When moving offices, one of the most important tasks a company must undertake is to ensure
that its IT assets (including computers and software, servers, peripheral devices, printers, copiers,
telecommunications equipment) transition smoothly to its new location. Doing so involves a wide
variety of considerations; from detailed planning of the move itself, to preparing the new premises,
and arranging the logistics and personnel necessary to make the move.
This guide provides a detailed account of the IT moving process from start to finish, with the goal
of making such a move as painless as possible for your organisation. It offers a thorough look at
all aspects of a move, from planning to inventory, logistics, safety, facilities, infrastructure, testing,
business continuity, security, communications and personnel. The information contained in this
guide is provided to help you conceptualise and implement your IT-related moving plans.
Planning and Scheduling
A properly designed moving plan can save you time and money, and should be considered a
worthwhile investment, rather than just as a cost to be incurred. Your planning should cover the
moving process as a whole; from inventory management to moving equipment, providing security,
and not least of all, ensuring business continuity during the move. Scheduling should encompass the
comprehensive plan for the move, including pre-move preparation, expected pickup and delivery
times for the equipment, as well as the details of the move itself. Factors to consider during the
planning process include:
•	 The plan should encompass potential delays and other setbacks.
•	 The new building should be fully prepared prior to the move. This includes infrastructure as well
as things like server racks and cabinets.
•	 Coordinate with all suppliers well ahead of the move. Make sure all suppliers and service
providers have access to a written copy of the moving plan.
HOW TO MOVE OFFICES
WITHOUT THE PAIN
2
•	 Schedule enough time to perform a backup of all data before the move begins.
•	 Set up a freeze point after which no further changes to the IT infrastructure will be made until
the move is complete.
•	 Target minimum operating capacity for IT on the first day after the move and for a three-month
working period thereafter to help prioritising the re-engagement of systems once the move has
been completed.
Take Inventory
To avoid losing or misplacing equipment in the process of a move, conducting an inventory check
prior to the move is essential. The following are some considerations to keep in mind when dealing
with inventory.
•	 Look for any disparity between inventory tracking software such as a configuration management
database (CMDB) and the equipment actually on the premises.
•	 Determine whether the electrical connections at the old and new facilities are the same; if not,
verify whether special adapters are required to allow equipment to function at the new location.
•	 Plan for IP changes: a move to a new facility involves new IP addresses, which in some cases
must be accounted for in various Internet enabled equipment for the equipment to function
properly.
•	 Plan for inventory movement according to proper server sequencing. Chained servers may
require a linked server to be started up first; this should be accounted for in inventory planning.
•	 Accurately label all wiring in order to correctly replicate equipment connections at the new
premises.
•	 Ensure that the equipment supply chain can be replicated when moving a data centre. Such
centres are highly sensitive to their infrastructure architecture. For best results, make note of the
setup so that it can be reassembled exactly the same way at the new location.
Server Racks:
•	 Verify that the server racks to be used at the new facility can hold any servers being moved.
Servers should be placed in racks where there is some extra space to allow for the release of
heat.
•	 Determine whether equipment will be communicating with other systems at greater distances
after the move. If so, certain connectors may need to be replaced or extended to facilitate
operation at the new facility.
3
Logistics
Coordinate all aspects of the move with service providers and others involved in the move to ensure
that effort is not being duplicated and moving equipment is not being double-booked. If people
will be working in the building while the move takes place look into making arrangements for them
to work away from the moving area for the day if possible.
•	 Equipment being moved should be tagged both for identification purposes and to indicate the
applicable workstations where it will be placed at the new location.
•	 Check the anticipated movement route of the equipment to prevent any potential damage to
the equipment. Conduct a walk-through of both the old and new buildings with the company
performing the move to define routes and determine the most fitting moving equipment to use.
•	 Server cabinets, especially when fully equipped, may not be able to be tilted when moved. In
these cases, arrangements must be made with the movers to move the cabinets in one go or the
servers will have to be unequipped to perform the move.
•	 Make sure the movers prepare for potentially inclement weather by having plastic covers
available to cover equipment.
•	 Make sure to communicate all information about the size and weight of the equipment gained
from the inventory process.
•	 The order to be followed during the move should be carefully considered for maximum
efficiency. When loading, first load the equipment and then furniture. When unloading,
follow the opposite process, first unloading and installing furniture and then unloading the IT
equipment.
Safety
A variety of steps should be taken to ensure the safety of all personnel involved in a move as well as
those passing by, including:
•	 Arrange for an individual qualified to administer first aid to be present during the move in case
of an accident or emergency.
•	 Use a certified electrician to disconnect servers when necessary for safety and warranty
compliance purposes.
•	 When moving servers, verify that any floors the equipment passes over are capable of handling
heavy loads.
•	 Make sure any of your employees involved in moving heavy equipment wear appropriate safety
equipment including hard hats when appropriate.
•	 Check all doors to server or equipment rooms to ensure that they open quickly and easily in case
of emergency. Doors should open in the direction of any escape route so they don’t serve as an
impediment to escaping.
4
Facilities
Make sure all necessary equipment is available at the facilities involved in the move and make sure
details of the move are accessible to everyone involved.
•	 Both digital and printed copies of the moving plan should be made available to all parties
involved in the move.
•	 Encourage all mobile device users to check that their devices are fully charged and to carry
chargers with them in case their devices run out of power during the course of the move.
•	 Establish a project room at the new location where those involved in the moving process can go
if they need further information or to consult with someone regarding organisational aspects of
the move. The room should have an internet connection and a whiteboard with pens.
•	 Ensure that the moving team has access to all necessary equipment including screwdrivers, nuts
and bolts, as well as spare parts such as cables in case any existing parts need replacement in
the course of the move.
Infrastructure
Plan for the location and the specific type of all IT infrastructure with your suppliers prior to any
move. Tips for handling infrastructure issues include:
•	 Take into account any difference in location distance from your service provider’s network
location after the move. If the difference is greater, it may affect network performance.
•	 Acquire a current wiring plan for both the old and new locations if possible: when cabling
workstations, try to provide excess cable space in terms of length to make it easier to add or
extend cables when necessary.
•	 Plan well in advance for the movement of connections such as VPNs, ADSL, WiFi and the like so
that they will be ready at your new location as soon as the move is complete. If your connection
is wired, make sure that the relevant telecommunications personnel have access to your new
offices before the move so that any necessary wiring can be done in advance. If you are using
wireless communication devices, make sure that any necessary routers or wireless access points
are ready to function upon arrival at your new offices.
•	 Verify that any wiring present at the new location is compatible with the equipment being
moved.
•	 When moving servers, make sure that they are mounted to the new racks with the proper
fasteners. Use of improper fasteners may necessitate a server being cut from a rack if it needs to
be moved.
5
•	 Plan the power distribution of each server rack so that particular groups of servers are connected
to particular power sources in order to properly plot the distribution of power.
•	 When moving a network, ensure that proper VLANs are in place for any VOIP applications.
Failure to do so may make it impossible for VLANs to access the appropriate applications.
•	 Verify that adequate cooling and power capacity exists for all IT equipment at the new location.
Testing
Testing is essential to determine if your equipment has been moved successfully without suffering
damage or impairment. The following measures can help you perform effective testing of your IT
equipment:
•	 Perform a benchmark level test before the move, preferably after you have frozen development
of your systems prior to the move. Then, once the equipment has been moved and re-
established, you can test it against the benchmark set by the pre-move test.
•	 Make sure to have wiring certified and coordinate all test protocols with your IT suppliers and
maintenance contractors.
•	 In addition to performance testing, use the pre-move testing period to look for faulty equipment
such as bad hard drives or other defective equipment.
•	 Check network configurations at the new location to ensure they are functional.
Business Continuity
A primary goal of any move is to restore business operations as quickly as possible. If something
occurs to interrupt this process, it is essential to have a backup plan to ensure business continuity.
The following measures can be used to help your company maintain continuous operations:
•	 The moving plan should delineate who has the responsibility to make decisions related to
business continuity during the course of the plan. This can include delaying or calling off
the move if necessary, as well as switching to a backup plan in the event of an accident or
emergency.
•	 If a move is interrupted or some sort of accident or emergency occurs, it may be necessary to
return to the old location for a time. Design your moving plan with a go/no go condition, so that
the move can be cancelled or postponed for a time if need be.
•	 Communicate all particulars of the layout and infrastructure design at the new location to
the new moving team to ensure they can properly connect your IT equipment once it has
been moved.
6
•	 Transport insurance covering the equipment and furniture being moved should be purchased.
•	 Confirm the details of any maintenance contract moving clauses relating to your equipment. In
some cases providers of the equipment require that disconnection and connection and even
moving, be performed by certified technicians.
•	 Transport backup equipment separately from primary equipment to ensure that an accident
doesn’t disable both sets of devices.
•	 Look into renting a replacement data centre in case of emergency. Such centres can be used
temporarily in case a move meets with setbacks or to provide necessary functionality for a day or
two during the course of a move.
•	 Include representatives from equipment suppliers in your moving plans so that they can be
available on the day of the move in case replacement parts are needed.
•	 Technicians and other equipment experts should be on scene the day after the move to make
sure all equipment is running properly and to deal with any unforeseen circumstances.
Security
When moving valuable IT equipment, paying attention to security issues is necessary to ensure the
move goes smoothly and to prevent the loss of valuable equipment. The following tips can help
accomplish this:
•	 Consult with those responsible for security at both the old and new locations prior to the move.
If not properly monitored during a move, valuable IT equipment is subject to going missing.
•	 Register all those involved in the move with the appropriate security staff prior to the move. You
should also arrange for access to the rooms necessary to facilitate the move at the new location.
•	 Server equipment such as cabinets are typically locked, and may be connected to other
equipment or furniture via locked cables as well. Make sure the movers have the necessary keys
to unlock such equipment or that personnel are on hand to do so.
•	 Servers and network equipment monitoring devices should be disabled for the move, and then
re-engaged as soon as possible at the new location.
•	 Provide the moving team with passwords necessary to test that equipment has been restarted
properly, or have personnel available to perform such tests.
Communication
To ensure a move proceeds as smoothly as possible, efficient communication is essential. The
following steps can help with communication before and during the move:
•	 Compile a list of all personnel involved in the move that also details their responsibilities during
the move.
7
•	 The above list can be combined with a communication map plan describing what needs to be
communicated to whom and when the communication should occur. Preparing such a plan in
advance helps to avoid miscommunication related to the stress that can occur while a move is in
progress.
•	 Appoint a communication contact from each department involved in the move to ensure that
messages are communicated accurately and to minimise confusion.
•	 Inform suppliers of equipment that sends automatic messages when disconnected about the
move so that they are aware of the reason for such messages in advance.
Personnel
Selecting the proper personnel to perform a move is an important step in ensuring the process goes
as smoothly as possible. Taking the following steps can help accomplish this:
•	 Determine who amongst your employees will have roles to perform during the move. Assign
their roles to other employees so they will be able to devote their full energy to their move-
related tasks.
•	 Professional movers should be hired to perform the bulk of the move. This will help the move
proceed smoothly, and reduce the potential liability generated by having your employees, who
are not trained to perform such activities, carrying out duties that they are not accustomed to.
•	 Check with your IT equipment suppliers to help find movers with the ability to move such
equipment. Not all moving companies are capable of moving equipment of this type.
•	 When building server racks, the process moves bottom to top, not top to bottom. Following this
procedure, helps prevent injuries to the personnel involved.
•	 Arrange for food and refreshments to be available to personnel during the course of the move. If
the move will extend beyond a single day, look into arranging lodging for employees who have
come from distant locations to help with the move.
•	 In the case of mission critical equipment and highly complex systems, having personnel from
the suppliers present when possible is recommended to help the move proceed as smoothly as
possible.
•	 A crisis team should be appointed to oversee the move as a whole and react to any issues. They
can operate from a centralized location and direct personnel to respond as and where needed to
any emergency or unforeseen event.
•	 When building server racks, the process moves bottom to top, not top to bottom. Following this
procedure, helps prevent injuries to the personnel involved.
•	 Arrange for food and refreshments to be available to personnel during the course of the move. If
the move will extend beyond a single day, look into arranging lodging for employees who have
come from distant locations to help with the move.
Contact your Bright representive today for more information:
333 Latimer Rd, London W10 6RA | 020 3031 9500 | sales@bright.co
•	 In the case of mission critical equipment and highly complex systems, having personnel from
the suppliers present when possible is recommended to help the move proceed as smoothly as
possible.
•	 A crisis team should be appointed to oversee the move as a whole and react to any issues. They
can operate from a centralized location and direct personnel to respond as and where needed to
any emergency or unforeseen event.

More Related Content

Viewers also liked

61
6161
61JIuc
 
Ash Colin - CID
Ash Colin - CIDAsh Colin - CID
Ash Colin - CIDColin Ash
 
032
032032
032JIuc
 
Information Security Awareness Training Open
Information Security Awareness Training OpenInformation Security Awareness Training Open
Information Security Awareness Training OpenFred Beck MBA, CPA
 
Coloana de lumina
Coloana de luminaColoana de lumina
Coloana de luminatachita2007
 
Presentation endoscopy power p
Presentation endoscopy power pPresentation endoscopy power p
Presentation endoscopy power pGuillermo Valle
 
Abch group results booklet 2011_final
Abch group results booklet 2011_finalAbch group results booklet 2011_final
Abch group results booklet 2011_finalwgjlubbe
 
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleVoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleFaisal Khan
 
Meios de transporte
Meios de transporteMeios de transporte
Meios de transporteedivalbal
 

Viewers also liked (14)

61
6161
61
 
FEMA IS-139 Certificate
FEMA IS-139 CertificateFEMA IS-139 Certificate
FEMA IS-139 Certificate
 
Ash Colin - CID
Ash Colin - CIDAsh Colin - CID
Ash Colin - CID
 
Myoval
MyovalMyoval
Myoval
 
032
032032
032
 
New Models of Care
New Models of CareNew Models of Care
New Models of Care
 
Silvestrismo
SilvestrismoSilvestrismo
Silvestrismo
 
Δορυφόροι
ΔορυφόροιΔορυφόροι
Δορυφόροι
 
Information Security Awareness Training Open
Information Security Awareness Training OpenInformation Security Awareness Training Open
Information Security Awareness Training Open
 
Coloana de lumina
Coloana de luminaColoana de lumina
Coloana de lumina
 
Presentation endoscopy power p
Presentation endoscopy power pPresentation endoscopy power p
Presentation endoscopy power p
 
Abch group results booklet 2011_final
Abch group results booklet 2011_finalAbch group results booklet 2011_final
Abch group results booklet 2011_final
 
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sampleVoiceBootcamp Ccnp collaboration lab guide v1.0 sample
VoiceBootcamp Ccnp collaboration lab guide v1.0 sample
 
Meios de transporte
Meios de transporteMeios de transporte
Meios de transporte
 

Similar to How To Move Offices Without The Pain - Guide

Pre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsPre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsRob Schroeder
 
The 4 Things You Need To Know Before Migrating Your Business To The Cloud
The 4 Things You Need To Know Before Migrating Your Business To The CloudThe 4 Things You Need To Know Before Migrating Your Business To The Cloud
The 4 Things You Need To Know Before Migrating Your Business To The CloudBright Technology
 
Scada security webinar 2012
Scada security webinar 2012Scada security webinar 2012
Scada security webinar 2012AVEVA
 
SRS and PMP of Smart Bio- Waste Management System
SRS and PMP of Smart Bio- Waste Management SystemSRS and PMP of Smart Bio- Waste Management System
SRS and PMP of Smart Bio- Waste Management SystemYahya Shuaibu
 
Network security, change control, outsourcing
Network security, change control, outsourcingNetwork security, change control, outsourcing
Network security, change control, outsourcingNicholas Davis
 
Network Security, Change Control, Outsourcing
Network Security, Change Control, OutsourcingNetwork Security, Change Control, Outsourcing
Network Security, Change Control, OutsourcingNicholas Davis
 
Cp7101 design and management of computer networks-requirements analysis
Cp7101 design and management of computer networks-requirements analysisCp7101 design and management of computer networks-requirements analysis
Cp7101 design and management of computer networks-requirements analysisDr Geetha Mohan
 
Whitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsWhitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsHappiest Minds Technologies
 
Digital Mining Solutions Simplified With VTPL
Digital Mining Solutions Simplified With VTPLDigital Mining Solutions Simplified With VTPL
Digital Mining Solutions Simplified With VTPLUpasnaBagrodia
 
Data center maintenance
Data center maintenanceData center maintenance
Data center maintenanceanilinvns
 
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 MigrationFour Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 MigrationPrecisely
 
basis cloudcomputing
basis cloudcomputingbasis cloudcomputing
basis cloudcomputingSNEHKUMAR30
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby
 
Network developer company report
Network developer company reportNetwork developer company report
Network developer company reportrindbaloch
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 

Similar to How To Move Offices Without The Pain - Guide (20)

Pre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsPre-Amble for Monitoring Applications
Pre-Amble for Monitoring Applications
 
Office Moving Checklist
Office Moving ChecklistOffice Moving Checklist
Office Moving Checklist
 
The 4 Things You Need To Know Before Migrating Your Business To The Cloud
The 4 Things You Need To Know Before Migrating Your Business To The CloudThe 4 Things You Need To Know Before Migrating Your Business To The Cloud
The 4 Things You Need To Know Before Migrating Your Business To The Cloud
 
Scada security webinar 2012
Scada security webinar 2012Scada security webinar 2012
Scada security webinar 2012
 
SRS and PMP of Smart Bio- Waste Management System
SRS and PMP of Smart Bio- Waste Management SystemSRS and PMP of Smart Bio- Waste Management System
SRS and PMP of Smart Bio- Waste Management System
 
GRANT DELP724
GRANT DELP724GRANT DELP724
GRANT DELP724
 
Network security, change control, outsourcing
Network security, change control, outsourcingNetwork security, change control, outsourcing
Network security, change control, outsourcing
 
Network Security, Change Control, Outsourcing
Network Security, Change Control, OutsourcingNetwork Security, Change Control, Outsourcing
Network Security, Change Control, Outsourcing
 
Cp7101 design and management of computer networks-requirements analysis
Cp7101 design and management of computer networks-requirements analysisCp7101 design and management of computer networks-requirements analysis
Cp7101 design and management of computer networks-requirements analysis
 
Whitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest MindsWhitepaper: Datacenter Migration - Happiest Minds
Whitepaper: Datacenter Migration - Happiest Minds
 
Digital Mining Solutions Simplified With VTPL
Digital Mining Solutions Simplified With VTPLDigital Mining Solutions Simplified With VTPL
Digital Mining Solutions Simplified With VTPL
 
Cloud Migration
Cloud MigrationCloud Migration
Cloud Migration
 
Cloud migration
Cloud migrationCloud migration
Cloud migration
 
Ardian CV
Ardian CVArdian CV
Ardian CV
 
Data center maintenance
Data center maintenanceData center maintenance
Data center maintenance
 
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 MigrationFour Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
 
basis cloudcomputing
basis cloudcomputingbasis cloudcomputing
basis cloudcomputing
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project Manger
 
Network developer company report
Network developer company reportNetwork developer company report
Network developer company report
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 

Recently uploaded

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 

Recently uploaded (20)

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 

How To Move Offices Without The Pain - Guide

  • 1. 1 When moving offices, one of the most important tasks a company must undertake is to ensure that its IT assets (including computers and software, servers, peripheral devices, printers, copiers, telecommunications equipment) transition smoothly to its new location. Doing so involves a wide variety of considerations; from detailed planning of the move itself, to preparing the new premises, and arranging the logistics and personnel necessary to make the move. This guide provides a detailed account of the IT moving process from start to finish, with the goal of making such a move as painless as possible for your organisation. It offers a thorough look at all aspects of a move, from planning to inventory, logistics, safety, facilities, infrastructure, testing, business continuity, security, communications and personnel. The information contained in this guide is provided to help you conceptualise and implement your IT-related moving plans. Planning and Scheduling A properly designed moving plan can save you time and money, and should be considered a worthwhile investment, rather than just as a cost to be incurred. Your planning should cover the moving process as a whole; from inventory management to moving equipment, providing security, and not least of all, ensuring business continuity during the move. Scheduling should encompass the comprehensive plan for the move, including pre-move preparation, expected pickup and delivery times for the equipment, as well as the details of the move itself. Factors to consider during the planning process include: • The plan should encompass potential delays and other setbacks. • The new building should be fully prepared prior to the move. This includes infrastructure as well as things like server racks and cabinets. • Coordinate with all suppliers well ahead of the move. Make sure all suppliers and service providers have access to a written copy of the moving plan. HOW TO MOVE OFFICES WITHOUT THE PAIN
  • 2. 2 • Schedule enough time to perform a backup of all data before the move begins. • Set up a freeze point after which no further changes to the IT infrastructure will be made until the move is complete. • Target minimum operating capacity for IT on the first day after the move and for a three-month working period thereafter to help prioritising the re-engagement of systems once the move has been completed. Take Inventory To avoid losing or misplacing equipment in the process of a move, conducting an inventory check prior to the move is essential. The following are some considerations to keep in mind when dealing with inventory. • Look for any disparity between inventory tracking software such as a configuration management database (CMDB) and the equipment actually on the premises. • Determine whether the electrical connections at the old and new facilities are the same; if not, verify whether special adapters are required to allow equipment to function at the new location. • Plan for IP changes: a move to a new facility involves new IP addresses, which in some cases must be accounted for in various Internet enabled equipment for the equipment to function properly. • Plan for inventory movement according to proper server sequencing. Chained servers may require a linked server to be started up first; this should be accounted for in inventory planning. • Accurately label all wiring in order to correctly replicate equipment connections at the new premises. • Ensure that the equipment supply chain can be replicated when moving a data centre. Such centres are highly sensitive to their infrastructure architecture. For best results, make note of the setup so that it can be reassembled exactly the same way at the new location. Server Racks: • Verify that the server racks to be used at the new facility can hold any servers being moved. Servers should be placed in racks where there is some extra space to allow for the release of heat. • Determine whether equipment will be communicating with other systems at greater distances after the move. If so, certain connectors may need to be replaced or extended to facilitate operation at the new facility.
  • 3. 3 Logistics Coordinate all aspects of the move with service providers and others involved in the move to ensure that effort is not being duplicated and moving equipment is not being double-booked. If people will be working in the building while the move takes place look into making arrangements for them to work away from the moving area for the day if possible. • Equipment being moved should be tagged both for identification purposes and to indicate the applicable workstations where it will be placed at the new location. • Check the anticipated movement route of the equipment to prevent any potential damage to the equipment. Conduct a walk-through of both the old and new buildings with the company performing the move to define routes and determine the most fitting moving equipment to use. • Server cabinets, especially when fully equipped, may not be able to be tilted when moved. In these cases, arrangements must be made with the movers to move the cabinets in one go or the servers will have to be unequipped to perform the move. • Make sure the movers prepare for potentially inclement weather by having plastic covers available to cover equipment. • Make sure to communicate all information about the size and weight of the equipment gained from the inventory process. • The order to be followed during the move should be carefully considered for maximum efficiency. When loading, first load the equipment and then furniture. When unloading, follow the opposite process, first unloading and installing furniture and then unloading the IT equipment. Safety A variety of steps should be taken to ensure the safety of all personnel involved in a move as well as those passing by, including: • Arrange for an individual qualified to administer first aid to be present during the move in case of an accident or emergency. • Use a certified electrician to disconnect servers when necessary for safety and warranty compliance purposes. • When moving servers, verify that any floors the equipment passes over are capable of handling heavy loads. • Make sure any of your employees involved in moving heavy equipment wear appropriate safety equipment including hard hats when appropriate. • Check all doors to server or equipment rooms to ensure that they open quickly and easily in case of emergency. Doors should open in the direction of any escape route so they don’t serve as an impediment to escaping.
  • 4. 4 Facilities Make sure all necessary equipment is available at the facilities involved in the move and make sure details of the move are accessible to everyone involved. • Both digital and printed copies of the moving plan should be made available to all parties involved in the move. • Encourage all mobile device users to check that their devices are fully charged and to carry chargers with them in case their devices run out of power during the course of the move. • Establish a project room at the new location where those involved in the moving process can go if they need further information or to consult with someone regarding organisational aspects of the move. The room should have an internet connection and a whiteboard with pens. • Ensure that the moving team has access to all necessary equipment including screwdrivers, nuts and bolts, as well as spare parts such as cables in case any existing parts need replacement in the course of the move. Infrastructure Plan for the location and the specific type of all IT infrastructure with your suppliers prior to any move. Tips for handling infrastructure issues include: • Take into account any difference in location distance from your service provider’s network location after the move. If the difference is greater, it may affect network performance. • Acquire a current wiring plan for both the old and new locations if possible: when cabling workstations, try to provide excess cable space in terms of length to make it easier to add or extend cables when necessary. • Plan well in advance for the movement of connections such as VPNs, ADSL, WiFi and the like so that they will be ready at your new location as soon as the move is complete. If your connection is wired, make sure that the relevant telecommunications personnel have access to your new offices before the move so that any necessary wiring can be done in advance. If you are using wireless communication devices, make sure that any necessary routers or wireless access points are ready to function upon arrival at your new offices. • Verify that any wiring present at the new location is compatible with the equipment being moved. • When moving servers, make sure that they are mounted to the new racks with the proper fasteners. Use of improper fasteners may necessitate a server being cut from a rack if it needs to be moved.
  • 5. 5 • Plan the power distribution of each server rack so that particular groups of servers are connected to particular power sources in order to properly plot the distribution of power. • When moving a network, ensure that proper VLANs are in place for any VOIP applications. Failure to do so may make it impossible for VLANs to access the appropriate applications. • Verify that adequate cooling and power capacity exists for all IT equipment at the new location. Testing Testing is essential to determine if your equipment has been moved successfully without suffering damage or impairment. The following measures can help you perform effective testing of your IT equipment: • Perform a benchmark level test before the move, preferably after you have frozen development of your systems prior to the move. Then, once the equipment has been moved and re- established, you can test it against the benchmark set by the pre-move test. • Make sure to have wiring certified and coordinate all test protocols with your IT suppliers and maintenance contractors. • In addition to performance testing, use the pre-move testing period to look for faulty equipment such as bad hard drives or other defective equipment. • Check network configurations at the new location to ensure they are functional. Business Continuity A primary goal of any move is to restore business operations as quickly as possible. If something occurs to interrupt this process, it is essential to have a backup plan to ensure business continuity. The following measures can be used to help your company maintain continuous operations: • The moving plan should delineate who has the responsibility to make decisions related to business continuity during the course of the plan. This can include delaying or calling off the move if necessary, as well as switching to a backup plan in the event of an accident or emergency. • If a move is interrupted or some sort of accident or emergency occurs, it may be necessary to return to the old location for a time. Design your moving plan with a go/no go condition, so that the move can be cancelled or postponed for a time if need be. • Communicate all particulars of the layout and infrastructure design at the new location to the new moving team to ensure they can properly connect your IT equipment once it has been moved.
  • 6. 6 • Transport insurance covering the equipment and furniture being moved should be purchased. • Confirm the details of any maintenance contract moving clauses relating to your equipment. In some cases providers of the equipment require that disconnection and connection and even moving, be performed by certified technicians. • Transport backup equipment separately from primary equipment to ensure that an accident doesn’t disable both sets of devices. • Look into renting a replacement data centre in case of emergency. Such centres can be used temporarily in case a move meets with setbacks or to provide necessary functionality for a day or two during the course of a move. • Include representatives from equipment suppliers in your moving plans so that they can be available on the day of the move in case replacement parts are needed. • Technicians and other equipment experts should be on scene the day after the move to make sure all equipment is running properly and to deal with any unforeseen circumstances. Security When moving valuable IT equipment, paying attention to security issues is necessary to ensure the move goes smoothly and to prevent the loss of valuable equipment. The following tips can help accomplish this: • Consult with those responsible for security at both the old and new locations prior to the move. If not properly monitored during a move, valuable IT equipment is subject to going missing. • Register all those involved in the move with the appropriate security staff prior to the move. You should also arrange for access to the rooms necessary to facilitate the move at the new location. • Server equipment such as cabinets are typically locked, and may be connected to other equipment or furniture via locked cables as well. Make sure the movers have the necessary keys to unlock such equipment or that personnel are on hand to do so. • Servers and network equipment monitoring devices should be disabled for the move, and then re-engaged as soon as possible at the new location. • Provide the moving team with passwords necessary to test that equipment has been restarted properly, or have personnel available to perform such tests. Communication To ensure a move proceeds as smoothly as possible, efficient communication is essential. The following steps can help with communication before and during the move: • Compile a list of all personnel involved in the move that also details their responsibilities during the move.
  • 7. 7 • The above list can be combined with a communication map plan describing what needs to be communicated to whom and when the communication should occur. Preparing such a plan in advance helps to avoid miscommunication related to the stress that can occur while a move is in progress. • Appoint a communication contact from each department involved in the move to ensure that messages are communicated accurately and to minimise confusion. • Inform suppliers of equipment that sends automatic messages when disconnected about the move so that they are aware of the reason for such messages in advance. Personnel Selecting the proper personnel to perform a move is an important step in ensuring the process goes as smoothly as possible. Taking the following steps can help accomplish this: • Determine who amongst your employees will have roles to perform during the move. Assign their roles to other employees so they will be able to devote their full energy to their move- related tasks. • Professional movers should be hired to perform the bulk of the move. This will help the move proceed smoothly, and reduce the potential liability generated by having your employees, who are not trained to perform such activities, carrying out duties that they are not accustomed to. • Check with your IT equipment suppliers to help find movers with the ability to move such equipment. Not all moving companies are capable of moving equipment of this type. • When building server racks, the process moves bottom to top, not top to bottom. Following this procedure, helps prevent injuries to the personnel involved. • Arrange for food and refreshments to be available to personnel during the course of the move. If the move will extend beyond a single day, look into arranging lodging for employees who have come from distant locations to help with the move. • In the case of mission critical equipment and highly complex systems, having personnel from the suppliers present when possible is recommended to help the move proceed as smoothly as possible. • A crisis team should be appointed to oversee the move as a whole and react to any issues. They can operate from a centralized location and direct personnel to respond as and where needed to any emergency or unforeseen event. • When building server racks, the process moves bottom to top, not top to bottom. Following this procedure, helps prevent injuries to the personnel involved. • Arrange for food and refreshments to be available to personnel during the course of the move. If the move will extend beyond a single day, look into arranging lodging for employees who have come from distant locations to help with the move.
  • 8. Contact your Bright representive today for more information: 333 Latimer Rd, London W10 6RA | 020 3031 9500 | sales@bright.co • In the case of mission critical equipment and highly complex systems, having personnel from the suppliers present when possible is recommended to help the move proceed as smoothly as possible. • A crisis team should be appointed to oversee the move as a whole and react to any issues. They can operate from a centralized location and direct personnel to respond as and where needed to any emergency or unforeseen event.