ADSSC Partners and Stakeholders
 Management Programme - PSMP
                 Presentation @



Palladium Partners and Stakeholders
     Management Road-show
                 31st May 2012



                        by
         Zillay Ahmed, ADSSC Business Support
ADSSC Background and Service Delivery Model


Established in June 2005.
Owned by the Government
of Abu Dhabi



                                                                Sewer tunnel project
Over US $ 6 billion                                             (STEP); 41 kms length,
Capital Investment                                              up to 5.5 m in diameter,
Projects (CIP) in                                               commissioning planned
progress                                                        for 2014, with capacity to
                                                                handle 1.6 million cubic
                                                                meters by 2030




 ADSSC currently                                                          510 employees
 services 1.3 million                                                     work at
 inhabitants, after                                                       ADSSC. O & M
 completion of its CIP                                                    is 100 %
 will serve a population                                                  outsourced
 base of 1.7 million
ADSSC Assets




               3
PSMP linkage to ADSSC Strategy Map 2011-2015

  What’s our
                                                               ADSSC Whole of Government Outcomes:
contribution to
                       Reliable, secure, safe and cost effective provision of sewerage         Sewerage network that complies with environmental regulations and
 AD Vision?                                       services                                                               standards


  Why do we         Our Mission: “To achieve excellence in the provision of high quality, cost effective, safe and environmentally compliant sewerage
   exist?                                                       services in the Emirate of Abu Dhabi.”


What “Value” do                       V1: Increase efficiency of ADSSC                                        V2: Ensure Customer Satisfaction
  we need to                                                                            Stakeholder
 deliver during
   the next 5
                                                                                       Collaboration
     years?                                 Service Delivery                           theme and 4-                     Customer Focus
                                            I1: Effectively manage                       priorities
                                            overloaded asset base
                                                                                                    I4: Improve management of            I5: Enhance domestic
Where should                                                                                         Trade Effluent customers              customer service
  we focus our        I2: Strengthen value-added              I3: Realistic planning and
                      partnerships with suppliers,
efforts in order      contractors and consultants           efficient delivery of CAPEX
 to deliver this
     Value?
                                                                      External Stakeholder Collaboration
                         I6: Ensure regulatory compliance                 I7: Enhance co-ordination with developers       I8: Ensure alignment and co-ordination
                                                                                                                            with relevant governmental entities

   What will
 enable us to                                                                Organisational Excellence
  execute all         E1: Attract qualified &        E2: Motivate & retain         E3: Ensure complete IT              E4: Enhance           E5: Implement best-
    these               experienced staff               human capital             segregation from ADWEA              communication          practice frameworks
                                                                                                                        capabilities
 challenges?
 www.adssc.ae                                                                                                                                                       4
PSMP linkage to ADSSC Strategy Map 2012-2016

  What’s our                                                      ADSSC Whole of Government Outcomes:
contribution to
                      Reliable, secure, safe and cost effective provision of sewerage          Sewerage network that complies with environmental regulations
  AD Vision?                                     services                                                             and standards


  Why do we
   exist?              Vision: “To be recognized by communities, businesses and                Mission: “To achieve excellence in the provision of high quality,
                   regulators as a world leader in the provision of sewerage services by        cost effective, safe and environmentally compliant sewerage
                                                    2020”                                                    services in the Emirate of Abu Dhabi.”

What “Value” do
  we need to
 deliver during                                                                          Stakeholder
   the next 5                        V1: Enhance Cost Efficiency                                                V2: Ensure Customer Satisfaction
     years?
                                                                                        Collaboration
                                                                                        theme and 2-
                                                                                          priorities
                                          Service Delivery                                                             Customer Focus
     Where
  should we         I1: Manage Overloaded Asset
                                                         I2: Plan and Deliver CAPEX
                                                                                                I3: Facilitate Implementation of         I4: Facilitate Transition
   focus our                   Base                                                               Trade Effluent Regulations            Towards Tariff Regime
   efforts in
    order to
  deliver this
     Value?
                                                                    External Stakeholder Collaboration

                                I5: Comply with Regulatory Requirements                             I6: Coordinate and Collaborate with External Stakeholders



   What will
                                                                          Organizational Excellence
 enable us to
  execute all                                                             E2: Deploy technology enablement                E3: Implement Best-Practice Frameworks
                   E1: Attract, Motivate & Retain Human Capital
    these
 challenges?
  www.adssc.ae                                                                                                                                                        5
What is PSMP?


ADSSC Partners & Stakeholders Management Program reviews & improves:
 • Relationship
 • Engagement
 • Management
 • Satisfaction

PSMP focuses on ADSSC stakeholders, including:
 • Contractors
 • Consultants
 • Government entities
 • Developers
 • Suppliers

PSMP excludes the following stakeholders, included under separate initiatives:
 • Employees
 • Customers
                                                                                 6
Why PSMP?


Strategic Planning framework mandated by Abu Dhabi Executive Council includes:
 • Strategic Stakeholder Mapping
 • Stakeholder Needs Analysis
 • Stakeholder Interactions

Abu Dhabi Government Excellence Award (EFQM model) stresses on Stakeholder:
 • Engagement
 • Consultation
 • Partnerships
 • Technological collaboration

Abu Dhabi Executive Council Performance Management Framework includes:
 • Whole-of-Government Outcomes
 • Inter-dependencies & Inter-linkages
 • Alignment with Abu Dhabi Vision

                                                                                 7
How did we proceed?


Internal Assessment, Planning and Actions:
 • Stakeholder Prioritization
 • Verification of process interfaces and touch points
 • Review of existing procedures, forms, technology deployment
 • Design of Stakeholder customized questionnaire
 • Issuance of participation invitation via MD office

Engagement Options:
 • 1-2-1
 • Focus Groups

Outcomes and Next Steps:
 • Communication (3-iterations)
 • Internal Improvement Projects
 • Integration with ADSSC Strategic Planning and Performance Management
   Scorecards
                                                                          8
ADSSC PSMP Framework

                                                                                                                                                                                                 •       Participation invitation by MD
                                                                                                                                                                                                 •       1-2-2 interviews
                                                                                                                                                                                                 •       Focus group sessions
                                                                                                                                                                                                 •       Report back via formal MD letter
                                                                                                                                                                                    Engagement
• Identification of concerns &
                                                                                                                                                                                                                              • Structured interview Q &A
  process improvement
                                                                                                                                                                                                                              • Tailored surveys
  opportunities                                                                                                                                                                                                               • Objective analysis
• Action planning
• Implementation
                                                                                                                                                                                                           Satisfaction
   Stakeholder Perceptions

1. Slow response time and
decision making



2. Lack of empowerment




3. Slow and inefficient
communication
                                         Why do /don’t you
                                              agree?
                                      Agree, this was the case
                                      when we were apart of
                                      ADWEA (in the MOUs)


                                      Don’t agree regarding
                                      internal empowerment –
                                      feel this is a legacy issue
                                      from ADWEA
                                      Yes, this is an existing
                                      problem. Communication
                                      channels and procedure is
                                                                       What should be done by ADSSC?

                                                                      We are appointing our legal advisor to
                                                                      review all MOUs and revisit the IDAs
                                                                      (removing Power and Water). Consider
                                                                      communicating this to Developers

                                                                      As above




                                                                      Clearly indicate the required protocol
                                                                      (e.g., use overseeing consultants)
                                                                                                                   Who should do it?

                                                                                                                   Assets




                                                                                                                   Assets




                                                                                                                   Business Support
                                                                                                                                        When should it be
                                                                                                                                            done?
                                                                                                                                       Already underway




                                                                                                                                       Already underway




                                                                                                                                       Immediately – quick
                                                                                                                                       win
                                                                                                                                                              Rank

                                                                                                                                                              3




                                                                                                                                                              3




                                                                                                                                                              1
                                                                                                                                                                     Relationship   PSMP
                                      not clear . Responses tend      Clear contact points on website (query)
                                      to be reactive (query
                                      specific)                       Implement strong reception system
4. No clear contact point             As above                        As above                                     Business Support    Immediately - next 3   1
                                                                                                                                       months
5. Stakeholder not clear on           No need to know internal        Clearly communicate relevant points of       Business Support    Immediately - next 3   1
ADSSC internal roles and              roles as long as contact        contact                                                          months
responsibilities                      points are clearly identified
6. Limited / no availability of TSE   Agree that this is a concern    A letter has been sent to all developers     Assets              Already underway       2
                                      but this is something that is   communicating that a Higher
                                      out of our hands                Committee for Water & Agricultural
                                                                      Strategy is deciding on the correct policy
                                                                      and use

                                                                      Continue to keep developers updated on
                                                                      status




                                                                                                                                                                                    Management       •    Contractual Ts’ & Cs’
                                                                                                                                                                                                     •    SLAs
                                                                                                                                                                                                     •    Technological interface
                                                                                                                                                                                                     •    Partnership opportunities

www.adssc.ae                                                                                                                                                                                                                                                 9
PSMP – Comparison between 2-cycles


                         2010                                                      2011
Approach :                                                 Approach :
   Launch of the programme                                    Enhanced approach with increased number of
                                                              participants (64)
   1-2-1 interviews with selected stakeholders (18)           Customized surveys & analysis for each stakeholder
                                                              group
   Workshop conducted to identify areas of improvement
                                                              Open discussions in focus group setting
   Action plans implementation                                Execution & monitoring framework for actions to be
                                                              taken

                     Participants
                                        Government
   Developers, 3                         Entities, 5




                                          Contractors, 5
    Consultants, 5



 www.adssc.ae                                                                                                       10
PSMP – Cycle 1 2010
                                          Project initiated in January 2010 and completed in April 2010


                  Interviews                       Workshops                    Management                    Action Plans
                                                                                Presentation
 2010 Approach




                      • Eighteen 1-2-1                 • Workshops were               • Feedback                 • An implementation
                        interviews were                  conducted to                   presentation               framework has
                        done with                        understand                     was made to                been developed
                        stakeholders                     stakeholders’                  Management of              along with the
                        from all                         perception and                 ADSSC                      relevant Action
                        identified                       to identify areas                                         Plans
                        strategic                        requiring change
                        stakeholder
                        groups



                                                  2010 External Stakeholders Feedback

   • An acknowledgment of the continuous efforts made to                        Areas of improvement were mostly focused on the
     improve the partnership between ADSSC and O&M                              following :
     Contractors.
   • ADSSC communication and reporting lines were seen to be                      •     Contract terms and conditions
     defined and clear.                                                           •     Scoping
   • Transparency and access to higher management is seen                         •     Bid bonds
     to be amongst the positive attributes resulting in higher                    •     Variation orders
     satisfaction results.                                                        •     HSE


www.adssc.ae                                                                                                                            11
PSMP – Cycle 1 2010 – Outcomes
                         All areas of concern were addressed and reported back to stakeholders

   Rank            Identified Issue                                   Action Taken

     1         Contract monitoring and    • New O & M contracts are performance based, with specific HSE KPIs’
               implementation on-site

                                          • Effective implementation of an Integrated Management System (IMS)
     2         HSE culture                resulted in achievement of the ADSSC IMS Certification in May 2010
                                          • HSE Specialist has been brought on-board


     3         Contracts Ts’ & Cs’        • New contracts are performance based
                                          •Terms and conditions aligned to FIDIC


               Variations Management      • End-to-end process review and re-design
     4
               and timelines


     5         Sharing of Bid Outcomes    • Relevant policy review is under consideration (changed in 2012)


www.adssc.ae                                                                                                      12
PSMP – Cycle II Details

Stakeholders Involvement – 64 external organizations:
 • 18 Government entities
 • 8 Developers
 • 14 Suppliers
 • 12 Contractors (Projects)
 • 5 Contractors (O & M)
 • 7 Consultants

Engagement Method:
 • Customized questionnaire
 • 6 Focus Groups (1-2 guests invited from each stakeholder entity)

Focus Group details:
 • ADSSC MD, Executive Management team and relevant staff attended
 • Survey results presented
 • Discussion and lunch

                                                                       13
ADSSC PSMP Cycle II – Government Entities




www.adssc.ae                                       14
ADSSC PSMP Cycle II - Developers
                                    ADSSC PSMP Cycle II – O&M Contractors




                                     General Construction Comp.




ADSSC PSMP Cycle II – Consultants




                                        Additionally 14 Suppliers
                                        participated, representing the full
                                        spectrum, in terms of volume of
                                        business and strategic importance for
                                        ADSSC


www.adssc.ae                                                                     15
PSMP – Cycle II Questionnaire Design




           SECTIONS
                                              SECTION 3                         SECTION 4
             1&2




• Frequency of Interaction      • Overall Satisfaction on General        • Overall Satisfaction on
• Perception of ADSSC:            Issues:                                  Technical Issues:
    −   Professionalism             − Quality and Timeliness of             − The Bidding Process
    −   Social Responsibility         Communication Material                − Contractual Terms and
    −   Technology                  − Professionalism, Knowledge and          Conditions
    −   Service Delivery              Responsiveness of ADSSC               − On-Site Coordination
    −   Bureaucracy                   Personnel                             − Integrated Management
    −   Responsiveness              − Clarity of Communication Channel        System
    −   Leadership                  − Contribution to Government            − The Handover Process
    −   Values                        Outcomes                              − The Variation Process
                                    − Frequency of interaction              − The Payment Process
www.adssc.ae                                                                                           16
Feedback Review and Analysis – typical example


Based on the results of the survey …         … we’ve built a “heat map” of the technical aspects
                                             of the interaction between ADSSC & the Consultants
                                             to identify major improvement areas:




               Higher Satisfaction Rates
                                                LEGEND:
               Moderate Satisfaction Rates          High             Moderate        Areas to
                                                    Satisfaction     Satisfaction    improve
               Lower Satisfaction Rates


www.adssc.ae                                                                                     17
PSMP – Cycle II Outcomes

Four Improvement Projects identified, related to:
 • Bidding
 • Consultant Effectiveness
 • Internal Divisional Coordination
 • Handover

What was done:
 • Internal multi-divisional teams formed
 • Maximum 6-month timeline per team
 • 4 concurrent projects
 • Monthly update to Management
 • Feedback to stakeholders at PSMP Cycle III planned for October 2012

PSMP Cycle III Options:
 • Repeat Cycle I or II methodology
 • Do collective Focus Group
 • Invite relevant stakeholders in joint session/s                        18
PSMP – Tips for Success

Design and Planning stage:
 • Drill down to smallest details
 • Ensure that stakeholder selection is representative of the group
 • Develop interview/survey methodology in coordination with relevant internal divisions
 • Leave 6-7 weeks window for receipt of participants feedback (reminders @W3/4/5)

Interaction stage:
 • Prepare well and stick to schedule
 • Brief executive management team prior to meeting
 • Deploy professional facilitation during workshop as interactions can get messy
 • Recognize / reward stakeholders

Analysis and Report back stage:
 • Capture all discussion notes
 • Communicate your action plans to stakeholders
 • Engage executive management in periodic review of agreed action plans / outcomes

                                                                                            19
ADSSC PSMP Focus Groups in Session




www.adssc.ae                              20
Appreciation Certificates




www.adssc.ae                    21
ADSSC Organizational Excellence –
           Sharing Best Practice Sessions

1. Western Region Development Council (WRDC) – March 2012 @ADSSC

2. DU Telecom – February 2012 @ADSSC

3. Regulation & Supervision Bureau (RSB) Abu Dhabi – January 2012 @ADSSC

4. Roads & Transport Authority Dubai (RTA) – June 2011 @ADSSC

5. Region of Peel, Mississauga, Canada - February 2011

6. Abu Dhabi Distribution Company – November 2010, at ADDC Head Office


7. Calgary Water, City of Calgary, Canada – October 2010


8. ETISALAT – October 2010 @ADSSC


9. Department of Transport (DoT) Abu Dhabi – July 2010 @ADSSC
                                                                            22
ADSSC Organizational Excellence –
              Presentations and Publications

1. “ADSSC Partners and Stakeholders Management Programme - PSMP”
   presentation at Palladium Round Table Workshops in May 2012, Abu Dhabi

2. “Organizational Excellence @ ADSSC: An integrated Approach” paper
   presentation at Balanced Scorecard Forum in April 2012, Dubai

3. “A Practical Guide to Performance Benchmarking” workshop (full-day) presentation
   at Balanced Scorecard Forum in April 2012, Dubai

4. “Benchmarking UAE Style” paper presentation at 6th International Benchmarking
   Conference, March 2012, Dubai

5. “International Innovation: Globally Leveraging a Canadian Best Practice” paper
   published in American Public Works Association (APWA), June 2011 issue

6. “Benchmarking Sewerage Services in Abu Dhabi” paper published in IWA Utility
   Water Management International, June 2011 issue
                                                                                       23
ADSSC Organizational Excellence –
              Presentations and Publications

7. “Strategic Performance Management @ ADSSC” paper presentation at NWWBI
   Conference in Banff, Canada, April 2011

8. “Risk Management @ADSSS” paper presentation at MENA ERM conference in April
   2011, Dubai

9. “ADSSC ARP Case Study” paper published by QPR in April 2011

10. “Using Process Benchmarking to Leverage Best Practices in the Establishment
   of a Functional and Dynamic Balanced Scorecard-based Performance
   Measurement System” paper presentation at IWA Benchmarking Conference,
   Valencia, Spain – January 2011

11. “Rapid Growth – an Abu Dhabi Perspective” paper presentation at WSAA
   Conference in Sydney, Australia – October 2008


                                                                                   24
Thank you.




              25

More Related Content

What's hot

The Aa Case Study
The Aa   Case StudyThe Aa   Case Study
The Aa Case StudyMikekholt
 
Dr Reddy's CPS - More Than Meets The Eye
Dr Reddy's CPS - More Than Meets The EyeDr Reddy's CPS - More Than Meets The Eye
Dr Reddy's CPS - More Than Meets The EyeChristian_Jones
 
SPEC INDIA Company Profile
SPEC INDIA Company ProfileSPEC INDIA Company Profile
SPEC INDIA Company ProfileSPEC INDIA
 
ecolab Shareholders
ecolab  Shareholdersecolab  Shareholders
ecolab Shareholdersfinance37
 
The AMMG Business Model (August 2008)
The AMMG Business Model (August 2008)The AMMG Business Model (August 2008)
The AMMG Business Model (August 2008)Jon Hansen
 
About Compvue Oct 01 2012 V2
About Compvue Oct 01 2012 V2About Compvue Oct 01 2012 V2
About Compvue Oct 01 2012 V2anishpremson
 
Tele Tech Corporate Overview
Tele Tech Corporate OverviewTele Tech Corporate Overview
Tele Tech Corporate OverviewSeanHart1766
 
Teletrips Partner Advantage Brochure
Teletrips Partner Advantage BrochureTeletrips Partner Advantage Brochure
Teletrips Partner Advantage Brochurecorporatecowboy
 
Underpinning Agreements: Keeping the End Goal in Mind
Underpinning Agreements:  Keeping the End Goal in MindUnderpinning Agreements:  Keeping the End Goal in Mind
Underpinning Agreements: Keeping the End Goal in MindITSM Academy, Inc.
 
ecolab ReviewOperations
ecolab  ReviewOperationsecolab  ReviewOperations
ecolab ReviewOperationsfinance37
 
Fusion Design A5 Brochure
Fusion Design A5 BrochureFusion Design A5 Brochure
Fusion Design A5 Brochurechrisbrayshaw
 
Group Collateral Ataglance
Group Collateral AtaglanceGroup Collateral Ataglance
Group Collateral Ataglancetyvanharpen
 
Piron Presentation Version 1.0 (4)
Piron Presentation Version 1.0 (4)Piron Presentation Version 1.0 (4)
Piron Presentation Version 1.0 (4)MylesFuchs
 
BMC Holistic Health & Retail Clinics
BMC Holistic Health & Retail ClinicsBMC Holistic Health & Retail Clinics
BMC Holistic Health & Retail ClinicsLauren Peters
 
KD Corporate Brochure
KD Corporate BrochureKD Corporate Brochure
KD Corporate Brochurerelalami
 
Gpi Capabilities 2011
Gpi Capabilities 2011Gpi Capabilities 2011
Gpi Capabilities 2011hdch1
 

What's hot (18)

The Aa Case Study
The Aa   Case StudyThe Aa   Case Study
The Aa Case Study
 
Dr Reddy's CPS - More Than Meets The Eye
Dr Reddy's CPS - More Than Meets The EyeDr Reddy's CPS - More Than Meets The Eye
Dr Reddy's CPS - More Than Meets The Eye
 
SPEC INDIA Company Profile
SPEC INDIA Company ProfileSPEC INDIA Company Profile
SPEC INDIA Company Profile
 
Cable & Wireless- Cisco
Cable & Wireless- CiscoCable & Wireless- Cisco
Cable & Wireless- Cisco
 
ecolab Shareholders
ecolab  Shareholdersecolab  Shareholders
ecolab Shareholders
 
The AMMG Business Model (August 2008)
The AMMG Business Model (August 2008)The AMMG Business Model (August 2008)
The AMMG Business Model (August 2008)
 
About Compvue Oct 01 2012 V2
About Compvue Oct 01 2012 V2About Compvue Oct 01 2012 V2
About Compvue Oct 01 2012 V2
 
Tele Tech Corporate Overview
Tele Tech Corporate OverviewTele Tech Corporate Overview
Tele Tech Corporate Overview
 
Teletrips Partner Advantage Brochure
Teletrips Partner Advantage BrochureTeletrips Partner Advantage Brochure
Teletrips Partner Advantage Brochure
 
Underpinning Agreements: Keeping the End Goal in Mind
Underpinning Agreements:  Keeping the End Goal in MindUnderpinning Agreements:  Keeping the End Goal in Mind
Underpinning Agreements: Keeping the End Goal in Mind
 
ecolab ReviewOperations
ecolab  ReviewOperationsecolab  ReviewOperations
ecolab ReviewOperations
 
Fusion Design A5 Brochure
Fusion Design A5 BrochureFusion Design A5 Brochure
Fusion Design A5 Brochure
 
Group Collateral Ataglance
Group Collateral AtaglanceGroup Collateral Ataglance
Group Collateral Ataglance
 
Piron Presentation Version 1.0 (4)
Piron Presentation Version 1.0 (4)Piron Presentation Version 1.0 (4)
Piron Presentation Version 1.0 (4)
 
About ITIL Foundation
About ITIL FoundationAbout ITIL Foundation
About ITIL Foundation
 
BMC Holistic Health & Retail Clinics
BMC Holistic Health & Retail ClinicsBMC Holistic Health & Retail Clinics
BMC Holistic Health & Retail Clinics
 
KD Corporate Brochure
KD Corporate BrochureKD Corporate Brochure
KD Corporate Brochure
 
Gpi Capabilities 2011
Gpi Capabilities 2011Gpi Capabilities 2011
Gpi Capabilities 2011
 

Similar to ZA PSMP presentation at palladium forum 2012

Infrastructure
InfrastructureInfrastructure
InfrastructureOSAEDA
 
Delivering the PCC Vision
Delivering the  PCC VisionDelivering the  PCC Vision
Delivering the PCC Visionpam_alliantist
 
Opus Global Group -Portfolio Cost Reduction Project
Opus Global Group -Portfolio Cost Reduction ProjectOpus Global Group -Portfolio Cost Reduction Project
Opus Global Group -Portfolio Cost Reduction Projecttsilvestri
 
Play Like a Champ - Southlake's High Peformance Game
Play Like a Champ - Southlake's High Peformance GamePlay Like a Champ - Southlake's High Peformance Game
Play Like a Champ - Southlake's High Peformance Gamebenthatcher
 
The wessex colleges_partnership_why_choose_cloud
The wessex colleges_partnership_why_choose_cloudThe wessex colleges_partnership_why_choose_cloud
The wessex colleges_partnership_why_choose_cloudAssociation of Colleges
 
Pmi kpmg study on drivers for success in inrastructure projects 2010
Pmi kpmg study on drivers for success in inrastructure projects 2010Pmi kpmg study on drivers for success in inrastructure projects 2010
Pmi kpmg study on drivers for success in inrastructure projects 2010CyberMedia Services Limited
 
Engine | Service development for ANA Airports
Engine | Service development for ANA AirportsEngine | Service development for ANA Airports
Engine | Service development for ANA AirportsJames Samperi
 
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...Affiliate Marketing Theatre; Powering performance marketing: how key technolo...
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...TFM&A
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Evbex
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed Mahran
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed Mahran
 
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...apidays
 
Innovation and Business Platforms
Innovation and Business PlatformsInnovation and Business Platforms
Innovation and Business PlatformsJeremy Caine
 
OPS Executive insights Webinar - Accenture
OPS Executive insights Webinar - AccentureOPS Executive insights Webinar - Accenture
OPS Executive insights Webinar - AccentureVMware Tanzu
 
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025Tom Hood, CPA,CITP,CGMA
 
Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020Ron Ellis
 

Similar to ZA PSMP presentation at palladium forum 2012 (20)

Infrastructure
InfrastructureInfrastructure
Infrastructure
 
Delivering the PCC Vision
Delivering the  PCC VisionDelivering the  PCC Vision
Delivering the PCC Vision
 
Opus Global Group -Portfolio Cost Reduction Project
Opus Global Group -Portfolio Cost Reduction ProjectOpus Global Group -Portfolio Cost Reduction Project
Opus Global Group -Portfolio Cost Reduction Project
 
Play Like a Champ - Southlake's High Peformance Game
Play Like a Champ - Southlake's High Peformance GamePlay Like a Champ - Southlake's High Peformance Game
Play Like a Champ - Southlake's High Peformance Game
 
The wessex colleges_partnership_why_choose_cloud
The wessex colleges_partnership_why_choose_cloudThe wessex colleges_partnership_why_choose_cloud
The wessex colleges_partnership_why_choose_cloud
 
Pmi kpmg study on drivers for success in inrastructure projects 2010
Pmi kpmg study on drivers for success in inrastructure projects 2010Pmi kpmg study on drivers for success in inrastructure projects 2010
Pmi kpmg study on drivers for success in inrastructure projects 2010
 
Engine | Service development for ANA Airports
Engine | Service development for ANA AirportsEngine | Service development for ANA Airports
Engine | Service development for ANA Airports
 
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...Affiliate Marketing Theatre; Powering performance marketing: how key technolo...
Affiliate Marketing Theatre; Powering performance marketing: how key technolo...
 
Products & Services Overview
Products & Services OverviewProducts & Services Overview
Products & Services Overview
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021
 
Linked in corp
Linked in corpLinked in corp
Linked in corp
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran Resume
 
Mohamed R. Mahran Resume
Mohamed R. Mahran ResumeMohamed R. Mahran Resume
Mohamed R. Mahran Resume
 
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...
apidays Australia 2022 - Guardianship Model - Managing digital hypergrowth at...
 
Innovation and Business Platforms
Innovation and Business PlatformsInnovation and Business Platforms
Innovation and Business Platforms
 
OPS Executive insights Webinar - Accenture
OPS Executive insights Webinar - AccentureOPS Executive insights Webinar - Accenture
OPS Executive insights Webinar - Accenture
 
Insights English
Insights EnglishInsights English
Insights English
 
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025
CPA Vision 2025 & Top Trends to Watch 2012 - CPA Horizons 2025
 
Tieto Introductie
Tieto IntroductieTieto Introductie
Tieto Introductie
 
Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020
 

Recently uploaded

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 

Recently uploaded (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 

ZA PSMP presentation at palladium forum 2012

  • 1. ADSSC Partners and Stakeholders Management Programme - PSMP Presentation @ Palladium Partners and Stakeholders Management Road-show 31st May 2012 by Zillay Ahmed, ADSSC Business Support
  • 2. ADSSC Background and Service Delivery Model Established in June 2005. Owned by the Government of Abu Dhabi Sewer tunnel project Over US $ 6 billion (STEP); 41 kms length, Capital Investment up to 5.5 m in diameter, Projects (CIP) in commissioning planned progress for 2014, with capacity to handle 1.6 million cubic meters by 2030 ADSSC currently 510 employees services 1.3 million work at inhabitants, after ADSSC. O & M completion of its CIP is 100 % will serve a population outsourced base of 1.7 million
  • 4. PSMP linkage to ADSSC Strategy Map 2011-2015 What’s our ADSSC Whole of Government Outcomes: contribution to Reliable, secure, safe and cost effective provision of sewerage Sewerage network that complies with environmental regulations and AD Vision? services standards Why do we Our Mission: “To achieve excellence in the provision of high quality, cost effective, safe and environmentally compliant sewerage exist? services in the Emirate of Abu Dhabi.” What “Value” do V1: Increase efficiency of ADSSC V2: Ensure Customer Satisfaction we need to Stakeholder deliver during the next 5 Collaboration years? Service Delivery theme and 4- Customer Focus I1: Effectively manage priorities overloaded asset base I4: Improve management of I5: Enhance domestic Where should Trade Effluent customers customer service we focus our I2: Strengthen value-added I3: Realistic planning and partnerships with suppliers, efforts in order contractors and consultants efficient delivery of CAPEX to deliver this Value? External Stakeholder Collaboration I6: Ensure regulatory compliance I7: Enhance co-ordination with developers I8: Ensure alignment and co-ordination with relevant governmental entities What will enable us to Organisational Excellence execute all E1: Attract qualified & E2: Motivate & retain E3: Ensure complete IT E4: Enhance E5: Implement best- these experienced staff human capital segregation from ADWEA communication practice frameworks capabilities challenges? www.adssc.ae  4
  • 5. PSMP linkage to ADSSC Strategy Map 2012-2016 What’s our ADSSC Whole of Government Outcomes: contribution to Reliable, secure, safe and cost effective provision of sewerage Sewerage network that complies with environmental regulations AD Vision? services and standards Why do we exist? Vision: “To be recognized by communities, businesses and Mission: “To achieve excellence in the provision of high quality, regulators as a world leader in the provision of sewerage services by cost effective, safe and environmentally compliant sewerage 2020” services in the Emirate of Abu Dhabi.” What “Value” do we need to deliver during Stakeholder the next 5 V1: Enhance Cost Efficiency V2: Ensure Customer Satisfaction years? Collaboration theme and 2- priorities Service Delivery Customer Focus Where should we I1: Manage Overloaded Asset I2: Plan and Deliver CAPEX I3: Facilitate Implementation of I4: Facilitate Transition focus our Base Trade Effluent Regulations Towards Tariff Regime efforts in order to deliver this Value? External Stakeholder Collaboration I5: Comply with Regulatory Requirements I6: Coordinate and Collaborate with External Stakeholders What will Organizational Excellence enable us to execute all E2: Deploy technology enablement E3: Implement Best-Practice Frameworks E1: Attract, Motivate & Retain Human Capital these challenges? www.adssc.ae  5
  • 6. What is PSMP? ADSSC Partners & Stakeholders Management Program reviews & improves: • Relationship • Engagement • Management • Satisfaction PSMP focuses on ADSSC stakeholders, including: • Contractors • Consultants • Government entities • Developers • Suppliers PSMP excludes the following stakeholders, included under separate initiatives: • Employees • Customers 6
  • 7. Why PSMP? Strategic Planning framework mandated by Abu Dhabi Executive Council includes: • Strategic Stakeholder Mapping • Stakeholder Needs Analysis • Stakeholder Interactions Abu Dhabi Government Excellence Award (EFQM model) stresses on Stakeholder: • Engagement • Consultation • Partnerships • Technological collaboration Abu Dhabi Executive Council Performance Management Framework includes: • Whole-of-Government Outcomes • Inter-dependencies & Inter-linkages • Alignment with Abu Dhabi Vision 7
  • 8. How did we proceed? Internal Assessment, Planning and Actions: • Stakeholder Prioritization • Verification of process interfaces and touch points • Review of existing procedures, forms, technology deployment • Design of Stakeholder customized questionnaire • Issuance of participation invitation via MD office Engagement Options: • 1-2-1 • Focus Groups Outcomes and Next Steps: • Communication (3-iterations) • Internal Improvement Projects • Integration with ADSSC Strategic Planning and Performance Management Scorecards 8
  • 9. ADSSC PSMP Framework • Participation invitation by MD • 1-2-2 interviews • Focus group sessions • Report back via formal MD letter Engagement • Identification of concerns & • Structured interview Q &A process improvement • Tailored surveys opportunities • Objective analysis • Action planning • Implementation Satisfaction Stakeholder Perceptions 1. Slow response time and decision making 2. Lack of empowerment 3. Slow and inefficient communication Why do /don’t you agree? Agree, this was the case when we were apart of ADWEA (in the MOUs) Don’t agree regarding internal empowerment – feel this is a legacy issue from ADWEA Yes, this is an existing problem. Communication channels and procedure is What should be done by ADSSC? We are appointing our legal advisor to review all MOUs and revisit the IDAs (removing Power and Water). Consider communicating this to Developers As above Clearly indicate the required protocol (e.g., use overseeing consultants) Who should do it? Assets Assets Business Support When should it be done? Already underway Already underway Immediately – quick win Rank 3 3 1 Relationship PSMP not clear . Responses tend Clear contact points on website (query) to be reactive (query specific) Implement strong reception system 4. No clear contact point As above As above Business Support Immediately - next 3 1 months 5. Stakeholder not clear on No need to know internal Clearly communicate relevant points of Business Support Immediately - next 3 1 ADSSC internal roles and roles as long as contact contact months responsibilities points are clearly identified 6. Limited / no availability of TSE Agree that this is a concern A letter has been sent to all developers Assets Already underway 2 but this is something that is communicating that a Higher out of our hands Committee for Water & Agricultural Strategy is deciding on the correct policy and use Continue to keep developers updated on status Management • Contractual Ts’ & Cs’ • SLAs • Technological interface • Partnership opportunities www.adssc.ae  9
  • 10. PSMP – Comparison between 2-cycles 2010 2011 Approach : Approach : Launch of the programme Enhanced approach with increased number of participants (64) 1-2-1 interviews with selected stakeholders (18) Customized surveys & analysis for each stakeholder group Workshop conducted to identify areas of improvement Open discussions in focus group setting Action plans implementation Execution & monitoring framework for actions to be taken Participants Government Developers, 3 Entities, 5 Contractors, 5 Consultants, 5 www.adssc.ae  10
  • 11. PSMP – Cycle 1 2010 Project initiated in January 2010 and completed in April 2010 Interviews Workshops Management Action Plans Presentation 2010 Approach • Eighteen 1-2-1 • Workshops were • Feedback • An implementation interviews were conducted to presentation framework has done with understand was made to been developed stakeholders stakeholders’ Management of along with the from all perception and ADSSC relevant Action identified to identify areas Plans strategic requiring change stakeholder groups 2010 External Stakeholders Feedback • An acknowledgment of the continuous efforts made to Areas of improvement were mostly focused on the improve the partnership between ADSSC and O&M following : Contractors. • ADSSC communication and reporting lines were seen to be • Contract terms and conditions defined and clear. • Scoping • Transparency and access to higher management is seen • Bid bonds to be amongst the positive attributes resulting in higher • Variation orders satisfaction results. • HSE www.adssc.ae  11
  • 12. PSMP – Cycle 1 2010 – Outcomes All areas of concern were addressed and reported back to stakeholders Rank Identified Issue Action Taken 1 Contract monitoring and • New O & M contracts are performance based, with specific HSE KPIs’ implementation on-site • Effective implementation of an Integrated Management System (IMS) 2 HSE culture resulted in achievement of the ADSSC IMS Certification in May 2010 • HSE Specialist has been brought on-board 3 Contracts Ts’ & Cs’ • New contracts are performance based •Terms and conditions aligned to FIDIC Variations Management • End-to-end process review and re-design 4 and timelines 5 Sharing of Bid Outcomes • Relevant policy review is under consideration (changed in 2012) www.adssc.ae  12
  • 13. PSMP – Cycle II Details Stakeholders Involvement – 64 external organizations: • 18 Government entities • 8 Developers • 14 Suppliers • 12 Contractors (Projects) • 5 Contractors (O & M) • 7 Consultants Engagement Method: • Customized questionnaire • 6 Focus Groups (1-2 guests invited from each stakeholder entity) Focus Group details: • ADSSC MD, Executive Management team and relevant staff attended • Survey results presented • Discussion and lunch  13
  • 14. ADSSC PSMP Cycle II – Government Entities www.adssc.ae  14
  • 15. ADSSC PSMP Cycle II - Developers ADSSC PSMP Cycle II – O&M Contractors General Construction Comp. ADSSC PSMP Cycle II – Consultants Additionally 14 Suppliers participated, representing the full spectrum, in terms of volume of business and strategic importance for ADSSC www.adssc.ae  15
  • 16. PSMP – Cycle II Questionnaire Design SECTIONS SECTION 3 SECTION 4 1&2 • Frequency of Interaction • Overall Satisfaction on General • Overall Satisfaction on • Perception of ADSSC: Issues: Technical Issues: − Professionalism − Quality and Timeliness of − The Bidding Process − Social Responsibility Communication Material − Contractual Terms and − Technology − Professionalism, Knowledge and Conditions − Service Delivery Responsiveness of ADSSC − On-Site Coordination − Bureaucracy Personnel − Integrated Management − Responsiveness − Clarity of Communication Channel System − Leadership − Contribution to Government − The Handover Process − Values Outcomes − The Variation Process − Frequency of interaction − The Payment Process www.adssc.ae  16
  • 17. Feedback Review and Analysis – typical example Based on the results of the survey … … we’ve built a “heat map” of the technical aspects of the interaction between ADSSC & the Consultants to identify major improvement areas: Higher Satisfaction Rates LEGEND: Moderate Satisfaction Rates High Moderate Areas to Satisfaction Satisfaction improve Lower Satisfaction Rates www.adssc.ae  17
  • 18. PSMP – Cycle II Outcomes Four Improvement Projects identified, related to: • Bidding • Consultant Effectiveness • Internal Divisional Coordination • Handover What was done: • Internal multi-divisional teams formed • Maximum 6-month timeline per team • 4 concurrent projects • Monthly update to Management • Feedback to stakeholders at PSMP Cycle III planned for October 2012 PSMP Cycle III Options: • Repeat Cycle I or II methodology • Do collective Focus Group • Invite relevant stakeholders in joint session/s  18
  • 19. PSMP – Tips for Success Design and Planning stage: • Drill down to smallest details • Ensure that stakeholder selection is representative of the group • Develop interview/survey methodology in coordination with relevant internal divisions • Leave 6-7 weeks window for receipt of participants feedback (reminders @W3/4/5) Interaction stage: • Prepare well and stick to schedule • Brief executive management team prior to meeting • Deploy professional facilitation during workshop as interactions can get messy • Recognize / reward stakeholders Analysis and Report back stage: • Capture all discussion notes • Communicate your action plans to stakeholders • Engage executive management in periodic review of agreed action plans / outcomes  19
  • 20. ADSSC PSMP Focus Groups in Session www.adssc.ae  20
  • 22. ADSSC Organizational Excellence – Sharing Best Practice Sessions 1. Western Region Development Council (WRDC) – March 2012 @ADSSC 2. DU Telecom – February 2012 @ADSSC 3. Regulation & Supervision Bureau (RSB) Abu Dhabi – January 2012 @ADSSC 4. Roads & Transport Authority Dubai (RTA) – June 2011 @ADSSC 5. Region of Peel, Mississauga, Canada - February 2011 6. Abu Dhabi Distribution Company – November 2010, at ADDC Head Office 7. Calgary Water, City of Calgary, Canada – October 2010 8. ETISALAT – October 2010 @ADSSC 9. Department of Transport (DoT) Abu Dhabi – July 2010 @ADSSC  22
  • 23. ADSSC Organizational Excellence – Presentations and Publications 1. “ADSSC Partners and Stakeholders Management Programme - PSMP” presentation at Palladium Round Table Workshops in May 2012, Abu Dhabi 2. “Organizational Excellence @ ADSSC: An integrated Approach” paper presentation at Balanced Scorecard Forum in April 2012, Dubai 3. “A Practical Guide to Performance Benchmarking” workshop (full-day) presentation at Balanced Scorecard Forum in April 2012, Dubai 4. “Benchmarking UAE Style” paper presentation at 6th International Benchmarking Conference, March 2012, Dubai 5. “International Innovation: Globally Leveraging a Canadian Best Practice” paper published in American Public Works Association (APWA), June 2011 issue 6. “Benchmarking Sewerage Services in Abu Dhabi” paper published in IWA Utility Water Management International, June 2011 issue  23
  • 24. ADSSC Organizational Excellence – Presentations and Publications 7. “Strategic Performance Management @ ADSSC” paper presentation at NWWBI Conference in Banff, Canada, April 2011 8. “Risk Management @ADSSS” paper presentation at MENA ERM conference in April 2011, Dubai 9. “ADSSC ARP Case Study” paper published by QPR in April 2011 10. “Using Process Benchmarking to Leverage Best Practices in the Establishment of a Functional and Dynamic Balanced Scorecard-based Performance Measurement System” paper presentation at IWA Benchmarking Conference, Valencia, Spain – January 2011 11. “Rapid Growth – an Abu Dhabi Perspective” paper presentation at WSAA Conference in Sydney, Australia – October 2008  24
  • 25. Thank you.  25