Your SlideShare is downloading. ×

GRM 2011: Theme 4 -- Capacity building

79

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
79
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Capacity BuildingPerspectivesGRM 21-25 September 2011
  • 2. Areas of support Genotyping support Training Communities of Practice (CoPs)
  • 3. Genotyping support : Strategy Promote the adoption and use of MB in NARSbreeding programmes Commissioned research Breeding applications Support for PhD students at Africa Centre forCrop Improvement (ACCI) and West AfricaCentre for Crop Improvement (WACCI)
  • 4.  Crops with platform developed: (Cassava, Chickpea,Cowpea, Rice, Sorghum) Breeding MABC MARS development QTL pyramiding Development of other types of populations Pre-breeding Fingerprinting Migration to SNPs QTL mappingGenotyping Support: Capacitybuilding for NARS partners
  • 5.  Crop targets: Bean, Cassava, Chickpea, Cowpea,Groundnut, Maize, Rice, Sorghum, Wheat Application of GCP products Application of non-GCP products Validation of on-going work (collaboration with GCPpartners)Genotyping support : ACCI –WACCI PhD students
  • 6. Areas of support Genotyping support Training CoP
  • 7. Capacity Building: Strategy Tools to carry out analysis of data within project Adoption of IBP tools (users cases and CoP) Maximum of efficiency Training target
  • 8. YEAR 1Germplasm ManagementBreeding Mgnt systemGermplasm evaluationField trial Mgnt systemCoP establishMYEAR 2Updates on tools of year1Molecular analysisGenotypic data Mgnt systemData analysisCoP implementaYEAR 3Updates on tools of year1&2Analytical pipelineBreeding decisionsDecision support systemCoP implementaEast Africa – West Africa – South East AsiaWUR team, DM CoP &other technical trainersSpecific training:Local levelSpecific LanguageDifferent level:Technicians
  • 9.  Year 1 : Training introduction (length TBD) Year 2 and 3 : Advanced training on specific tools Priority setting of partners (surveys) Allowed partners to be trained à la carte to better fitthe need of their programme (parallel session) E-leaning material to complement the trainingmodulesCapacity Building:Feedback from partnersOrganisation of training programme
  • 10.  Involvement in MB activities The practitioners : breeders, young scientists, technicians Structure of NARS Staff constitution Ensure spill-over : critical mass in institution Senior scientists not to be excluded totally: Technology and concepts new to some of them Some of them are doing the workCapacity Building:Feedback from partnersTarget of training programme
  • 11.  Capacity built at personal level with scientists Main challenge in the capacity of the institutions Disbursement of the funding Monitoring of the projectCapacity Building for leadership:Feedback from partners
  • 12. Phenotyping support to partners Implementation of handheld tablets in NARSprogrammes Support for implementation of DB at institutionlevel Support for implementation of DB at project level
  • 13. Areas of support Genotyping support Training CoP
  • 14. CoP : Achieved : Rice in the Mekong Cassava in Africa Data Managers Chickpea Cowpea and Soybean SorghumEstablishment Cooking : Bean Maize Wheat
  • 15. CoP : To be enhanced: Rice in Asia Rice in Africa Cassava in Africa Energizing the community Sustaining the communityImplementationLearning together with help of skilled people
  • 16. Thanks

×