Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
SEPEV @PassiEXPO 2013
1.
2. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Tugba Salman Gurcan
Certified Passive House Designer
President of Board
3. -
a young organization
founded in 2012 December
has 32 members by day
-
Promotion of the Passive House Standard and Zero-Energy
Buildings in Turkey.
-
Platform for architects, engineers and contractors,
students, for all who concerned with build environment.
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
SEPEV – Zero Energy and Passive
House Association of TURKEY
4. energy efficiency
+ healthy
+ cost optimized
-----------------------
FUTURE
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Passivhaus =
5. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Obstacles of
Passive House
in Turkey
6. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
•„passive“ doesn`t make sense in Turkish and doesn„t
sound very sexy
• Private idea – no legal standard (confusion, …)
• No abundant component market (lack of rivalry, aligned)
• Experts needed (costs,…)
• Missing quality of craftsmanship (costs, …)
• All this certifications (fears, costs, …)
• PHPP (no interest, fee, …)
• Limited design freedom and new technologies (fears, …)
• Thermal bridge free construction (costs, …)
• Optimized building services (costs, …)
7. Moliere
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
The greater the obstacle, the more
glory in overcoming it.
8. is calling for Passive
Zero Energy and Passive House Association - TURKEY
House
PASSIVE HOUSE
GAZIANTEP - The town of Baklava and Kebap
9. 37 04'01"N and 37 23'00”E
Mediterranean climate with influences of continental
climate during winter with very hot summers and cold, wet
occasionally snowy winters
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
GAZIANTEP
10. Questioning ‘how Passive House should
be in hot/dry climates?’
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
While designing a building in Gaziantep with
Passive House measures, special care had to
be taken to the summer protection and to the
avoidance of overheating.
11. 1st Passive House Building of Turkey
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Human Resources Centre of Gaziantep
Metropolitan Municipality
12. The Mayor of Gaziantep was convinced to
build a prototype Passive House Building
The Human Resources Centre
- with 315m2 treated floor area
- a training center for the employment of the architectural and
construction professionals in Gaziantep
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
In 2010….
13. since 1999 to 2013
More than 350 Passive House buildings
were designed by r-m-p architects all over
Europe
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
German Experience comes to Turkey
15. U-value : 0.112 W/m2K
U-value (Ground): 0,105 W/m2K
Zero Energy and Passive House Association - TURKEY
U-value (wall) : 0.085 W/m2K
PASSIVE HOUSE
Highly Insulated Building Fabric
16. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Triple Glazed
PHI certified Aluminium and PVC window system
17. - a ground-air heat exchanger system
(earth tubes) for pre-tempering
ventilation air
GEA Isisan
- the system is linked up with a high
performance mechanical ventilation unit
with heat recovery (MVHR) – (%92
efficiency rate) to offer a full ventilation
solution
Rehau EcoAir
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Heat recovery for energy efficiency
and comfort
18. South Façade Solar
shading
Green Roof
Water Source Heat
Pump
PV Array
Grey water and rain
water collection
ECO Friendly Interior
Materials
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Aluminum Triple
Glazing
19. PHPP model
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Energy Performance of the building:
28. Quality of workmanship is even
more important than careful
planning!!!
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Achieving
AIRTIGHTNESS….
34. Cases with and without tress & without
solar shading:
Figure 1 both with trees and solar shading
Figure 2 solar shading only
Figure 3 trees only
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
DIALux Day-lighting
Analysis
35. application was done in Oct, 2013
waiting to be certified by PHI.....
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Final cost: 1,200 € / m2
36. 1st Energy efficient renovation
- 283m2 (total floor area)
- old building from 1970s
- project is founded by UNDP – Ministry of Development
Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Next challenge of Passive House
in Gaziantep
37. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Very poor conditions and too many
leakages on building fabric….
38. Blower Door Test (Pre-retrofit conditions)
28.09.2013
Figure 1 The Main Entrance of the building (wing A)
PASSIVE HOUSE
Latitude: 37.14810717243555
Longitude: 37.29483851289751
Test Date:
28.09.2013
Figure 2 A, B and C Wings
There are 3 wings (parts) within the 283m2 building (Figure 1). For each wing depressur
pressurization methods were applied and carried out with BlowerDoor Test following EN
The project targeting EnerPHit Standard, pre-retrofit test was carried out to indicate curre
After the renovation the same test will be performed to ascertain the airtightness level of
Figure 1 The Main Entrance of the building (wing A) Figure 2 A, B and C Wings
according to EnerPHit Standard. The existing building was air tested to give approx. 9, 3
changes (Table 1). For detailed information wing depressurization
There are 3 wings (parts) within the 283m2 building (Figure 1). For each refer to appendix A. and
pressurization methods were applied and carried out with BlowerDoor Test following EN13829 Standard.
Comm
The project targeting EnerPHit Standard,Object
pre-retrofit test was n50: Air Changes per Hour (1/h)
carried out to indicate current conditions.
1
After the renovation the same test EnerPHit Standard ascertain the airtightness level of the building
will be performed to
according to EnerPHit Standard. The existing building was air tested to give9.04
approx. 9, 3 and 4 air The test results
Wing A
regula
changes (Table 1). For detailed information refer to appendix A.
The test results
3.80
Wing B
regula
Object
n50: Air Changes per Hour (1/h)
Comments
The test results
4.84
Wing C 1
EnerPHit Standard
regula
The test results do not meet the
Table 1
9.04
Wing A
Zero Energy and Passive House Association - TURKEY
regulation.
39. Office Building / Ankara
Single Family House / Ankara
Zero Energy and Passive House Association - TURKEY
University Building / Ankara
Office Building / Balikesir
PASSIVE HOUSE
New Passive House Projects on board
40. Zero Energy and Passive House Association - TURKEY
PASSIVE HOUSE
Tugba Salman Gurcan
tugba@sepev.org