Project Chapter
Project Name : Establish Academic Information System of
SMAN 2 Mandau
Project Start Date : January 23, 2017
Completed Project Date : June 12, 2017
Project Manager : Theo Luckita M
Analys : Argawanda
Programmer : Rolly Fahdial
1. INTRODUCTION
Project Objectives
build an academic information system at SMAN 2 Mandau that can provide
technology and information related to academic at SMAN 2 Mandau which includes new
student enrollment, teacher data storage, active student data storage and alumni students
per force, and so forth.
Thus it can provide convenience and advantages for the school and also students / i. The
project starts with analyzing existing system processes, designing systems, designing computer
network architectures to be used, network testing, to system implementation. This project will be
done for 5 months with estimated cost of Rp. 10,000,000.00, -
The following are some of the critical success factors of the project:
Determinants of Success
Commitment and support from the management.
The availability of human resources in accordance
with their respective competencies.
Commitment and support of the project team
Good cooperation of all parties in accordance with their
respective competencies
Continuity of project implementation.
Discipline implementation in accordance with the project
work plan.
Good and complete project documentation ..
The availability of all project support facilities is
appropriate and adequate.
Good cooperation of all parties in accordance with their respective competencies
Expected Benefits
From the school side:
Provide wider and faster information access to students.
Improve the quality of education in SMAN 2 Mandau.
From student / i:
Improve the effectiveness of learning from the circulation of knowledge of technology and
information.
Supporting educational facilities for students of SMAN 2 Mandau.
2. APPROACHES IN PROJECT MANAGEMENT
Stages of the Project Approach
o Analysis of the needs of computer users, hardware and software to be implemented.
o The design of computer network architecture.
o System development.
o Test computer network connectivity.
o Develop project cost estimation for implementation.
3. COVERAGE OF
PROJECT
The academic information system project is a project to build
an academic information system and design a computer network
system in the environment of SMAN 2 Mandau. The system to be
implemented is a LAN network system (Local Area Network).
a. Specification of Functional Requirements
From the analysis needs of SMAN 2 Mandau and the use of computers, required a LAN
network system. Here in is a list of system functional requirements needed campus and also its
users (server computers, client computers).
Function Name Description
Server
Computer
To manage all activities performed by the admin, where data is
entered or issued will be stored and managed on the server computer.
Computer Client
For use by the user as a means of delivering information and teaching
learning by students / i.
b. Non-Functional Requirement Specification
The following is a list of non-functional requirements of academic information
system of SMAN 2 Mandau:
No Non-Functional Needs
1
All applications required in learning activities must be
provided on every computer.
2 The computer used must be of the best quality and speck.
3 Network connectivity should be quickly accessible.
4 The computer used should be safe for use by the user.
Description of Project Scope
 The device that will be used in this project is hardware, and other supporting software in
SMAN 1 Bena2 Mandau.
 The modules developed include: network connectivity, network architecture, and reports
required when there are additions or complaints from the modules we develop.
 The network model used by LAN network, so that all existing connections can only be used in
the environment of SMAN 2 Mandau.
 Academic information system is built by using PHP, mysql and xampp programming languages.
Submission of Project
Outputs that will be included in this project are reports of system malfunction, network
performance decryption, and others.
Criteria for Project Acceptance
Team pegembang will perform network testing in the final stages, after the installation of
applications on the server computer or client is done. In addition to testing from the developer, this
final test will also be performed by the client in this case is the SMAN 2 Mandau, and if everything
is considered sufficient and can be smoothly then it will be submitted to the SMAN 2 Mandau.
Limitations• The information system built is academic information system of SMAN 2 Mandau.
• The features that will be displayed on the system is home, student enrollment / i, teacher
menu, student menu, alumni menu, about.
• Applications are built using PHP, mysql and xampp programming languages
• Network system built using LAN network system.
• Internet access is only provided around the environment of SMAN 2 Mandau.
• Restrict access to excessive bandwidth usage that can harm the SMAN 2 Mandau.
4. SCHEDULE OF PROJECT IMPLEMENTATION
Jadwal Tanggal
Mulai proyek 23 Januari 2017
Analisa sistem yang ada 25 Januari 2017
Project charter ditandatangani 27 Januari 2017
Proposal disetujui 27 Januari 2017
Perekrutan tim proyek 03 Februari 2017
Hasil analisa sistem disetujui 10 Februari 2017
Pembuatan laporan 28 Januari – 05 Juni 2017
Membangun sistem 15 Maret 2017
Penerapan instalasi jaringan komputer 17 April 2017
Penerapan Instalasi OS pada komputer
server dan client
02 Mei 2017
Testing jaringan 19 mei 2017
Seminar 10 Juni 2017
Proyek selesai 12 Juni 2017
5. CHANGE MANAGEMENT PLAN
In the course of a project, there is almost always a demand for change. To anticipate this,
it is necessary to prepare a procedure. The procedure for controlling changes in a project is often
called the Change Control Procedure.
Any approved modifications or changes to the project schedule and cost should refer to the following
procedures:
• Submission of changes may come from each team member when necessary, especially for changes
that will affect the schedule and scope of work.
• Approval on the change request form indicates approval of changes to the schedule.
Change Control Procedures
CONTINUE..
Submission of Changes
 A change can be submitted to the project manager through formal communication (regular meetings) or non-
formal (other communications).
 Fill out the change request form.
 Every change is recorded on the change request note.
Monitor Perubahan
 When the change request form has been approved, work can begin.
 The project manager will change the project schedule or work plan to accommodate the agreed changes and present
them in the project progress meeting for approval.
 Progress in change control will be reported in project meetings, the project manager must sign the change request form
if the change has been completed.
6. COMMUNICATION MANAGEMENT PLAN
Communicating Planning
Communication planning outlines the need for regular communication
among team members involved in the construction of the academic
information system development project of SMAN 2 Mandau.
Communication should not be done formally, communication can be done
openly and informally to facilitate knowledge transfer between all parties
involved / interested
Preparation for the Meeting
Distributing the agenda of the meeting, at least one day before the meeting,
discussion of topics in order of importance begins with easy topics and each topic is
allocated time.
• Distributing meeting materials, agenda, as well as location and time information.
• Each member of the project team is responsible for preparing, attending and
participating actively in meetings.
• Leaders of meetings and facilitators ensure meetings are on track and effective, so
meeting objectives can be achieved.
• The meeting leader will appoint a notary to make the meeting documentation and
distribute appropriately.
Continue....
The meeting discussed at least the following topks:
• Activities that will soon be done
• Review of change controls
7. PROJECT TEAM DIRECTORY
Nama Posisi Email Telephone
Theo Luckita Project Manajer theoluckita@gmail.com 082144991000
Argawanda Analisa Perancangan
dan training operator
argawanda@gmail.com 085216422219
1. Rolly fahdial Konfigurasi server,
setting router, switch
dan hub
1. rollyfahdial@gmail.com 1. 082384455454
8. MANAGEMENT PLAN COST
The project will use accepted value metrics to track and manage costs and the cost basis
provides the basis for reporting, tracking, and managing costs. The cost breakdown for the project to
build the academic information system of SMAN 2 Mandau covers all budgeted costs for the
successful completion of the project. The details of the cost as follows:
Jenis Pengerjaan max Type Fee
Base
Calender
Project Manajer 100% Work 90.000/hari
Analisa Perancangan dan
Training Operator 100% Work 80.000/hari
Konfigurasi server, Setting
Router, Switch dan Hub 100% Work 75.000/hari
9. MANAGEMENT PLAN CREATION PROJECT
Project scope management is the management of processes for defining and
controlling what is included and not included in the project. Implementation of the
project and all stakeholders should have the same perception of the outcome of the
project and the process that will be undertaken in making the project outcome. Project
scope management processes include:
Continue ..
1.Project initiation: the initial process of the project or the transition from one stage to the
next.
2.Planning coverage: the creation of documents to be used as the basis for decision making in
project implementation.
3.Screen definition: details of the final project result into smaller and more manageable
component parts
4.Verification of coverage: a formal process of approval of project coverage
5.Control of coverage changes: process control over changes in project scope.
COMPLETE
THANK YOU

More Related Content

Similar to Slide management project

(Project Charter )V 2.0Project Sc.docx
 (Project Charter )V 2.0Project Sc.docx (Project Charter )V 2.0Project Sc.docx
(Project Charter )V 2.0Project Sc.docxaryan532920
 
online education system project report
online education system project reportonline education system project report
online education system project reportHagi Sahib
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2Media-Mosaic
 
Ignou MCA mini project report
Ignou MCA mini project reportIgnou MCA mini project report
Ignou MCA mini project reportHitesh Jangid
 
Project Information System
Project Information SystemProject Information System
Project Information SystemSaurabhAdhau1
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback systemmsandbhor
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxmattinsonjanel
 
Project Review Management System
Project Review Management SystemProject Review Management System
Project Review Management SystemIRJET Journal
 
Assignment 8.14.docx
Assignment 8.14.docxAssignment 8.14.docx
Assignment 8.14.docxssuser562afc1
 
Project report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlProject report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlRaj Sharma
 
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.doc
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.docSCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.doc
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.docbosed0737
 
Preliminry report
 Preliminry report Preliminry report
Preliminry reportJiten Ahuja
 
Project Management System
Project Management SystemProject Management System
Project Management SystemAftab Mirza
 
Sem-4 Project Presentation1 (1).pptx
Sem-4 Project Presentation1 (1).pptxSem-4 Project Presentation1 (1).pptx
Sem-4 Project Presentation1 (1).pptxDhruvPrajapati394464
 
Online Examination system mini project -1.ppt
Online Examination system mini project -1.pptOnline Examination system mini project -1.ppt
Online Examination system mini project -1.pptParvatiRathod1
 
E 5 development-of_a_data_management_system_for_stud
E 5 development-of_a_data_management_system_for_studE 5 development-of_a_data_management_system_for_stud
E 5 development-of_a_data_management_system_for_studEdress Oryakhail
 

Similar to Slide management project (20)

(Project Charter )V 2.0Project Sc.docx
 (Project Charter )V 2.0Project Sc.docx (Project Charter )V 2.0Project Sc.docx
(Project Charter )V 2.0Project Sc.docx
 
Chapter 4.pptx
Chapter 4.pptxChapter 4.pptx
Chapter 4.pptx
 
online education system project report
online education system project reportonline education system project report
online education system project report
 
Hafsa 131003112307-phpapp02
Hafsa 131003112307-phpapp02Hafsa 131003112307-phpapp02
Hafsa 131003112307-phpapp02
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2
 
Ignou MCA mini project report
Ignou MCA mini project reportIgnou MCA mini project report
Ignou MCA mini project report
 
Project Information System
Project Information SystemProject Information System
Project Information System
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback system
 
Tony_CV New
Tony_CV NewTony_CV New
Tony_CV New
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
 
Project Review Management System
Project Review Management SystemProject Review Management System
Project Review Management System
 
Assignment 8.14.docx
Assignment 8.14.docxAssignment 8.14.docx
Assignment 8.14.docx
 
Project report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysqlProject report-on-student-information-management-system-php-mysql
Project report-on-student-information-management-system-php-mysql
 
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.doc
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.docSCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.doc
SCHOOL_MANAGEMENT_SYSTEM_This_Report_Pre.doc
 
Proposal DMS
Proposal   DMS Proposal   DMS
Proposal DMS
 
Preliminry report
 Preliminry report Preliminry report
Preliminry report
 
Project Management System
Project Management SystemProject Management System
Project Management System
 
Sem-4 Project Presentation1 (1).pptx
Sem-4 Project Presentation1 (1).pptxSem-4 Project Presentation1 (1).pptx
Sem-4 Project Presentation1 (1).pptx
 
Online Examination system mini project -1.ppt
Online Examination system mini project -1.pptOnline Examination system mini project -1.ppt
Online Examination system mini project -1.ppt
 
E 5 development-of_a_data_management_system_for_stud
E 5 development-of_a_data_management_system_for_studE 5 development-of_a_data_management_system_for_stud
E 5 development-of_a_data_management_system_for_stud
 

Recently uploaded

Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 

Recently uploaded (20)

The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 

Slide management project

  • 1. MANAGEMENT PROYEK Project Developing Academic Information System of SMAN 2 Mandau THEO LUCKITA MILALA 11453105939 Program Studi S1 Sistem Informasi Fakultas Sains dan Teknologi Universitas Islam Sultan Syarif Kasim Riau http://sif.uin-suska.ac.id/ http://fst.uin-suska.ac.id/ http://www.uin-suska.ac.id/
  • 2. Project Chapter Project Name : Establish Academic Information System of SMAN 2 Mandau Project Start Date : January 23, 2017 Completed Project Date : June 12, 2017 Project Manager : Theo Luckita M Analys : Argawanda Programmer : Rolly Fahdial 1. INTRODUCTION
  • 3. Project Objectives build an academic information system at SMAN 2 Mandau that can provide technology and information related to academic at SMAN 2 Mandau which includes new student enrollment, teacher data storage, active student data storage and alumni students per force, and so forth. Thus it can provide convenience and advantages for the school and also students / i. The project starts with analyzing existing system processes, designing systems, designing computer network architectures to be used, network testing, to system implementation. This project will be done for 5 months with estimated cost of Rp. 10,000,000.00, -
  • 4. The following are some of the critical success factors of the project: Determinants of Success Commitment and support from the management. The availability of human resources in accordance with their respective competencies. Commitment and support of the project team Good cooperation of all parties in accordance with their respective competencies Continuity of project implementation. Discipline implementation in accordance with the project work plan. Good and complete project documentation .. The availability of all project support facilities is appropriate and adequate. Good cooperation of all parties in accordance with their respective competencies
  • 5. Expected Benefits From the school side: Provide wider and faster information access to students. Improve the quality of education in SMAN 2 Mandau. From student / i: Improve the effectiveness of learning from the circulation of knowledge of technology and information. Supporting educational facilities for students of SMAN 2 Mandau.
  • 6. 2. APPROACHES IN PROJECT MANAGEMENT Stages of the Project Approach o Analysis of the needs of computer users, hardware and software to be implemented. o The design of computer network architecture. o System development. o Test computer network connectivity. o Develop project cost estimation for implementation.
  • 7. 3. COVERAGE OF PROJECT The academic information system project is a project to build an academic information system and design a computer network system in the environment of SMAN 2 Mandau. The system to be implemented is a LAN network system (Local Area Network).
  • 8. a. Specification of Functional Requirements From the analysis needs of SMAN 2 Mandau and the use of computers, required a LAN network system. Here in is a list of system functional requirements needed campus and also its users (server computers, client computers). Function Name Description Server Computer To manage all activities performed by the admin, where data is entered or issued will be stored and managed on the server computer. Computer Client For use by the user as a means of delivering information and teaching learning by students / i.
  • 9. b. Non-Functional Requirement Specification The following is a list of non-functional requirements of academic information system of SMAN 2 Mandau: No Non-Functional Needs 1 All applications required in learning activities must be provided on every computer. 2 The computer used must be of the best quality and speck. 3 Network connectivity should be quickly accessible. 4 The computer used should be safe for use by the user.
  • 10. Description of Project Scope  The device that will be used in this project is hardware, and other supporting software in SMAN 1 Bena2 Mandau.  The modules developed include: network connectivity, network architecture, and reports required when there are additions or complaints from the modules we develop.  The network model used by LAN network, so that all existing connections can only be used in the environment of SMAN 2 Mandau.  Academic information system is built by using PHP, mysql and xampp programming languages.
  • 11. Submission of Project Outputs that will be included in this project are reports of system malfunction, network performance decryption, and others. Criteria for Project Acceptance Team pegembang will perform network testing in the final stages, after the installation of applications on the server computer or client is done. In addition to testing from the developer, this final test will also be performed by the client in this case is the SMAN 2 Mandau, and if everything is considered sufficient and can be smoothly then it will be submitted to the SMAN 2 Mandau.
  • 12. Limitations• The information system built is academic information system of SMAN 2 Mandau. • The features that will be displayed on the system is home, student enrollment / i, teacher menu, student menu, alumni menu, about. • Applications are built using PHP, mysql and xampp programming languages • Network system built using LAN network system. • Internet access is only provided around the environment of SMAN 2 Mandau. • Restrict access to excessive bandwidth usage that can harm the SMAN 2 Mandau.
  • 13. 4. SCHEDULE OF PROJECT IMPLEMENTATION Jadwal Tanggal Mulai proyek 23 Januari 2017 Analisa sistem yang ada 25 Januari 2017 Project charter ditandatangani 27 Januari 2017 Proposal disetujui 27 Januari 2017 Perekrutan tim proyek 03 Februari 2017 Hasil analisa sistem disetujui 10 Februari 2017 Pembuatan laporan 28 Januari – 05 Juni 2017 Membangun sistem 15 Maret 2017 Penerapan instalasi jaringan komputer 17 April 2017 Penerapan Instalasi OS pada komputer server dan client 02 Mei 2017 Testing jaringan 19 mei 2017 Seminar 10 Juni 2017 Proyek selesai 12 Juni 2017
  • 14. 5. CHANGE MANAGEMENT PLAN In the course of a project, there is almost always a demand for change. To anticipate this, it is necessary to prepare a procedure. The procedure for controlling changes in a project is often called the Change Control Procedure. Any approved modifications or changes to the project schedule and cost should refer to the following procedures: • Submission of changes may come from each team member when necessary, especially for changes that will affect the schedule and scope of work. • Approval on the change request form indicates approval of changes to the schedule. Change Control Procedures
  • 15. CONTINUE.. Submission of Changes  A change can be submitted to the project manager through formal communication (regular meetings) or non- formal (other communications).  Fill out the change request form.  Every change is recorded on the change request note. Monitor Perubahan  When the change request form has been approved, work can begin.  The project manager will change the project schedule or work plan to accommodate the agreed changes and present them in the project progress meeting for approval.  Progress in change control will be reported in project meetings, the project manager must sign the change request form if the change has been completed.
  • 16. 6. COMMUNICATION MANAGEMENT PLAN Communicating Planning Communication planning outlines the need for regular communication among team members involved in the construction of the academic information system development project of SMAN 2 Mandau. Communication should not be done formally, communication can be done openly and informally to facilitate knowledge transfer between all parties involved / interested
  • 17. Preparation for the Meeting Distributing the agenda of the meeting, at least one day before the meeting, discussion of topics in order of importance begins with easy topics and each topic is allocated time. • Distributing meeting materials, agenda, as well as location and time information. • Each member of the project team is responsible for preparing, attending and participating actively in meetings. • Leaders of meetings and facilitators ensure meetings are on track and effective, so meeting objectives can be achieved. • The meeting leader will appoint a notary to make the meeting documentation and distribute appropriately.
  • 18. Continue.... The meeting discussed at least the following topks: • Activities that will soon be done • Review of change controls
  • 19. 7. PROJECT TEAM DIRECTORY Nama Posisi Email Telephone Theo Luckita Project Manajer theoluckita@gmail.com 082144991000 Argawanda Analisa Perancangan dan training operator argawanda@gmail.com 085216422219 1. Rolly fahdial Konfigurasi server, setting router, switch dan hub 1. rollyfahdial@gmail.com 1. 082384455454
  • 20. 8. MANAGEMENT PLAN COST The project will use accepted value metrics to track and manage costs and the cost basis provides the basis for reporting, tracking, and managing costs. The cost breakdown for the project to build the academic information system of SMAN 2 Mandau covers all budgeted costs for the successful completion of the project. The details of the cost as follows: Jenis Pengerjaan max Type Fee Base Calender Project Manajer 100% Work 90.000/hari Analisa Perancangan dan Training Operator 100% Work 80.000/hari Konfigurasi server, Setting Router, Switch dan Hub 100% Work 75.000/hari
  • 21. 9. MANAGEMENT PLAN CREATION PROJECT Project scope management is the management of processes for defining and controlling what is included and not included in the project. Implementation of the project and all stakeholders should have the same perception of the outcome of the project and the process that will be undertaken in making the project outcome. Project scope management processes include:
  • 22. Continue .. 1.Project initiation: the initial process of the project or the transition from one stage to the next. 2.Planning coverage: the creation of documents to be used as the basis for decision making in project implementation. 3.Screen definition: details of the final project result into smaller and more manageable component parts 4.Verification of coverage: a formal process of approval of project coverage 5.Control of coverage changes: process control over changes in project scope.