The 7 Things I Know About Cyber Security After 25 Years | April 2024
hit2gap - Highly Innovative building control Tools Tackling the energy Performance Gap
1. HIT2GAP
Date, Location, Month of the Project GM # WP #
Highly Innovative building control Tools
Tackling the energy performance GAP
EINSTEIN project seminar
GALWAY, 14/Nov/2016
2. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP – AMBITIONS
HIT2GAP
Ambition 1 –
Generic
platform for
new generation
of BMS;
Ambition 2 –
Alternative and
complementary
solutions for
data colection;
Ambition 3 –
Data driven
models and
loads
forecasting;
Ambition 4 –
Building
performance
simulation;
Ambition 5 –
Usage patterns
and occupand
behaviour;
Ambition 6 –
Modular
information
display.
hardware
services
applications
3. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP - ARCHITECTURE
“Management Level Services “
4. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP – NUIG Modelling Strategy
• Design Stage
• WBS
• Uncalibrated based on
Engineering Judgement
BASELINE
Model
• Operational Stage
• Tarteged at supporting energy services like
ESCO, FDD, ENMS.
• Calibrated Model based on Actual Data
• Lightweight web application
R-O Model
5. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP SERVICES
HIT 2 GAP Core Platform – Common Data Model – Ontology - API
MANAGEMENT LEVEL H2G Services APP Store
Modelling Services
Model
Preparation
Model Analysis
and
improvement
Performance
Assessment
Methods
• Uncertainty and
Sensitivity analysis
• Calibration services
• GAP reasoner
• UoS - Overheating Risks
• NUIG Model Supported AHU controls
• MPC services
• Additional Model-Supported Services
• BIM supported semi
automated generation
(BIM2BEM - ZUTEC)
• Engineering support
services
Data Driven
Model Services
Forecasting
Services
Dissagregation
Services
Behavioural/Occupant
Models
HIT2GAP Field Level Data Acquisition
BMS
CYLON
LEED Tool
ENERIT ENMS
ZUTEC
Emperor Database
6. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP SERVICES
MADSEN & BACHER MODEL
ON MODELICA LANGUAGE
The developed model is composed of some blocks that correspond to different aspects of the building
WEATHER
BUILDING
OCCUPANCY
AHU
Based on: Sara Scarpini, Alberto Giretti. (2016). Reduced Order Models for EPC. Master Thesis. UNIVPLM
7. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
HIT2GAP SERVICES
0
2000
4000
6000
8000
10000
12000
EnergyConsumption[kWh]
Model Baseline
CALIBRATION RESULTS
Tolerance ASHRAE 14 Error Calculated
MONTHLY
CALIBRATION
NMBE 5% 1,44%
CV(RMSE) 15% 11,31%
MODEL CALIBRATED
OK
OK
>
>
Based on: Sara Scarpini, Alberto Giretti. (2016). Reduced Order Models for EPC. Master Thesis. UNIVPLM
8. GM # WP #14th November 2016 - NUIG EINSTEIN & HIT2GAP Seminar
IRISH PILOT – MODSCO Concept Arch.