Your SlideShare is downloading. ×
0
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
SEPEV @PassiEXPO 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

SEPEV @PassiEXPO 2013

354

Published on

Zero Energy and Passive House Association of TURKEY …

Zero Energy and Passive House Association of TURKEY
Tugba Salman Gurcan
Certified Passive House Designer
President of Board

Published in: Real Estate, Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
354
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
14
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Tugba Salman Gurcan Certified Passive House Designer President of Board
  • 2. - a young organization founded in 2012 December has 32 members by day - Promotion of the Passive House Standard and Zero-Energy Buildings in Turkey. - Platform for architects, engineers and contractors, students, for all who concerned with build environment. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE SEPEV – Zero Energy and Passive House Association of TURKEY
  • 3. energy efficiency + healthy + cost optimized ----------------------- FUTURE Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Passivhaus =
  • 4. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Obstacles of Passive House in Turkey
  • 5. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE •„passive“ doesn`t make sense in Turkish and doesn„t sound very sexy • Private idea – no legal standard (confusion, …) • No abundant component market (lack of rivalry, aligned) • Experts needed (costs,…) • Missing quality of craftsmanship (costs, …) • All this certifications (fears, costs, …) • PHPP (no interest, fee, …) • Limited design freedom and new technologies (fears, …) • Thermal bridge free construction (costs, …) • Optimized building services (costs, …)
  • 6. Moliere Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE The greater the obstacle, the more glory in overcoming it.
  • 7. is calling for Passive Zero Energy and Passive House Association - TURKEY House PASSIVE HOUSE GAZIANTEP - The town of Baklava and Kebap
  • 8. 37 04'01"N and 37 23'00”E Mediterranean climate with influences of continental climate during winter with very hot summers and cold, wet occasionally snowy winters Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE GAZIANTEP
  • 9. Questioning ‘how Passive House should be in hot/dry climates?’ Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE While designing a building in Gaziantep with Passive House measures, special care had to be taken to the summer protection and to the avoidance of overheating.
  • 10. 1st Passive House Building of Turkey Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Human Resources Centre of Gaziantep Metropolitan Municipality
  • 11. The Mayor of Gaziantep was convinced to build a prototype Passive House Building The Human Resources Centre - with 315m2 treated floor area - a training center for the employment of the architectural and construction professionals in Gaziantep Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE In 2010….
  • 12. since 1999 to 2013 More than 350 Passive House buildings were designed by r-m-p architects all over Europe Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE German Experience comes to Turkey
  • 13. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 14. U-value : 0.112 W/m2K U-value (Ground): 0,105 W/m2K Zero Energy and Passive House Association - TURKEY U-value (wall) : 0.085 W/m2K PASSIVE HOUSE Highly Insulated Building Fabric
  • 15. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Triple Glazed PHI certified Aluminium and PVC window system
  • 16. - a ground-air heat exchanger system (earth tubes) for pre-tempering ventilation air GEA Isisan - the system is linked up with a high performance mechanical ventilation unit with heat recovery (MVHR) – (%92 efficiency rate) to offer a full ventilation solution Rehau EcoAir Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Heat recovery for energy efficiency and comfort
  • 17. South Façade Solar shading Green Roof Water Source Heat Pump PV Array Grey water and rain water collection ECO Friendly Interior Materials Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Aluminum Triple Glazing
  • 18. PHPP model Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Energy Performance of the building:
  • 19. LEED Platinum Certified Passivhaus Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Candidate for
  • 20. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 21. 2012 Summer Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE The construction started...
  • 22. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 23. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 24. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 25. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 26. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 27. Quality of workmanship is even more important than careful planning!!! Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Achieving AIRTIGHTNESS….
  • 28. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 29. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 30. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 31. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 32. PASSIVE HOUSE Zero Energy and Passive House Association - TURKEY
  • 33. Cases with and without tress & without solar shading: Figure 1 both with trees and solar shading Figure 2 solar shading only Figure 3 trees only Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE DIALux Day-lighting Analysis
  • 34. application was done in Oct, 2013 waiting to be certified by PHI..... Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Final cost: 1,200 € / m2
  • 35. 1st Energy efficient renovation - 283m2 (total floor area) - old building from 1970s - project is founded by UNDP – Ministry of Development Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Next challenge of Passive House in Gaziantep
  • 36. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Very poor conditions and too many leakages on building fabric….
  • 37. Blower Door Test (Pre-retrofit conditions) 28.09.2013 Figure 1 The Main Entrance of the building (wing A) PASSIVE HOUSE Latitude: 37.14810717243555 Longitude: 37.29483851289751 Test Date: 28.09.2013 Figure 2 A, B and C Wings There are 3 wings (parts) within the 283m2 building (Figure 1). For each wing depressur pressurization methods were applied and carried out with BlowerDoor Test following EN The project targeting EnerPHit Standard, pre-retrofit test was carried out to indicate curre After the renovation the same test will be performed to ascertain the airtightness level of Figure 1 The Main Entrance of the building (wing A) Figure 2 A, B and C Wings according to EnerPHit Standard. The existing building was air tested to give approx. 9, 3 changes (Table 1). For detailed information wing depressurization There are 3 wings (parts) within the 283m2 building (Figure 1). For each refer to appendix A. and pressurization methods were applied and carried out with BlowerDoor Test following EN13829 Standard. Comm The project targeting EnerPHit Standard,Object pre-retrofit test was n50: Air Changes per Hour (1/h) carried out to indicate current conditions. 1 After the renovation the same test EnerPHit Standard ascertain the airtightness level of the building will be performed to according to EnerPHit Standard. The existing building was air tested to give9.04 approx. 9, 3 and 4 air The test results Wing A regula changes (Table 1). For detailed information refer to appendix A. The test results 3.80 Wing B regula Object n50: Air Changes per Hour (1/h) Comments The test results 4.84 Wing C 1 EnerPHit Standard regula The test results do not meet the Table 1 9.04 Wing A Zero Energy and Passive House Association - TURKEY regulation.
  • 38. Office Building / Ankara Single Family House / Ankara Zero Energy and Passive House Association - TURKEY University Building / Ankara Office Building / Balikesir PASSIVE HOUSE New Passive House Projects on board
  • 39. Zero Energy and Passive House Association - TURKEY PASSIVE HOUSE Tugba Salman Gurcan tugba@sepev.org

×