You are in IT management/leadership team in a medium size IT organization and are
responsible for three engineering teams. Your teams are implementing about 15-20
projects per year for the company, and also provide support and maintenance of current
systems. While your teams have been successful in project delivery overall, you have to
constantly shift people from project to project to meet multiple competing timelines, the
engineers are overworked and stressed, and any small delay or problem impacts multiple
project deliveries. Your engineers are also reminding you that some of the core technologies
your systems are built on are getting old and will need upgrades or completely different
technical approaches. Their preliminary analysis also shows that upgrading or replacing
core technologies will result in the need to reengineer some of your existing systems, so
that teams can better support current and future projects as well as take advantage of the
new technologies.A new CIO has recently joined your company and has assembled a
committee to determine and prioritize the necessary changes in IT processes, technologies,
and approaches to project delivery. You have been invited to participate in this committee
to provide your and your teams’ perspectives as input to upcoming operational strategy
changes.As you reflect on the day-to-day issues your teams are facing, you note the
following trends:People – your employee staff is relatively small compared to the number
of people needed to staff all projects and other IT activities your teams are responsible for.
When you have requested additional employee positions, you were told that the company
does not want to expand IT organization at this point. There is a budget associated with
each project, so you can use this budget to hire contracting resources. You are asked to keep
costs down, so you have to think of creative ways to staff projects quickly and with qualified
people, while reducing costs. You are concerned that the system and technology knowledge
may be lost when contractors leave. You can also see the strain on your employees, who are
tasked with overseeing contractors, facilitating knowledge transfer and ensuring the
projects remain high quality and with on-time delivery despite the changing staff
members.Project delivery – your company has a thorough process of selecting projects
for IT implementation based on business priorities. Selected projects go through multiple
reviews of technical and architecture approaches and a detailed budgeting process before
they are approved for implementation. While you value the diligent governance for IT
project delivery, you are also concerned that many of the projects end up with a very short
implementation timeline due to the long initial selection/ideation/budgeting/approval
process. Your teams are often faced with delivering projects on very compressed schedules,
resulting in cuts to time spent testing, stressed team members, and some functionality being
delivered in later releases.Core technology upgrades – while your teams are busy on
project implementation and deliveries, technology frameworks that your systems are built
on seem to be aging quickly. You have been setting aside some budget and engineering time
every year to upgrade or replace one or two of the multitude core technologies powering
your systems. These technology improvements seem to always take longer than you expect,
impact a lot of the systems, require some changes and lots ofretesting. In some cases, there
is no choice but to upgrade, as vendors announce plans to retire your versions of their
products. In other cases, you have some flexibility on the timing of the upgrade, and wonder
about the relative costs of upgrading vs. falling behind on the technology curve. Your
engineers bring up various opportunities and advantages of switching to new technologies
or the latest versions of the vendor products. You are wondering how you can balance the
cost and impact of continuous technology changes with the need to deliver new projects
and maintain/enhance current systems.Your Challenge:What changes in the current
operational strategy can you propose to the new CIO, as your input tooperational strategy
committee? Please address the following topics in your response:Provide a summary of the
challenges of the current operational process. Describe the current and expected long-term
impact of these challenges if they are not addressed.For each challenge, provide three
alternative strategies to address the challenge – aggressive, balanced, and moderate.o An
aggressive strategy can be a major change to the current processes and ways of operating. It
may also have major impacts on the organization in terms of restructuring, changing people
roles/responsibilities, major changes to how work is done, or major cost impacts.o A
balanced strategy may be an introduction of some changes to the current processes and
operating strategy, with less impact and disruption compared to an aggressive strategy. It
may also be a phased introduction of the some or all elements of the aggressive strategy.o A
moderate strategy may have some incremental changes to the current processes and
operating strategy, while leaving most of the current way of operating as is. A moderate
strategy aims to minimize changes and disruptions, while introducing gradual
improvements.Provide your recommendation of the preferred strategy for each challenge.
Explain why the selected strategy is preferred in each case, and provide the next steps to
plan for or introduce the new strategy.o Please consider the overall impact of your
recommendations for the organization – if you are recommending aggressive strategy
changes in all areas, there will be major changes in the work processes, with higher
improvement potential. If all recommendations are moderate, the changes will be
minimized, but the positive impact may not be sufficient. What is the right combination?
How well is your company prepared to deal with recommended changes?Create your
response to this challenge as a proposal you will submit to operational strategy committee.
Format your response as an APA paper and include a bibliography with references/sources
you have consulted in preparing your proposal.

More Related Content

Similar to case study on operational strategy for an it organization.docx

Agile Project Management 1 17 2007[1]
Agile Project Management 1 17 2007[1]Agile Project Management 1 17 2007[1]
Agile Project Management 1 17 2007[1]
leaptocheap
 
Performance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics WorkbookPerformance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics Workbook
David Paschane, Ph.D.
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
PMI2011
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02
PMI_IREP_TP
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project Controls
Mohamed El-Mehalawi
 
EBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoftEBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoft
Bob McFarland
 
EBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoftEBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoft
David Barron
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklist
Mitch Rushing
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
wkyra78
 

Similar to case study on operational strategy for an it organization.docx (20)

WEEK2-Analyzing the Business Case.pdf
WEEK2-Analyzing the    Business Case.pdfWEEK2-Analyzing the    Business Case.pdf
WEEK2-Analyzing the Business Case.pdf
 
Agile Project Management 1 17 2007[1]
Agile Project Management 1 17 2007[1]Agile Project Management 1 17 2007[1]
Agile Project Management 1 17 2007[1]
 
5 practical ways to efficient change and release management
5 practical ways to efficient change and release management5 practical ways to efficient change and release management
5 practical ways to efficient change and release management
 
Mindtree: Shift to Continuous Delivery
Mindtree: Shift to Continuous DeliveryMindtree: Shift to Continuous Delivery
Mindtree: Shift to Continuous Delivery
 
Whitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM CompensationWhitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM Compensation
 
Performance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics WorkbookPerformance Methodology It Project Metrics Workbook
Performance Methodology It Project Metrics Workbook
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project Controls
 
EBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoftEBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoft
 
EBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoftEBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoft
 
EBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoftEBook-ProcessvsProject-LLamasoft
EBook-ProcessvsProject-LLamasoft
 
Chapter 2 analyzing the business case
Chapter 2 analyzing the business caseChapter 2 analyzing the business case
Chapter 2 analyzing the business case
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklist
 
Ch23
Ch23Ch23
Ch23
 
Enterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesEnterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning Strategies
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
 
Hsc project management 2018pptx
Hsc project management 2018pptxHsc project management 2018pptx
Hsc project management 2018pptx
 
Technology Planning and Implementation
Technology Planning and ImplementationTechnology Planning and Implementation
Technology Planning and Implementation
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 

More from write12

Social What directed your interest to this.docx
Social What directed your interest to this.docxSocial What directed your interest to this.docx
Social What directed your interest to this.docx
write12
 
Soap notes will be uploaded to Moodle and put through.docx
Soap notes will be uploaded to Moodle and put through.docxSoap notes will be uploaded to Moodle and put through.docx
Soap notes will be uploaded to Moodle and put through.docx
write12
 
SOC101 Assignment Sheet Interview.docx
SOC101 Assignment Sheet Interview.docxSOC101 Assignment Sheet Interview.docx
SOC101 Assignment Sheet Interview.docx
write12
 
Social media sites have recently drew decision attention and influenced.docx
Social media sites have recently drew decision attention and influenced.docxSocial media sites have recently drew decision attention and influenced.docx
Social media sites have recently drew decision attention and influenced.docx
write12
 
Social cognition is the mental activity relating to social.docx
Social cognition is the mental activity relating to social.docxSocial cognition is the mental activity relating to social.docx
Social cognition is the mental activity relating to social.docx
write12
 
Social Context Ethics Prior to beginning work on the.docx
Social Context Ethics Prior to beginning work on the.docxSocial Context Ethics Prior to beginning work on the.docx
Social Context Ethics Prior to beginning work on the.docx
write12
 
Social media and its data are both a challenge and.docx
Social media and its data are both a challenge and.docxSocial media and its data are both a challenge and.docx
Social media and its data are both a challenge and.docx
write12
 
Social Media and Consumer Behavior.docx
Social Media and Consumer Behavior.docxSocial Media and Consumer Behavior.docx
Social Media and Consumer Behavior.docx
write12
 

More from write12 (20)

Social What directed your interest to this.docx
Social What directed your interest to this.docxSocial What directed your interest to this.docx
Social What directed your interest to this.docx
 
Soap notes will be uploaded to Moodle and put through.docx
Soap notes will be uploaded to Moodle and put through.docxSoap notes will be uploaded to Moodle and put through.docx
Soap notes will be uploaded to Moodle and put through.docx
 
Social Poverty.docx
Social Poverty.docxSocial Poverty.docx
Social Poverty.docx
 
Soap Note Diabetes Mellitus.docx
Soap Note Diabetes Mellitus.docxSoap Note Diabetes Mellitus.docx
Soap Note Diabetes Mellitus.docx
 
Social Disorganization.docx
Social Disorganization.docxSocial Disorganization.docx
Social Disorganization.docx
 
SOC101 Assignment Sheet Interview.docx
SOC101 Assignment Sheet Interview.docxSOC101 Assignment Sheet Interview.docx
SOC101 Assignment Sheet Interview.docx
 
Slide 1 Title Page Slide 2 3.docx
Slide 1 Title Page Slide 2 3.docxSlide 1 Title Page Slide 2 3.docx
Slide 1 Title Page Slide 2 3.docx
 
Social media sites have recently drew decision attention and influenced.docx
Social media sites have recently drew decision attention and influenced.docxSocial media sites have recently drew decision attention and influenced.docx
Social media sites have recently drew decision attention and influenced.docx
 
Smart Desk For Elderly.docx
Smart Desk For Elderly.docxSmart Desk For Elderly.docx
Smart Desk For Elderly.docx
 
Social cognition is the mental activity relating to social.docx
Social cognition is the mental activity relating to social.docxSocial cognition is the mental activity relating to social.docx
Social cognition is the mental activity relating to social.docx
 
Social Context Ethics Prior to beginning work on the.docx
Social Context Ethics Prior to beginning work on the.docxSocial Context Ethics Prior to beginning work on the.docx
Social Context Ethics Prior to beginning work on the.docx
 
Sketching a Process flow diagram.docx
Sketching a Process flow diagram.docxSketching a Process flow diagram.docx
Sketching a Process flow diagram.docx
 
Sixth Century Course SX3504.docx
Sixth Century Course SX3504.docxSixth Century Course SX3504.docx
Sixth Century Course SX3504.docx
 
Social media and its data are both a challenge and.docx
Social media and its data are both a challenge and.docxSocial media and its data are both a challenge and.docx
Social media and its data are both a challenge and.docx
 
Social Media and.docx
Social Media and.docxSocial Media and.docx
Social Media and.docx
 
Social Psychology of Prosocial.docx
Social Psychology of Prosocial.docxSocial Psychology of Prosocial.docx
Social Psychology of Prosocial.docx
 
Social media for.docx
Social media for.docxSocial media for.docx
Social media for.docx
 
Sleep report.docx
Sleep report.docxSleep report.docx
Sleep report.docx
 
Social Media and Consumer Behavior.docx
Social Media and Consumer Behavior.docxSocial Media and Consumer Behavior.docx
Social Media and Consumer Behavior.docx
 
social media.docx
social media.docxsocial media.docx
social media.docx
 

Recently uploaded

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

case study on operational strategy for an it organization.docx

  • 1. case study on operational strategy for an it organization You are in IT management/leadership team in a medium size IT organization and are responsible for three engineering teams. Your teams are implementing about 15-20 projects per year for the company, and also provide support and maintenance of current systems. While your teams have been successful in project delivery overall, you have to constantly shift people from project to project to meet multiple competing timelines, the engineers are overworked and stressed, and any small delay or problem impacts multiple project deliveries. Your engineers are also reminding you that some of the core technologies your systems are built on are getting old and will need upgrades or completely different technical approaches. Their preliminary analysis also shows that upgrading or replacing core technologies will result in the need to reengineer some of your existing systems, so that teams can better support current and future projects as well as take advantage of the new technologies.A new CIO has recently joined your company and has assembled a committee to determine and prioritize the necessary changes in IT processes, technologies, and approaches to project delivery. You have been invited to participate in this committee to provide your and your teams’ perspectives as input to upcoming operational strategy changes.As you reflect on the day-to-day issues your teams are facing, you note the following trends:People – your employee staff is relatively small compared to the number of people needed to staff all projects and other IT activities your teams are responsible for. When you have requested additional employee positions, you were told that the company does not want to expand IT organization at this point. There is a budget associated with each project, so you can use this budget to hire contracting resources. You are asked to keep costs down, so you have to think of creative ways to staff projects quickly and with qualified people, while reducing costs. You are concerned that the system and technology knowledge may be lost when contractors leave. You can also see the strain on your employees, who are tasked with overseeing contractors, facilitating knowledge transfer and ensuring the projects remain high quality and with on-time delivery despite the changing staff members.Project delivery – your company has a thorough process of selecting projects for IT implementation based on business priorities. Selected projects go through multiple reviews of technical and architecture approaches and a detailed budgeting process before they are approved for implementation. While you value the diligent governance for IT project delivery, you are also concerned that many of the projects end up with a very short
  • 2. implementation timeline due to the long initial selection/ideation/budgeting/approval process. Your teams are often faced with delivering projects on very compressed schedules, resulting in cuts to time spent testing, stressed team members, and some functionality being delivered in later releases.Core technology upgrades – while your teams are busy on project implementation and deliveries, technology frameworks that your systems are built on seem to be aging quickly. You have been setting aside some budget and engineering time every year to upgrade or replace one or two of the multitude core technologies powering your systems. These technology improvements seem to always take longer than you expect, impact a lot of the systems, require some changes and lots ofretesting. In some cases, there is no choice but to upgrade, as vendors announce plans to retire your versions of their products. In other cases, you have some flexibility on the timing of the upgrade, and wonder about the relative costs of upgrading vs. falling behind on the technology curve. Your engineers bring up various opportunities and advantages of switching to new technologies or the latest versions of the vendor products. You are wondering how you can balance the cost and impact of continuous technology changes with the need to deliver new projects and maintain/enhance current systems.Your Challenge:What changes in the current operational strategy can you propose to the new CIO, as your input tooperational strategy committee? Please address the following topics in your response:Provide a summary of the challenges of the current operational process. Describe the current and expected long-term impact of these challenges if they are not addressed.For each challenge, provide three alternative strategies to address the challenge – aggressive, balanced, and moderate.o An aggressive strategy can be a major change to the current processes and ways of operating. It may also have major impacts on the organization in terms of restructuring, changing people roles/responsibilities, major changes to how work is done, or major cost impacts.o A balanced strategy may be an introduction of some changes to the current processes and operating strategy, with less impact and disruption compared to an aggressive strategy. It may also be a phased introduction of the some or all elements of the aggressive strategy.o A moderate strategy may have some incremental changes to the current processes and operating strategy, while leaving most of the current way of operating as is. A moderate strategy aims to minimize changes and disruptions, while introducing gradual improvements.Provide your recommendation of the preferred strategy for each challenge. Explain why the selected strategy is preferred in each case, and provide the next steps to plan for or introduce the new strategy.o Please consider the overall impact of your recommendations for the organization – if you are recommending aggressive strategy changes in all areas, there will be major changes in the work processes, with higher improvement potential. If all recommendations are moderate, the changes will be minimized, but the positive impact may not be sufficient. What is the right combination? How well is your company prepared to deal with recommended changes?Create your response to this challenge as a proposal you will submit to operational strategy committee. Format your response as an APA paper and include a bibliography with references/sources you have consulted in preparing your proposal.