A3 LEAP Facility Use & Building Security
PLAN
THEME: Facility Use & Building Security
BACKGROUND: Spring 2013- Maintenance/LEAP
meet to discuss building security as well as facility
scheduling issues. Executive decision was made to
reserve all gyms for LEAP purposes from the time of
dismissal until 8 PM. No outside rentals will be allowed
before this time. As a result, facility use calendar
should not be relied upon to schedule doors. Detailed
schedules of actual gym use days and times will be
sent to the AA’s from the LEAP Office, at which point
building doors can be scheduled accordingly.
As a result this will:
1) Ensure LEAP has facilities reserved when needed.
2) Relieve Janna/Debbie of the extensive process of
entering detailed schedules.
3) Be a huge cost saving measure in regards to the
times spent scheduling, invoicing
3) Eliminate the problem of conflicting schedules with
LEAP and outside rentals in the common event of a
schedule change.
4) Eliminate the issue of building security as doors can
be scheduled according to detailed schedules
provided by the LEAP Office.
CURRENT CONDITION: Increased efficiency with
reduced security. All gyms are currently reserved for
LEAP use until 8 PM. Time spent on facility use
scheduling has been greatly reduced freeing
Janna/Debbie to do other duties as required. No
rentals (prior to 8 PM) policy has been adhered to with
minimal resistance from community members,
however basketball season is just beginning and
makes up a large majority of our rental requests. At
the building level, principals/admins feel security is
compromised as doors are remaining open until 8 PM.
PROBLEM: Doors are remaining open until 8 PM
because they are being set based on the online facility
use system. This compromises the security of the
buildings.
DO
TARGET CONDITION: Continued increased efficiency along
with maximum possible building security. All doors should be
programmed based on actual building use provided by the
LEAP Office, not the facility use calendar.
IMPLEMENTATION CHART:
Task Person Deadline
Create written policy including all
pertinent decisions regarding
facility use scheduling.
Communicate Policy to all
building principals and AA’s
Provide each building
with detailed schedules
reflecting actual facility use.
Janna/Cindy
CHECK
IMMEDIATE:
LONG TERM:
ACT/ADJUST
METRICS:
jdeering TCAPS 5.1

More Related Content

Viewers also liked (9)

Scale Model Sizes
Scale Model SizesScale Model Sizes
Scale Model Sizes
 
Appreciation July-14
Appreciation July-14Appreciation July-14
Appreciation July-14
 
Ravi resume
Ravi  resume Ravi  resume
Ravi resume
 
강남오피,대전오피방 사이트◁OpHoLic5.Com▷ 안양오피 선릉오피
강남오피,대전오피방 사이트◁OpHoLic5.Com▷ 안양오피 선릉오피강남오피,대전오피방 사이트◁OpHoLic5.Com▷ 안양오피 선릉오피
강남오피,대전오피방 사이트◁OpHoLic5.Com▷ 안양오피 선릉오피
 
Certificate of Completion (5)
Certificate of Completion (5)Certificate of Completion (5)
Certificate of Completion (5)
 
2970_001
2970_0012970_001
2970_001
 
Jerry Resume
Jerry ResumeJerry Resume
Jerry Resume
 
Streeter_2016_CMResume
Streeter_2016_CMResumeStreeter_2016_CMResume
Streeter_2016_CMResume
 
Infografia cts. liseth requena
Infografia cts. liseth requenaInfografia cts. liseth requena
Infografia cts. liseth requena
 

Similar to jdeering TCAPS 5.1

Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
Jamie Lee
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
mattinsonjanel
 
PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
Todd Sullivan
 
DASC 5303 00 – Team 4 - Assignment 6.pptx
DASC 5303 00 – Team 4 - Assignment 6.pptxDASC 5303 00 – Team 4 - Assignment 6.pptx
DASC 5303 00 – Team 4 - Assignment 6.pptx
17542Saiteja
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
JB Nartey
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
JB Nartey
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
Tahir B Mirza
 
Raccf filestorage url access-cloudberrylab
Raccf filestorage url access-cloudberrylabRaccf filestorage url access-cloudberrylab
Raccf filestorage url access-cloudberrylab
baskaranmani123
 

Similar to jdeering TCAPS 5.1 (20)

Top 9 issues in construction industry and how Ayoga can solve it
Top 9 issues in construction industry and how Ayoga can solve itTop 9 issues in construction industry and how Ayoga can solve it
Top 9 issues in construction industry and how Ayoga can solve it
 
Management project
Management projectManagement project
Management project
 
Student Project
Student ProjectStudent Project
Student Project
 
Kandil_Sameh_CPMPart 3 _b
Kandil_Sameh_CPMPart 3 _bKandil_Sameh_CPMPart 3 _b
Kandil_Sameh_CPMPart 3 _b
 
Contracts 2
Contracts 2Contracts 2
Contracts 2
 
Leonia Borough Facility Construction Overview
Leonia Borough Facility Construction OverviewLeonia Borough Facility Construction Overview
Leonia Borough Facility Construction Overview
 
Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Slide management project
Slide management projectSlide management project
Slide management project
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
 
Timekeeping refresher 2015 vote
Timekeeping refresher 2015 voteTimekeeping refresher 2015 vote
Timekeeping refresher 2015 vote
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
 
PreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroupPreFab_Whitepaper-TheMorseGroup
PreFab_Whitepaper-TheMorseGroup
 
DASC 5303 00 – Team 4 - Assignment 6.pptx
DASC 5303 00 – Team 4 - Assignment 6.pptxDASC 5303 00 – Team 4 - Assignment 6.pptx
DASC 5303 00 – Team 4 - Assignment 6.pptx
 
Atos pitfalls-moving-ict-infra-uk
Atos pitfalls-moving-ict-infra-ukAtos pitfalls-moving-ict-infra-uk
Atos pitfalls-moving-ict-infra-uk
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
Raccf filestorage url access-cloudberrylab
Raccf filestorage url access-cloudberrylabRaccf filestorage url access-cloudberrylab
Raccf filestorage url access-cloudberrylab
 

More from OfficeChampion (10)

Jdeering.tcaps.lean office champion
Jdeering.tcaps.lean office championJdeering.tcaps.lean office champion
Jdeering.tcaps.lean office champion
 
Wsmc outpatient flow lean project
Wsmc outpatient flow lean projectWsmc outpatient flow lean project
Wsmc outpatient flow lean project
 
jvance Coldwell 1a
jvance Coldwell 1ajvance Coldwell 1a
jvance Coldwell 1a
 
Lean office champion
Lean office championLean office champion
Lean office champion
 
Cbailey NMC Final
Cbailey NMC FinalCbailey NMC Final
Cbailey NMC Final
 
Project charter pre registration for radiology patients
Project charter pre registration for radiology patientsProject charter pre registration for radiology patients
Project charter pre registration for radiology patients
 
Office Ergonomics
Office ErgonomicsOffice Ergonomics
Office Ergonomics
 
dkimball MMC FINAL
dkimball MMC FINALdkimball MMC FINAL
dkimball MMC FINAL
 
Project charter pre registration for radiology patients
Project charter pre registration for radiology patientsProject charter pre registration for radiology patients
Project charter pre registration for radiology patients
 
ARommell POMH 1.1
ARommell POMH 1.1ARommell POMH 1.1
ARommell POMH 1.1
 

jdeering TCAPS 5.1

  • 1. A3 LEAP Facility Use & Building Security PLAN THEME: Facility Use & Building Security BACKGROUND: Spring 2013- Maintenance/LEAP meet to discuss building security as well as facility scheduling issues. Executive decision was made to reserve all gyms for LEAP purposes from the time of dismissal until 8 PM. No outside rentals will be allowed before this time. As a result, facility use calendar should not be relied upon to schedule doors. Detailed schedules of actual gym use days and times will be sent to the AA’s from the LEAP Office, at which point building doors can be scheduled accordingly. As a result this will: 1) Ensure LEAP has facilities reserved when needed. 2) Relieve Janna/Debbie of the extensive process of entering detailed schedules. 3) Be a huge cost saving measure in regards to the times spent scheduling, invoicing 3) Eliminate the problem of conflicting schedules with LEAP and outside rentals in the common event of a schedule change. 4) Eliminate the issue of building security as doors can be scheduled according to detailed schedules provided by the LEAP Office. CURRENT CONDITION: Increased efficiency with reduced security. All gyms are currently reserved for LEAP use until 8 PM. Time spent on facility use scheduling has been greatly reduced freeing Janna/Debbie to do other duties as required. No rentals (prior to 8 PM) policy has been adhered to with minimal resistance from community members, however basketball season is just beginning and makes up a large majority of our rental requests. At the building level, principals/admins feel security is compromised as doors are remaining open until 8 PM. PROBLEM: Doors are remaining open until 8 PM because they are being set based on the online facility use system. This compromises the security of the buildings. DO TARGET CONDITION: Continued increased efficiency along with maximum possible building security. All doors should be programmed based on actual building use provided by the LEAP Office, not the facility use calendar. IMPLEMENTATION CHART: Task Person Deadline Create written policy including all pertinent decisions regarding facility use scheduling. Communicate Policy to all building principals and AA’s Provide each building with detailed schedules reflecting actual facility use. Janna/Cindy CHECK IMMEDIATE: LONG TERM: ACT/ADJUST METRICS: