Green business conf 041410

578 views
514 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
578
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Green business conf 041410

  1. 1. AEP Ohio Energy Efficiency Initiatives GREEN BUSINESS CONFERENCE Chuck Jennings Manager, Consumer Programs Energy Efficiency/Demand Reduction April 14, 2010
  2. 2. Overview of SB 221 <ul><li>SB 221 requires 22.2% cumulative kWh reductions through energy efficiency programs by 2025 and 7.75% cumulative demand reduction by 2018. </li></ul><ul><li>SB 221 also sets 25% Alternative Energy Portfolio Standard: minimum 12.5% from renewable energy and the rest from advanced energy (a portion of which can include energy efficiency). </li></ul><ul><li>Financial penalties prescribed for failure to meet incremental targets on an annual basis. </li></ul><ul><li>Program cost recovery through EE/PDR rider. </li></ul>
  3. 3. SB 221 Requirements for Efficiency
  4. 4. <ul><li>SMART Lighting </li></ul><ul><ul><li>Immediate savings online at www.gridSMARTohio.com </li></ul></ul><ul><ul><li>Immediate savings at checkout on CFL bulbs and light fixtures at participating retailers </li></ul></ul><ul><ul><li>EnergyStar ® </li></ul></ul><ul><ul><li>13-42 W, dimmable, 3-way options </li></ul></ul><ul><ul><li>Range of 86 -197 kwh annual energy savings </li></ul></ul>Residential Programs
  5. 5. <ul><li>Refrigerator Recycling </li></ul><ul><ul><li>For “old” second refrigerator, 10 cubic feet or larger </li></ul></ul><ul><ul><li>Must be in working condition </li></ul></ul><ul><ul><li>$25 reward for each </li></ul></ul><ul><ul><li>Free pick up </li></ul></ul><ul><ul><li>Recycling 97% components </li></ul></ul><ul><ul><li>1-877-545-4112 to schedule pickup </li></ul></ul>Residential Programs
  6. 6. <ul><li>More Programs to Come Summer 2010 </li></ul><ul><ul><li>Existing Home </li></ul></ul><ul><ul><li>Retrofit Efficiency </li></ul></ul><ul><ul><li>Low Income </li></ul></ul><ul><ul><li>Weatherization </li></ul></ul><ul><ul><li>New Construction </li></ul></ul>Residential Programs
  7. 7. Education (K-12) Program <ul><li>School-to-Home Energy Efficiency </li></ul><ul><ul><li>Addresses science standards grades 5-12 </li></ul></ul><ul><ul><li>Takes learning from school to home </li></ul></ul><ul><ul><li>Seven lessons </li></ul></ul><ul><ul><ul><li>Intro to Energy </li></ul></ul></ul><ul><ul><ul><li>Insulation & Air Leaks </li></ul></ul></ul><ul><ul><ul><li>Heating & Cooling </li></ul></ul></ul><ul><ul><ul><li>Saving Water & Energy </li></ul></ul></ul><ul><ul><ul><li>Light bulbs & Energy </li></ul></ul></ul><ul><ul><ul><li>Appliances & Energy </li></ul></ul></ul><ul><ul><ul><li>Energy Synopsis </li></ul></ul></ul><ul><ul><li>Fourteen energy saving devices </li></ul></ul><ul><ul><li>Implemented by Ohio Energy Project </li></ul></ul><ul><ul><li>180 schools, 13,500 students </li></ul></ul>
  8. 8. Reduce your investment payback period and create long-term reduction in energy consumption and costs. <ul><li>Three Programs: </li></ul><ul><ul><ul><li>Lighting </li></ul></ul></ul><ul><ul><ul><li>Custom </li></ul></ul></ul><ul><ul><ul><li>Self-Direct </li></ul></ul></ul><ul><ul><li>Incentives for energy savings and peak demand reduction </li></ul></ul><ul><ul><li>Applications and guidelines found at www.gridSMARTohio.com </li></ul></ul><ul><ul><li>Technical assistance for completing Custom and Self-Direct applications available </li></ul></ul>Business Programs
  9. 9. <ul><li>Set incentives for purchasing & installing efficient lighting </li></ul><ul><li>All business (non-residential) customers are eligible </li></ul><ul><li>Equipment must meet requirements in program application </li></ul><ul><li>Incentives may not exceed 50% of the total project cost </li></ul><ul><li>AEP Ohio dispenses funds based on availability </li></ul>Business Lighting Program Incentives range from $2 per CFL to $350/kW for new T8/T5 fixtures
  10. 10. <ul><li>Incentives for new high-efficiency equipment and industrial process improvements that reduce energy consumption and peak demand </li></ul><ul><li>For retrofit and new applications </li></ul><ul><li>Measures must be installed for five years </li></ul><ul><li>All business (non-residential) customers are eligible </li></ul><ul><li>Equipment must meet requirements in program application </li></ul><ul><li>AEP Ohio dispenses funds based on availability </li></ul>Business Custom Program 50% Max % of total project cost 1 to 7 years Range of payback qualifying for incentive $.08/kWh + $100/kW PDR Incentive Level
  11. 11. <ul><li>SB 221 allows qualifying customers to submit previously completed energy efficiency and peak demand reduction projects </li></ul><ul><li>Eligible customers: </li></ul><ul><ul><li>Non-residential customers with energy consumption >700,000 kWh/year from AEP Ohio; or </li></ul></ul><ul><ul><li>A national or regional account involving multiple facilities in one or more states </li></ul></ul><ul><li>Customer responsible for costs to document energy saving projects and should have experience and staff capability to manage, implement, and verify an energy management program within their facilities </li></ul>Business Self-Direct Program
  12. 12. Business Self-Direct Program <ul><li>Customer commits their completed energy efficiency and peak demand reduction projects to AEP Ohio. </li></ul><ul><ul><li>Option One: Incentive payment upon approval, stays in EE/PDR rider </li></ul></ul><ul><ul><li>Option Two: Exemption from EE/PDR rider as long as NPV of calculated incentive is greater than value of their rider obligation </li></ul></ul><ul><li>Customers must be accepted into the Self-Direct program by AEP Ohio and the Public Utility Commission of Ohio, and sign a participation agreement. </li></ul><ul><li>Projects completed from January 1 st , 2006 – December 31, 2008 can qualify. </li></ul><ul><li>Measures must be installed for five years. </li></ul><ul><li>AEP Ohio dispenses funds based on availability. </li></ul>50% Max % of total project cost 1 to 7 years Range of payback qualifying for incentive 75% of Custom or Lighting Programs Incentive Level
  13. 13. <ul><li>In design phase with input from stakeholders </li></ul><ul><li>Technology program open to all customer classes </li></ul><ul><li>Launch program in 2010 if approved </li></ul>Renewable Energy
  14. 14. Program Guidelines & Applications

×