitants
                         350.000 Commuters

                         Public Sector Organisation
290,6 million journeys




                         STIB provided no less than
                         290.6 million journeys in 2009.
                         This is an increase of 1.56% in
                         relation to the previous year,
                         and 4.5 million additional trips.

                         The number of journeys has
                         continuously risen for the last
                         10 years. The division of
                         journeys is as follows:

                         80.9 million bus journeys
                         76.3 million tram journeys
                         133.4 million metro journeys
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
Taurus-i

      At Taurus-i, we believe that your core business is not about
      implementing SAP. That is why our Performance Management
      consultants are extraordinary people with an expert business
      background and a strong no-nonsense mentality.

      They will guide you in your process from idea to ROI
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
Legacy Problems (as seen from IT)




Main painpoints
 Growing disconnect between IT and business
 Low user confidence
 Poorly maintained reports
 Priviliged relationships between business and IT
 Business developing on their own and bringing in
  own consultants
 IT responsible for data quality
Legacy Problems (as seen from Business)




Main painpoints
 Data is incorrect or partially correct in systems
 Correcting data is too timeconsuming
 IT reacts too slow
 My excel has all the data we need
  Why doesn´t IT use this as a basis?
  I do this every month, can´t we automate this?
 Data “magically” changes after closure/approval
Where we started


 How we started to tackle this situation
   Development of a BI Roadmap to achieve
        Stable system environment
        Harmonised team structure
        BI Competence Center
        BI Quality Procedures
   Enterprise Reporting Methods
        KPI & Report Libraries
        Standards & Procedures
        Business Sponsors & Data Owners
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
BI Maturity Model




 Source: Gartner (August 2010)
Long term vision
                                 Business Users




Project Mode                                            Operational mode


                                      Standar
                                   Enterprise reports
                                      d KPI &
                                      Reports
               Quality Manager
                                   Daily Monitoring         Support




                       KPI Governance
                            Board
High Level Roadmap for BI (IT)
                               Phase 2:
                         Stable Environment




       Phase 1:
Standards & Procedures                                   June 2012




                          December 2011



     April 2011
                                                         Phase 3:
                                              Operational Competence Center
MIVB – STIB
Taurus-i / Keneos
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
New IT Organisation


                      Advantages
                       Clear IT – Business contact
                       No more priv. Relationships
                       Clear lines of escalation
                       Single Quality Manager
                       Operational & Project team
Leading Principals
                     • Focused on increasing
   Continual           the effectiveness and/or
                       efficiency of an
 Improvement           organisation to fulfill its
                       policy and objectives.

                     • Covers the entire history of a
   Application         software solution. Provides
    Lifecycle          processes to optimize
                       business continuity and
   Management          agility.

                      • Align Business and IT Goals
    Release             to achieve the Business
                        operational objectives
  Management            derived from the Enterprise
                        strategy
What is the source?


                       Incoming business requests
                        where all for “strategic” type
                        reporting while in many areas
                        “operational” level was not
                        yet functional.

                       Created awareness among
                        business users and
                        willingness to invest time
                        once the link was clear.
Analysis Process


                   “What do I do to answer
                   question X?”

                   Created awareness
                   within the business that
                   analysis of data also
                   follows specific steps.

                   Leading to better specs
                   and harmonised reports
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
Current Progress:
In the IT organisation
Only one more resource tackling daily issues
   Down from 3 to 4
Data loading stabilised, Reporting availability up
    Internal SLAs
Harmonising Report layouts
    Documenting formulas and content
Negociating Data Contracts with Data Providers
    Data Quality no longer responsibility of IT
Team Structure clarified (within IT and Business)
4 releases per year
Quality control implemented
Current Progress:
In the business – Comex Operations

High visibility Project for Executive Commitee
Covering all three business modes (Bus, Tram, Metro)
Topdown project (dashboards to operational reports)
Re-using existing developments, correcting and
creating new ones


Current Progress:
In the business – HR Reporting
Spin-off of Comex: HR definitions were quite clear and
HR department had a dedicated Metrics Manager that
served as a sponsor.
He also distributed a (manual created) dashboard
based on SAP data. This is now automated.
Current Progress:
In the business – Dispatching
IRIS handles all dispatching events for Bus, Metro and
Tram and is crucial for the operation of the network.
Currently limited reporting is only possible for a 30 day
history (response time OLTP). This data will be made
available via SAP BI for full analysis and dispatching
terminology is being harmonised across modes.


Current Progress:
In the business – Planning in BPC
 Implemented BPC to improve planning processes and
 make sure all data is available in SAP Systems.
 Currently a pilot to provide mandatory reporting to the
 National Bank of Belgium.
Current Progress:
In the business – DOT
Every time a vehicle door is opened or closed the time
and location are recorded. This data is analysed by
our department of transport (DOT) to find out if
schedules are kept, they look for anomalies in delay or
advance times and tweak to have optimal punctuality.

This data is loaded into SAP BI and is now available
on a daily basis to the analysts. In the past this data
was provided in hardcopy, once a month after
preparation by the department.
Current Progress:
In the business – SAP Standard
Lots of processes in our ECC are not modelled
according to SAP standard (CO, AA,…) we are slowly
removing the custom ABAP and implementing the
standard. Leading to more transparency in our source
MIVB – STIB
Taurus-i
Where we Started
Vision and Roadmap
Methodology
Current progress
Future challenges
Future Challenges

Master Data Harmonisation
Discipline
    For Quality Control
    For Releases
    For “Single version of the Truth”
Strong Sponsorship
Keep (and rebuild) trust of business in BI
Build business knowledge on IT side
Integrate BI reporting from top to bottom into the
enterprise
Link between operation initiatives and strategic
changes
Our new Motto




What gets measured gets done
20110621 vc_value_event_businessinsight_mivb

More Related Content

What's hot

What's hot (20)

Target operating model definition
Target operating model definitionTarget operating model definition
Target operating model definition
 
Application Management Framework
Application Management FrameworkApplication Management Framework
Application Management Framework
 
The Evolution of the Enterprise Operating Model - Ryan Lockard
The Evolution of the Enterprise Operating Model - Ryan LockardThe Evolution of the Enterprise Operating Model - Ryan Lockard
The Evolution of the Enterprise Operating Model - Ryan Lockard
 
Government transformation and HP
Government transformation and HPGovernment transformation and HP
Government transformation and HP
 
A Better Plan for Planning
A Better Plan for PlanningA Better Plan for Planning
A Better Plan for Planning
 
Marlabs Capabilities Overview: SMAC Services
Marlabs Capabilities Overview: SMAC ServicesMarlabs Capabilities Overview: SMAC Services
Marlabs Capabilities Overview: SMAC Services
 
Boski CV
Boski CVBoski CV
Boski CV
 
Driving PPM Adoption Through Effective Change Management
Driving PPM Adoption Through Effective Change ManagementDriving PPM Adoption Through Effective Change Management
Driving PPM Adoption Through Effective Change Management
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
 
Unified Communications Service Portfolio Executive Overview V7
Unified Communications Service Portfolio Executive Overview V7Unified Communications Service Portfolio Executive Overview V7
Unified Communications Service Portfolio Executive Overview V7
 
BPM Case Management Global Summit - Building a BPM CoE
BPM Case Management Global Summit - Building a BPM CoEBPM Case Management Global Summit - Building a BPM CoE
BPM Case Management Global Summit - Building a BPM CoE
 
ITSM (IT Service Management) & ITIL V3 Foundation
ITSM (IT Service Management) & ITIL V3 FoundationITSM (IT Service Management) & ITIL V3 Foundation
ITSM (IT Service Management) & ITIL V3 Foundation
 
Establishing 24x7 global application support operations
Establishing 24x7 global application support operationsEstablishing 24x7 global application support operations
Establishing 24x7 global application support operations
 
Bpo overview niit
Bpo overview   niitBpo overview   niit
Bpo overview niit
 
Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]
 
Marlabs Capabilities Overview: India Professional Services
Marlabs Capabilities Overview: India Professional ServicesMarlabs Capabilities Overview: India Professional Services
Marlabs Capabilities Overview: India Professional Services
 
Users group meeting 2012 july yale presentation v2
Users group meeting 2012 july yale presentation v2Users group meeting 2012 july yale presentation v2
Users group meeting 2012 july yale presentation v2
 
Anirban Das_BE-NIT_MBA-Symbiosis
Anirban Das_BE-NIT_MBA-SymbiosisAnirban Das_BE-NIT_MBA-Symbiosis
Anirban Das_BE-NIT_MBA-Symbiosis
 
Technological Breakthroughs in 2011 and Beyond
Technological Breakthroughs in 2011 and BeyondTechnological Breakthroughs in 2011 and Beyond
Technological Breakthroughs in 2011 and Beyond
 
Rcmppt
RcmpptRcmppt
Rcmppt
 

Similar to 20110621 vc_value_event_businessinsight_mivb

1.3. sa pience.be techday 2011 presentation-mivb-stib-taurus-i
1.3. sa pience.be techday 2011   presentation-mivb-stib-taurus-i1.3. sa pience.be techday 2011   presentation-mivb-stib-taurus-i
1.3. sa pience.be techday 2011 presentation-mivb-stib-taurus-i
Omar Akabi
 
Ibm cloud forum april - blue insight final
Ibm cloud forum  april - blue insight finalIbm cloud forum  april - blue insight final
Ibm cloud forum april - blue insight final
Mauricio Godoy
 
Oracle Business Intelligence for Public Sector
Oracle Business Intelligence for Public SectorOracle Business Intelligence for Public Sector
Oracle Business Intelligence for Public Sector
Ravi Tirumalai
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced Scorecards
Michael Sim
 
Balance Sheet (Financial) Consolidation
Balance Sheet (Financial) ConsolidationBalance Sheet (Financial) Consolidation
Balance Sheet (Financial) Consolidation
Dhiren Gala
 

Similar to 20110621 vc_value_event_businessinsight_mivb (20)

1.3. sa pience.be techday 2011 presentation-mivb-stib-taurus-i
1.3. sa pience.be techday 2011   presentation-mivb-stib-taurus-i1.3. sa pience.be techday 2011   presentation-mivb-stib-taurus-i
1.3. sa pience.be techday 2011 presentation-mivb-stib-taurus-i
 
Sherwood Group Consulting: PM Executive Presentation
Sherwood Group Consulting: PM Executive PresentationSherwood Group Consulting: PM Executive Presentation
Sherwood Group Consulting: PM Executive Presentation
 
Happiness is a Warm Bot: How to Generate Value from Process Mining Insight
Happiness is a Warm Bot: How to Generate Value from Process Mining InsightHappiness is a Warm Bot: How to Generate Value from Process Mining Insight
Happiness is a Warm Bot: How to Generate Value from Process Mining Insight
 
Resume_Arvindh Shyam Sundar v6
Resume_Arvindh Shyam Sundar v6Resume_Arvindh Shyam Sundar v6
Resume_Arvindh Shyam Sundar v6
 
Ibm cloud forum april - blue insight final
Ibm cloud forum  april - blue insight finalIbm cloud forum  april - blue insight final
Ibm cloud forum april - blue insight final
 
Get One Single View
Get One Single ViewGet One Single View
Get One Single View
 
Tdwi bif-short form
Tdwi bif-short formTdwi bif-short form
Tdwi bif-short form
 
CV JAN 2017
CV JAN 2017CV JAN 2017
CV JAN 2017
 
Business intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road mapBusiness intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road map
 
Fail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systemsFail to prepare, prepare to fail: implementing ERP and CRM systems
Fail to prepare, prepare to fail: implementing ERP and CRM systems
 
Fail to prepare - Softworld 2011
Fail to prepare -  Softworld 2011Fail to prepare -  Softworld 2011
Fail to prepare - Softworld 2011
 
Oracle Business Intelligence for Public Sector
Oracle Business Intelligence for Public SectorOracle Business Intelligence for Public Sector
Oracle Business Intelligence for Public Sector
 
A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...
 
NG_Resume
NG_ResumeNG_Resume
NG_Resume
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced Scorecards
 
Balance Sheet (Financial) Consolidation
Balance Sheet (Financial) ConsolidationBalance Sheet (Financial) Consolidation
Balance Sheet (Financial) Consolidation
 
[DSC Europe 22] The Making of a Data Organization - Denys Holovatyi
[DSC Europe 22] The Making of a Data Organization - Denys Holovatyi[DSC Europe 22] The Making of a Data Organization - Denys Holovatyi
[DSC Europe 22] The Making of a Data Organization - Denys Holovatyi
 
7 itil v3 csi 7 v1.8
7 itil v3 csi 7 v1.87 itil v3 csi 7 v1.8
7 itil v3 csi 7 v1.8
 
Using Technology Transformation Effectively To Improve It Business Alignment
Using Technology Transformation Effectively To Improve It Business AlignmentUsing Technology Transformation Effectively To Improve It Business Alignment
Using Technology Transformation Effectively To Improve It Business Alignment
 
Cognos BI Training Orientation
Cognos BI Training Orientation Cognos BI Training Orientation
Cognos BI Training Orientation
 

Recently uploaded

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 

20110621 vc_value_event_businessinsight_mivb

  • 1. Comprehensive Enterprise Reporting at STIB-MIVB Omar Akabi Domain Manager BI – FI Rob Roemers Partner Taurus-i June 21, 2011 Syntra Tour&Taxis, Brussels
  • 2. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 3. MIVB-STIB Regional Public Transportation for the Brussels Area founded in 1954 Employees: 6500 Operating Budget: 207.150.040,8 EUR Kilometers serviced to passengers: Metro: 3.636,1 Millions Tram: 1.669,5 Millions Bus: 1.466,9 Millions Customers: 1.100.000 Inhabitants 350.000 Commuters Public Sector Organisation
  • 4. 290,6 million journeys STIB provided no less than 290.6 million journeys in 2009. This is an increase of 1.56% in relation to the previous year, and 4.5 million additional trips. The number of journeys has continuously risen for the last 10 years. The division of journeys is as follows: 80.9 million bus journeys 76.3 million tram journeys 133.4 million metro journeys
  • 5. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 6. Taurus-i At Taurus-i, we believe that your core business is not about implementing SAP. That is why our Performance Management consultants are extraordinary people with an expert business background and a strong no-nonsense mentality. They will guide you in your process from idea to ROI
  • 7. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 8. Legacy Problems (as seen from IT) Main painpoints  Growing disconnect between IT and business  Low user confidence  Poorly maintained reports  Priviliged relationships between business and IT  Business developing on their own and bringing in own consultants  IT responsible for data quality
  • 9. Legacy Problems (as seen from Business) Main painpoints  Data is incorrect or partially correct in systems  Correcting data is too timeconsuming  IT reacts too slow  My excel has all the data we need  Why doesn´t IT use this as a basis?  I do this every month, can´t we automate this?  Data “magically” changes after closure/approval
  • 10. Where we started How we started to tackle this situation  Development of a BI Roadmap to achieve  Stable system environment  Harmonised team structure  BI Competence Center  BI Quality Procedures  Enterprise Reporting Methods  KPI & Report Libraries  Standards & Procedures  Business Sponsors & Data Owners
  • 11. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 12. BI Maturity Model Source: Gartner (August 2010)
  • 13. Long term vision Business Users Project Mode Operational mode Standar Enterprise reports d KPI & Reports Quality Manager Daily Monitoring Support KPI Governance Board
  • 14. High Level Roadmap for BI (IT) Phase 2: Stable Environment Phase 1: Standards & Procedures June 2012 December 2011 April 2011 Phase 3: Operational Competence Center
  • 15. MIVB – STIB Taurus-i / Keneos Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 16. New IT Organisation Advantages  Clear IT – Business contact  No more priv. Relationships  Clear lines of escalation  Single Quality Manager  Operational & Project team
  • 17. Leading Principals • Focused on increasing Continual the effectiveness and/or efficiency of an Improvement organisation to fulfill its policy and objectives. • Covers the entire history of a Application software solution. Provides Lifecycle processes to optimize business continuity and Management agility. • Align Business and IT Goals Release to achieve the Business operational objectives Management derived from the Enterprise strategy
  • 18. What is the source?  Incoming business requests where all for “strategic” type reporting while in many areas “operational” level was not yet functional.  Created awareness among business users and willingness to invest time once the link was clear.
  • 19. Analysis Process “What do I do to answer question X?” Created awareness within the business that analysis of data also follows specific steps. Leading to better specs and harmonised reports
  • 20. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 21. Current Progress: In the IT organisation Only one more resource tackling daily issues Down from 3 to 4 Data loading stabilised, Reporting availability up Internal SLAs Harmonising Report layouts Documenting formulas and content Negociating Data Contracts with Data Providers Data Quality no longer responsibility of IT Team Structure clarified (within IT and Business) 4 releases per year Quality control implemented
  • 22. Current Progress: In the business – Comex Operations High visibility Project for Executive Commitee Covering all three business modes (Bus, Tram, Metro) Topdown project (dashboards to operational reports) Re-using existing developments, correcting and creating new ones Current Progress: In the business – HR Reporting Spin-off of Comex: HR definitions were quite clear and HR department had a dedicated Metrics Manager that served as a sponsor. He also distributed a (manual created) dashboard based on SAP data. This is now automated.
  • 23. Current Progress: In the business – Dispatching IRIS handles all dispatching events for Bus, Metro and Tram and is crucial for the operation of the network. Currently limited reporting is only possible for a 30 day history (response time OLTP). This data will be made available via SAP BI for full analysis and dispatching terminology is being harmonised across modes. Current Progress: In the business – Planning in BPC Implemented BPC to improve planning processes and make sure all data is available in SAP Systems. Currently a pilot to provide mandatory reporting to the National Bank of Belgium.
  • 24. Current Progress: In the business – DOT Every time a vehicle door is opened or closed the time and location are recorded. This data is analysed by our department of transport (DOT) to find out if schedules are kept, they look for anomalies in delay or advance times and tweak to have optimal punctuality. This data is loaded into SAP BI and is now available on a daily basis to the analysts. In the past this data was provided in hardcopy, once a month after preparation by the department. Current Progress: In the business – SAP Standard Lots of processes in our ECC are not modelled according to SAP standard (CO, AA,…) we are slowly removing the custom ABAP and implementing the standard. Leading to more transparency in our source
  • 25. MIVB – STIB Taurus-i Where we Started Vision and Roadmap Methodology Current progress Future challenges
  • 26. Future Challenges Master Data Harmonisation Discipline For Quality Control For Releases For “Single version of the Truth” Strong Sponsorship Keep (and rebuild) trust of business in BI Build business knowledge on IT side Integrate BI reporting from top to bottom into the enterprise Link between operation initiatives and strategic changes
  • 27. Our new Motto What gets measured gets done