Reprint from ModernPowerSystems                      Author:
September 2005                                       Matthias Wink




Az Zour: 1000 MWe of
Workhorse Power Help Kuwait
Beat the Heat




                                  Power Generation

Power Plants
GAS TURBINES



Az Zour: 1000 MWe of
workhorse power help
Kuwait beat the heat
                    The SGT5-2000E (formerly known as the V94.2) is by no means the newest or most
                       sophisticated machine around, but that could be one of its strengths. Great robustness, fuel
                             flexibility and maintainability, together with substantial upgrading over the years, mean
                               that it still occupies a key niche as the workhorse of the Siemens gas turbine
                                        portfolio. Kuwait's new 1000 MWe Az Zour power plant uses eight V94.2s in
                                             simple cycle mode, with scope for later conversion to combined cycle.




Matthias Wink, Siemens Power Generation, Offenbach, Germany

          lectrical supply has become a critical   International acting as local partner), it is the   conversion to combined cycle and have been



E         issue for Kuwait, in particular during
          the hot summer months when net
          capacity utilisation can exceed
          95% due to air conditioning
requirements. Power demand in summer is
roughly three times the peak load demand
during winter.
                                                   first new Siemens power plant in Kuwait in
                                                   nearly three decades. The owner’s engineer
                                                   and technical advisor is PB Power.
                                                      The Az Zour plant comprises eight Siemens
                                                   Econopacs, each of which includes the gas
                                                   turbine and generator, fin fan coolers for
                                                   generator and oil cooling, plant control system,
                                                                                                       designed to operate with dual-fuel firing by
                                                                                                       using both gas oil (with dry low-NOx burners)
                                                                                                       as well as gas.
                                                                                                          The Az Zour South Gas Turbine Project is
                                                                                                       located around 80 km south of Kuwait City
                                                                                                       within the premises of an existing oil fired
                                                                                                       thermal power station. The 1000 MW
   The growth in construction and support          electrical equipment, air intake and filter         installed capacity of the new plant
industries in Kuwait has contributed to a          house, exhaust diffuser and stack.                  supplements the existing 2400 MW
steady 5% annual growth rate in electricity           The design features of the plant have been       conventional thermal plant nearby.
demand in recent years, which is projected to      carefully considered in an attempt to reach an         The architecture of the power plant uses ma-
continue. It is to meet this growth in demand      optimum balance between capital cost, plant         terials, textures and colours very carefully, re-
that the Az Zour South gas turbine plant has       performance and operation and maintenance           ducing its visual impact and adapting it to the
been built for the Ministry of Energy.             requirements. Plant exhaust emissions are           environment.
   The plant was officially opened by Federal      minimised through the use of Siemens hybrid            Local materials and methods of construction
Chancellor Gerhard Schröder on 28 February         burners, which allow for operation on both          have been used wherever possible, thereby
2005 as part of his state visit to Kuwait.         gas and oil.                                        providing a link between the new plant and
Installed as a turnkey project by Siemens             The eight gas turbines are located in a single   the existing architecture of the region.
Power      Generation       (with     Alghanim     275 m long turbine hall, with capacity for later       Site planning has ensured that the opera-

                                                           September 2005 Modern Power Systems
GAS TURBINES


                                                                                                       the motors, actuators and servo drives.

                                                                                                       The electrical concept
                                                                                                       The gas turbine generators feed into the 132
                                                                                                       kV and 275 kV grid via the unit
                                                                                                       transformers. Two generators each are
                                                                                                       connected via one three winding unit
                                                                                                       transformer. Four unit auxiliary transform-
                                                                                                       ers provide the plant auxiliary power
                                                                                                       supply from the generator leads to the 6.6
                                                                                                       kV unit switchgear. Each unit auxiliary
                                                                                                       transformer supplies the auxiliary power for
                                                                                                       a pair of two gas turbines.
                                                                                                          In the event of a grid failure, the 1600 kVA
                                                                                                       emergency diesel generator sets provide
                                                                                                       power to the most essential loads of the gas
                                                                                                       turbine generator sets.
                                                                                                          The 6.6 kV switchgear via low voltage
tional areas are well separated from the                                                               distribution transformers supplies the various
residential and service facilities, while                                                              400 V AC switchgears.
detailed attention to landscaping has further                                                             Battery-backed 220 V DC systems are fed from
lessened the impact upon the environment.                                                              the 400 V unit and common switchgear via
                                                                                                       rectifiers. Static converters are used in order to
The gas turbine units                                                                                  step the 220 V DC down to a 24 V DC voltage
The SGT5-2000E (formerly known as the                                                                  level for the control and instrumentation loads.
V94.2) is a long-proven gas turbine over all        room equipped with a Teleperm XP process              The gas turbines are started via start-up
load ranges – particularly peak load operation.     and control system.                                frequency converters, which accelerate the
The machine is of a robust design capable of           The operating and monitoring of the Az          turbines by motoring the generators. During
burning a variety of fuels – from gas and/or        Zour Power Plant is carried out via plant          start-up and also during standstill periods of
liquid fuels of widely varying calorific values     diagrams, which can be displayed by simply         the entire power plant, the plant auxiliary
to treated heavy oil. The SGT5-2000E fleet con-     opening individual operation buttons on the        power is supplied to the 6.6 kV unit
sists of more than 140 units, with over 75 000      computer screen.                                   switchgear via the 132kV (275 kV) grid via the
starts and a total of 6 900 000 operating hours.       The diagram element is a dynamic unit,          unit and unit auxiliary transformers with the
   Six years ago market requirements                which represents the current system status         generator circuit breakers open.
prompted an upgrade of the product, which           via changes in colour, form or position.
has been rewarded by orders from both the           More detailed information for the operator         Tight schedule
modernisation and new build market.                 can be provided in the standard plant              Timescales are always a key factor in any con-
Consequently the SGT5-2000E remains a key           diagrams by clicking the operation buttons         struction project. Az Zour South is no excep-
member of the Siemens heavy duty gas                of individual objects.                             tion. With an already ambitious schedule of
turbine portfolio. Its most important features         The annunciation part is integrated into the    16 months being reduced before the works
can be summarised as follows:                       operating and monitoring system. The current       had even started, the challenge of meeting the
• 16-stage compressor, adjustable inlet guide       alarms and messages are indicated in the alarm     planned completion date was one that was
  vanes (IGVs), optionally fast-acting for grid     sequence display.                                  met with a "will to win" attitude.
  frequency stabilisation;                             Additionally a back-up mimic panel exists,         The tight time schedule called for
• two large external silo-type combustors           where all crucial trip and alarm signals as well   considerable efforts to be made in terms of
  equipped with 2x8 hybrid burners for premix       as important analogue indicators are shown.        logistics: in January 2004, over 30 000 freight
  and diffusion mode operation with natural            The data exchange between the operations        tons had to be brought ashore within two weeks
  gas, fuel oil and special fuels, such as heavy    management level and the automation level is       and to be installed in the shortest possible time.
  oil and refinery residues;                        realized via a redundant data highway.               Four of the eight SGT5-2000E gas turbines
• hot casings weld-fabricated from Ni-based            The operator terminals for Az Zour are          were available for commercial operation to help
  material, designed with single shell for          connected to an overall multimedia bus and         meet the high summer demand of 2004,
  elbow-shaped mixing casings or double             human-machine interface to the plant bus.          surpassing expectations.                     MPS
  shell for inner casing;                              The SINEC H1 FO is a bus system
• four-stage turbine with conventionally cast       for high data transmission data
  blading made of Ni-based material, stages 1       rates. The advantages of fibre optic
  and 2 having conventional cooling                 cables over coaxial cables are
  providing fuel flexibility (including ash-        higher      availability,  electrical
  forming fuels, that cannot be burnt when          isolation and insensitivity to
  film-cooled blading is used);                     electromagnetic interference.
• built-up disc rotor with a self-centring radial      The data exchange between the
  Hirth serrations and one central tie rod;         automation level and the process
• two bearing design;                               level is realised with process-bus
• generator drive at cold end;                      lines. The L2 bus lines consist of
• axial exhaust design;                             fibre optic cables in order to avoid
• fast starting capability, a major advantage for   high voltage influences.
  peaking and black start applications;                The process values of the
• compressor and turbine blades and vanes           single-cycle power plant are
  exchangeable with rotor in place;                 converted to analogue or binary
• high availability due to long maintenance         transmitter signals at the process
  intervals; and                                    level. These signals are digitised in
• capability for hot-gas-path to be inspected       the input/output modules of the
  without cover lift thanks to the walk-in          peripheral cabinets (ET200), which
  combustion chambers.                              are installed around the plant rather                                        Cutaway of the SGT5-
                                                    than centrally. The input/output                                             2000E (formerly
I&C equipment                                       modules transmit the switching and                                           V94.2)
The Az Zour power plant has a central control       positioning signals for controlling

                                                         Modern Power Systems September 2005
SEPTEMBER 2005




  ModernPowerSystems
  COMMUNICATING POWER TECHNOLOGY WORLDWIDE             www.modernpowersystems.com




  TRANSMISSION                                           GAS TURBINES
  & DISTRIBUTION                                         Az Zour’s 1000 MWe
  AC, DC and the                                         of workhorse power
  Chinese grid                                           helps Kuwait beat
                                                         the heat
  COAL POWER                                             RENEWABLES
  Black, the new green?                                  A period of calm fol-
                                                         lowing turbulence
  A circular argument                                    for US wind?
  for improved
  boiler design                                          Iceland heads for
                                                         total independence
  NUCLEAR                                                DISTRIBUTED
  US renaissance and                                     POWER
  the boiling water                                      CHP/fuel cell
  reactor revisited                                      alliance in Scotland




This article appeared in:
ModernPowerSystems
September 2005
Copyright © 2005 by
Wilmington Publishing Ltd.
www.connectingpower.com

This reprint is published by:
Siemens AG
Power Generation
Freyeslebenstrasse 1
91058 Erlangen, Germany

Siemens Power Generation, Inc.
4400 Alafaya Trail
Orlando, FL 32826-2399, USA

www.siemens.com/powergeneration

Order No. A96001-S90-A416-X-4A00
Printed in Germany
1353 107592B SD 02061.

All rights reserved.
Subject to change without prior notice.
Printed on paper treated with chlorine-free bleach.

Trademarks mentioned in this document are the property
of Siemens AG, its affiliates, or their respective owners.

The information in this document contains general
descriptions of the technical options available, which
may not apply in all cases. The required technical options
should therefore be specified in the contract.

More Related Content

What's hot

Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptaryan5808
 
THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.Anish Anand
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t21403515
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23Munna Sagar
 
Generation of electricity from coal parul
Generation of electricity from coal  parulGeneration of electricity from coal  parul
Generation of electricity from coal parulSwapnil Sharma
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivankshivank Kumar
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 

What's hot (20)

Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t
 
thermal power station
thermal power stationthermal power station
thermal power station
 
project -2
project -2project -2
project -2
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Generation of electricity from coal parul
Generation of electricity from coal  parulGeneration of electricity from coal  parul
Generation of electricity from coal parul
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivank
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 

Viewers also liked

Viewers also liked (9)

Musium mikroba
Musium mikrobaMusium mikroba
Musium mikroba
 
Coal Reburning
Coal ReburningCoal Reburning
Coal Reburning
 
Siemens Fuel Gasifier
Siemens Fuel GasifierSiemens Fuel Gasifier
Siemens Fuel Gasifier
 
Layout Basics I Ne
Layout Basics I NeLayout Basics I Ne
Layout Basics I Ne
 
Compressor Valves
Compressor ValvesCompressor Valves
Compressor Valves
 
Jarman on Wills
Jarman on WillsJarman on Wills
Jarman on Wills
 
Cen iso tr 20173 english
Cen iso tr 20173 englishCen iso tr 20173 english
Cen iso tr 20173 english
 
How To Use A Transit Final2
How To Use A Transit Final2How To Use A Transit Final2
How To Use A Transit Final2
 
Steam Turbinesforcombinedcycle
Steam TurbinesforcombinedcycleSteam Turbinesforcombinedcycle
Steam Turbinesforcombinedcycle
 

Similar to Siemens1000 Mw

Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbcRajesh Sheoran
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfKhalidAyaz3
 
Apex Microturbine Powerpoint
Apex Microturbine PowerpointApex Microturbine Powerpoint
Apex Microturbine PowerpointMario Viscovich
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFULHafiz M .Hamid
 
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdfShivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdfShivam Dubey
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
Don Talend Turbine Efficiency Article
Don Talend Turbine Efficiency ArticleDon Talend Turbine Efficiency Article
Don Talend Turbine Efficiency ArticleDon Talend
 
NTPC Training Report
NTPC Training ReportNTPC Training Report
NTPC Training ReportPratik Gupta
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station aryanmewara2
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plantYuvraj Singh
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdfRahulLodha11
 

Similar to Siemens1000 Mw (20)

NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
Arun
ArunArun
Arun
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbc
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
 
Power generation
Power generationPower generation
Power generation
 
Apex Microturbine Powerpoint
Apex Microturbine PowerpointApex Microturbine Powerpoint
Apex Microturbine Powerpoint
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
 
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdfShivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Don Talend Turbine Efficiency Article
Don Talend Turbine Efficiency ArticleDon Talend Turbine Efficiency Article
Don Talend Turbine Efficiency Article
 
NTPC Training Report
NTPC Training ReportNTPC Training Report
NTPC Training Report
 
Power stations
Power stationsPower stations
Power stations
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plant
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdf
 

More from AmericanMillwright (19)

Triangle Chart
Triangle ChartTriangle Chart
Triangle Chart
 
10 Inch Diameter
10 Inch Diameter10 Inch Diameter
10 Inch Diameter
 
Ge Steam Turbinesfor Industrial
Ge Steam Turbinesfor IndustrialGe Steam Turbinesfor Industrial
Ge Steam Turbinesfor Industrial
 
Ge Steam Turbine Products
Ge Steam Turbine ProductsGe Steam Turbine Products
Ge Steam Turbine Products
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
Metric & Inch Equivalent
Metric & Inch EquivalentMetric & Inch Equivalent
Metric & Inch Equivalent
 
Millimeter Tap Drill Sizes
Millimeter Tap Drill SizesMillimeter Tap Drill Sizes
Millimeter Tap Drill Sizes
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 FSiemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
 
Soft Foot
Soft FootSoft Foot
Soft Foot
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
 
Easy Laser Shaft Alignment Worksheet
Easy Laser   Shaft Alignment WorksheetEasy Laser   Shaft Alignment Worksheet
Easy Laser Shaft Alignment Worksheet
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Millwright Entire Packet
Millwright  Entire PacketMillwright  Entire Packet
Millwright Entire Packet
 
Nccer Rigger
Nccer RiggerNccer Rigger
Nccer Rigger
 
Nccer Maintenance
Nccer MaintenanceNccer Maintenance
Nccer Maintenance
 
Nccer Millwright
Nccer MillwrightNccer Millwright
Nccer Millwright
 
Rigging Fundamentals
Rigging FundamentalsRigging Fundamentals
Rigging Fundamentals
 

Siemens1000 Mw

  • 1. Reprint from ModernPowerSystems Author: September 2005 Matthias Wink Az Zour: 1000 MWe of Workhorse Power Help Kuwait Beat the Heat Power Generation Power Plants
  • 2. GAS TURBINES Az Zour: 1000 MWe of workhorse power help Kuwait beat the heat The SGT5-2000E (formerly known as the V94.2) is by no means the newest or most sophisticated machine around, but that could be one of its strengths. Great robustness, fuel flexibility and maintainability, together with substantial upgrading over the years, mean that it still occupies a key niche as the workhorse of the Siemens gas turbine portfolio. Kuwait's new 1000 MWe Az Zour power plant uses eight V94.2s in simple cycle mode, with scope for later conversion to combined cycle. Matthias Wink, Siemens Power Generation, Offenbach, Germany lectrical supply has become a critical International acting as local partner), it is the conversion to combined cycle and have been E issue for Kuwait, in particular during the hot summer months when net capacity utilisation can exceed 95% due to air conditioning requirements. Power demand in summer is roughly three times the peak load demand during winter. first new Siemens power plant in Kuwait in nearly three decades. The owner’s engineer and technical advisor is PB Power. The Az Zour plant comprises eight Siemens Econopacs, each of which includes the gas turbine and generator, fin fan coolers for generator and oil cooling, plant control system, designed to operate with dual-fuel firing by using both gas oil (with dry low-NOx burners) as well as gas. The Az Zour South Gas Turbine Project is located around 80 km south of Kuwait City within the premises of an existing oil fired thermal power station. The 1000 MW The growth in construction and support electrical equipment, air intake and filter installed capacity of the new plant industries in Kuwait has contributed to a house, exhaust diffuser and stack. supplements the existing 2400 MW steady 5% annual growth rate in electricity The design features of the plant have been conventional thermal plant nearby. demand in recent years, which is projected to carefully considered in an attempt to reach an The architecture of the power plant uses ma- continue. It is to meet this growth in demand optimum balance between capital cost, plant terials, textures and colours very carefully, re- that the Az Zour South gas turbine plant has performance and operation and maintenance ducing its visual impact and adapting it to the been built for the Ministry of Energy. requirements. Plant exhaust emissions are environment. The plant was officially opened by Federal minimised through the use of Siemens hybrid Local materials and methods of construction Chancellor Gerhard Schröder on 28 February burners, which allow for operation on both have been used wherever possible, thereby 2005 as part of his state visit to Kuwait. gas and oil. providing a link between the new plant and Installed as a turnkey project by Siemens The eight gas turbines are located in a single the existing architecture of the region. Power Generation (with Alghanim 275 m long turbine hall, with capacity for later Site planning has ensured that the opera- September 2005 Modern Power Systems
  • 3. GAS TURBINES the motors, actuators and servo drives. The electrical concept The gas turbine generators feed into the 132 kV and 275 kV grid via the unit transformers. Two generators each are connected via one three winding unit transformer. Four unit auxiliary transform- ers provide the plant auxiliary power supply from the generator leads to the 6.6 kV unit switchgear. Each unit auxiliary transformer supplies the auxiliary power for a pair of two gas turbines. In the event of a grid failure, the 1600 kVA emergency diesel generator sets provide power to the most essential loads of the gas turbine generator sets. The 6.6 kV switchgear via low voltage tional areas are well separated from the distribution transformers supplies the various residential and service facilities, while 400 V AC switchgears. detailed attention to landscaping has further Battery-backed 220 V DC systems are fed from lessened the impact upon the environment. the 400 V unit and common switchgear via rectifiers. Static converters are used in order to The gas turbine units step the 220 V DC down to a 24 V DC voltage The SGT5-2000E (formerly known as the level for the control and instrumentation loads. V94.2) is a long-proven gas turbine over all room equipped with a Teleperm XP process The gas turbines are started via start-up load ranges – particularly peak load operation. and control system. frequency converters, which accelerate the The machine is of a robust design capable of The operating and monitoring of the Az turbines by motoring the generators. During burning a variety of fuels – from gas and/or Zour Power Plant is carried out via plant start-up and also during standstill periods of liquid fuels of widely varying calorific values diagrams, which can be displayed by simply the entire power plant, the plant auxiliary to treated heavy oil. The SGT5-2000E fleet con- opening individual operation buttons on the power is supplied to the 6.6 kV unit sists of more than 140 units, with over 75 000 computer screen. switchgear via the 132kV (275 kV) grid via the starts and a total of 6 900 000 operating hours. The diagram element is a dynamic unit, unit and unit auxiliary transformers with the Six years ago market requirements which represents the current system status generator circuit breakers open. prompted an upgrade of the product, which via changes in colour, form or position. has been rewarded by orders from both the More detailed information for the operator Tight schedule modernisation and new build market. can be provided in the standard plant Timescales are always a key factor in any con- Consequently the SGT5-2000E remains a key diagrams by clicking the operation buttons struction project. Az Zour South is no excep- member of the Siemens heavy duty gas of individual objects. tion. With an already ambitious schedule of turbine portfolio. Its most important features The annunciation part is integrated into the 16 months being reduced before the works can be summarised as follows: operating and monitoring system. The current had even started, the challenge of meeting the • 16-stage compressor, adjustable inlet guide alarms and messages are indicated in the alarm planned completion date was one that was vanes (IGVs), optionally fast-acting for grid sequence display. met with a "will to win" attitude. frequency stabilisation; Additionally a back-up mimic panel exists, The tight time schedule called for • two large external silo-type combustors where all crucial trip and alarm signals as well considerable efforts to be made in terms of equipped with 2x8 hybrid burners for premix as important analogue indicators are shown. logistics: in January 2004, over 30 000 freight and diffusion mode operation with natural The data exchange between the operations tons had to be brought ashore within two weeks gas, fuel oil and special fuels, such as heavy management level and the automation level is and to be installed in the shortest possible time. oil and refinery residues; realized via a redundant data highway. Four of the eight SGT5-2000E gas turbines • hot casings weld-fabricated from Ni-based The operator terminals for Az Zour are were available for commercial operation to help material, designed with single shell for connected to an overall multimedia bus and meet the high summer demand of 2004, elbow-shaped mixing casings or double human-machine interface to the plant bus. surpassing expectations. MPS shell for inner casing; The SINEC H1 FO is a bus system • four-stage turbine with conventionally cast for high data transmission data blading made of Ni-based material, stages 1 rates. The advantages of fibre optic and 2 having conventional cooling cables over coaxial cables are providing fuel flexibility (including ash- higher availability, electrical forming fuels, that cannot be burnt when isolation and insensitivity to film-cooled blading is used); electromagnetic interference. • built-up disc rotor with a self-centring radial The data exchange between the Hirth serrations and one central tie rod; automation level and the process • two bearing design; level is realised with process-bus • generator drive at cold end; lines. The L2 bus lines consist of • axial exhaust design; fibre optic cables in order to avoid • fast starting capability, a major advantage for high voltage influences. peaking and black start applications; The process values of the • compressor and turbine blades and vanes single-cycle power plant are exchangeable with rotor in place; converted to analogue or binary • high availability due to long maintenance transmitter signals at the process intervals; and level. These signals are digitised in • capability for hot-gas-path to be inspected the input/output modules of the without cover lift thanks to the walk-in peripheral cabinets (ET200), which combustion chambers. are installed around the plant rather Cutaway of the SGT5- than centrally. The input/output 2000E (formerly I&C equipment modules transmit the switching and V94.2) The Az Zour power plant has a central control positioning signals for controlling Modern Power Systems September 2005
  • 4. SEPTEMBER 2005 ModernPowerSystems COMMUNICATING POWER TECHNOLOGY WORLDWIDE www.modernpowersystems.com TRANSMISSION GAS TURBINES & DISTRIBUTION Az Zour’s 1000 MWe AC, DC and the of workhorse power Chinese grid helps Kuwait beat the heat COAL POWER RENEWABLES Black, the new green? A period of calm fol- lowing turbulence A circular argument for US wind? for improved boiler design Iceland heads for total independence NUCLEAR DISTRIBUTED US renaissance and POWER the boiling water CHP/fuel cell reactor revisited alliance in Scotland This article appeared in: ModernPowerSystems September 2005 Copyright © 2005 by Wilmington Publishing Ltd. www.connectingpower.com This reprint is published by: Siemens AG Power Generation Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens Power Generation, Inc. 4400 Alafaya Trail Orlando, FL 32826-2399, USA www.siemens.com/powergeneration Order No. A96001-S90-A416-X-4A00 Printed in Germany 1353 107592B SD 02061. All rights reserved. Subject to change without prior notice. Printed on paper treated with chlorine-free bleach. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.