Compendium of Infrastructure Projects in Uganda

COMPENDIUM OF INFRASTRUCTURE PROJECTS
IN
TRANSPORT & ENERGY INVESTMENTS

Willy Mutenza
Head Office: 12 Eric Wilkins House, Avondale Square Estate, Old Kent Road, London SE1 5ES
Tel: +207 237 7317 Mob: +447790 647 089 - Email: info@mm2capital.com

Website: www.mm2capital.com
Skype: willymutenza
---------------------------------------------------Services: MM2 Capital, the convergence focal point for Investors and Business Entrepreneurs.

1
Compendium of Infrastructure Projects in Uganda

TABLE OF CONTENTS
Transport projects……………………………………………………….….. 4
Roads Transport …………………………………….……………….….

5

Alternative Route to Entebbe…………………………………………………….…… 6
Flyover between Jinja Road and Kibuye……………………………………….…… 7
Construction Equipment for Districts Roads…………………………………..…… .8
Kibuye - Busega - Mpigi Road……………………………………………………….. 9
Kampala Northern Bypass ………………………………………………………… 10
Kampala - Jinja ………………………………………………………………………11
Kampala (Zana) – Entebbe………………………………………………………… 12

Air Transport …………………………………………………….…. ….... 13
Commercial Free Zone…………………………………………………………… ….14
Cargo Center………………………………………………………...................... .....15

Rail Transport …………………………………………………..… ….... 16
Extension of Gulu Line to Juba………………………………………………………17
Reactivation of kampala – Kasese line and future extension of Rwanda and the
Democratic Republic of Congo……………………………………………………….18

Water Transport ……………………………………………….………..... 19
Redevelopment of Portbell Port……………………………………………….…..…20

Energy projects………………………………………………….………. ….21
Karuma large hydro power site (200mw)………………………………………..….22
Isimba large hydro power project (87 mw)…………………………………….……23
Ayago north large hydro power project (304mw)…………………………….…….24
Ayago south large hydro power project…………………………………….……….25
Murchision large hydropower project (642mw)………………………….…………26
Bugumira large hydro power project (109mw)…………………………….……….27
Kakaka small hydro power project (7.2 mw)…………………………….…………28
Muyembe/sirimityo small hydro power project (9.0 mw)……………….…………29
Nyamabuye small hydro power project (2.2mw)……………………….………….30
Yerya, Mahoma confluence hydro power project (3.0 mw)………….…………..31
Siti small hydro power project (2.5 mw)…………………………………………….32
Sipi/chebonet small hydro power project (2.5mw)…………………………… … ..33
2
Compendium of Infrastructure Projects in Uganda

Mvepi small hydro power project (2.4mw)………………………………………… .34
Sogahi small hydro power project (2.0 mw)……………………………………….. 35
Ela small hydro power project (1.5 mw)……….…………………………………….36
Ririma small hydro power project (1.5mw)………………………………………….37
Haisesero small hydro power project (1.0 mw)……………………………… …..38
Nyahuka small hydro power project (0.65mw)…………………………………......39
Nkusi small hydro power project (0.6mw)…………………………………………..40
Rwizi small hydro power project (0.5mw)……………………………………… …41
Sezibwa small hydro power project (0.5mw)……………………………………….42
Rwigo small hydro power project (0.48mw)……………………………… ………..43
Narwodo small hydro power project (0.4mw)……………………………… ………44
Agoi small hydro power project (0.35mw)…………………………………………..45
Kitumba small hydro power project (0.2 mw)……………………………………….46
Tokwe small hydro power project (0.4mw)………………………… ……………..47
Amua small hydro power project (0.18mw)…………………………………………48
Ngiti small hydro power project (0.15mw)…………………………..………………49
Leya small hydro power project (0.12mw)…………………………………………..50
Nyakibale hydro power project (0.1mw)……………………………………… …..51
Miria adua small hydro power project (0.1mw)……………………………………..52
Nkusi small hydro power project (11mw)……………………………………………53
Esia hydro power project (1.0 mw)…………………………………………… ……54
Manafwa small hydro power project (0.15mw)………………………………… …55

3
Compendium of Infrastructure Projects in Uganda

TRANSPORT PROJECTS
A. ROADS
B. AIR
C. RAIL
D. WATER
TOTAL NUMBER OF PROJECTS: 12

TOTAL ESTIMATED COST USD: 1,620,900,000

4
Compendium of Infrastructure Projects in Uganda

A)

ROADS TRANSPORT
NUMBER OF PROJECTS: 07

PROJECT NAMES:
1) Alternative Route to Entebbe
2) Flyover between Jinja Road and Kibuye
3) Construction Equipment for Districts Roads
4) Kibuye – Busega – Mpigi Road
5) Kampala Northern By pass
6) Kampala – Jinja Road
7) Kampala (zana) - Entebbe

TOTAL ESTIMATED COST USD: 782.4 MILLION

5
Compendium of Infrastructure Projects in Uganda

1) ALTERNATIVE ROUTE TO ENTEBBE (40KM)
Project Description/Scope

Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
50 Million

Project Status

Feasibility Study and Detailed Engineering Design in
progress

Responsible Institution

Ministry of Works and Transport

6
Compendium of Infrastructure Projects in Uganda

2)

FLYOVER BETWEEN
KIBUYE (4.7KM)

JINJA

ROAD

AND

Project Description/Scope
Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
75 Million

Project Status
To be in place by year 2018

Responsible Institution

Ministry of Works and Transport

7
Compendium of Infrastructure Projects in Uganda

3) SUPPLY OF CONSTRUCTION EQUIPMENT
FOR DISTRICT ROADS
Project Description/Scope
Supply of Equipment
After sales Service
Managing Workshops
Training Managers and operators

Estimated Costs (US $)
80 Million

Project Status/Remarks

Government will meet the cost of constructing the
mechanical workshops

Responsible Institution

Ministry of Works and Transport

8
Compendium of Infrastructure Projects in Uganda

4) KIBUYE – BUSEGA – MPIGI (32 KMS)
Project Description/Scope
Review of detailed studies
Construction works for dualling the road
construction consultancy supervision services

and

Estimated Costs (US $)
128 Million

Project Status

Procurement of consultancy services for the feasibility
study, detailed engineering designs and other tender
assistance is on course

Responsible Institution

Ministry of Works and Transport

9
Compendium of Infrastructure Projects in Uganda

5) KAMPALA NORTHERN BY PASS (18.6 KMS)
Project Description/Scope

Review of detailed studies
Construction works for dualling the road
construction consultancy supervision services

and

Estimated Costs (US $)
74.4 Million

Project Status

Procurement of consultancy services for the feasibility
study, detailed engineering designs and other tender
assistance is on course

Responsible Institution
Ministry of Works and Transport

10
Compendium of Infrastructure Projects in Uganda

6) KAMPALA – JINJA (72 KMS)
Project Description/Scope

Review of detailed studies
Construction works for dualling the road
construction consultancy supervision services

and

Estimated Costs (US $)
288 Million

Project Status

Procurement of consultancy services for the feasibility
study, detailed engineering designs and other tender
assistance is on course

Responsible Institution
Ministry of Works and Transport

11
Compendium of Infrastructure Projects in Uganda

7) KAMPALA – (ZANA) ENTEBBE (32 KMS)
Project Description/Scope

Review of detailed studies
Construction works for dualling the road
construction consultancy supervision services

and

Estimated Costs (US $)
87 Million

Project Status

Procurement of consultancy services for the feasibility
study, detailed engineering designs and other tender
assistance is on course

Responsible Institution
Ministry of Works and Transport

12
Compendium of Infrastructure Projects in Uganda

B)

AIR TRANSPORT
NUMBER OF PROJECTS: 02

PROJECT NAMES:
1) Commercial Free Zone
2) Cargo Center

TOTAL ESTIMATED COST USD:

55 MILLION

13
Compendium of Infrastructure Projects in Uganda

1) COMMERCIAL FREE ZONE
Project Description/Scope

Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
30 Million

Project Status/Remarks

Pre-feasibility already done

Responsible Institution
Ministry of Works and Transport

14
Compendium of Infrastructure Projects in Uganda

2) CARGO CENTRE
Project Description/Scope

Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
25 Million

Project Status/Remarks
To be in Place by year 2012

Responsible Institution
Ministry of Works and Transport

15
Compendium of Infrastructure Projects in Uganda

C)

RAIL TRANSPORT
NUMBER OF PROJECTS: 02

PROJECT NAMES:
1. Extension of Gulu line to Juba (320km)
2. Reactivation of Kampala-Kasese line (333km) and
future extension to Rwanda and the Democratic
Republic of Congo

TOTAL ESTIMATED COST USD:

770 MILLION

16
Compendium of Infrastructure Projects in Uganda

1) EXTENSION OF GULU LINE TO JUBA (320KM)
Project Description/Scope
Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
420 Million

Project Status
The cost covers all the items listed in the project scope

Responsible Institution

Ministry of Works and Transport

17
Compendium of Infrastructure Projects in Uganda

2) REACTIVATION OF KAMPALA-KASES LINE
(333KM) AND FUTURE EXTENSION OF LINE
TO RWANDA AND THE DEMOCRATIC
REPUBLIC OF CONGO
Project Description/Scope

Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
350 Million

Project Status/Remarks

The cost only covers the rehabilitation of the existing line
up to Kasese

Responsible Institution

Ministry of Works and Transport

18
Compendium of Infrastructure Projects in Uganda

D)

WATER TRANSPORT
NUMBER OF PROJECTS: 01

PROJECT NAME:
1. Redevelopment of Port Bell Port

TOTAL ESTIMATED COST USD:

13.5 MILLION

19
Compendium of Infrastructure Projects in Uganda

1) REDEVELOPMENT OF PORT BELL PORT
Project Description/Scope

Feasibility Study
Detailed Engineering Design
Construction

Estimated Costs (US $)
420 Million

Project Status/Remarks

The cost includes rehabilitation of the Port and terminal
building facilities

Responsible Institution

Ministry of Works and Transport

20
Compendium of Infrastructure Projects in Uganda

ENERGY PROJECTS
A) LARGE HYDRO POWER PROJECTS
-

NUMBER OF PROJECTS

-

06

B) SMALL HYDRO POWER PROJECTS
-

NUMBER OF PROJECTS

-

TOTAL NUMBER OF ENERGY PROJECTS: -

28

34

21
Compendium of Infrastructure Projects in Uganda

1) DEVELOPMENT OF KARUMA LARGE HYDRO
POWER SITE (200MW)
Estimated Costs (US $)
300 - 700 Million1

Project Status/Remarks

To be developed as a Public Project

Responsible Institution

Ministry of Energy and Mineral Development

1

Note: Hydro power project development costs in Uganda range between US$ 1.5

Million and US$ 3.5 Million per MW (Electricity Regulatory Authority)

22
Compendium of Infrastructure Projects in Uganda

2) DEVELOPMENT OF ISIMBA LARGE HYDRO
POWER PROJECT (87 MW)
Estimated Costs (US $)
130 – 304.5 Million

Project Status/Remarks
Preliminary Studies are available

Responsible Institution

Ministry of Energy and Mineral Development

23
Compendium of Infrastructure Projects in Uganda

3) DEVELOPMENT OF AYAGO NORTH LARGE
HYDRO POWER PROJECT (304MW)
Estimated Costs (US $)

456 Million – 1.064 Billion

Project Status/Remarks

Preliminary studies have been done and are available

Responsible Institution

Ministry of Energy and Mineral Development

24
Compendium of Infrastructure Projects in Uganda

4) DEVELOPMENT OF AYAGO SOUTH LARGE
HYDRO POWER PROJECT
Estimated Costs (US $)
351- 819 Million

Project Status/Remarks

Preliminary studies done and are available

Responsible Institution

Ministry of Energy and Mineral Development

25
Compendium of Infrastructure Projects in Uganda

5) DEVELOPMENT OF MURCHISION LARGE
HYDROPOWER PROJECT (642MW)
Estimated Costs (US $)

963 Million – 2.247 Billion

Project Status/Remarks

Preliminary Studies have been done and are available.
Project has adverse environment effects

Responsible Institution
Ministry of Energy and Mineral Development

26
Compendium of Infrastructure Projects in Uganda

6) DEVELOPMENT OF BUGUMIRA LARGE
HYDRO POWER PROJECT (109MW)
Estimated Costs (US $)
163.5 – 381.5 Million

Project Status/Remarks
Preliminary studies are available

Responsible Institution

Ministry of Energy and Mineral Development

27
Compendium of Infrastructure Projects in Uganda

7) DEVELOPMENT OF KAKAKA SMALL HYDRO
POWER PROJECT (7.2 MW)
Estimated Costs (US $)
10.8 – 25.2 Million

Project Status/Remarks

Preliminary technical studies carried out in 1999 and
2003

Responsible Institution
Ministry of Energy and Mineral Development

28
Compendium of Infrastructure Projects in Uganda

8) DEVELOPMENT OF MUYEMBE/SIRIMITYO
SMALL HYDRO POWER PROJECT (9.0 MW)
Estimated Costs (US $)
13.5 – 31.5 Million

Project Status/Remarks

Pre feasibility technical studies carried out

Responsible Institution
Ministry of Energy and Mineral Development

29
Compendium of Infrastructure Projects in Uganda

9) DEVELOPMENT OF NYAMABUYE SMALL
HYDRO POWER PROJECT (2.2MW)
Estimated Costs (US $)
3.3 – 7.7 Million

Project Status/Remarks
Preliminary technical studies carried out.

Responsible Institution

Ministry of Energy and Mineral Development

30
Compendium of Infrastructure Projects in Uganda

10) DEVELOPMENT OF YERYA, MAHOMA
CONFLUENCE HYDRO POWER PROJECT (3.0
MW)
Estimated Costs (US $)
4.5 – 10.5 Million

Project Status/Remarks

Preliminary technical studies are available

Responsible Institution
Ministry of Energy and Mineral Development

31
Compendium of Infrastructure Projects in Uganda

11) DEVELOPMENT OF SITI SMALL HYDRO
POWER PROJECT (2.5 MW)
Estimated Costs (US $)
3.75 – 8.75 Million

Project Status/Remarks
Preliminary technical studies are available

Responsible Institution

Ministry of Energy and Mineral Development

32
Compendium of Infrastructure Projects in Uganda

12) DEVELOPMENT OF SIPI/CHEBONET SMALL
HYDRO POWER PROJECT (2.5MW)
Estimated Costs (US $)
3.75 – 8.75 Million

Project Status/Remarks
Preliminary studies are available

Responsible Institution

Ministry of Energy and Mineral Development

33
Compendium of Infrastructure Projects in Uganda

13) DEVELOPMENT OF MVEPI SMALL HYDRO
POWER PROJECT (2.4MW)
Estimated Costs (US $)
3.6 – 8.4 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

34
Compendium of Infrastructure Projects in Uganda

14) DEVELOPMENT OF SOGAHI SMALL HYDRO
POWER PROJECT (2.0 MW)
Estimated Costs (US $)
3.75 – 7 Million

Project Status/Remarks
No studies.

Responsible Institution

Ministry of Energy and Mineral Development

35
Compendium of Infrastructure Projects in Uganda

15) DEVELOPMENT OF ELA SMALL HYDRO
POWER PROJECT (1.5 MW)
Estimated Costs (US $)
2.25 – 5.25 Million

Project Status/Remarks

Preliminary studies are available

Responsible Institution
Ministry of Energy and Mineral Development

36
Compendium of Infrastructure Projects in Uganda

16) DEVELOPMENT OF RIRIMA SMALL HYDRO
POWER PROJECT (1.5MW)
Estimated Costs (US $)
2.25 – 5.25 Million

Project Status/Remarks

Pre feasibility studies are available

Responsible Institution
Ministry of Energy and Mineral Development

37
Compendium of Infrastructure Projects in Uganda

17) DEVELOPMENT OF HAISESERO SMALL
HYDRO POWER PROJECT (1.0 MW)
Estimated Costs (US $)
1.5 – 3.5 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

38
Compendium of Infrastructure Projects in Uganda

18) DEVELOPMENT OF NYAHUKA SMALL
HYDRO POWER PROJECT (0.65MW)
Estimated Costs (US $)
0.975 – 2.275 Million

Project Status/Remarks
Preliminary technical studies are available

Responsible Institution

Ministry of Energy and Mineral Development

39
Compendium of Infrastructure Projects in Uganda

19) DEVELOPMENT OF NKUSI SMALL HYDRO
POWER PROJECT (0.6MW)
Estimated Costs (US $)
0.9 – 2.1 Million

Project Status/Remarks

Preliminary technical studies are available

Responsible Institution

Ministry of Energy and Mineral Development

40
Compendium of Infrastructure Projects in Uganda

20) DEVELOPMENT OF RWIZI SMALL HYDRO
POWER PROJECT (0.5MW)
Estimated Costs (US $)
0.75 – 1.75 Million

Project Status/Remarks

Preliminary studies are available

Responsible Institution

Ministry of Energy and Mineral Development

41
Compendium of Infrastructure Projects in Uganda

21) DEVELOPMENT OF SEZIBWA SMALL HYDRO
POWER PROJECT (0.5MW)
Estimated Costs (US $)
0.75 – 1.75 Million

Project Status/Remarks

Preliminary technical studies are available

Responsible Institution

Ministry of Energy and Mineral Development

42
Compendium of Infrastructure Projects in Uganda

22) DEVELOPMENT OF RWIGO SMALL HYDRO
POWER PROJECT (0.48MW)
Estimated Costs (US $)
0.72 – 1.68 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

43
Compendium of Infrastructure Projects in Uganda

23) DEVELOPMENT OF NARWODO SMALL
HYDRO POWER PROJECT (0.4MW)
Estimated Costs (US $)
0.6 – 1.4 Million

Project Status/Remarks

Preliminary studies are available

Responsible Institution

Ministry of Energy and Mineral Development

44
Compendium of Infrastructure Projects in Uganda

24) DEVELOPMENT OF AGOI SMALL HYDRO
POWER PROJECT (0.35MW)
Estimated Costs (US $)
0.525 –1.225 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

45
Compendium of Infrastructure Projects in Uganda

25) DEVELOPMENT OF KITUMBA SMALL
HYDRO POWER PROJECT (0.2 MW)
Estimated Costs (US $)
0.3 – 0.7 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

46
Compendium of Infrastructure Projects in Uganda

26) DEVELOPMENT OF TOKWE SMALL HYDRO
POWER PROJECT (0.4MW)
Estimated Costs (US $)
0.6 –1.4 Million

Project Status/Remarks

Preliminary technical studies

Responsible Institution

Ministry of Energy and Mineral Development

47
Compendium of Infrastructure Projects in Uganda

27) DEVELOPMENT OF AMUA SMALL HYDRO
POWER PROJECT (0.18MW)
Estimated Costs (US $)
0.27 – 0.63 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

48
Compendium of Infrastructure Projects in Uganda

28) DEVELOPMENT OF NGITI SMALL HYDRO
POWER PROJECT (0.15MW)
Estimated Costs (US $)
0.225 – 0.525 Million

Project Status/Remarks
Preliminary technical studies are available

Responsible Institution

Ministry of Energy and Mineral Development

49
Compendium of Infrastructure Projects in Uganda

29) DEVELOPMENT OF LEYA SMALL HYDRO
POWER PROJECT (0.12MW)
Estimated Costs (US $)
0.18 – 0.42 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

50
Compendium of Infrastructure Projects in Uganda

30) DEVELOPMENT OF NYAKIBALE HYDRO
POWER PROJECT (0.1MW)
Estimated Costs (US $)
0.15 – 0.35 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

51
Compendium of Infrastructure Projects in Uganda

31) DEVELOPMENT OF MIRIA ADUA SMALL
HYDRO POWER PROJECT (0.1MW)

Estimated Costs (US $)
0.15 – 0.35 Million

Project Status/Remarks
Preliminary studies are available

Responsible Institution
Ministry of Energy and Mineral Development

52
Compendium of Infrastructure Projects in Uganda

32) DEVELOPMENT OF NKUSI SMALL HYDRO
POWER PROJECT (11MW)
Estimated Costs (US $)
16.5 – 38.5 Million

Project Status/Remarks
No studies

Responsible Institution

Ministry of Energy and Mineral Development

53
Compendium of Infrastructure Projects in Uganda

33) DEVELOPMENT OF ESIA HYDRO POWER
PROJECT (1.0 MW)
Estimated Costs (US $)
1.5 – 3.5 Million

Project Status/Remarks

Preliminary studies are available

Responsible Institution

Ministry of Energy and Mineral Development

54
Compendium of Infrastructure Projects in Uganda

34) DEVELOPMENT OF MANAFWA SMALL
HYDRO POWER PROJECT (0.15MW)
Estimated Costs (US $)

0.225 – 0.525 Million

Project Status/Remarks

Preliminary technical studies carried out

Responsible Institution

Ministry of Energy and Mineral Development

55

More Related Content

Similar to Infrastructure projects 2013

PLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAINPLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAINRishab Acharya
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV Edward Afful-Packson
 
E bike project report new full shivam
E bike project report new full shivamE bike project report new full shivam
E bike project report new full shivamShivam Shukla
 
UKPN Smart Charging Architecture Roadmap EVConsult
UKPN Smart Charging Architecture Roadmap EVConsultUKPN Smart Charging Architecture Roadmap EVConsult
UKPN Smart Charging Architecture Roadmap EVConsultEVConsult
 
Sectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesSectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesNepal Investment Summit
 
E bike project report new full shivam
E bike project report new full shivamE bike project report new full shivam
E bike project report new full shivamShivam Shukla
 
ACCIONA Concessions: Commited to public-private projects
ACCIONA Concessions: Commited to public-private projectsACCIONA Concessions: Commited to public-private projects
ACCIONA Concessions: Commited to public-private projectsacciona
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
 
Show and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdfShow and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdfSIFOfgem
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport ReportTransformNG
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar FMINigeria
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011Harith
 
Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Leonardo ENERGY
 
Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report MuhammadIrshadK
 
140211 KIUMA Electrical Proposal(S)
140211 KIUMA Electrical Proposal(S)140211 KIUMA Electrical Proposal(S)
140211 KIUMA Electrical Proposal(S)Neil Eichstadt
 
Innovation week MASEN Presentation
Innovation week MASEN PresentationInnovation week MASEN Presentation
Innovation week MASEN PresentationMaghrenov
 
Uganda Electricity Strategy- An Outlook.pdf
Uganda Electricity Strategy- An Outlook.pdfUganda Electricity Strategy- An Outlook.pdf
Uganda Electricity Strategy- An Outlook.pdfIan Ortega
 
Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Business Turku
 

Similar to Infrastructure projects 2013 (20)

PLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAINPLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAIN
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV
 
E bike project report new full shivam
E bike project report new full shivamE bike project report new full shivam
E bike project report new full shivam
 
UKPN Smart Charging Architecture Roadmap EVConsult
UKPN Smart Charging Architecture Roadmap EVConsultUKPN Smart Charging Architecture Roadmap EVConsult
UKPN Smart Charging Architecture Roadmap EVConsult
 
Sectoral Overview and Investment Opportunities
Sectoral Overview and Investment OpportunitiesSectoral Overview and Investment Opportunities
Sectoral Overview and Investment Opportunities
 
E bike project report new full shivam
E bike project report new full shivamE bike project report new full shivam
E bike project report new full shivam
 
ACCIONA Concessions: Commited to public-private projects
ACCIONA Concessions: Commited to public-private projectsACCIONA Concessions: Commited to public-private projects
ACCIONA Concessions: Commited to public-private projects
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
Show and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdfShow and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdf
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 
Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...
 
Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report
 
140211 KIUMA Electrical Proposal(S)
140211 KIUMA Electrical Proposal(S)140211 KIUMA Electrical Proposal(S)
140211 KIUMA Electrical Proposal(S)
 
Innovation week MASEN Presentation
Innovation week MASEN PresentationInnovation week MASEN Presentation
Innovation week MASEN Presentation
 
Uganda Electricity Strategy- An Outlook.pdf
Uganda Electricity Strategy- An Outlook.pdfUganda Electricity Strategy- An Outlook.pdf
Uganda Electricity Strategy- An Outlook.pdf
 
Eu horizon europe_info_29042021
Eu horizon europe_info_29042021Eu horizon europe_info_29042021
Eu horizon europe_info_29042021
 

More from Willy Mutenza

Ugandan UK Convention 2011 report
Ugandan UK Convention 2011 reportUgandan UK Convention 2011 report
Ugandan UK Convention 2011 reportWilly Mutenza
 
Resolution from the 2nd convention
Resolution from the 2nd conventionResolution from the 2nd convention
Resolution from the 2nd conventionWilly Mutenza
 
Report of the Ugandan UK Convention - an investment Forum 2012
Report of the Ugandan UK Convention - an investment Forum 2012Report of the Ugandan UK Convention - an investment Forum 2012
Report of the Ugandan UK Convention - an investment Forum 2012Willy Mutenza
 
Hon Rebecca Kadaga 2012 presentation at the 2012 UK Convention
Hon Rebecca Kadaga 2012 presentation at the 2012 UK ConventionHon Rebecca Kadaga 2012 presentation at the 2012 UK Convention
Hon Rebecca Kadaga 2012 presentation at the 2012 UK ConventionWilly Mutenza
 
2012 convention summary
2012 convention summary2012 convention summary
2012 convention summaryWilly Mutenza
 
2nd uganda uk convention_report_2012
2nd uganda uk convention_report_20122nd uganda uk convention_report_2012
2nd uganda uk convention_report_2012Willy Mutenza
 
Uk convention completed feedback form-2013
Uk convention   completed feedback form-2013Uk convention   completed feedback form-2013
Uk convention completed feedback form-2013Willy Mutenza
 
Patrick bitature.doc
Patrick bitature.docPatrick bitature.doc
Patrick bitature.docWilly Mutenza
 
Mutenza's presentation
Mutenza's presentationMutenza's presentation
Mutenza's presentationWilly Mutenza
 
Kamajungo presentation
Kamajungo presentationKamajungo presentation
Kamajungo presentationWilly Mutenza
 
Investing in agriculture & agri processing in uganda
Investing in agriculture & agri processing in ugandaInvesting in agriculture & agri processing in uganda
Investing in agriculture & agri processing in ugandaWilly Mutenza
 
Hon nekesa presentation at the 3rd ugandan uk convention
Hon nekesa presentation at the 3rd ugandan uk conventionHon nekesa presentation at the 3rd ugandan uk convention
Hon nekesa presentation at the 3rd ugandan uk conventionWilly Mutenza
 
Hon. edward ssekandi presentation
Hon. edward ssekandi presentationHon. edward ssekandi presentation
Hon. edward ssekandi presentationWilly Mutenza
 
Energy session discussion
Energy session discussionEnergy session discussion
Energy session discussionWilly Mutenza
 
Conventionsreport2013
Conventionsreport2013Conventionsreport2013
Conventionsreport2013Willy Mutenza
 
Widening and strengthening_of_gulu_airport
Widening and strengthening_of_gulu_airportWidening and strengthening_of_gulu_airport
Widening and strengthening_of_gulu_airportWilly Mutenza
 
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbi
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbiUganda investment forum_-_natural_resources_-_keith_winning_-_cbi
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbiWilly Mutenza
 
1200 site irrigation_pilot_programme
1200 site irrigation_pilot_programme1200 site irrigation_pilot_programme
1200 site irrigation_pilot_programmeWilly Mutenza
 
Kidepo airstrip upgrade
Kidepo airstrip upgradeKidepo airstrip upgrade
Kidepo airstrip upgradeWilly Mutenza
 

More from Willy Mutenza (20)

Ugandan UK Convention 2011 report
Ugandan UK Convention 2011 reportUgandan UK Convention 2011 report
Ugandan UK Convention 2011 report
 
Resolution from the 2nd convention
Resolution from the 2nd conventionResolution from the 2nd convention
Resolution from the 2nd convention
 
Report of the Ugandan UK Convention - an investment Forum 2012
Report of the Ugandan UK Convention - an investment Forum 2012Report of the Ugandan UK Convention - an investment Forum 2012
Report of the Ugandan UK Convention - an investment Forum 2012
 
Hon Rebecca Kadaga 2012 presentation at the 2012 UK Convention
Hon Rebecca Kadaga 2012 presentation at the 2012 UK ConventionHon Rebecca Kadaga 2012 presentation at the 2012 UK Convention
Hon Rebecca Kadaga 2012 presentation at the 2012 UK Convention
 
2012 convention summary
2012 convention summary2012 convention summary
2012 convention summary
 
2nd uganda uk convention_report_2012
2nd uganda uk convention_report_20122nd uganda uk convention_report_2012
2nd uganda uk convention_report_2012
 
Uk convention completed feedback form-2013
Uk convention   completed feedback form-2013Uk convention   completed feedback form-2013
Uk convention completed feedback form-2013
 
Patrick bitature.doc
Patrick bitature.docPatrick bitature.doc
Patrick bitature.doc
 
Mutenza's presentation
Mutenza's presentationMutenza's presentation
Mutenza's presentation
 
Kamajungo presentation
Kamajungo presentationKamajungo presentation
Kamajungo presentation
 
Investing in agriculture & agri processing in uganda
Investing in agriculture & agri processing in ugandaInvesting in agriculture & agri processing in uganda
Investing in agriculture & agri processing in uganda
 
Hon nekesa presentation at the 3rd ugandan uk convention
Hon nekesa presentation at the 3rd ugandan uk conventionHon nekesa presentation at the 3rd ugandan uk convention
Hon nekesa presentation at the 3rd ugandan uk convention
 
Hon. edward ssekandi presentation
Hon. edward ssekandi presentationHon. edward ssekandi presentation
Hon. edward ssekandi presentation
 
Feedback form 2013
Feedback form 2013Feedback form 2013
Feedback form 2013
 
Energy session discussion
Energy session discussionEnergy session discussion
Energy session discussion
 
Conventionsreport2013
Conventionsreport2013Conventionsreport2013
Conventionsreport2013
 
Widening and strengthening_of_gulu_airport
Widening and strengthening_of_gulu_airportWidening and strengthening_of_gulu_airport
Widening and strengthening_of_gulu_airport
 
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbi
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbiUganda investment forum_-_natural_resources_-_keith_winning_-_cbi
Uganda investment forum_-_natural_resources_-_keith_winning_-_cbi
 
1200 site irrigation_pilot_programme
1200 site irrigation_pilot_programme1200 site irrigation_pilot_programme
1200 site irrigation_pilot_programme
 
Kidepo airstrip upgrade
Kidepo airstrip upgradeKidepo airstrip upgrade
Kidepo airstrip upgrade
 

Recently uploaded

The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Recently uploaded (20)

The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Infrastructure projects 2013

  • 1. Compendium of Infrastructure Projects in Uganda COMPENDIUM OF INFRASTRUCTURE PROJECTS IN TRANSPORT & ENERGY INVESTMENTS Willy Mutenza Head Office: 12 Eric Wilkins House, Avondale Square Estate, Old Kent Road, London SE1 5ES Tel: +207 237 7317 Mob: +447790 647 089 - Email: info@mm2capital.com Website: www.mm2capital.com Skype: willymutenza ---------------------------------------------------Services: MM2 Capital, the convergence focal point for Investors and Business Entrepreneurs. 1
  • 2. Compendium of Infrastructure Projects in Uganda TABLE OF CONTENTS Transport projects……………………………………………………….….. 4 Roads Transport …………………………………….……………….…. 5 Alternative Route to Entebbe…………………………………………………….…… 6 Flyover between Jinja Road and Kibuye……………………………………….…… 7 Construction Equipment for Districts Roads…………………………………..…… .8 Kibuye - Busega - Mpigi Road……………………………………………………….. 9 Kampala Northern Bypass ………………………………………………………… 10 Kampala - Jinja ………………………………………………………………………11 Kampala (Zana) – Entebbe………………………………………………………… 12 Air Transport …………………………………………………….…. ….... 13 Commercial Free Zone…………………………………………………………… ….14 Cargo Center………………………………………………………...................... .....15 Rail Transport …………………………………………………..… ….... 16 Extension of Gulu Line to Juba………………………………………………………17 Reactivation of kampala – Kasese line and future extension of Rwanda and the Democratic Republic of Congo……………………………………………………….18 Water Transport ……………………………………………….………..... 19 Redevelopment of Portbell Port……………………………………………….…..…20 Energy projects………………………………………………….………. ….21 Karuma large hydro power site (200mw)………………………………………..….22 Isimba large hydro power project (87 mw)…………………………………….……23 Ayago north large hydro power project (304mw)…………………………….…….24 Ayago south large hydro power project…………………………………….……….25 Murchision large hydropower project (642mw)………………………….…………26 Bugumira large hydro power project (109mw)…………………………….……….27 Kakaka small hydro power project (7.2 mw)…………………………….…………28 Muyembe/sirimityo small hydro power project (9.0 mw)……………….…………29 Nyamabuye small hydro power project (2.2mw)……………………….………….30 Yerya, Mahoma confluence hydro power project (3.0 mw)………….…………..31 Siti small hydro power project (2.5 mw)…………………………………………….32 Sipi/chebonet small hydro power project (2.5mw)…………………………… … ..33 2
  • 3. Compendium of Infrastructure Projects in Uganda Mvepi small hydro power project (2.4mw)………………………………………… .34 Sogahi small hydro power project (2.0 mw)……………………………………….. 35 Ela small hydro power project (1.5 mw)……….…………………………………….36 Ririma small hydro power project (1.5mw)………………………………………….37 Haisesero small hydro power project (1.0 mw)……………………………… …..38 Nyahuka small hydro power project (0.65mw)…………………………………......39 Nkusi small hydro power project (0.6mw)…………………………………………..40 Rwizi small hydro power project (0.5mw)……………………………………… …41 Sezibwa small hydro power project (0.5mw)……………………………………….42 Rwigo small hydro power project (0.48mw)……………………………… ………..43 Narwodo small hydro power project (0.4mw)……………………………… ………44 Agoi small hydro power project (0.35mw)…………………………………………..45 Kitumba small hydro power project (0.2 mw)……………………………………….46 Tokwe small hydro power project (0.4mw)………………………… ……………..47 Amua small hydro power project (0.18mw)…………………………………………48 Ngiti small hydro power project (0.15mw)…………………………..………………49 Leya small hydro power project (0.12mw)…………………………………………..50 Nyakibale hydro power project (0.1mw)……………………………………… …..51 Miria adua small hydro power project (0.1mw)……………………………………..52 Nkusi small hydro power project (11mw)……………………………………………53 Esia hydro power project (1.0 mw)…………………………………………… ……54 Manafwa small hydro power project (0.15mw)………………………………… …55 3
  • 4. Compendium of Infrastructure Projects in Uganda TRANSPORT PROJECTS A. ROADS B. AIR C. RAIL D. WATER TOTAL NUMBER OF PROJECTS: 12 TOTAL ESTIMATED COST USD: 1,620,900,000 4
  • 5. Compendium of Infrastructure Projects in Uganda A) ROADS TRANSPORT NUMBER OF PROJECTS: 07 PROJECT NAMES: 1) Alternative Route to Entebbe 2) Flyover between Jinja Road and Kibuye 3) Construction Equipment for Districts Roads 4) Kibuye – Busega – Mpigi Road 5) Kampala Northern By pass 6) Kampala – Jinja Road 7) Kampala (zana) - Entebbe TOTAL ESTIMATED COST USD: 782.4 MILLION 5
  • 6. Compendium of Infrastructure Projects in Uganda 1) ALTERNATIVE ROUTE TO ENTEBBE (40KM) Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 50 Million Project Status Feasibility Study and Detailed Engineering Design in progress Responsible Institution Ministry of Works and Transport 6
  • 7. Compendium of Infrastructure Projects in Uganda 2) FLYOVER BETWEEN KIBUYE (4.7KM) JINJA ROAD AND Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 75 Million Project Status To be in place by year 2018 Responsible Institution Ministry of Works and Transport 7
  • 8. Compendium of Infrastructure Projects in Uganda 3) SUPPLY OF CONSTRUCTION EQUIPMENT FOR DISTRICT ROADS Project Description/Scope Supply of Equipment After sales Service Managing Workshops Training Managers and operators Estimated Costs (US $) 80 Million Project Status/Remarks Government will meet the cost of constructing the mechanical workshops Responsible Institution Ministry of Works and Transport 8
  • 9. Compendium of Infrastructure Projects in Uganda 4) KIBUYE – BUSEGA – MPIGI (32 KMS) Project Description/Scope Review of detailed studies Construction works for dualling the road construction consultancy supervision services and Estimated Costs (US $) 128 Million Project Status Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course Responsible Institution Ministry of Works and Transport 9
  • 10. Compendium of Infrastructure Projects in Uganda 5) KAMPALA NORTHERN BY PASS (18.6 KMS) Project Description/Scope Review of detailed studies Construction works for dualling the road construction consultancy supervision services and Estimated Costs (US $) 74.4 Million Project Status Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course Responsible Institution Ministry of Works and Transport 10
  • 11. Compendium of Infrastructure Projects in Uganda 6) KAMPALA – JINJA (72 KMS) Project Description/Scope Review of detailed studies Construction works for dualling the road construction consultancy supervision services and Estimated Costs (US $) 288 Million Project Status Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course Responsible Institution Ministry of Works and Transport 11
  • 12. Compendium of Infrastructure Projects in Uganda 7) KAMPALA – (ZANA) ENTEBBE (32 KMS) Project Description/Scope Review of detailed studies Construction works for dualling the road construction consultancy supervision services and Estimated Costs (US $) 87 Million Project Status Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course Responsible Institution Ministry of Works and Transport 12
  • 13. Compendium of Infrastructure Projects in Uganda B) AIR TRANSPORT NUMBER OF PROJECTS: 02 PROJECT NAMES: 1) Commercial Free Zone 2) Cargo Center TOTAL ESTIMATED COST USD: 55 MILLION 13
  • 14. Compendium of Infrastructure Projects in Uganda 1) COMMERCIAL FREE ZONE Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 30 Million Project Status/Remarks Pre-feasibility already done Responsible Institution Ministry of Works and Transport 14
  • 15. Compendium of Infrastructure Projects in Uganda 2) CARGO CENTRE Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 25 Million Project Status/Remarks To be in Place by year 2012 Responsible Institution Ministry of Works and Transport 15
  • 16. Compendium of Infrastructure Projects in Uganda C) RAIL TRANSPORT NUMBER OF PROJECTS: 02 PROJECT NAMES: 1. Extension of Gulu line to Juba (320km) 2. Reactivation of Kampala-Kasese line (333km) and future extension to Rwanda and the Democratic Republic of Congo TOTAL ESTIMATED COST USD: 770 MILLION 16
  • 17. Compendium of Infrastructure Projects in Uganda 1) EXTENSION OF GULU LINE TO JUBA (320KM) Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 420 Million Project Status The cost covers all the items listed in the project scope Responsible Institution Ministry of Works and Transport 17
  • 18. Compendium of Infrastructure Projects in Uganda 2) REACTIVATION OF KAMPALA-KASES LINE (333KM) AND FUTURE EXTENSION OF LINE TO RWANDA AND THE DEMOCRATIC REPUBLIC OF CONGO Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 350 Million Project Status/Remarks The cost only covers the rehabilitation of the existing line up to Kasese Responsible Institution Ministry of Works and Transport 18
  • 19. Compendium of Infrastructure Projects in Uganda D) WATER TRANSPORT NUMBER OF PROJECTS: 01 PROJECT NAME: 1. Redevelopment of Port Bell Port TOTAL ESTIMATED COST USD: 13.5 MILLION 19
  • 20. Compendium of Infrastructure Projects in Uganda 1) REDEVELOPMENT OF PORT BELL PORT Project Description/Scope Feasibility Study Detailed Engineering Design Construction Estimated Costs (US $) 420 Million Project Status/Remarks The cost includes rehabilitation of the Port and terminal building facilities Responsible Institution Ministry of Works and Transport 20
  • 21. Compendium of Infrastructure Projects in Uganda ENERGY PROJECTS A) LARGE HYDRO POWER PROJECTS - NUMBER OF PROJECTS - 06 B) SMALL HYDRO POWER PROJECTS - NUMBER OF PROJECTS - TOTAL NUMBER OF ENERGY PROJECTS: - 28 34 21
  • 22. Compendium of Infrastructure Projects in Uganda 1) DEVELOPMENT OF KARUMA LARGE HYDRO POWER SITE (200MW) Estimated Costs (US $) 300 - 700 Million1 Project Status/Remarks To be developed as a Public Project Responsible Institution Ministry of Energy and Mineral Development 1 Note: Hydro power project development costs in Uganda range between US$ 1.5 Million and US$ 3.5 Million per MW (Electricity Regulatory Authority) 22
  • 23. Compendium of Infrastructure Projects in Uganda 2) DEVELOPMENT OF ISIMBA LARGE HYDRO POWER PROJECT (87 MW) Estimated Costs (US $) 130 – 304.5 Million Project Status/Remarks Preliminary Studies are available Responsible Institution Ministry of Energy and Mineral Development 23
  • 24. Compendium of Infrastructure Projects in Uganda 3) DEVELOPMENT OF AYAGO NORTH LARGE HYDRO POWER PROJECT (304MW) Estimated Costs (US $) 456 Million – 1.064 Billion Project Status/Remarks Preliminary studies have been done and are available Responsible Institution Ministry of Energy and Mineral Development 24
  • 25. Compendium of Infrastructure Projects in Uganda 4) DEVELOPMENT OF AYAGO SOUTH LARGE HYDRO POWER PROJECT Estimated Costs (US $) 351- 819 Million Project Status/Remarks Preliminary studies done and are available Responsible Institution Ministry of Energy and Mineral Development 25
  • 26. Compendium of Infrastructure Projects in Uganda 5) DEVELOPMENT OF MURCHISION LARGE HYDROPOWER PROJECT (642MW) Estimated Costs (US $) 963 Million – 2.247 Billion Project Status/Remarks Preliminary Studies have been done and are available. Project has adverse environment effects Responsible Institution Ministry of Energy and Mineral Development 26
  • 27. Compendium of Infrastructure Projects in Uganda 6) DEVELOPMENT OF BUGUMIRA LARGE HYDRO POWER PROJECT (109MW) Estimated Costs (US $) 163.5 – 381.5 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 27
  • 28. Compendium of Infrastructure Projects in Uganda 7) DEVELOPMENT OF KAKAKA SMALL HYDRO POWER PROJECT (7.2 MW) Estimated Costs (US $) 10.8 – 25.2 Million Project Status/Remarks Preliminary technical studies carried out in 1999 and 2003 Responsible Institution Ministry of Energy and Mineral Development 28
  • 29. Compendium of Infrastructure Projects in Uganda 8) DEVELOPMENT OF MUYEMBE/SIRIMITYO SMALL HYDRO POWER PROJECT (9.0 MW) Estimated Costs (US $) 13.5 – 31.5 Million Project Status/Remarks Pre feasibility technical studies carried out Responsible Institution Ministry of Energy and Mineral Development 29
  • 30. Compendium of Infrastructure Projects in Uganda 9) DEVELOPMENT OF NYAMABUYE SMALL HYDRO POWER PROJECT (2.2MW) Estimated Costs (US $) 3.3 – 7.7 Million Project Status/Remarks Preliminary technical studies carried out. Responsible Institution Ministry of Energy and Mineral Development 30
  • 31. Compendium of Infrastructure Projects in Uganda 10) DEVELOPMENT OF YERYA, MAHOMA CONFLUENCE HYDRO POWER PROJECT (3.0 MW) Estimated Costs (US $) 4.5 – 10.5 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 31
  • 32. Compendium of Infrastructure Projects in Uganda 11) DEVELOPMENT OF SITI SMALL HYDRO POWER PROJECT (2.5 MW) Estimated Costs (US $) 3.75 – 8.75 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 32
  • 33. Compendium of Infrastructure Projects in Uganda 12) DEVELOPMENT OF SIPI/CHEBONET SMALL HYDRO POWER PROJECT (2.5MW) Estimated Costs (US $) 3.75 – 8.75 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 33
  • 34. Compendium of Infrastructure Projects in Uganda 13) DEVELOPMENT OF MVEPI SMALL HYDRO POWER PROJECT (2.4MW) Estimated Costs (US $) 3.6 – 8.4 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 34
  • 35. Compendium of Infrastructure Projects in Uganda 14) DEVELOPMENT OF SOGAHI SMALL HYDRO POWER PROJECT (2.0 MW) Estimated Costs (US $) 3.75 – 7 Million Project Status/Remarks No studies. Responsible Institution Ministry of Energy and Mineral Development 35
  • 36. Compendium of Infrastructure Projects in Uganda 15) DEVELOPMENT OF ELA SMALL HYDRO POWER PROJECT (1.5 MW) Estimated Costs (US $) 2.25 – 5.25 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 36
  • 37. Compendium of Infrastructure Projects in Uganda 16) DEVELOPMENT OF RIRIMA SMALL HYDRO POWER PROJECT (1.5MW) Estimated Costs (US $) 2.25 – 5.25 Million Project Status/Remarks Pre feasibility studies are available Responsible Institution Ministry of Energy and Mineral Development 37
  • 38. Compendium of Infrastructure Projects in Uganda 17) DEVELOPMENT OF HAISESERO SMALL HYDRO POWER PROJECT (1.0 MW) Estimated Costs (US $) 1.5 – 3.5 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 38
  • 39. Compendium of Infrastructure Projects in Uganda 18) DEVELOPMENT OF NYAHUKA SMALL HYDRO POWER PROJECT (0.65MW) Estimated Costs (US $) 0.975 – 2.275 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 39
  • 40. Compendium of Infrastructure Projects in Uganda 19) DEVELOPMENT OF NKUSI SMALL HYDRO POWER PROJECT (0.6MW) Estimated Costs (US $) 0.9 – 2.1 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 40
  • 41. Compendium of Infrastructure Projects in Uganda 20) DEVELOPMENT OF RWIZI SMALL HYDRO POWER PROJECT (0.5MW) Estimated Costs (US $) 0.75 – 1.75 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 41
  • 42. Compendium of Infrastructure Projects in Uganda 21) DEVELOPMENT OF SEZIBWA SMALL HYDRO POWER PROJECT (0.5MW) Estimated Costs (US $) 0.75 – 1.75 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 42
  • 43. Compendium of Infrastructure Projects in Uganda 22) DEVELOPMENT OF RWIGO SMALL HYDRO POWER PROJECT (0.48MW) Estimated Costs (US $) 0.72 – 1.68 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 43
  • 44. Compendium of Infrastructure Projects in Uganda 23) DEVELOPMENT OF NARWODO SMALL HYDRO POWER PROJECT (0.4MW) Estimated Costs (US $) 0.6 – 1.4 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 44
  • 45. Compendium of Infrastructure Projects in Uganda 24) DEVELOPMENT OF AGOI SMALL HYDRO POWER PROJECT (0.35MW) Estimated Costs (US $) 0.525 –1.225 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 45
  • 46. Compendium of Infrastructure Projects in Uganda 25) DEVELOPMENT OF KITUMBA SMALL HYDRO POWER PROJECT (0.2 MW) Estimated Costs (US $) 0.3 – 0.7 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 46
  • 47. Compendium of Infrastructure Projects in Uganda 26) DEVELOPMENT OF TOKWE SMALL HYDRO POWER PROJECT (0.4MW) Estimated Costs (US $) 0.6 –1.4 Million Project Status/Remarks Preliminary technical studies Responsible Institution Ministry of Energy and Mineral Development 47
  • 48. Compendium of Infrastructure Projects in Uganda 27) DEVELOPMENT OF AMUA SMALL HYDRO POWER PROJECT (0.18MW) Estimated Costs (US $) 0.27 – 0.63 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 48
  • 49. Compendium of Infrastructure Projects in Uganda 28) DEVELOPMENT OF NGITI SMALL HYDRO POWER PROJECT (0.15MW) Estimated Costs (US $) 0.225 – 0.525 Million Project Status/Remarks Preliminary technical studies are available Responsible Institution Ministry of Energy and Mineral Development 49
  • 50. Compendium of Infrastructure Projects in Uganda 29) DEVELOPMENT OF LEYA SMALL HYDRO POWER PROJECT (0.12MW) Estimated Costs (US $) 0.18 – 0.42 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 50
  • 51. Compendium of Infrastructure Projects in Uganda 30) DEVELOPMENT OF NYAKIBALE HYDRO POWER PROJECT (0.1MW) Estimated Costs (US $) 0.15 – 0.35 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 51
  • 52. Compendium of Infrastructure Projects in Uganda 31) DEVELOPMENT OF MIRIA ADUA SMALL HYDRO POWER PROJECT (0.1MW) Estimated Costs (US $) 0.15 – 0.35 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 52
  • 53. Compendium of Infrastructure Projects in Uganda 32) DEVELOPMENT OF NKUSI SMALL HYDRO POWER PROJECT (11MW) Estimated Costs (US $) 16.5 – 38.5 Million Project Status/Remarks No studies Responsible Institution Ministry of Energy and Mineral Development 53
  • 54. Compendium of Infrastructure Projects in Uganda 33) DEVELOPMENT OF ESIA HYDRO POWER PROJECT (1.0 MW) Estimated Costs (US $) 1.5 – 3.5 Million Project Status/Remarks Preliminary studies are available Responsible Institution Ministry of Energy and Mineral Development 54
  • 55. Compendium of Infrastructure Projects in Uganda 34) DEVELOPMENT OF MANAFWA SMALL HYDRO POWER PROJECT (0.15MW) Estimated Costs (US $) 0.225 – 0.525 Million Project Status/Remarks Preliminary technical studies carried out Responsible Institution Ministry of Energy and Mineral Development 55