 TECHNICAL COMPETENCIES
• Microsoft Office Suite
• Process Definition and Flow Charts (Windows Visio)
• Procedure Development/ Policy Implementation/ Project Flow/ Team Management/ Hardware Procurement
• Recruit Max/ Astea/ A.R.M (Active Risk Management)/ Kintana/ Avocent/ Service Now/ AtTask/
Smartsheet/ Microsoft Project
• WebEx One/ SharePoint/ Support Central Databases/ Google Docs/ Colab/ Box
 PROFESSIONAL EXPERIENCE
CBTS (Technology Solutions for Business)
July 2008 – Present
July 2014 – Present
Sr. Project Manager (Cincinnati, OH)
 PM on GE Corp/3rd Party RAIL Network Team (Full Time Project Work)
 Led the development and execution phases ofIT projects, by working with the project team to define a
plan, and estimate timelines
 Followed GE standards and policies for all 3rd Party RAIL projects (Network Engineering)
 Managed the scope,tasks,changes,escalations,status reports,communication plans,and resources for the
full life cycle of a project. Used Microsoft Project and/orAtTask to plan all projects and timelines
 Provided weekly project status to GE Business Leaders, Stake Holders, and CBTS Management
 Facilitated all weekly and ad hoc meetings with the project team and stake holder updates/processes
 Procured and shipped all network hardware for various projects – Planned installation and “go live” dates
for all GE networks
 Generated or updated any process documentation the CBTS PMO uses to manage projects for GE
 Managed network migration projects including RE-IP initiatives and OSM devices
 Managed a network team for the Acquisitions & Divestiture GE program
January 2014 – June 2014
Sr. Project Manager (Mason, OH)
 PM on GE Corp/CBTS Management and Migration Team (6 Month Project)
 Led meetings surrounding technical aspects ofprojects, with various task owners , stake holders, and
business leaders
 Tracked and managed Project Plans for various initiatives using Microsoft Project and Excel
 Managed and tracked vendor relations
 Assigned action items and tasks to various other project managers and network engineers
 Documented and created new processes for server migrations, both virtual and physical
 Communicated project status to stakeholders and program managers.(Included creating mitigation plans,
and escalating risks/issues)
September 2012 – January 2014
Sr. Project Manager (Cincinnati, OH)
 PM on the Cincinnati Bell Network Management Systems/Systems Engineering Team (12 Month
Project)
 Lead manager in implementing Service Now and At Task in the NMS department
 Tracked the Project Plan for various initiatives and projects in the NMS/SE team, using Microsoft Project
and/orAtTask, managing the full life-cycle of the projects
 Facilitated project and team meetings (Included conference calls with vendors and management)
 Managed and tracked vendor responsibilities, relationships, and tasks.
 Assigned action items and follow-ups with project managers and network engineers (Included
implementing, testing,and reporting)
 Documented various processes used by the department (Included using lean process on existing processes)
 Communicated project status to stakeholders and program managers.(Included creating mitigation plans,
communication plans, and escalating risks/issues)
September 2009 – September 2012
Project Manager (Mason, OH)
• PM on the GE Global Infrastructure Services Team (Full Time Project Work) (Team Outsourced in
2012)
• Assigned and implemented work flow tickets
• Facilitated Engineer’s tasks and all project meetings
• Created daily reports for GE personnel/management
• Created process flow charts and defined processes for the PMO and GE server de-install and transition
processes
• Kept and maintained a risk/issues log
• Prepared risk response planning and identification of risk
• Assisted in the creation and maintaining of a communications plan for management
July 2008 - May 2009
Project Management Office Project Manager (Cincinnati, OH)
• Led the reporting team for a British Telecom/Procter & Gamble transition project (12 Month
Project)
• Created weekly/monthly reports for BT and P&G personnel/management
• Created process flow charts and defined processes for the PMO and BT
• Kept and maintained a risk/issues log for various projects using A.R.M, and various databases
• Prepared a project schedule for multiple projects using Microsoft Project
• Prepared risk response planning and identification of risk
• Assisted in the creation of a communications plan for management
• Successfully administered and controlled change requests on the scope of all projects
Pomeroy IT (Infrastructure Optimized)
November 2004 – July 2008
January 2007 - July 2008
Project Management Office Sr. Project Coordinator (Hebron, KY)
• Worked closely with the Human Resource department and created/implemented a new hire process
• Approved technician’s time and expenses for PMO projects
• Wrote processes forthe “people” side of the PMO’s business
• Coordinated policies and processes forobtaining technicians with Pomeroy’s HR Recruiting team
• Trained any incoming project coordinators/technicians within the PMO
• Acted as a liaison between field technicians,Project Managers and Human Resources
• Built and maintained WebEx One databases for various projects
• Had direct contact with customers and insured proper installs using Pomeroy field technicians
• Assisted in the creation of a communications plan for various projects
• Kept and maintained a risk/issues log for various projects using SharePoint
• Collected and posted any data the customer required (serial numbers, inventories, etc…)
• Shipped and tracked equipment shipped out from Pomeroy’s warehouse
• Assisted the PMO director w/creating work breakdown structures for technicians on various projects
• Maintained customer quality specifications on all projects
June 2006 – January 2007
Implementations and Deployments Coordinator (Hebron, KY)
• Prepared the project plan/schedule for multiple projects
• Prepared risk response planning and identification of risk
• Involved in the scope management planning and definition
• Created work breakdown structures (WBS) for multiple projects
• Assisted in the creation of a communications plan for management
• Successfully administered and controlled change requests on the scope of projects
• Reported all findings and progress to senior Pomeroy management and the customer
• Collected and posted any data the customer may have required (serial numbers, inventories, etc…)
• Directed field technicians and project coordinators working on various projects
EDUCATION
B.A., Western Kentucky University, 2000
Major: Film & Television Production (Direction)
Minor: Economics
Training: Six Sigma Green Belt 2007-2009
PMI 2006-2017
ITIL 2008-2017
SCRUM 2015-2017
Project Management 2008-2017

More Related Content

What's hot

Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Chetanraj M
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training pptglobalp7
 
Project management part 5
Project management part 5Project management part 5
Project management part 5hkbhadraa
 
Primavera Project Management P6 Course session 4
Primavera Project Management P6 Course session 4Primavera Project Management P6 Course session 4
Primavera Project Management P6 Course session 4Mohamed Adel
 
Softwares used in project management
Softwares used in project managementSoftwares used in project management
Softwares used in project managementAmmar abbas
 
Project management
Project managementProject management
Project managementnethisip13
 
Managing the p6 schedule from the perspective of an owner ppt
Managing the p6 schedule from the perspective of an owner pptManaging the p6 schedule from the perspective of an owner ppt
Managing the p6 schedule from the perspective of an owner pptp6academy
 
Beit 381 se lec 13 - 11 - 12 mar20 - project management
Beit 381 se lec 13  -  11 -  12 mar20 - project managementBeit 381 se lec 13  -  11 -  12 mar20 - project management
Beit 381 se lec 13 - 11 - 12 mar20 - project managementbabak danyal
 
Successful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project ScheduleSuccessful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project SchedulePraveen Malik, PMP
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction EstimatorRana Alyas
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume Rebecca Selinger
 
Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...p6academy
 
Christina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina Brown
 
Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christina Brown
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14p6academy
 

What's hot (20)

Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training ppt
 
Project management part 5
Project management part 5Project management part 5
Project management part 5
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
Primavera Project Management P6 Course session 4
Primavera Project Management P6 Course session 4Primavera Project Management P6 Course session 4
Primavera Project Management P6 Course session 4
 
Softwares used in project management
Softwares used in project managementSoftwares used in project management
Softwares used in project management
 
Project management
Project managementProject management
Project management
 
Managing the p6 schedule from the perspective of an owner ppt
Managing the p6 schedule from the perspective of an owner pptManaging the p6 schedule from the perspective of an owner ppt
Managing the p6 schedule from the perspective of an owner ppt
 
Microsoft Project
Microsoft ProjectMicrosoft Project
Microsoft Project
 
Beit 381 se lec 13 - 11 - 12 mar20 - project management
Beit 381 se lec 13  -  11 -  12 mar20 - project managementBeit 381 se lec 13  -  11 -  12 mar20 - project management
Beit 381 se lec 13 - 11 - 12 mar20 - project management
 
Successful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project ScheduleSuccessful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project Schedule
 
Douglas Carlesco Resume
Douglas Carlesco ResumeDouglas Carlesco Resume
Douglas Carlesco Resume
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction Estimator
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume
 
P6 brief
P6 briefP6 brief
P6 brief
 
Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...
 
Systems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work TogetherSystems Commissioning CX - Efficient Systems Work Together
Systems Commissioning CX - Efficient Systems Work Together
 
Christina l brown_2016_o&g resume
Christina l brown_2016_o&g resumeChristina l brown_2016_o&g resume
Christina l brown_2016_o&g resume
 
Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304Christinalbrown2016ogresume 160707183304
Christinalbrown2016ogresume 160707183304
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
 

Similar to Wells Resume 2017

Similar to Wells Resume 2017 (20)

Kincaid86 - 2
Kincaid86 - 2Kincaid86 - 2
Kincaid86 - 2
 
Debra Rose Resume May 2015
Debra Rose Resume May 2015Debra Rose Resume May 2015
Debra Rose Resume May 2015
 
Angela.Jackson.2016
Angela.Jackson.2016Angela.Jackson.2016
Angela.Jackson.2016
 
JC_Gabuya_Resume
JC_Gabuya_ResumeJC_Gabuya_Resume
JC_Gabuya_Resume
 
Resume Sally Gentry 17 Feb11
Resume Sally Gentry   17 Feb11Resume Sally Gentry   17 Feb11
Resume Sally Gentry 17 Feb11
 
Alma Sepulveda Resume
Alma Sepulveda ResumeAlma Sepulveda Resume
Alma Sepulveda Resume
 
Parthiban J Resume-Enterprise Architect
Parthiban J Resume-Enterprise ArchitectParthiban J Resume-Enterprise Architect
Parthiban J Resume-Enterprise Architect
 
Mc PM Resume
Mc PM ResumeMc PM Resume
Mc PM Resume
 
STEVE VEATCH - Resume Feb 2015
STEVE VEATCH - Resume Feb 2015STEVE VEATCH - Resume Feb 2015
STEVE VEATCH - Resume Feb 2015
 
H Akhtar Resume 2016 PM
H Akhtar Resume 2016 PMH Akhtar Resume 2016 PM
H Akhtar Resume 2016 PM
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRM
 
Krishnaprasad_chembakassery_BSA
Krishnaprasad_chembakassery_BSAKrishnaprasad_chembakassery_BSA
Krishnaprasad_chembakassery_BSA
 
Robert_Lima 01_14_16
Robert_Lima 01_14_16Robert_Lima 01_14_16
Robert_Lima 01_14_16
 
HIDAIPP
HIDAIPPHIDAIPP
HIDAIPP
 
Lana gutnik resume new
Lana gutnik resume newLana gutnik resume new
Lana gutnik resume new
 
Laura Bush Resume_20150618
Laura Bush Resume_20150618Laura Bush Resume_20150618
Laura Bush Resume_20150618
 
Himmelrich 8-2015
Himmelrich 8-2015Himmelrich 8-2015
Himmelrich 8-2015
 
PMP IT
PMP ITPMP IT
PMP IT
 
PMP certified project manger with around 8 years of experience
PMP certified project manger with around 8 years of experiencePMP certified project manger with around 8 years of experience
PMP certified project manger with around 8 years of experience
 
CV - Jahangeer Raza
CV - Jahangeer RazaCV - Jahangeer Raza
CV - Jahangeer Raza
 

Wells Resume 2017

  • 1. Jeremiah T. Wells 2409 Treetop Lane Hebron, KY 41048 (859) 663-6565 wellsjt77@gmail.com  TECHNICAL COMPETENCIES • Microsoft Office Suite • Process Definition and Flow Charts (Windows Visio) • Procedure Development/ Policy Implementation/ Project Flow/ Team Management/ Hardware Procurement • Recruit Max/ Astea/ A.R.M (Active Risk Management)/ Kintana/ Avocent/ Service Now/ AtTask/ Smartsheet/ Microsoft Project • WebEx One/ SharePoint/ Support Central Databases/ Google Docs/ Colab/ Box  PROFESSIONAL EXPERIENCE CBTS (Technology Solutions for Business) July 2008 – Present July 2014 – Present Sr. Project Manager (Cincinnati, OH)  PM on GE Corp/3rd Party RAIL Network Team (Full Time Project Work)  Led the development and execution phases ofIT projects, by working with the project team to define a plan, and estimate timelines  Followed GE standards and policies for all 3rd Party RAIL projects (Network Engineering)  Managed the scope,tasks,changes,escalations,status reports,communication plans,and resources for the full life cycle of a project. Used Microsoft Project and/orAtTask to plan all projects and timelines  Provided weekly project status to GE Business Leaders, Stake Holders, and CBTS Management  Facilitated all weekly and ad hoc meetings with the project team and stake holder updates/processes  Procured and shipped all network hardware for various projects – Planned installation and “go live” dates for all GE networks  Generated or updated any process documentation the CBTS PMO uses to manage projects for GE  Managed network migration projects including RE-IP initiatives and OSM devices  Managed a network team for the Acquisitions & Divestiture GE program January 2014 – June 2014 Sr. Project Manager (Mason, OH)  PM on GE Corp/CBTS Management and Migration Team (6 Month Project)  Led meetings surrounding technical aspects ofprojects, with various task owners , stake holders, and business leaders  Tracked and managed Project Plans for various initiatives using Microsoft Project and Excel  Managed and tracked vendor relations  Assigned action items and tasks to various other project managers and network engineers  Documented and created new processes for server migrations, both virtual and physical  Communicated project status to stakeholders and program managers.(Included creating mitigation plans, and escalating risks/issues)
  • 2. September 2012 – January 2014 Sr. Project Manager (Cincinnati, OH)  PM on the Cincinnati Bell Network Management Systems/Systems Engineering Team (12 Month Project)  Lead manager in implementing Service Now and At Task in the NMS department  Tracked the Project Plan for various initiatives and projects in the NMS/SE team, using Microsoft Project and/orAtTask, managing the full life-cycle of the projects  Facilitated project and team meetings (Included conference calls with vendors and management)  Managed and tracked vendor responsibilities, relationships, and tasks.  Assigned action items and follow-ups with project managers and network engineers (Included implementing, testing,and reporting)  Documented various processes used by the department (Included using lean process on existing processes)  Communicated project status to stakeholders and program managers.(Included creating mitigation plans, communication plans, and escalating risks/issues) September 2009 – September 2012 Project Manager (Mason, OH) • PM on the GE Global Infrastructure Services Team (Full Time Project Work) (Team Outsourced in 2012) • Assigned and implemented work flow tickets • Facilitated Engineer’s tasks and all project meetings • Created daily reports for GE personnel/management • Created process flow charts and defined processes for the PMO and GE server de-install and transition processes • Kept and maintained a risk/issues log • Prepared risk response planning and identification of risk • Assisted in the creation and maintaining of a communications plan for management July 2008 - May 2009 Project Management Office Project Manager (Cincinnati, OH) • Led the reporting team for a British Telecom/Procter & Gamble transition project (12 Month Project) • Created weekly/monthly reports for BT and P&G personnel/management • Created process flow charts and defined processes for the PMO and BT • Kept and maintained a risk/issues log for various projects using A.R.M, and various databases • Prepared a project schedule for multiple projects using Microsoft Project • Prepared risk response planning and identification of risk • Assisted in the creation of a communications plan for management • Successfully administered and controlled change requests on the scope of all projects
  • 3. Pomeroy IT (Infrastructure Optimized) November 2004 – July 2008 January 2007 - July 2008 Project Management Office Sr. Project Coordinator (Hebron, KY) • Worked closely with the Human Resource department and created/implemented a new hire process • Approved technician’s time and expenses for PMO projects • Wrote processes forthe “people” side of the PMO’s business • Coordinated policies and processes forobtaining technicians with Pomeroy’s HR Recruiting team • Trained any incoming project coordinators/technicians within the PMO • Acted as a liaison between field technicians,Project Managers and Human Resources • Built and maintained WebEx One databases for various projects • Had direct contact with customers and insured proper installs using Pomeroy field technicians • Assisted in the creation of a communications plan for various projects • Kept and maintained a risk/issues log for various projects using SharePoint • Collected and posted any data the customer required (serial numbers, inventories, etc…) • Shipped and tracked equipment shipped out from Pomeroy’s warehouse • Assisted the PMO director w/creating work breakdown structures for technicians on various projects • Maintained customer quality specifications on all projects June 2006 – January 2007 Implementations and Deployments Coordinator (Hebron, KY) • Prepared the project plan/schedule for multiple projects • Prepared risk response planning and identification of risk • Involved in the scope management planning and definition • Created work breakdown structures (WBS) for multiple projects • Assisted in the creation of a communications plan for management • Successfully administered and controlled change requests on the scope of projects • Reported all findings and progress to senior Pomeroy management and the customer • Collected and posted any data the customer may have required (serial numbers, inventories, etc…) • Directed field technicians and project coordinators working on various projects EDUCATION B.A., Western Kentucky University, 2000 Major: Film & Television Production (Direction) Minor: Economics Training: Six Sigma Green Belt 2007-2009 PMI 2006-2017 ITIL 2008-2017 SCRUM 2015-2017 Project Management 2008-2017