5S
Place for everything and everything is in its place.
1) Seiri –Sort
2) Setion-Set in order
3) Seison-Shine
4) Seiketsu-Standardize
5) Shitsuke-Sustain
Created by Vinay (Vinaya9056@gmail.com)
KAIZEN
1) Continuouslyimprove all function.
2) Aims to eliminate waste.
3) Change for better.
4) Flow –process kaizen- Flow is material and information , Improving and make
it easy to do the production.
5) Kai –good, Zen-Change.
Created by Vinay (Vinaya9056@gmail.com)
KANBAN
Kanbanis a visual system for managing work as it moves through a
process. ...Kanban is a concept related to lean and just-in-time (JIT)
production, where it is used as a schedulingsystem that tells you what to
produce,when to produceit, and how much to produce.
Created by Vinay (Vinaya9056@gmail.com)
7QC Tool
Created by Vinay (Vinaya9056@gmail.com)
PPAP (Production part approval process)
1) Design Records.
A printed copy of drawing needs to be provided. If the customer is responsiblefor
designing, this is a copy of customer drawing that is sent together with the Purchase
Order(PO). If supplieris responsiblefor designing this is a released drawing in
supplier's release system. "Each and every feature must be “ballooned”or “road
mapped” to correspondwith the inspection results (includingprint notes, standard
tolerancenotes and specifications, and anything else relevant to the design of the
part).
2) Authorized Engineering Change (note) Documents.
A document that shows the detailed description of the change. Usually this document
is called "Engineering Change Notice", but it may be covered by the customer PO or
any otherengineering authorization.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
3) Engineering Approval.
This approval is usually the Engineering trial with productionparts performed at
the customer plant. A"temporary deviation" usually is required to send parts to
customer before PPAP. Customer may require other "Engineering Approvals".
4) DFMEA
A copy of the Design Failure Mode and Effect Analysis (DFMEA), reviewed and
signed-off by supplier and customer. If customer is design responsible, usually
customer may not share this document with the supplier. However, the list of all
critical or high impact productcharacteristics should be shared with the supplier,
so they can be addressed on the PFMEA and ControlPlan.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
5) Process flow diagram.
A copy of the Process Flow, indicating all steps and sequencein the fabrication
process, includingincoming components.
6) PFMEA.
A copy of the Process Failure Mode and Effect Analysis (PFMEA), reviewed and
signed-off by supplierand customer. The PFMEA follows the Process Flow steps,
and indicates "what could go wrong" during the fabrication and assembly of each
component.
7) Control Plan.
A copy of the ControlPlan, reviewed and signed-off by supplierand customer.
The ControlPlan follows the PFMEAsteps, and provides more details on how the
"potential issues" are checked in the incoming quality, assembly process or during
inspectionsof finished products.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
8) Measurement System Analysis Studies (MSA).
MSA usually containsthe Gauge R&R for the critical or high impact
characteristics, and a confirmation that gauges used to measure these characteristics
are calibrated.
9) Dimensional Results.
A list of every dimension noted on the ballooneddrawing. This list shows the
productcharacteristic, specification, the measurement results and the assessment
showing if this dimension is "ok" or "not ok". Usually a minimum of 6 pieces is
reported per product/ process combination.
10) Records of Material / Performance Tests.
A summary of every test performed on the part. This summary is usuallyon a form
of DVP&R (Design Verification Plan and Report), which lists each individual test,
when it was performed, the specification, results and the assessment pass / fail. If
there is an Engineering Specification, usually it is noted on the print. The DVP&R
shall be reviewed and signed off by both customer and supplier engineering groups.
The quality engineer will look for a customer signature on this document.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
11) Initial Sample Inspection Report
The report for material samples which is initially inspected before the prototype is
made.
12) Initial Process Studies.
Usually this section shows all Statistical Process Control chartsaffecting the most
critical characteristics. The intent is to demonstratethat critical processes have
stable variability and that is running near the intendednominal value.
13) Qualified Laboratory Documentation.
Copy of all laboratorycertifications (e.g. A2LA, TS, NABL) of the laboratories
that performed the tests reported on section 10.
14) Appearance Approval Report.
A copy of theAAI (AppearanceApproval Inspection) form signed by the customer.
Applicablefor componentsaffecting appearanceonly.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
15) Sample Production Parts.
A sample from the same lot of initial production run. The PPAP package usually
shows a picture of the sample and where it is kept (customer or supplier).
16) Master Sample
A sample signed off by customer and supplier, that usuallyis used to train operators
on subjective inspectionssuch as visual or for noise.
17) Checking Aids
When there are special toolsfor checking parts, this section shows a picture of the
tool and calibration records, includingdimensional report of the tool.
18) Customer-Specific Requirements
Each customer may have specific requirementsto be includedon the PPAP
package. It is a good practice to ask the customer for PPAP expectationsbefore
even quotingfor a job. North American auto makers OEM (Original Equipment
Manufacturer)requirementsare listed on the IATF website.
Created by Vinay (Vinaya9056@gmail.com)
PPAP
19) Part Submission Warrant (PSW)
This is the form that summarizes the whole PPAP package. This form shows the
reason for submission (design change, annual revalidation, etc.) and the level of
documentssubmitted to the customer. There is a section that asks for "results
meeting all drawing and specification requirements: yes/no" refers to the whole
package. If there are any deviations the supplier should noteon the warrant or
inform that PPAP cannot be submitted.
PPAP requirements are typically distinguished by level as
follows:
Level 1 – Part Submission Warrant (PSW) only submitted to the customer.
Level 2 – PSW with productsamples and limited supportingdata.
Level 3 – PSW with productsamples and complete supportingdata.
Level 4 – PSW and other requirements as defined by the customer.
Level 5 – PSW with productsamples and complete supportingdata available for
review at the supplier's manufacturinglocation. Completedocumentation
Created by Vinay (Vinaya9056@gmail.com)
APQP
Listening to the voice of the customer is what Advanced Product Quality Planning
(APQP) is all about. Having a clear understandingof what customers want, need,
and expect in a productand then planningaccordingly will ensure customer
productexpectationsare met in every way.
5 Phases ofAPQP: The Nuts and Bolts
1) Product Planningand Quality Program Definition
2) Product Design and Development
3) Process Design and Development
4) Validation of Product and Process
5) Production Launch, Assessment, and Improvement
Created by Vinay (Vinaya9056@gmail.com)
ISO-9001-2015
The ISO 9001 family of quality management systems (QMS) standardsis designed
to help organizationsensure that they meet the needs of customers and other
stakeholderswhile meeting statutoryand regulatory requirementsrelated to a
productor service.
The seven quality management principlesare:
QMP 1 – Customer focus
QMP 2 – Leadership
QMP 3 – Engagement of people
QMP 4 – Process approach
QMP 5 – Improvement
QMP 6 – Evidence-based decision making
QMP 7 – Relationship management
Created by Vinay (Vinaya9056@gmail.com)
ISO-9001-2015
Contentsof ISO 9001:2015 are as follows:
Section 1: Scope
Section 2: Normative references
Section 3: Terms and definitions
Section 4: Context of the organization
Section 5: Leadership
Section 6: Planning
Section 7: Support
Section 8: Operation
Section 9: Performance evaluation
Section 10: ContinualImprovement
ISO/TS 16949:2009is an interpretationagreed upon by major automotive
manufacturers (American and European manufacturers); thelatest version is
based on ISO 9001:2008. After the new edition of ISO 9001:2015the ISO/TS
16949:2009was also completelyrevised and reissued by IATF (International
Automotive Task Force) IATF 16949:2016 is now a stand-alonestandard which
doesn't includethe ISO 9001:2015 requirementsbut still refer to them and works
as additionalautomotive specific requirement to ISO 9001.
Created by Vinay (Vinaya9056@gmail.com)
ISO-14001
ISO 14001 is the international standardthat specifies requirements for an effective
environmental management system (EMS). It provides a framework that an
organization can follow, rather than establishing environmental performance
requirements.
ISO 14001 is an internationallyagreed standard that sets out the requirementsfor an
environmental management system. It helps organizationsimprove their
environmental performance through more efficient use of resources and reduction of
waste, gaining a competitive advantageand the trust of stakeholders.
Scope of the EMS (clause 4.3)
Environmental policy (clause 5.2)
Risk and opportunities to be addressed and processes needed (clause 6.1.1)
Criteria for evaluation of significant environmental aspects (clause 6.1.2)
Environmental aspects with associated environmental impacts (clause 6.1.2)
Significant environmental aspects (clause 6.1.2)
Environmental objectives and plans for achieving them (clause 6.2)
Operational control (clause8.1)
Emergency preparednessand response (clause 8.2)
Created by Vinay (Vinaya9056@gmail.com)
8 Discipline for problem solving
Eight disciplines(8Ds)problemsolvingis a method developed at Ford Motor
Company used to approach and to resolve problems, typicallyemployed by
engineers or other professionals. Focused on product and process improvement, its
purposeis to identify, correct, and eliminate recurring problems. It establishes a
permanent corrective action based on statistical analysis of the problemand on the
origin of the problemby determining the root causes. Although it originally
comprised eight stages, or 'disciplines', it was later augmented by an initial planning
stage. 8D follows the logic of the PDCA cycle.
The disciplines are:
1) Establish problemsolving team.
2) Describe the problem.
3) Immediate containment action.
4) Root cause analysis
5) Identify the corrective action.
6) Implement corrective action.
7) Identify and implement preventive action to avoid the reoccurrence.
8) Congratulatethe team. Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Six Sigma is a set of management tools and techniquesdesigned to improve
business by reducing the likelihood of error. It is a data-driven approachwhich uses
a statistical methodology for eliminating defects.
Six Sigma has its foundationsin five key principles:
1) Focus on the customer. This is based on the popularbelief that the “customer is
the king.” The primary goal is to bring maximum benefit to the customer. For this, a
business needs to understandits customers, their needs, and what drives sales or
loyalty. This requires establishing the standard of qualityas defined by what the
customer or market demands.
2) Measure the value streamand find your problem. Map the steps in a given
process to determine areas of waste. Gather data to discover the specific problem
area that is to be addressed or transformed. Have clearly defined goals for data
collection,includingdefining the data to be collected, thereason for the data
gathering, insights expected, ensuring the accuracy of measurements, and
establishing a standardized datacollectionsystem. Ascertain if the data is helpingto
achieve the goals, whetheror not the data needs to be refined, or additional
information collected. Identify the problem. Ask questionsand find the root cause.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
3) Get rid of the junk. Once the problemis identified, make changes to the process
to eliminate variation, thus removing defects. Remove the activities in the process
that do not add to the customer value. If the value stream doesn’t reveal where the
problemlies, tools are used to help discover the outliers and problemareas.
Streamline functionsto achieve qualitycontrol and efficiency. In the end, by taking
out the junk, bottlenecksin the process are removed.
4) Keep the ball rolling. Involve all stakeholders. Adopta structured process where
your team contributesand collaboratestheir varied expertise for the purposesof
problem-solving. Six Sigma processes can have a great impact on an organization,
so the team has to be proficient in the principlesand methodologies used. Hence,
specialized training and knowledge are required to reducethe risk of project or re-
design failures, and ensure that the process performs optimally.
5) Ensure a flexibleand responsiveecosystem. The essence of Six Sigma is
business transformation and change. When a faulty or inefficient process is
removed, it calls for a change in the work practice and employee approach. Arobust
cultureof flexibility and responsiveness to changes in procedurescan ensure
streamlined project implementation.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
The Six Sigma Methodology
The two main Six Sigma methodologies are DMAIC and DMADV. Each has its
own set of recommended proceduresto be implemented for business
transformation.
DMAIC is a data-driven method, used to improve existing productsor services for
bettercustomer satisfaction. It is the acronym for the five phases: D – Define, M –
Measure, A – Analyse, I – Improve, C – Control. DMAIC is applied in the
manufacturing of a productor delivery of a service.
DMADV is a part of the Design for Six Sigma (DFSS) process, used to design or
redesign different processes of productmanufacturing or service delivery. The five
phases of DMADV are: D – Define, M – Measure, A – Analyse, D – Design, V –
Validate. DMADV is employed when existing processes do not meet customer
conditions, even after optimization, or when it is required to develop new processes.
It is executed by Six Sigma Green Belts and Six Sigma Black Belts and underthe
supervision of Six Sigma Master Black Belts. We’ll get to the beltslater.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Each of the above phases of business transformation has several steps:
Define:The Six Sigma process begins with a customer-centric approach
1)The business problemis defined from the customer perspective.
2)Goals are set. What do you want to achieve? What are the resources you will use
in achieving the goals?
3)Map the process. Verify with the stakeholdersthat you are on the right track.
Measure:The second phase is focused on the metrics of the project and the tools
used in the measurement. How can you improve? How can you quantify this?
1) Measure your problemin numbers or with supporting data.
2) Define performance yardstick. Fix the limits for “Y.”
3) Evaluate the measurement system to be used. Can it help you achieve your
outcome?
Analyze: The third phase analyzes the process to discover the influencing variables.
1) Determine if your process is efficient and effective. Does the process help
achieve what you need?
2) Quantify your goals in numbers. For instance, reduce defective goods by 20%.
3) Identify variations, using historical data.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Improve:This process investigates how the changes in “X” impacts “Y.” This
phase is where you identify how you can improve the process implementation.
Step 1: Identify possible reasons. Test to identify which of the “X” variables
identified in Process III influence “Y.”
Step 2: Discover relationshipsbetween the variables.
Step 3: Establish process tolerance, defined as the precise values that certain
variables can have and still fall within acceptableboundaries, for instance the
qualityof any given product.Which boundariesneed X to hold Y within
specifications? What operatingconditionscan impact the outcome?Process
tolerancescan be achieved by using toolslike robust
optimization and validation set.
Control:In this final phase, you determine that the performance objective
identified in the previous phase is well implemented and that the designed
improvements are sustainable.
Step 1: Validate the measurement system to be used.
Step 2: Establish process capability. Is the goal being met? For instance, will
the goal of reducing defective goods by 20 percent be achieved?
Step 3: Once the previous step is satisfied, implement the process.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Six Sigma Techniques
The Six Sigma methodology also uses a mix of statistical and data analysis tools
such as process mapping and design, and proven qualitative and quantitative
techniques, in order to achieve the desired outcome.
1) Brain storming.
2) Root cause analysis.
3) Voice of customer.
4) 5s system.
5) Kaizen.
6) Benchmarking.
7) Poka yoke Mistake proofing.
8) Value stream mapping.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
The Six Sigma Tools
1) Cause and Effect Analysis
2) Flow Chart
3) Pareto Chart
4) Histogram
5) Check Sheet
6) Scatter Plot
7) Control Chart
7 Waste
1) Transportation
2) Inventory
3) Motion
4) Waiting
5) Over processing
6) Over production
7) Defect
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Value streammapping
Value stream mapping is a lean management tool that helps visualize the steps
needed to take from productcreation to delivering it to the end-customer. As with
other business process mapping methods, it helps with introspection(understanding
your business better), as well as analysis and process improvement.
Step #1: Decide How FarYouWantto Go
Step #2: Define the Steps
Step #3: Indicate the InformationFlows
Step #4: Gather the CriticalData
The inventory items held for each process
The cycle time (typicallyper unit)
The transfer time
The number of peopleneeded to perform each step
A number of productsthat must be scrapped
The pack or pallet size that will be used
The overall batch size that each step handles
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Step #5:Add Data and Time Lines to the Map
Step #6: Identify the Seven Wastes of Lean
Step #7: Create the Ideal Value Stream Map
As we’ve already mentioned, a value stream map allows you to see a top-down
overview of your business processes. Then, you can analyze the process
or workflow, identifying wastes and inefficiencies. Typically, here’s a coupleof
things you’d want to be on the lookoutfor:
Delays that hold up the process
Restraints that limit the process
Excess inventory that ties up resources unproductively
While value stream mapping is usuallyused for manufacturing processes, the same
principlescan apply to other industries too.
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Created by Vinay (Vinaya9056@gmail.com)
Six Sigma
Define
Six Sigma DMAIC Process - Define Phase - Capturing Voice of Customer (VOC)
What is Voice of Customer?Voice of Customer is the customer'svoice,
expectations, preferences, comments, of a product or service in discussion. It is the
statement made by the customer on a particularproduct or service.
Kano model
1) Must be quality.
2) One dimensionalquality
3) Attractive quality
4) Indifferent quality
5) Reverse quality
Created by Vinay (Vinaya9056@gmail.com)

More Related Content

Similar to Copy of Basic Quality infromation for maufacturing sector.pdf

Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5DANANG WID
 
Awareness of IATF 16949.pptx
Awareness of IATF 16949.pptxAwareness of IATF 16949.pptx
Awareness of IATF 16949.pptxPrasenjit Puri
 
2F9_S4HANA2020_BPD_EN_US.docx
2F9_S4HANA2020_BPD_EN_US.docx2F9_S4HANA2020_BPD_EN_US.docx
2F9_S4HANA2020_BPD_EN_US.docxArun Obilisetty
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfFaizyNoh
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdfinfoqtc
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptssuser09851b1
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptxsonutyagi20
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajalAJAL A J
 
QUALITY FUNCTION DEPLOYEMENT.pptx
QUALITY FUNCTION DEPLOYEMENT.pptxQUALITY FUNCTION DEPLOYEMENT.pptx
QUALITY FUNCTION DEPLOYEMENT.pptxAmuthaSaravanan3
 
scribd.vdownloaders.com_day-6-quality.pdf
scribd.vdownloaders.com_day-6-quality.pdfscribd.vdownloaders.com_day-6-quality.pdf
scribd.vdownloaders.com_day-6-quality.pdfAbdullahSamy6
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engerkinguler
 

Similar to Copy of Basic Quality infromation for maufacturing sector.pdf (20)

Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
 
Awareness of IATF 16949.pptx
Awareness of IATF 16949.pptxAwareness of IATF 16949.pptx
Awareness of IATF 16949.pptx
 
2F9_S4HANA2020_BPD_EN_US.docx
2F9_S4HANA2020_BPD_EN_US.docx2F9_S4HANA2020_BPD_EN_US.docx
2F9_S4HANA2020_BPD_EN_US.docx
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
 
PPAP.pdf
PPAP.pdfPPAP.pdf
PPAP.pdf
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdf
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
QUALITY FUNCTION DEPLOYEMENT.pptx
QUALITY FUNCTION DEPLOYEMENT.pptxQUALITY FUNCTION DEPLOYEMENT.pptx
QUALITY FUNCTION DEPLOYEMENT.pptx
 
Qa
QaQa
Qa
 
Qa
QaQa
Qa
 
Qa
QaQa
Qa
 
SQA
SQASQA
SQA
 
Slides chapters 26-27
Slides chapters 26-27Slides chapters 26-27
Slides chapters 26-27
 
scribd.vdownloaders.com_day-6-quality.pdf
scribd.vdownloaders.com_day-6-quality.pdfscribd.vdownloaders.com_day-6-quality.pdf
scribd.vdownloaders.com_day-6-quality.pdf
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
 
APQP APPL.ppt
APQP APPL.pptAPQP APPL.ppt
APQP APPL.ppt
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Copy of Basic Quality infromation for maufacturing sector.pdf

  • 1. 5S Place for everything and everything is in its place. 1) Seiri –Sort 2) Setion-Set in order 3) Seison-Shine 4) Seiketsu-Standardize 5) Shitsuke-Sustain Created by Vinay (Vinaya9056@gmail.com)
  • 2. KAIZEN 1) Continuouslyimprove all function. 2) Aims to eliminate waste. 3) Change for better. 4) Flow –process kaizen- Flow is material and information , Improving and make it easy to do the production. 5) Kai –good, Zen-Change. Created by Vinay (Vinaya9056@gmail.com)
  • 3. KANBAN Kanbanis a visual system for managing work as it moves through a process. ...Kanban is a concept related to lean and just-in-time (JIT) production, where it is used as a schedulingsystem that tells you what to produce,when to produceit, and how much to produce. Created by Vinay (Vinaya9056@gmail.com)
  • 4. 7QC Tool Created by Vinay (Vinaya9056@gmail.com)
  • 5. PPAP (Production part approval process) 1) Design Records. A printed copy of drawing needs to be provided. If the customer is responsiblefor designing, this is a copy of customer drawing that is sent together with the Purchase Order(PO). If supplieris responsiblefor designing this is a released drawing in supplier's release system. "Each and every feature must be “ballooned”or “road mapped” to correspondwith the inspection results (includingprint notes, standard tolerancenotes and specifications, and anything else relevant to the design of the part). 2) Authorized Engineering Change (note) Documents. A document that shows the detailed description of the change. Usually this document is called "Engineering Change Notice", but it may be covered by the customer PO or any otherengineering authorization. Created by Vinay (Vinaya9056@gmail.com)
  • 6. PPAP 3) Engineering Approval. This approval is usually the Engineering trial with productionparts performed at the customer plant. A"temporary deviation" usually is required to send parts to customer before PPAP. Customer may require other "Engineering Approvals". 4) DFMEA A copy of the Design Failure Mode and Effect Analysis (DFMEA), reviewed and signed-off by supplier and customer. If customer is design responsible, usually customer may not share this document with the supplier. However, the list of all critical or high impact productcharacteristics should be shared with the supplier, so they can be addressed on the PFMEA and ControlPlan. Created by Vinay (Vinaya9056@gmail.com)
  • 7. PPAP 5) Process flow diagram. A copy of the Process Flow, indicating all steps and sequencein the fabrication process, includingincoming components. 6) PFMEA. A copy of the Process Failure Mode and Effect Analysis (PFMEA), reviewed and signed-off by supplierand customer. The PFMEA follows the Process Flow steps, and indicates "what could go wrong" during the fabrication and assembly of each component. 7) Control Plan. A copy of the ControlPlan, reviewed and signed-off by supplierand customer. The ControlPlan follows the PFMEAsteps, and provides more details on how the "potential issues" are checked in the incoming quality, assembly process or during inspectionsof finished products. Created by Vinay (Vinaya9056@gmail.com)
  • 8. PPAP 8) Measurement System Analysis Studies (MSA). MSA usually containsthe Gauge R&R for the critical or high impact characteristics, and a confirmation that gauges used to measure these characteristics are calibrated. 9) Dimensional Results. A list of every dimension noted on the ballooneddrawing. This list shows the productcharacteristic, specification, the measurement results and the assessment showing if this dimension is "ok" or "not ok". Usually a minimum of 6 pieces is reported per product/ process combination. 10) Records of Material / Performance Tests. A summary of every test performed on the part. This summary is usuallyon a form of DVP&R (Design Verification Plan and Report), which lists each individual test, when it was performed, the specification, results and the assessment pass / fail. If there is an Engineering Specification, usually it is noted on the print. The DVP&R shall be reviewed and signed off by both customer and supplier engineering groups. The quality engineer will look for a customer signature on this document. Created by Vinay (Vinaya9056@gmail.com)
  • 9. PPAP 11) Initial Sample Inspection Report The report for material samples which is initially inspected before the prototype is made. 12) Initial Process Studies. Usually this section shows all Statistical Process Control chartsaffecting the most critical characteristics. The intent is to demonstratethat critical processes have stable variability and that is running near the intendednominal value. 13) Qualified Laboratory Documentation. Copy of all laboratorycertifications (e.g. A2LA, TS, NABL) of the laboratories that performed the tests reported on section 10. 14) Appearance Approval Report. A copy of theAAI (AppearanceApproval Inspection) form signed by the customer. Applicablefor componentsaffecting appearanceonly. Created by Vinay (Vinaya9056@gmail.com)
  • 10. PPAP 15) Sample Production Parts. A sample from the same lot of initial production run. The PPAP package usually shows a picture of the sample and where it is kept (customer or supplier). 16) Master Sample A sample signed off by customer and supplier, that usuallyis used to train operators on subjective inspectionssuch as visual or for noise. 17) Checking Aids When there are special toolsfor checking parts, this section shows a picture of the tool and calibration records, includingdimensional report of the tool. 18) Customer-Specific Requirements Each customer may have specific requirementsto be includedon the PPAP package. It is a good practice to ask the customer for PPAP expectationsbefore even quotingfor a job. North American auto makers OEM (Original Equipment Manufacturer)requirementsare listed on the IATF website. Created by Vinay (Vinaya9056@gmail.com)
  • 11. PPAP 19) Part Submission Warrant (PSW) This is the form that summarizes the whole PPAP package. This form shows the reason for submission (design change, annual revalidation, etc.) and the level of documentssubmitted to the customer. There is a section that asks for "results meeting all drawing and specification requirements: yes/no" refers to the whole package. If there are any deviations the supplier should noteon the warrant or inform that PPAP cannot be submitted. PPAP requirements are typically distinguished by level as follows: Level 1 – Part Submission Warrant (PSW) only submitted to the customer. Level 2 – PSW with productsamples and limited supportingdata. Level 3 – PSW with productsamples and complete supportingdata. Level 4 – PSW and other requirements as defined by the customer. Level 5 – PSW with productsamples and complete supportingdata available for review at the supplier's manufacturinglocation. Completedocumentation Created by Vinay (Vinaya9056@gmail.com)
  • 12. APQP Listening to the voice of the customer is what Advanced Product Quality Planning (APQP) is all about. Having a clear understandingof what customers want, need, and expect in a productand then planningaccordingly will ensure customer productexpectationsare met in every way. 5 Phases ofAPQP: The Nuts and Bolts 1) Product Planningand Quality Program Definition 2) Product Design and Development 3) Process Design and Development 4) Validation of Product and Process 5) Production Launch, Assessment, and Improvement Created by Vinay (Vinaya9056@gmail.com)
  • 13. ISO-9001-2015 The ISO 9001 family of quality management systems (QMS) standardsis designed to help organizationsensure that they meet the needs of customers and other stakeholderswhile meeting statutoryand regulatory requirementsrelated to a productor service. The seven quality management principlesare: QMP 1 – Customer focus QMP 2 – Leadership QMP 3 – Engagement of people QMP 4 – Process approach QMP 5 – Improvement QMP 6 – Evidence-based decision making QMP 7 – Relationship management Created by Vinay (Vinaya9056@gmail.com)
  • 14. ISO-9001-2015 Contentsof ISO 9001:2015 are as follows: Section 1: Scope Section 2: Normative references Section 3: Terms and definitions Section 4: Context of the organization Section 5: Leadership Section 6: Planning Section 7: Support Section 8: Operation Section 9: Performance evaluation Section 10: ContinualImprovement ISO/TS 16949:2009is an interpretationagreed upon by major automotive manufacturers (American and European manufacturers); thelatest version is based on ISO 9001:2008. After the new edition of ISO 9001:2015the ISO/TS 16949:2009was also completelyrevised and reissued by IATF (International Automotive Task Force) IATF 16949:2016 is now a stand-alonestandard which doesn't includethe ISO 9001:2015 requirementsbut still refer to them and works as additionalautomotive specific requirement to ISO 9001. Created by Vinay (Vinaya9056@gmail.com)
  • 15. ISO-14001 ISO 14001 is the international standardthat specifies requirements for an effective environmental management system (EMS). It provides a framework that an organization can follow, rather than establishing environmental performance requirements. ISO 14001 is an internationallyagreed standard that sets out the requirementsfor an environmental management system. It helps organizationsimprove their environmental performance through more efficient use of resources and reduction of waste, gaining a competitive advantageand the trust of stakeholders. Scope of the EMS (clause 4.3) Environmental policy (clause 5.2) Risk and opportunities to be addressed and processes needed (clause 6.1.1) Criteria for evaluation of significant environmental aspects (clause 6.1.2) Environmental aspects with associated environmental impacts (clause 6.1.2) Significant environmental aspects (clause 6.1.2) Environmental objectives and plans for achieving them (clause 6.2) Operational control (clause8.1) Emergency preparednessand response (clause 8.2) Created by Vinay (Vinaya9056@gmail.com)
  • 16. 8 Discipline for problem solving Eight disciplines(8Ds)problemsolvingis a method developed at Ford Motor Company used to approach and to resolve problems, typicallyemployed by engineers or other professionals. Focused on product and process improvement, its purposeis to identify, correct, and eliminate recurring problems. It establishes a permanent corrective action based on statistical analysis of the problemand on the origin of the problemby determining the root causes. Although it originally comprised eight stages, or 'disciplines', it was later augmented by an initial planning stage. 8D follows the logic of the PDCA cycle. The disciplines are: 1) Establish problemsolving team. 2) Describe the problem. 3) Immediate containment action. 4) Root cause analysis 5) Identify the corrective action. 6) Implement corrective action. 7) Identify and implement preventive action to avoid the reoccurrence. 8) Congratulatethe team. Created by Vinay (Vinaya9056@gmail.com)
  • 17. Six Sigma Six Sigma is a set of management tools and techniquesdesigned to improve business by reducing the likelihood of error. It is a data-driven approachwhich uses a statistical methodology for eliminating defects. Six Sigma has its foundationsin five key principles: 1) Focus on the customer. This is based on the popularbelief that the “customer is the king.” The primary goal is to bring maximum benefit to the customer. For this, a business needs to understandits customers, their needs, and what drives sales or loyalty. This requires establishing the standard of qualityas defined by what the customer or market demands. 2) Measure the value streamand find your problem. Map the steps in a given process to determine areas of waste. Gather data to discover the specific problem area that is to be addressed or transformed. Have clearly defined goals for data collection,includingdefining the data to be collected, thereason for the data gathering, insights expected, ensuring the accuracy of measurements, and establishing a standardized datacollectionsystem. Ascertain if the data is helpingto achieve the goals, whetheror not the data needs to be refined, or additional information collected. Identify the problem. Ask questionsand find the root cause. Created by Vinay (Vinaya9056@gmail.com)
  • 18. Six Sigma 3) Get rid of the junk. Once the problemis identified, make changes to the process to eliminate variation, thus removing defects. Remove the activities in the process that do not add to the customer value. If the value stream doesn’t reveal where the problemlies, tools are used to help discover the outliers and problemareas. Streamline functionsto achieve qualitycontrol and efficiency. In the end, by taking out the junk, bottlenecksin the process are removed. 4) Keep the ball rolling. Involve all stakeholders. Adopta structured process where your team contributesand collaboratestheir varied expertise for the purposesof problem-solving. Six Sigma processes can have a great impact on an organization, so the team has to be proficient in the principlesand methodologies used. Hence, specialized training and knowledge are required to reducethe risk of project or re- design failures, and ensure that the process performs optimally. 5) Ensure a flexibleand responsiveecosystem. The essence of Six Sigma is business transformation and change. When a faulty or inefficient process is removed, it calls for a change in the work practice and employee approach. Arobust cultureof flexibility and responsiveness to changes in procedurescan ensure streamlined project implementation. Created by Vinay (Vinaya9056@gmail.com)
  • 19. Six Sigma The Six Sigma Methodology The two main Six Sigma methodologies are DMAIC and DMADV. Each has its own set of recommended proceduresto be implemented for business transformation. DMAIC is a data-driven method, used to improve existing productsor services for bettercustomer satisfaction. It is the acronym for the five phases: D – Define, M – Measure, A – Analyse, I – Improve, C – Control. DMAIC is applied in the manufacturing of a productor delivery of a service. DMADV is a part of the Design for Six Sigma (DFSS) process, used to design or redesign different processes of productmanufacturing or service delivery. The five phases of DMADV are: D – Define, M – Measure, A – Analyse, D – Design, V – Validate. DMADV is employed when existing processes do not meet customer conditions, even after optimization, or when it is required to develop new processes. It is executed by Six Sigma Green Belts and Six Sigma Black Belts and underthe supervision of Six Sigma Master Black Belts. We’ll get to the beltslater. Created by Vinay (Vinaya9056@gmail.com)
  • 20. Six Sigma Each of the above phases of business transformation has several steps: Define:The Six Sigma process begins with a customer-centric approach 1)The business problemis defined from the customer perspective. 2)Goals are set. What do you want to achieve? What are the resources you will use in achieving the goals? 3)Map the process. Verify with the stakeholdersthat you are on the right track. Measure:The second phase is focused on the metrics of the project and the tools used in the measurement. How can you improve? How can you quantify this? 1) Measure your problemin numbers or with supporting data. 2) Define performance yardstick. Fix the limits for “Y.” 3) Evaluate the measurement system to be used. Can it help you achieve your outcome? Analyze: The third phase analyzes the process to discover the influencing variables. 1) Determine if your process is efficient and effective. Does the process help achieve what you need? 2) Quantify your goals in numbers. For instance, reduce defective goods by 20%. 3) Identify variations, using historical data. Created by Vinay (Vinaya9056@gmail.com)
  • 21. Six Sigma Improve:This process investigates how the changes in “X” impacts “Y.” This phase is where you identify how you can improve the process implementation. Step 1: Identify possible reasons. Test to identify which of the “X” variables identified in Process III influence “Y.” Step 2: Discover relationshipsbetween the variables. Step 3: Establish process tolerance, defined as the precise values that certain variables can have and still fall within acceptableboundaries, for instance the qualityof any given product.Which boundariesneed X to hold Y within specifications? What operatingconditionscan impact the outcome?Process tolerancescan be achieved by using toolslike robust optimization and validation set. Control:In this final phase, you determine that the performance objective identified in the previous phase is well implemented and that the designed improvements are sustainable. Step 1: Validate the measurement system to be used. Step 2: Establish process capability. Is the goal being met? For instance, will the goal of reducing defective goods by 20 percent be achieved? Step 3: Once the previous step is satisfied, implement the process. Created by Vinay (Vinaya9056@gmail.com)
  • 22. Six Sigma Six Sigma Techniques The Six Sigma methodology also uses a mix of statistical and data analysis tools such as process mapping and design, and proven qualitative and quantitative techniques, in order to achieve the desired outcome. 1) Brain storming. 2) Root cause analysis. 3) Voice of customer. 4) 5s system. 5) Kaizen. 6) Benchmarking. 7) Poka yoke Mistake proofing. 8) Value stream mapping. Created by Vinay (Vinaya9056@gmail.com)
  • 23. Six Sigma The Six Sigma Tools 1) Cause and Effect Analysis 2) Flow Chart 3) Pareto Chart 4) Histogram 5) Check Sheet 6) Scatter Plot 7) Control Chart 7 Waste 1) Transportation 2) Inventory 3) Motion 4) Waiting 5) Over processing 6) Over production 7) Defect Created by Vinay (Vinaya9056@gmail.com)
  • 24. Six Sigma Value streammapping Value stream mapping is a lean management tool that helps visualize the steps needed to take from productcreation to delivering it to the end-customer. As with other business process mapping methods, it helps with introspection(understanding your business better), as well as analysis and process improvement. Step #1: Decide How FarYouWantto Go Step #2: Define the Steps Step #3: Indicate the InformationFlows Step #4: Gather the CriticalData The inventory items held for each process The cycle time (typicallyper unit) The transfer time The number of peopleneeded to perform each step A number of productsthat must be scrapped The pack or pallet size that will be used The overall batch size that each step handles Created by Vinay (Vinaya9056@gmail.com)
  • 25. Six Sigma Step #5:Add Data and Time Lines to the Map Step #6: Identify the Seven Wastes of Lean Step #7: Create the Ideal Value Stream Map As we’ve already mentioned, a value stream map allows you to see a top-down overview of your business processes. Then, you can analyze the process or workflow, identifying wastes and inefficiencies. Typically, here’s a coupleof things you’d want to be on the lookoutfor: Delays that hold up the process Restraints that limit the process Excess inventory that ties up resources unproductively While value stream mapping is usuallyused for manufacturing processes, the same principlescan apply to other industries too. Created by Vinay (Vinaya9056@gmail.com)
  • 26. Six Sigma Created by Vinay (Vinaya9056@gmail.com)
  • 27. Six Sigma Define Six Sigma DMAIC Process - Define Phase - Capturing Voice of Customer (VOC) What is Voice of Customer?Voice of Customer is the customer'svoice, expectations, preferences, comments, of a product or service in discussion. It is the statement made by the customer on a particularproduct or service. Kano model 1) Must be quality. 2) One dimensionalquality 3) Attractive quality 4) Indifferent quality 5) Reverse quality Created by Vinay (Vinaya9056@gmail.com)