SlideShare a Scribd company logo
1 of 26
Part I

         Administrative Portion
                Part 1
1.   Who approves the construction
     documents prior to the issuance of a
     building permit?

     A. Site superintendent
     B. Company president
     C. Building official
     D. Architect
2. What agency licenses contractors in
  Virginia?

 A. Board for Contractors
 B. State Corporation Commission
 C. Department of Revenue
 D. Licensing Commission
3. What is the maximum storage capacity of a
  sediment trap?

  A. 134 cubic yards per acre but limited to 3 acres
  B. 134 cubic yards per acre but limited to under 3
  acres
  C. 500 cubic yards per acre
  D. 500 cubic yards per acre but limited to
      under 3 acres
4. When must the contractor provide a copy of
  the signed residential contract to the

 A. Within 30 days of signing the contract
 B. Within 7 days of signing the contract
 C. Prior to commencing work
 D. Prior to hiring subcontractors
5. Under which of the following circumstances is a landscape
   irrigation contractor required to obtain a Class A license?

  A. Less than five (5) years after receiving the Class B
  license
  B. On acceptance of an irrigation project valued at more
  than $7,500
  C. On acceptance of an irrigation project valued at more
  than $35,000
  D. When annual receipts total or exceed $750,000
6. A nonresident or a foreign corporation wishes to
  bid on a construction project in Virginia. Who
  must be appointed as the Virginia agent upon
  whom lawful process or notices may be filed?

  A. Chairman of the Board for Contractors
  B. Corporation’s attorney
  C. Director of the Department of Professional
      and Occupational Regulation (DPOR)
  D. President of the corporation
7. What fees are required to reinstate a Class B
  license?

  A. The renewal fee and a license application
  fee
  B. The reinstatement fee and a license
  application fee
  C. The renewal fee and reinstatement fee
  D. The renewal, reinstatement, and license
  application fees
8. What is the required license classification for a
  residential contractor who is contracted to enlarge
  the building envelope?

  A. BLD
  B. HIC
  C. CIC
  D. H/H
9. What is the electrical potential limit on
  installations/ repairs of equipment or
  services under an ESC license?

  A. 12 volts
  B. 50 volts
  C. 120 volts
  D. 240 volts
10. Which of the following classifications is
  also included in the PLB classification?

 A. BLD
 B. FIC
 C. ISC
 D. SPR
11. The minimum experience required for a qualified
  individual for a Class A license is _____.

  A. 2 years’ technical training
  B. 3 years’ hands-on-training
  C. 2 years’ technical training plus three
      years’
  D. 5 years’ experience
12. An applicant for a Class B license must
  submit financial information indicating a
  minimum net worth or equity of ____.

 A. $0
 B. $15,000
 C. $30,000
 D. $45,000
13. What is an option for a contractor who has
  received a notice of code violation?

  A. File an appeal 180 days of receipt
  B. Disregard the notice if it is not issued
  within the second year after occupancy
  C. Disregard and send an appeal to the
  Department of Professional and Occupational
  Regulation
  D. File an appeal within 30 days of receipt
14. A person fails to obtain necessary building
  permits. Legal proceedings may be instituted
  when the person has been served ____.

  A. after one violation
  B. with two notices of violation
  C. with three notices of violation
  D. with five or more notices of violation
15. Under the USBC, all of the following require a
  building permit EXCEPT _____.

  A. converting a single-family home to a bed-and-
  breakfast.
  B. demolishing a single-family home after a fire.
  C. installing wiring and electrical equipment
  operating at 50 volts or less.
  D. removing lead paint or asbestos shingles
  during a renovation
16. What is the minimum number of sets of
  construction documents required by the USBC
  when filing for a permit?

  A. 1
  B. 2
  C. Whatever number is specified by the
  architect
  D. Whatever number is required by the local
  building official
17. The minimum number of inspections and
  approvals required under the USBC prior to
  issuance of a Certificate of Occupancy is at least
  ____.

  A. 3
  B. 5
  C. 7
  D. 9
18. What is the initial assessment for the
  Transaction Recovery Fund when applying for a
  Class B BLD license?

  A. None. This assessment applies only to Class A
  licenses.
  B. $25
  C. $50
  D. $75
19. The maximum biennial assessment per license
  holder for the Transaction Recovery Fund is _____.

  A. not limited, but determined by the   minimum
  balance in the fund
  B. $25
  C. $50
  D. $75
20. After a judgment becomes final, a claim
  must be filed with the Transaction Recovery
  Fund within what period?

 A. 30 days
 B. 3 months
 C. 6 months
 D. 12 months
21. The maximum aggregate claim payment
  of one claimant from the Transaction
  Recovery Fund is ____.

 A. $10,000
 B. $20,000
 C. $30,000
 D. $40,000
22. What board action is required upon payment of a
  claim from the Transaction Recovery Fund?

  A. An assessment against all contractors to rebuild
      the Transaction Recovery Fund
  B. File a lawsuit against the contractor for
  recovery of the amount paid
  C. File a lien against the property (project)
      for recovery of the amount paid
  D. Revocation of the contractor’s license
23. A subdivision contractor has neglected to obtain
  final approval of an erosion control plan prior to
  work. What is the maximum penalty allowed
  under the Erosion and Sediment Control Act?

  A. $100
  B. $1,100
  C. $3,000
  D. $10,000
24. What is the maximum length of trench
  that may be open at any one time when
  installing utilities?

 A. 134 cubic yards
 B. 134 linear feet
 C. 250 linear feet
 D. 500 linear feet
25. Denuded areas must be stabilizes within ____.

  A. 7 days after final grade is achieved on any
  portion of the site
  B. 30 days after completion of construction
  C. 30 days after final grade is achieved on the
  entire site
  D. 3 months after final grading

More Related Content

Viewers also liked

London (Pasillos Interactivos)
London (Pasillos Interactivos)London (Pasillos Interactivos)
London (Pasillos Interactivos)cpnsdla
 
Racehorse 911 first month 2013
Racehorse 911 first month 2013Racehorse 911 first month 2013
Racehorse 911 first month 2013Robyn Daly
 
Venio value prop 2013_portal1
Venio value prop 2013_portal1Venio value prop 2013_portal1
Venio value prop 2013_portal1gthorntonvs
 
3.4 phylocode
3.4 phylocode3.4 phylocode
3.4 phylocodescardonar
 
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3Julia Vargiu
 
Camtasia getting started guide
Camtasia getting started guideCamtasia getting started guide
Camtasia getting started guideehaabjamal
 
TIK BAB 2 (IGO Inside~)
TIK BAB 2 (IGO Inside~)TIK BAB 2 (IGO Inside~)
TIK BAB 2 (IGO Inside~)Tutin9H09
 
Peny.tindakan.ppt1
Peny.tindakan.ppt1Peny.tindakan.ppt1
Peny.tindakan.ppt1tajul2
 
Test evaluation project2
Test evaluation project2Test evaluation project2
Test evaluation project2Melanie Hook
 
Certifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating SystemCertifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating SystemSandeep Jain
 
Utilization of waste paper sludge in construction industry
Utilization of waste paper sludge in construction industryUtilization of waste paper sludge in construction industry
Utilization of waste paper sludge in construction industrySandeep Jain
 

Viewers also liked (17)

London (Pasillos Interactivos)
London (Pasillos Interactivos)London (Pasillos Interactivos)
London (Pasillos Interactivos)
 
Life+
Life+Life+
Life+
 
Getting started
Getting startedGetting started
Getting started
 
Ffdfdoios
FfdfdoiosFfdfdoios
Ffdfdoios
 
Racehorse 911 first month 2013
Racehorse 911 first month 2013Racehorse 911 first month 2013
Racehorse 911 first month 2013
 
Dkm himage its
Dkm himage   itsDkm himage   its
Dkm himage its
 
Venio value prop 2013_portal1
Venio value prop 2013_portal1Venio value prop 2013_portal1
Venio value prop 2013_portal1
 
3.4 phylocode
3.4 phylocode3.4 phylocode
3.4 phylocode
 
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3
Creating the Ultimate Client/Agency Relationship keynote for MediaSocial 3
 
Camtasia getting started guide
Camtasia getting started guideCamtasia getting started guide
Camtasia getting started guide
 
TIK BAB 2 (IGO Inside~)
TIK BAB 2 (IGO Inside~)TIK BAB 2 (IGO Inside~)
TIK BAB 2 (IGO Inside~)
 
Peny.tindakan.ppt1
Peny.tindakan.ppt1Peny.tindakan.ppt1
Peny.tindakan.ppt1
 
Uu 29 2004
Uu 29 2004Uu 29 2004
Uu 29 2004
 
Muscles
MusclesMuscles
Muscles
 
Test evaluation project2
Test evaluation project2Test evaluation project2
Test evaluation project2
 
Certifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating SystemCertifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating System
 
Utilization of waste paper sludge in construction industry
Utilization of waste paper sludge in construction industryUtilization of waste paper sludge in construction industry
Utilization of waste paper sludge in construction industry
 

Similar to Part 1 administrative portion

Item # 8 Sewer Rehab Contract - Ogden
Item # 8   Sewer Rehab Contract - OgdenItem # 8   Sewer Rehab Contract - Ogden
Item # 8 Sewer Rehab Contract - Ogdenahcitycouncil
 
Basement finish package
Basement finish packageBasement finish package
Basement finish packageStan Perlinski
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95MaximaSheffield592
 
Leed green associate pool e - question
Leed green associate   pool e - questionLeed green associate   pool e - question
Leed green associate pool e - questionBilal Mohamed
 
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERA
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERAGOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERA
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERACA. (Dr.) Rajkumar Adukia
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansNatlMortgagePro
 
Leed green associate pool a - question
Leed green associate    pool a - questionLeed green associate    pool a - question
Leed green associate pool a - questionBilal Mohamed
 
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...McKonly & Asbury, LLP
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Bilal Mohamed
 
2022_07_28 DECD RFP Brainard Airport Property Study.pdf
2022_07_28 DECD RFP Brainard Airport Property Study.pdf2022_07_28 DECD RFP Brainard Airport Property Study.pdf
2022_07_28 DECD RFP Brainard Airport Property Study.pdfMichaelTeiger1
 
Nishant Raj Kapoor present IGBC lec 2
Nishant Raj Kapoor present IGBC lec 2Nishant Raj Kapoor present IGBC lec 2
Nishant Raj Kapoor present IGBC lec 2Nishant Raj Kapoor
 
Benchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit PresentationBenchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit PresentationChristopher_Fields
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAAvinash Kumar Gupta
 
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bRedevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bOMKAR CHODANKAR
 
1Acquisition cost of long-lived assets the following items repr.docx
1Acquisition cost of long-lived assets the following items repr.docx1Acquisition cost of long-lived assets the following items repr.docx
1Acquisition cost of long-lived assets the following items repr.docxfelicidaddinwoodie
 

Similar to Part 1 administrative portion (20)

bp
bpbp
bp
 
ACCA P2 mcq3
ACCA P2 mcq3ACCA P2 mcq3
ACCA P2 mcq3
 
Item # 8 Sewer Rehab Contract - Ogden
Item # 8   Sewer Rehab Contract - OgdenItem # 8   Sewer Rehab Contract - Ogden
Item # 8 Sewer Rehab Contract - Ogden
 
Basement finish package
Basement finish packageBasement finish package
Basement finish package
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
 
Leed green associate pool e - question
Leed green associate   pool e - questionLeed green associate   pool e - question
Leed green associate pool e - question
 
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERA
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERAGOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERA
GOLDMINE OF PROFESSIONAL OPPORTUNITIES UNDER RERA
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab Loans
 
Leed green associate pool a - question
Leed green associate    pool a - questionLeed green associate    pool a - question
Leed green associate pool a - question
 
6428 Georgia Avenue RFO
6428 Georgia Avenue RFO6428 Georgia Avenue RFO
6428 Georgia Avenue RFO
 
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...
Protecting Your Contract Receivables – PA Mechanics Lien Law and Payment Bond...
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...
 
2022_07_28 DECD RFP Brainard Airport Property Study.pdf
2022_07_28 DECD RFP Brainard Airport Property Study.pdf2022_07_28 DECD RFP Brainard Airport Property Study.pdf
2022_07_28 DECD RFP Brainard Airport Property Study.pdf
 
Nishant Raj Kapoor present IGBC lec 2
Nishant Raj Kapoor present IGBC lec 2Nishant Raj Kapoor present IGBC lec 2
Nishant Raj Kapoor present IGBC lec 2
 
N.raj present igbc lec 2
N.raj present igbc lec 2N.raj present igbc lec 2
N.raj present igbc lec 2
 
Benchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit PresentationBenchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit Presentation
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Reeves Retail RFO
Reeves Retail RFOReeves Retail RFO
Reeves Retail RFO
 
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bRedevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
 
1Acquisition cost of long-lived assets the following items repr.docx
1Acquisition cost of long-lived assets the following items repr.docx1Acquisition cost of long-lived assets the following items repr.docx
1Acquisition cost of long-lived assets the following items repr.docx
 

Recently uploaded

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 

Recently uploaded (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 

Part 1 administrative portion

  • 1. Part I Administrative Portion Part 1
  • 2. 1. Who approves the construction documents prior to the issuance of a building permit? A. Site superintendent B. Company president C. Building official D. Architect
  • 3. 2. What agency licenses contractors in Virginia? A. Board for Contractors B. State Corporation Commission C. Department of Revenue D. Licensing Commission
  • 4. 3. What is the maximum storage capacity of a sediment trap? A. 134 cubic yards per acre but limited to 3 acres B. 134 cubic yards per acre but limited to under 3 acres C. 500 cubic yards per acre D. 500 cubic yards per acre but limited to under 3 acres
  • 5. 4. When must the contractor provide a copy of the signed residential contract to the A. Within 30 days of signing the contract B. Within 7 days of signing the contract C. Prior to commencing work D. Prior to hiring subcontractors
  • 6. 5. Under which of the following circumstances is a landscape irrigation contractor required to obtain a Class A license? A. Less than five (5) years after receiving the Class B license B. On acceptance of an irrigation project valued at more than $7,500 C. On acceptance of an irrigation project valued at more than $35,000 D. When annual receipts total or exceed $750,000
  • 7. 6. A nonresident or a foreign corporation wishes to bid on a construction project in Virginia. Who must be appointed as the Virginia agent upon whom lawful process or notices may be filed? A. Chairman of the Board for Contractors B. Corporation’s attorney C. Director of the Department of Professional and Occupational Regulation (DPOR) D. President of the corporation
  • 8. 7. What fees are required to reinstate a Class B license? A. The renewal fee and a license application fee B. The reinstatement fee and a license application fee C. The renewal fee and reinstatement fee D. The renewal, reinstatement, and license application fees
  • 9. 8. What is the required license classification for a residential contractor who is contracted to enlarge the building envelope? A. BLD B. HIC C. CIC D. H/H
  • 10. 9. What is the electrical potential limit on installations/ repairs of equipment or services under an ESC license? A. 12 volts B. 50 volts C. 120 volts D. 240 volts
  • 11. 10. Which of the following classifications is also included in the PLB classification? A. BLD B. FIC C. ISC D. SPR
  • 12. 11. The minimum experience required for a qualified individual for a Class A license is _____. A. 2 years’ technical training B. 3 years’ hands-on-training C. 2 years’ technical training plus three years’ D. 5 years’ experience
  • 13. 12. An applicant for a Class B license must submit financial information indicating a minimum net worth or equity of ____. A. $0 B. $15,000 C. $30,000 D. $45,000
  • 14. 13. What is an option for a contractor who has received a notice of code violation? A. File an appeal 180 days of receipt B. Disregard the notice if it is not issued within the second year after occupancy C. Disregard and send an appeal to the Department of Professional and Occupational Regulation D. File an appeal within 30 days of receipt
  • 15. 14. A person fails to obtain necessary building permits. Legal proceedings may be instituted when the person has been served ____. A. after one violation B. with two notices of violation C. with three notices of violation D. with five or more notices of violation
  • 16. 15. Under the USBC, all of the following require a building permit EXCEPT _____. A. converting a single-family home to a bed-and- breakfast. B. demolishing a single-family home after a fire. C. installing wiring and electrical equipment operating at 50 volts or less. D. removing lead paint or asbestos shingles during a renovation
  • 17. 16. What is the minimum number of sets of construction documents required by the USBC when filing for a permit? A. 1 B. 2 C. Whatever number is specified by the architect D. Whatever number is required by the local building official
  • 18. 17. The minimum number of inspections and approvals required under the USBC prior to issuance of a Certificate of Occupancy is at least ____. A. 3 B. 5 C. 7 D. 9
  • 19. 18. What is the initial assessment for the Transaction Recovery Fund when applying for a Class B BLD license? A. None. This assessment applies only to Class A licenses. B. $25 C. $50 D. $75
  • 20. 19. The maximum biennial assessment per license holder for the Transaction Recovery Fund is _____. A. not limited, but determined by the minimum balance in the fund B. $25 C. $50 D. $75
  • 21. 20. After a judgment becomes final, a claim must be filed with the Transaction Recovery Fund within what period? A. 30 days B. 3 months C. 6 months D. 12 months
  • 22. 21. The maximum aggregate claim payment of one claimant from the Transaction Recovery Fund is ____. A. $10,000 B. $20,000 C. $30,000 D. $40,000
  • 23. 22. What board action is required upon payment of a claim from the Transaction Recovery Fund? A. An assessment against all contractors to rebuild the Transaction Recovery Fund B. File a lawsuit against the contractor for recovery of the amount paid C. File a lien against the property (project) for recovery of the amount paid D. Revocation of the contractor’s license
  • 24. 23. A subdivision contractor has neglected to obtain final approval of an erosion control plan prior to work. What is the maximum penalty allowed under the Erosion and Sediment Control Act? A. $100 B. $1,100 C. $3,000 D. $10,000
  • 25. 24. What is the maximum length of trench that may be open at any one time when installing utilities? A. 134 cubic yards B. 134 linear feet C. 250 linear feet D. 500 linear feet
  • 26. 25. Denuded areas must be stabilizes within ____. A. 7 days after final grade is achieved on any portion of the site B. 30 days after completion of construction C. 30 days after final grade is achieved on the entire site D. 3 months after final grading

Editor's Notes

  1. 1. Answer : THE BUILDING OFFICIAL The building official will examine the documents and issue the permit. The site superintendent, company president, and architect may very well review the documents prior to sending them for permit issuance, but the building official has ultimate authority in this matter. Reference : USBC Section 109.
  2. 2. Answer : BOARD OF CONTRACTORS The Board for Contractors is empowered to promulgate regulations for the licensure (and re-licensure) of contractors and tradesmen, and the certification of back flow prevention device workers. Neither the State Corporation Commission nor the Department of Revenue may license anyone, and there is no licensing commission. Reference: Virginia Contractor’s Law. Code of Virginia & 54.1-1102.
  3. 3. Answer : 134 CUBIC YARDS PER ACRE BUT LIMITED TO UNDER 3 ACRES Sediment traps and sediment basins are designed and constructed based on the total drainage areas served by the trap or basin. The minimum storage capacity is 134 cubic yards per acre of drainage area, and the trap may control drainage areas of less than 3 acres. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 4VAC50-30-40, Minimum Standards.
  4. 4. Answer : PRIOR TO COMMENCING WORK All other delivery times are incorrect. The consumer must have a signed copy prior to work starting. Reference : 18VA50-22-260, paragraphs 8 and 10.
  5. 5. Answer : WHEN ANNUAL RECEIPTS TOTAL OR EXCEED $750,000 A Class A license is required when the total value of a single project is $120,000 or more, or if the total annual value of all such projects is $750,000 or more. Class B licenses are required if the single project is between $7,500 and $120,000 or if the total annual value is between $150,000 and $750,000. Reference : Virginia Contractor’s Law. Code of Virginia &54.1-1100.
  6. 6. Answer : DIRECTOR OF THE DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULASTION (DPOR) Before any nonresident person or any foreign corporation bids on any work in Virginia, the nonresident or foreign corporation, by written power of attorney, must appoint the Director of the Department of Professional and Occupational Regulation (DPOR) as agent upon whom all lawful process or notice may be served. Reference: Virginia Contractor’s Law Code of Virginia &54.1-1133
  7. 7. Answer : THE RENEWAL FEE AND REINSTATEMENT FEE The applicant or regulant must remit the original renewal fee plus an additional reinstatement application charge as set by the Department. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-170, Reinstatement fees.
  8. 8. Answer : BLD Building contractors (BLD) are individuals whose contracts include construction on real property owned by others of commercial, industrial, institutional, governmental, residential, and accessory use buildings or structures. HIC and CIC contractors may not charge the size of the building envelope. Highway/heavy contractors are not licensed to build residential. Reference: Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-20, Definitions of license classifications.
  9. 9. Answer : 50 VOLTS An electronic/communications service contractor may service electronic or communications systems annexed to real property that operate at 50 volts or less. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-20, Definitions of specialty services.
  10. 10. Answer : ISC The PLB classification means those who install, maintain, and so on, all piping, fixtures, and appliances that do with plumbing. They can also provide service to install, repair, improve, or remove irrigation sprinkler systems, as can the highway/heavy contractors (H/H). Reference : Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-30, Definitions of license classifications and specialty services.
  11. 11. Answer : FIVE YEAR’S EXPERIENCE To qualify for a Class A license, an applicant must be at least 18 years of age, have a minimum of five years’ experience in the classification or specialty, be a full-time employee, and have passed any appropriate trade-related examinations. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-60, Additional requirements for a Class A license.
  12. 12. Answer : $15,000 Each firm must submit financial information indicating a net worth or equity of $15,000 or more. Reference: Virginia Contractor’s Law. Virginia Administrative Code, 18VAC50-22-50, Requirements for a Class B license.
  13. 13. Answer : FILE AN APPEAL WITHIN 90 DAYS OF RECEIPT Filing an appeal in 180 days is beyond the time limit. Disregarding any notice of a code violation will result in prosecution. DPOR does not process building code appeals. Reference : USBC Section 119.
  14. 14. Answer : WITH THREE NOTICES OF VIOLATION Legal proceedings may be instituted for prosecution when a person, firm, or corporation is served with three or more notices of violation within one calendar year for failure to obtain a required construction permit prior to beginning work. Reference : Virginia Contractor’s Law. Virginia Uniform Statewide Building Code, 115.3 Further action when violation not corrected.
  15. 15. Answer : INSTALLING WIRING AND ELECTRICAL EQUIPMENT OPERATING AT 50 VOLTS OR LESS Installation of wiring and equipment operating at less than 50 volts is exempt from the application permit requirement. A permit is required for the conversion of the family home to a bed-and-breakfast; demolishing a single family home after a fire; and removing either lead-based paint or asbestos shingles during renovation. Reference : Virginia Contractor’s Law. Virginia Uniform Statewide Building Code 108.1 When applications are required.
  16. 16 Answer : WHATEVER NUMBER IS REQUIRED BY THE LOCAL BUILDING OFFICIAL Other than the copy that must be kept on the job site, the USBC does not require a specific number of construction documents, leaving that up to the locality. Reference : Virginia Contractor’s Law. Virginia Uniform Statewide Building Code, 109.1 Construction Documents.
  17. 17. Answer : SEVEN At least seven inspections are required by law, and more may be required by the local building officials to ensure that all of the work has been satisfactorily completed. Reference: Virginia Contractor’s Law. Virginia Uniform Statewide Building Code 113.3 Minimum Inspections.
  18. 18. Answer : $25 A $25 recovery fund is also required with each initial license application, which is refunded if the applicant does not meet all requirements and does not become licensed. Reference : Virginia Contractor’s Law. Virginia Contractor Transaction Recovery Act & 54.1-1119 Assessments by Director, etc.
  19. 19. Answer : $50 No regulant may be assessed a total amount of more than $50 during any biennium. Reference : Virginia Contractor’s Law. Virginia Contractor Transaction Recovery Act & 54.1-1119 Assessments by Director, etc.
  20. 20. Answer : 12 MONTHS For judgment entered on or after July 1, 1996, a verified claim must be filed with the director no later than 12 months after the judgment became final. Reference : Virginia Contractor’s Law. Virginia Contractor Transaction Recovery Act & 54.1-1120 Recovery from Fund.
  21. 21. Answer : $40,000 The maximum claim of an aggregate claimant against the fund based on an unpaid judgment arising out of the improper or dishonest conduct of one regulant in connection with a single transaction involving contracting is limited to $40,000. $10,000 is the older regulation maximum of a single claim, and $20,000 is the 2005 maximum for one claim. $30,000 is incorrect. Reference : Virginia Contractor’s Law. Virginia Contractor Transaction Recovery Act, & 54.1-1123 Assessments by Director, etc.
  22. 22. Answer : REVOCATION OF THE CONTRACTOR’S LICENSE On payment from the fund, the board must immediately revoke the license of the regulant whose improper or dishonest conduct resulted in the payment. The regulant may regain the license upon repaying the fund with interest and applying for re-licensure. Reference : Virginia Contractor’s Law. Virginia Contractor Transaction Recovery Act & 54.1-1126 Revocation of license upon payment from Fund.
  23. 23. Answer : $10,000 For a series of violations under the Erosion and Sediment Control Act, the maximum penalty allowed is $10,000. The minimum penalty for any one violation is $100. The penalty jumps to $1,000 for beginning any land-disturbing work that is a violation of a local erosion control ordinance. For any series of violations of a local erosion control ordinance, except land-disturbing activities, the minimum penalty is $3,000. Reference : Virginia Contractor’s Law. Code of Virginia & 10.1-562.
  24. 24. Answer : LINEAR FEET No more than 500 linear feet of trench may be opened at one time. The minimum storage capacity of a sediment basin is 134 cubic yards. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 4VAC50-30-40(16), Minimum standards.
  25. 25. Answer : 7 DAYS AFTER FINAL GRADE IS ACHIEVED ON ANY PORTION OF THE SITE Permanent or temporary soil stabilization must be applied to denuded areas within seven days after final grade is reached on any portion of the site. Reference : Virginia Contractor’s Law. Virginia Administrative Code, 4VAC50-30-40(1), Minimum standards.