1. Resume
Basic information
Age: 28 Marital status: Unmarried
Mobile phone: 18701793604 Mailbox: 552476574@qq.com
Nationality: China Registered residence: Jiangsu
Current status: Look at new opportunities Residency: Shanghai-Jia ding
Career Objective
Career Objective: Project management / Consulting Management
Time Period: June, 2014-Now
Company: STEP
Job Title: Project Manager
Description: 1、participate in customer meetings, organize the requirements document, ensure that the
requirements is same to the description.
2、make overallplan and stage plan according to the project scope, quality, time and cost of the
integrated factors, perform WBS decomposition And allocate resources to accomplish the tasks
3、regularly issue the project status report, timely assessment of the project risk, and make the
corresponding response measures.
4、track and check the quality of the work of the project team during the various stages of the
project life cycle.
5、customized the communication plan of project team inside and outside to ensure that the
project team's goal is clear, understanding, communication smoothly, clear responsibilities.
6、to discover and deal with the problems in the project team in time.
7、tracking the order delivery after the small batch production.
8、to participate in the company's pre-sale project support, customer visits, etc., to help the
company to meet the project smoothly.
Time Period: July, 2012-August,2014
Company: STEP
Job Title: Hardware Engineer
Description: 1、design and develop hardware single board for the project;
2、responsible for the project design document preparation;
3、responsible for the selection of the device and communication with suppliers and
customers;
4、Provide technical support for the project;
5、tracking project progress, responsible for single board debugging and related testing.
2. In addition responsible for the assignment of the Department project as well as handle the
daily on-site feedback problems, including:
1) assign daily tasks, track project progress;
2) Handle the after-sale feedback;
3) Deal with the problem form production, quality, customer service and other department’s
feedback.
Time Period: July, 2011-October,2011
Company: Honeywell China Co., Ltd.
Job Title: Assistant Engineer
Description: Assist leader to complete the EMC test, and install the product, HCD3, HCD5.learned the
basic knowledge of digital video, analog video and television monitoring, camera professional
terms, understood the development of camera as well as the IP camera performance
advantage and test items, and learn about the photography image processing method. App
Co dedicated test platform IP Utility for web testing.
Education
Time Period: September, 2005-July, 2009
School: China University of Mining and Technology
Degree: Bachelor
Major: Electrical Engineering and Automation
Description: The professional students can be engaged in the electrical engineering of the system
operation, automatic control, power electronics technology, information processing,
testing technology, research and development, economic management and electronic
and computer technology applications, is a wide range of advanced engineering and
technical personnel.
Main Courses:
Circuit, automatic control theory, mathematics, motion control, electric drive, power
electronic technology
Time Period: September, 2005-July, 2009
School: China University of Mining and Technology
Degree: Bachelor
Major: Electrical Engineering and Automation
Description: The professional students can be engaged in the electrical engineering of the system
operation, automatic control, power electronics technology, information processing,
testing technology, research and development, economic management and electronic
and computer technology applications, is a wide range of advanced engineering and
3. technical personnel.
Main Courses: Detection technology and automatic device, detection technology
Language skills
Language:English Level:CET6
Project Experience
Time period: December,2014-Now
Project Title: Kang Li Jin Yan series of man-machine interface project
Description: a set of interface products, including call Box, display panel, stop lamp
Time Period: October,2014-May,2015
Project Title: Giantkone elevator large packing project
Description: Giantkone elevator project, including control box, emergency lamp plate, call Box,
display board etc
Time Period: April ,2014-September,2014
Project Title: Modern 4 inch monochrome LCD
Description: To develop a 4 inch monochrome LCD
Time Period: October,2013-May,2014
Project Title: India Thyssen special display board
Description: Thyssen special lattice and the liquid crystal display panel
Self-assessment
1、have project management experience, with management knowledge and project operation experience,
familiar with project management methods and management tools;
2、 master degree, major in electrical engineer and automation;
3、two years working experience in embedded hardware engineer, ARM/DSP/FPGA series of relevant
experience, can skillfully use Altium Design、or cad and other tools;
4、have independent project development experience, including scheme design, schematic and PCB design,
debug, write project documentation and product failure analysis, etc.
5、have project management experience, with management knowledge and project operation experience,
familiar with project management methods and management tools;
6、skilled operation of computer and Word, Excel, PowerPoint, Visio and other related office software;
7、with logical thinking and the courage to accept the challenge, strong organizational behavior, with good
learning, communication and coordination skills.