INSTALLATION MANUAL
for Lay-in Modular Ceiling
2
• Ceiling panels must be kept clean, dry, and protected from the elements. Remove the panels from the cartons 24 hours
before installation to acclimatize to interior conditions.
• The installation site must be free from debris and dust.
• Irrespective of varying temperature and humidity recommendations which vary from product to product, all products must
be stored in a interior space and not exterior space.
Metal & Soft fibre
Mineral Fibre

Armstrong recommends that RH 99, 90 & 80 products are to be opened and left to acclimatize for 24 hours before fixing.
This makes the tiles dry and hard.
Opening a mineral fibre tile carton
Opening a grid carton
Step 3: Remove the tile
Step 4: Ready to remove
Step 2: Remove the polythene
film
Step 3: Open from one side
Wrong box opening method
Step 1:Identify dotted line
Step 1: Cut the polythene film
Step 2: Cut along dotted line





Storage and Handling
F R A G I L E
U P
Index
Section I: Standard Modular Ceiling Installation and Maintenance
9 Step Ceiling Installation Procedure.............................................................4
MetalWorks Tiles Cutting Procedure............................................................17
Section II: Components, Safety and Tools
Ceiling Components..................................................................................18
Safety & Precautions..................................................................................19
Tools..........................................................................................................21
Section III: Appendix
Maintenance..............................................................................................22
Check list for Lay-in Ceiling Installation........................................................23
Glossary....................................................................................................39
Note: The installation procedure for MetalWorks lay-in ceiling systems is similar to that for Mineral fibre ceiling
systems, except for the procedure required to cut MetalWorks tiles, which is given on page 17.
3
9 Step Ceiling Installation Procedure
Important Note: Please read Section II: Components, Safety and Tools before commencement of ceiling installation.
Sketch showing basic ceiling layout and placing of the components
1. Main Runner
2. 1200mm Cross Tee
3. 600mm Cross Tee
4. Suspension System
5. Wall Angle
6. Tile
5
1200 mm
3
≤ 450 mm
3. Installing perimeter trims (Wall angle)
1 B
B
A
800
600 1000 A
1. Planning grid layout
Min 100 mm
2
M
2. Mark perimeter trim lines
4
1200 mm
1200 mm
Max
600 mm
4. Mark hanger positions 5. Installation of hangers
7
7. Cross Tees installation
8
8. Installation of field and service tiles
9
A/B
A/B
9. Measure and cut
border tiles
6. Installation of Main Runners
6
1
2
3
4
6
5
min 300mm
max 600mm
1200mm
600mm
600mm
600mm
600mm
600mm
600mm
min 600mm
4
5
Step 1: Planning Grid Layout
450mm 1200mm
360mm
600mm
450mm
360mm
2700mm
4320mm
MODULAR
LIGHT
FIXTURE
600mm
1200mm Cross Tee
600mm Cross Tee
Main Runner
Suspension System
(Hanger Wire)
Service Tiles
Border Tiles
Walls
Field Tiles
2985mm
1335mm
Main
Runner
Connection
Diagram 1.1
Diagram 1.0
A) Wall to wall (with field and border tiles)
This is one of the most important step before commencement of actual ceiling installation. Here grid layout is arrived by
taking into consideration room dimensions {length(l) x breadth(b) x height(h)}
Points to remember: In practical conditions, often the room dimensions are not exactly square in dimensions.
Thumb  rule: Armstrong recommends to have border cut tiles greater than half the size of the ceiling tiles on all
four sides of the wall.
Refer layout for diagram 1.1
Ceiling Module: 600mm x 600mm
Room dimensions: 4320mm x 2700mm (l x b)
Tiles calculation l: 4320mm
= 7 full tiles + 2 x 60mm cut tiles (incorrect calculation)
= 6 full tiles + 2 x 360mm cut tiles (correct calculation)
Note: Please follow the above method for breadth border cut tile calculation.
4320mm
2700mm
600mm
600mm
250mm
600mm
250mm
120mm
2985mm
1335mm
Main
Runner
Connection

Wrong Method Correct Method

KEY POINT
TO NOTE
Border tiles should
be more than
≥ 300mm
B) With Plaster bulk heads (full tiles module)
Plaster bulk heads are used to design spaces to enclose full border tiles and enclose vertical grilles for HVAC.
Below mention is a simple thumb  rule to calculate ceiling installation with full border tiles.
Assuming, we are developing a module of 3600mm X 3600 mm i.e 6 tiles X 6 tiles within the plaster bulk head.
• Most often one would take an internal measurement, between the bulkheads of 3600mm X 3600mm. But this
is an incorrect method and while doing final installation, you may end up cutting the border tiles on all the four sides.
• Thumb  rule: Add two sides wall angle width and deduct the width of the main tee to get the extra length.
• Assume we use 19mm wall angle and 24mm grid facing, then the overall length should be 3614mm to achieve the full tile
visual.
Thumb  rule calculation
Wall Angle Steel Angle Face Width
Description Size (mm) 15mm 24mm
Wall Molding 19x19x3000mm Add 23mm Add 14mm
Shadow Molding 19x7x7x14x3600mm Add 13mm Add 04mm
Wall Molding 32x24x3000mm Add 33mm Add 24mm
Aluminium Wall
Molding
19x25x3000mm Add 35mm Add 26mm
Stainless Steel Wall
Molding
19x32mm Add 49mm Add 40mm
Wall Molding 22x22x3000mm Add 29mm Add 20mm
Note: The addition to the original length or breadth will avoid the need for border tiles.
Step 1: Planning Grid Layout
n = Number of panel
F = Full tile size
T = T-grid face width
A = Distace between angle moulding face and bulkhead
D = Distance between bulkhead
D = nF + (2A-T)
Bulkhead
(A-T/2)
A T
F
D
6
KEY POINT
TO NOTE
Arriving at
bulkhead dimensions
critical for full tiles
module
Diagram 1.2
7
Step 2: Mark Perimeter Trim Lines
• Measuring the ceiling height is the most crucial stage before commencing installation.
• The minimum plenum height from the ceiling slab should not be less than 100mm for lay-in system.
• The reference ceiling level should be established by the main contractor with the help of all other services vendors
like light fixtures, Air condition grilles, sprinklers, speakers etc.
• Using a plumb mark as a reference point, place line laser leveller on it. Then with the help of laser point, mark wall angle
level on all sides of the room.
KEY POINT
TO NOTE
Line laser leveller
saves time and
ensures precision
• The marking with the help of line laser leveller has to be done above the wall angle level on all the walls.
• Post marking used hand drill to installed the wall angle.
• The first and the last fasteners on wall angle should be installed at 150mm from the wall (see for details recommended
fastener on page no.19).
• Subsequent fasteners to be installed at 450mm spacing in between.
• At the corners of the room, the conjunction area of wall angle should be miter cut for a clean finish
450mm
150mm
 
 
Step 3: Installing Perimeter Trims (Wall Angle)
Y
X
a
b
1200
600
600
Bottom view Bottom view
Top view Top view
8
KEY POINT
TO NOTE
Secure to wall at
450mm maximum
centres




9
• The hanger on the main runner shoud be placed at or within 600mm distance from the wall angle
(450mm is recommended in case of heavier ceilings) and then subsequently at 1200mm centres.
• There should also be a hanger within 150mm of any main runner to runner connection.
Step 4: Mark Hanger Positions
450mm 1200mm
360mm
2985mm
1335mm
Main
Runner
Connection
600mm
450mm
360mm
2700mm
4320mm
600mm
Main tee connection
Main Runner
Suspension System
(Hanger Wire)
Walls
x
x
x
x
450mm 1200mm
360mm
600mm
450mm
360mm
2700mm
4320mm
MODULAR
LIGHT
FIXTURE
600mm
1200mm Cross Tee
600mm Cross Tee
Main Runner
Suspension System
(Hanger Wire)
Service Tiles
Border Tiles
Walls
Field Tiles
2985mm
1335mm
Main
Runner
Connection
Diagram 1.1
Diagram 1.0
KEY POINT
TO NOTE
KEY POINT
TO NOTE
Hanger position must
be within 150mm
distance of every
main runner
connection
Hanger position
must be within
600mm distance
from the wall
• Use a rotary hammer machine to drill and install the hangers from the concrete ceiling slab.
• If the hanger wire plumb more than 1.8 meter then use counter splaying wire refer above diagram.
• In counter splaying, two hanger wires from the structural slab form an angle of 450
near the main runners. One
suspension countering another in the same plane.
• Install the hanger wire as per the position in the diagram 1.1.
• Suspension hanger wire shall be pre-straightened with minimum 2.5mm dia (# 12 Gauge).
• Insert wire of required length into hanger wire hole and encircle the wire 3 times within 75mm.
Installation under AC duct
• If AC duct is greater than 1200mm in length, then ensure you suspend a separate bracket under the duct and from it, a
hanger-wire can be suspended for ceiling installation.
300mm
450 450
300mm
1.80mtr.
WIRES PLUMB:
MAX. SLOPE 1 IN 1.8MTR IN ANY PLANE
IF MORE, USE COUNTER SPLAYING WIRES
Step 5: Installation of Hangers
90
1200mm
100
1400mm
KEY POINT
TO NOTE
KEY POINT
TO NOTE
Use counter
splaying wires if
hanger length is
≥1.8mtr.
Ensure suspension
free from services
10
Diagram 1.3
Diagram 1.4
• Run a string line the length of your first main runner offset to the edge flange. This will help to keep the main runner set
distance of the wall.
• Cut the main runner to the length with respect to the border tile, so that the rout hole on the adjacent main runner
matches.
• E.g. As per diagram 1.5, the main runner will be cut at 15 mm using an aviation snip cutter to ensure that the rout hole
will be at a distance of 360 mm.
11
Step 6: Installation of Main Runners
• Cut the main runner at inclination of 30-45 degree to avoid obstruction of protruding screws.
Armstrong provides following grids.
Grids Rout Hole
Interval (mm)
Distance of 1st
Rout Hole from
the End Clip
(mm)
Prelude 32 150mm 75mm
Prelude 38 150mm 75mm
Prelude 43 100mm 50mm
Suprafine 32 150mm 75mm
Suprafine 38 150mm 75mm
Suprafine 43 100mm 50mm
Silhouette 38 600mm 300mm
Silhouette 45 600mm 300mm
Select 38 600mm 300mm
Select 45 600mm 300mm
KEY POINT
TO NOTE
Use only aviation
snip for precise
cutting of main
runners
String Line
Cross tee
Main runner
Diagram 1.5
• The first main runner should be less than 600mm from the perimeter wall.
• The distance between next main runner shall be at 1200 mm maximum.
• You may incline the first suspension system slightly to push the main runner in one direction so that the rout holes
are better aligned.
• Hangers with hook clip options can be inserted in alternate direction on the main runner for better stability.
• Border cross tees should be more than 300mm but less than 600mm in length.
• Cut the excess portion or bend the wire as shown in the picture.
• Insert an additional row of main runner or alternatively suspend all
border cross tees longer than 600mm.
12
KEY POINT
TO NOTE
Main runner
and border cross
tee should not be
more than 600mm
distance from
the wall
• As per diagram 1.1 (page 5) install border cross tee 448mm (2mm allowance is kept for cross tee to rest on the
wall angle easily).
• Install border cross tees temporarily to the wall molding using a clamp to keep them intact.
• Install two 1200 cross tees between the two main runners at an distance of 600mm.
• A click sound confirms that the cross tee has been properly locked into the main runner.
• Measurements should be taken diagonally in the 600 x 1200mm module. Both the diagonals must be of the same length.
• In case of any deviation in the measurement of the diagonals gently tap at the corners.
• This will ensure that the entire ceiling grids will be in a perfect shape.
• Once the system is in perfect shape run another string line at the first cross tee slot on the main runner to the far adjacent
wall angle using the first two square mains as the guide. This ensure the tee rout holes on all the main runners stay in
aligned.
13
Step 7: Cross Tees Installation
Y
X
a
b
1200
600
600
MAIN
RUNNER
(a-b) shold be less than
1mm for 600x600mm tiles
and less than 2mm for
600x1200mm tiles.
KEY POINT
TO NOTE
Click sound
confirms cross
tee locked
Clamp
Diagram 1.6
String Line
Main runner
Cross tee
• Check the level once again using line laser leveller.
• Ensure that all the services placed on service tiles are tested and confirmed by the principal contractor. Only after that,
laying of field tiles can be commenced.
• Use fresh / clean Gloves while installing the ceiling tiles.
• Ensure that there are no dust and stain marks on the gloves.
• While installing down lighters, spotlights, sprinklers, speakers, smoke detectors etc. 6mm plywood (pattress backing
must be placed on the grid).
• It is mandatory to independently suspend modular light fixtures.
• GI wire 2.5 mm is recommended to suspend the light fixtures.
• Hook Clips and Chains are not recommended.
Step 8: Installation of Field and Service Tiles
 
KEY POINT
TO NOTE
Patress a must for
installing services
to avoid direct
loading on
ceiling system
14
Patress backing
• Measure the border tile size.
• Mark the border size on back side of the tile.
• Use a grid or a steel ruler (2 ft long) to mark and cut the border tiles.
• While installing, slightly tilt the tile and gently rest it on the main runner and adjacent cross tee and wall angle.
How to make tegular and curved shape edges on border tile
A) Tegular edge
• Use a sharp knife.
• Lay the tile on a smooth surface.
• Make vertical cut into face of the tile.
• Make horizontal cut to form tegular edge.
15
KEY POINT
TO NOTE
Chalk the cut
edges of
border tiles
Step 9: Measure and Cut Border Tiles
Installing end cap in tegular edge installation
• End cap ensures that a tegular look is achieved at the border.
• Lift the steel angle and insert the end cap between the tee and the wall angle.
• End cap ensures aligned level difference at the perimeter.
B) Curved shape (square edge)
• Use a sharp knife.
• Lay the tile on a smooth surface.
• Use a cardboard or plywood template.
• Mark outline of the template.
• Use a sharp knife to cut through.
16
17
• Measure and mark the line on the metal tile using a pencil.
• The bent edge of tile should be cut using aviation snip.
• Use a shear machine to cut the face of the metal tile.
• Use an end profile for MetalWorks lay-in cut tiles.
• Slide the edge cap in to the cut tile. Install the tile into the ceiling grid.
Metalworks Tiles Cutting Procedure
KEY POINT
TO NOTE
KEY POINT
TO NOTE
Cut the metal tile
edge using aviation
snip and only then
use shear machine
Use edge cap for
cut tiles
Wall angle and Shadow molding: Available in 3.6mtr. and 3mtr. lengths respectively
Main Runner: Available in 3.6mtr. and 3mtr. length respectively.
Cross Tees: Available in 1200mm and 600mm respectively.
Mineral fibre Lay-in tiles: Sizes available in 600x1200mm, 600x600mm and 300x1200mm.
Ceiling Components
Section Applicable Tile Edge Details
'L' Angle
1) Board (site cut or full tile) for wet-felt or soft
2) 
Tegular or Bevelled Tegular (site cut square) for wet-felt, soft or wood with cross
tee supported by perimeter fill-in block
3) 
Tegular or Bevelled Tegular (site recut to recess edge) for wet-felt or soft with cross
tee supported by perimeter trim
4) 
Bevelled Tegular (site cut square) on Silhouette steel angle with cross tee
supported by perimeter trim
'L' Angle
1) 
Board (site cut or full tile) for Ceramaguard used in 100% RH areas and other
applications using corrosion resistant steel angle
2) Metal clip-in tiles
Shadowline
1) 
Bevelled Tegular (site cut square) on Silhouette steel angle with cross tee
supported by perimeter trim
2) 
Vector (site cut square) for Ultima wet-felt or Optra soft tiles with
cross tee supported by perimeter upper ledge
19
32
19
7
7
14
*All above measurements in mm.
Tile Edge Compatibility Grids/Edge Flange
24mm face
24mm face
15mm face
15mm face (Silhoutte)
Board/Square edge
Angle Tegular
Bevelled Tegular
Silhouette Bevelled Tegular
4.7mm
9.5mm
9.5mm
18
Accessories: (refer accessories manual for more details)
			
			Hook clip: This is a height adjustment clip to align the ceiling system and ensure it’s rigidity.
			
			Hanger wire: 2.5mm pre-straightened wire to hang the suspended ceiling from the ceiling slab.
			
			Anchor fastener: It is anchored into the ceiling soffit and used to suspend the GI wire.
			Recommended fasteners:
				 • 1½ “ screws/nails on wood
				 • Screws on metal surface.
				 • Expanded fasteners on concrete and brick wall surfaces.
				 • Fence staples for dry wall partitions.
Ladder safety:
Ladders are recommended for ceiling heights from the flooring up to 3 meters, provided the flooring surface is level, with a
plain finish.
Ladders are not recommend for ceiling heights exceeding 3 meters, a Platform with 4-sided pillars is recommended.
Armstrong recommends that installers wear a tool belt for easy access to tools during installation.
It is unsafe to keep tools on the ceiling tiles.
Safety  precautions
19
Ceiling Components
Wrong standing position Platform
Wheels
Locked
Right standing position
 

Item Description
Hard Hat Prevents injury to the head from small falling
objects at construction site.
Rubberized Gloves
(CL3)
Prevents injury to the hand from flared edges.
Jacket Provides better visibility at low visibility
construction site.
Glasses Prevents small particles while cuting from entering
into the eyes and causing injury.
Steel Toes Prevents toe injury due to sharp or obstructive
objects laying on the floor.
Personal protective equipment (PPE):
Armstrong World Industries advocates a strong safety policy and thus all installers MUST wear PPE consisting of hard hat,
rubberized gloves, jacket, steel toes and glasses during installation of the ceiling system.
Safety  Precautions
20
Distance meter:
Hand drill /driver:
Aviation snip:
Pop Rivet:
21
Tools
Measuring Tape:
Chalk line:
Wire snip:
Knife:
Line laser leveler:
Rotary hammer machine:
Clamp:
Slitting shear machine:
Maintenance
Standard Maintenance
Armstrong Ceiling Systems require no more maintenance than painted drywall ceilings. However, when maintenance is
necessary, certain procedures should be followed to insure continued high performance and attractive appearance.
Dust and loose dirt may easily be removed by brushing or with a vacuum cleaner. Vacuum cleaner attachments such
as those designed for cleaning upholstery or walls do the best job. Be certain to clean in one direction only. This will
prevent rubbing dust into the surface of the ceiling. After loose dust has been removed, pencil marks, smudges, or clinging
dirt may easily be erased with an ordinary art gum eraser.
Armstrong metal ceilings may be cleaned with a moist cloth or a sponge dampened in water containing mild soap.
The sponge should contain as little water as possible. After washing, the soapy film should be wiped off with a cloth or
sponge slightly dampened in clean water.
22
Project Name :
Location:
Area : m2
Checklist For Lay-in Ceiling Installation
Phase			 q			 Activity 			
i. Preparation Phase		
Storage			 q Store materials at site in a covered space isolated from ground free of undulations,
					debris, humidity and precipitation.					
				 q Material should be free of damages (Inspect material to assess damages, if any).
		
Drawings			 q Reflected ceiling plan (RCP) and sectional drawings received from Architect and duly verified for suitability of
installation at site and services like lights, AC diffusers correctly marked in the drawings.
Site preparation		 q All relevant work that preceeds ceiling installation have been completed (e.g. the drywall perimeter, AC ducts,
					 cable trays, under-deck insulation) before commencing ceiling installation.					
				
Ceiling height q Has been approved by the concerned authority.					
Installation phase		 q All work completed as per co-ordinated drawing.
ii. Suspension accessories		
Anchor Fasteners Precondition:
				 q Marked location on structural soffit on the basis of the ceiling plans issued by the Architect.
			 q Suspension wires located and fixed at 1200mm centre-to-centre max and not more than 600mm away from
					wall/perimeter.
				 q Suspension wires are not above services like HVAC ducts or any other obstruction/provided additional
					 suspension (trapeze installation method) locations to ensure verticality of hanger and adequate transfer of load.
							
					Material:
				 q Minimum M6 Grade Anchor Fasteners/appropriate quality used/procured.
				
					Installation:
				 q Appropriate hole size for inserting the anchor fasteners.
				 q Anchor fasteners fixed and secured properly to take the load of the ceiling hanger wire.
				
					Precondition:
				 q Anchor fasteners fixed properly at appropriate locations.
				 q Location of suspension wires such that they can be hanged vertically without obstructions.		
					
					Material:
				 q Minimum 12 gauge hanger wires (i.e. 2-2.6mm diawires) used/procured.
				 q Hanger wires procured/used are pre-straightened- no local kinks or bends (Ideally, machine-straightened wires
					recommended).					
				 q Appropriate gauge of wire used to suite quick hangers/ hook or butterfly clips.
					
					Installation:
				 q Hanger wires cut to appropriate size (ceiling drop +150mm to 200mm allowance for tying on either ends).
			 q Top and bottom ends secured to the anchor fastener and grid/quick hanger respectively with minimum three tight
twists within 75mm of the ends.
				 q Wire adjusted appropriately to ensure that the grid is in perfect level (verified using laser leveller).
			 q Hanger wires should be perpendicular after grids are suspended (a maximum 5 degree variation allowed).
			 q Distance of hanger wires from the base of slab should not be greater than 1.8mtr.
				 q If hanger wire distance from the base of slab is more than 1.8mtr., counter splaying wires installed.
						
Quick hangers (optional)		 Precondition:
				 q 2.5mm of hanger wire is used to suit the quick hanger/hook clip.
				 q Hanger wires are maintained absolutely straight to ensure line and level.
					
					Material:
				 q Tensile strength of quick hangers (or hook clip of Armstrong) offers adequate resistance against
					 movement of the hanger wire (pull test).				

Installation:
				 q Hanger wires secured to the quick hanger (or hook clips) with the other hanger wire (or the hook clip end) 		
				 inserted into the rout hole of grid and secured.
				 q Level of the grid to be adjusted by pressing the ends of the clip/hanger and released to secure the hanger wire
					 once the level has been appropriately adjusted.
iii. Grid 			Precondition:
				 q All relevant works like service ducts, cable trays, plastering and painting of walls, drywall perimeter trims,
					 hanger wires have been completed.		
				 q The site conditions, humidity, temperature etc., are as within control and very close to actual usage.		
			
					Material:
			 q All services like lights, A/C, fire alarms etc. are suspended directly from structural soffit.
			 q Suitable to tile edge (e.g. board, tegular, bevelled tegular, SL2, K2C2) and colour has been procured.
					
					Installation:
				 q Wall angles installed first by securing to the wall or plaster trim at every 450mm max centre to centre
(Incase of floating ceilings, the perimeter trims-Axioms should be installed after grid components).
				 q Main runners suspended preferably along the longer side of room/ceiling at every 1200 mm centre to centre.
			 q Main runners are not spaced more than 600mm from the perimeter.
				 q Hanger wire suspensions to main runners do not exceed 1200mm centre to centre.  
				 q 1200mm cross tees placed across by spanning the main runners and be placed at every 600mm intervals.
			 q 600 mm cross tees are fixed by spanning 1200mm cross tees with the slots provided in the 1200mm cross tees.
			 q All the cross tees connected with each other from the right side (for proper alignment).
			 q Double locking in cross tees ensured.						
iv. Tile				Precondition:
				 q The grid is in absolute line, level  squareness and as per the RCP.
				 q The tiles are acclimatized to the actual site conditions 24 hours before commencing installation.
			 q All service fixtures like 600x600 light fittings, AC diffusers and other service items are rested on the grid
					and independently suspended.				
				 q 2mm gap given between corner tile and wall angle for ease of removal during maintenance.			
			 q Protective cover removed on the metal tiles before placing the tile.
					
					Material: 		
				 q Tile edges are suitable to grid (e.g. Prelude 24mm, Suprafine  Silhouette 15mm).
			 q Extra tiles (attic stock) are procured in case of damage of tiles during installation or after handover.
				
					Installation:
				 q Service tiles (e.g. tiles carrying services like Speakers, Fire Alarm system, spotlights installed) first.
			 q Border tiles installed subsequently. 							
				 q Field cut tegular edges incorporated at periimeters (depending on edge detail) or shadow molding used
(esp. in case of soft fibre tiles)/metal end cap used (in case of metal tiles with tegular edge).
			 q Field tile modules installed.
								
v. Commissioning Phase		
Pre-handover checks q Ceiling checked for line and level.
				 q Ceiling checked for squareness.
				 q Broken/damaged tiles checked and replaced with new tiles from attic stock.
				 q Tiles are cleaned and without stains.
				
Handover			 q Joint inspection and handover by client representative and the ceiling installer completed.
Remarks: 							
		
Date: / / Name  Signature
Glossary
1. Plenum: The space between the main structural slab and suspended ceiling is called the plenum.
2. Tegular: A functional edge detail that allows a suspended ceiling tile to extend below the grid, making the grid less
noticeable.
3. Rout hole: A hole on main runner to insert and lock the cross tees on the main tee.
4. Plumb mark: Measuring either from the floor or roof level and marking the ceiling height is known as plumb mark.
From the plumb mark point, the entire ceiling level will be marked.
5. Plaster bulk heads: Plaster bulkhead is otherwise called Plaster board boxing. Plaster bulkhead is designed to
accommodate HVAC grilles vertically.
6. Flange: The visible area of the grid from below the ceiling i.e. the horizontal surface on the face on the main runner
or cross tee.
Knauf Ceiling Solutions (India) Private Limited
Boomerang, A-304, Chandivali Farm Road (near Chandivali Studio) Andheri (E), Mumbai - 400 072.
Contact us: 1860 266 7080 | e-mail : Helpdeskindia@knaufarmstrong.com

More Related Content

Similar to Tukang pasang plafon gypsum 081381278719.pdf

11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
20130901_jumbogrid_WEB
20130901_jumbogrid_WEB20130901_jumbogrid_WEB
20130901_jumbogrid_WEBJanine Course
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideWestern-Building-Center
 
Structural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxStructural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxSTRUCTURALDYNAMICS
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 CablesThorne & Derrick International
 
Long Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed TileLong Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed TileElgin Butler
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexPriya Raj
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallZulaiha Amaria
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panelsMoldtech SL
 
Flinders park apc_pisabrochure
Flinders park apc_pisabrochureFlinders park apc_pisabrochure
Flinders park apc_pisabrochurekristenjames
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
Longboard Installation Instructions
Longboard Installation InstructionsLongboard Installation Instructions
Longboard Installation Instructionsjhaveruk
 
Nutek & Boston Retail (2)
Nutek & Boston Retail (2)Nutek & Boston Retail (2)
Nutek & Boston Retail (2)mondeodriver
 
Allan block Commercial brochure
Allan block Commercial brochureAllan block Commercial brochure
Allan block Commercial brochurekristenjames
 
Slabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingSlabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingMake Mannan
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guideibrahimnabil17
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 

Similar to Tukang pasang plafon gypsum 081381278719.pdf (20)

11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
20130901_jumbogrid_WEB
20130901_jumbogrid_WEB20130901_jumbogrid_WEB
20130901_jumbogrid_WEB
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
 
Structural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxStructural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptx
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
 
Long Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed TileLong Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed Tile
 
Guidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporexGuidelines for construction of masonry with siporex
Guidelines for construction of masonry with siporex
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panels
 
Flinders park apc_pisabrochure
Flinders park apc_pisabrochureFlinders park apc_pisabrochure
Flinders park apc_pisabrochure
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
Longboard Installation Instructions
Longboard Installation InstructionsLongboard Installation Instructions
Longboard Installation Instructions
 
Nutek & Boston Retail (2)
Nutek & Boston Retail (2)Nutek & Boston Retail (2)
Nutek & Boston Retail (2)
 
Allan block Commercial brochure
Allan block Commercial brochureAllan block Commercial brochure
Allan block Commercial brochure
 
Slabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingSlabs Beam Reinforcement Detailing
Slabs Beam Reinforcement Detailing
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guide
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Structure covering
Structure coveringStructure covering
Structure covering
 

Recently uploaded

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 

Recently uploaded (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 

Tukang pasang plafon gypsum 081381278719.pdf

  • 2. 2 • Ceiling panels must be kept clean, dry, and protected from the elements. Remove the panels from the cartons 24 hours before installation to acclimatize to interior conditions. • The installation site must be free from debris and dust. • Irrespective of varying temperature and humidity recommendations which vary from product to product, all products must be stored in a interior space and not exterior space. Metal & Soft fibre Mineral Fibre  Armstrong recommends that RH 99, 90 & 80 products are to be opened and left to acclimatize for 24 hours before fixing. This makes the tiles dry and hard. Opening a mineral fibre tile carton Opening a grid carton Step 3: Remove the tile Step 4: Ready to remove Step 2: Remove the polythene film Step 3: Open from one side Wrong box opening method Step 1:Identify dotted line Step 1: Cut the polythene film Step 2: Cut along dotted line      Storage and Handling F R A G I L E U P
  • 3. Index Section I: Standard Modular Ceiling Installation and Maintenance 9 Step Ceiling Installation Procedure.............................................................4 MetalWorks Tiles Cutting Procedure............................................................17 Section II: Components, Safety and Tools Ceiling Components..................................................................................18 Safety & Precautions..................................................................................19 Tools..........................................................................................................21 Section III: Appendix Maintenance..............................................................................................22 Check list for Lay-in Ceiling Installation........................................................23 Glossary....................................................................................................39 Note: The installation procedure for MetalWorks lay-in ceiling systems is similar to that for Mineral fibre ceiling systems, except for the procedure required to cut MetalWorks tiles, which is given on page 17. 3
  • 4. 9 Step Ceiling Installation Procedure Important Note: Please read Section II: Components, Safety and Tools before commencement of ceiling installation. Sketch showing basic ceiling layout and placing of the components 1. Main Runner 2. 1200mm Cross Tee 3. 600mm Cross Tee 4. Suspension System 5. Wall Angle 6. Tile 5 1200 mm 3 ≤ 450 mm 3. Installing perimeter trims (Wall angle) 1 B B A 800 600 1000 A 1. Planning grid layout Min 100 mm 2 M 2. Mark perimeter trim lines 4 1200 mm 1200 mm Max 600 mm 4. Mark hanger positions 5. Installation of hangers 7 7. Cross Tees installation 8 8. Installation of field and service tiles 9 A/B A/B 9. Measure and cut border tiles 6. Installation of Main Runners 6 1 2 3 4 6 5 min 300mm max 600mm 1200mm 600mm 600mm 600mm 600mm 600mm 600mm min 600mm 4
  • 5. 5 Step 1: Planning Grid Layout 450mm 1200mm 360mm 600mm 450mm 360mm 2700mm 4320mm MODULAR LIGHT FIXTURE 600mm 1200mm Cross Tee 600mm Cross Tee Main Runner Suspension System (Hanger Wire) Service Tiles Border Tiles Walls Field Tiles 2985mm 1335mm Main Runner Connection Diagram 1.1 Diagram 1.0 A) Wall to wall (with field and border tiles) This is one of the most important step before commencement of actual ceiling installation. Here grid layout is arrived by taking into consideration room dimensions {length(l) x breadth(b) x height(h)} Points to remember: In practical conditions, often the room dimensions are not exactly square in dimensions. Thumb  rule: Armstrong recommends to have border cut tiles greater than half the size of the ceiling tiles on all four sides of the wall. Refer layout for diagram 1.1 Ceiling Module: 600mm x 600mm Room dimensions: 4320mm x 2700mm (l x b) Tiles calculation l: 4320mm = 7 full tiles + 2 x 60mm cut tiles (incorrect calculation) = 6 full tiles + 2 x 360mm cut tiles (correct calculation) Note: Please follow the above method for breadth border cut tile calculation. 4320mm 2700mm 600mm 600mm 250mm 600mm 250mm 120mm 2985mm 1335mm Main Runner Connection  Wrong Method Correct Method  KEY POINT TO NOTE Border tiles should be more than ≥ 300mm
  • 6. B) With Plaster bulk heads (full tiles module) Plaster bulk heads are used to design spaces to enclose full border tiles and enclose vertical grilles for HVAC. Below mention is a simple thumb  rule to calculate ceiling installation with full border tiles. Assuming, we are developing a module of 3600mm X 3600 mm i.e 6 tiles X 6 tiles within the plaster bulk head. • Most often one would take an internal measurement, between the bulkheads of 3600mm X 3600mm. But this is an incorrect method and while doing final installation, you may end up cutting the border tiles on all the four sides. • Thumb  rule: Add two sides wall angle width and deduct the width of the main tee to get the extra length. • Assume we use 19mm wall angle and 24mm grid facing, then the overall length should be 3614mm to achieve the full tile visual. Thumb  rule calculation Wall Angle Steel Angle Face Width Description Size (mm) 15mm 24mm Wall Molding 19x19x3000mm Add 23mm Add 14mm Shadow Molding 19x7x7x14x3600mm Add 13mm Add 04mm Wall Molding 32x24x3000mm Add 33mm Add 24mm Aluminium Wall Molding 19x25x3000mm Add 35mm Add 26mm Stainless Steel Wall Molding 19x32mm Add 49mm Add 40mm Wall Molding 22x22x3000mm Add 29mm Add 20mm Note: The addition to the original length or breadth will avoid the need for border tiles. Step 1: Planning Grid Layout n = Number of panel F = Full tile size T = T-grid face width A = Distace between angle moulding face and bulkhead D = Distance between bulkhead D = nF + (2A-T) Bulkhead (A-T/2) A T F D 6 KEY POINT TO NOTE Arriving at bulkhead dimensions critical for full tiles module Diagram 1.2
  • 7. 7 Step 2: Mark Perimeter Trim Lines • Measuring the ceiling height is the most crucial stage before commencing installation. • The minimum plenum height from the ceiling slab should not be less than 100mm for lay-in system. • The reference ceiling level should be established by the main contractor with the help of all other services vendors like light fixtures, Air condition grilles, sprinklers, speakers etc. • Using a plumb mark as a reference point, place line laser leveller on it. Then with the help of laser point, mark wall angle level on all sides of the room. KEY POINT TO NOTE Line laser leveller saves time and ensures precision
  • 8. • The marking with the help of line laser leveller has to be done above the wall angle level on all the walls. • Post marking used hand drill to installed the wall angle. • The first and the last fasteners on wall angle should be installed at 150mm from the wall (see for details recommended fastener on page no.19). • Subsequent fasteners to be installed at 450mm spacing in between. • At the corners of the room, the conjunction area of wall angle should be miter cut for a clean finish 450mm 150mm     Step 3: Installing Perimeter Trims (Wall Angle) Y X a b 1200 600 600 Bottom view Bottom view Top view Top view 8 KEY POINT TO NOTE Secure to wall at 450mm maximum centres    
  • 9. 9 • The hanger on the main runner shoud be placed at or within 600mm distance from the wall angle (450mm is recommended in case of heavier ceilings) and then subsequently at 1200mm centres. • There should also be a hanger within 150mm of any main runner to runner connection. Step 4: Mark Hanger Positions 450mm 1200mm 360mm 2985mm 1335mm Main Runner Connection 600mm 450mm 360mm 2700mm 4320mm 600mm Main tee connection Main Runner Suspension System (Hanger Wire) Walls x x x x 450mm 1200mm 360mm 600mm 450mm 360mm 2700mm 4320mm MODULAR LIGHT FIXTURE 600mm 1200mm Cross Tee 600mm Cross Tee Main Runner Suspension System (Hanger Wire) Service Tiles Border Tiles Walls Field Tiles 2985mm 1335mm Main Runner Connection Diagram 1.1 Diagram 1.0 KEY POINT TO NOTE KEY POINT TO NOTE Hanger position must be within 150mm distance of every main runner connection Hanger position must be within 600mm distance from the wall
  • 10. • Use a rotary hammer machine to drill and install the hangers from the concrete ceiling slab. • If the hanger wire plumb more than 1.8 meter then use counter splaying wire refer above diagram. • In counter splaying, two hanger wires from the structural slab form an angle of 450 near the main runners. One suspension countering another in the same plane. • Install the hanger wire as per the position in the diagram 1.1. • Suspension hanger wire shall be pre-straightened with minimum 2.5mm dia (# 12 Gauge). • Insert wire of required length into hanger wire hole and encircle the wire 3 times within 75mm. Installation under AC duct • If AC duct is greater than 1200mm in length, then ensure you suspend a separate bracket under the duct and from it, a hanger-wire can be suspended for ceiling installation. 300mm 450 450 300mm 1.80mtr. WIRES PLUMB: MAX. SLOPE 1 IN 1.8MTR IN ANY PLANE IF MORE, USE COUNTER SPLAYING WIRES Step 5: Installation of Hangers 90 1200mm 100 1400mm KEY POINT TO NOTE KEY POINT TO NOTE Use counter splaying wires if hanger length is ≥1.8mtr. Ensure suspension free from services 10 Diagram 1.3 Diagram 1.4
  • 11. • Run a string line the length of your first main runner offset to the edge flange. This will help to keep the main runner set distance of the wall. • Cut the main runner to the length with respect to the border tile, so that the rout hole on the adjacent main runner matches. • E.g. As per diagram 1.5, the main runner will be cut at 15 mm using an aviation snip cutter to ensure that the rout hole will be at a distance of 360 mm. 11 Step 6: Installation of Main Runners • Cut the main runner at inclination of 30-45 degree to avoid obstruction of protruding screws. Armstrong provides following grids. Grids Rout Hole Interval (mm) Distance of 1st Rout Hole from the End Clip (mm) Prelude 32 150mm 75mm Prelude 38 150mm 75mm Prelude 43 100mm 50mm Suprafine 32 150mm 75mm Suprafine 38 150mm 75mm Suprafine 43 100mm 50mm Silhouette 38 600mm 300mm Silhouette 45 600mm 300mm Select 38 600mm 300mm Select 45 600mm 300mm KEY POINT TO NOTE Use only aviation snip for precise cutting of main runners String Line Cross tee Main runner Diagram 1.5
  • 12. • The first main runner should be less than 600mm from the perimeter wall. • The distance between next main runner shall be at 1200 mm maximum. • You may incline the first suspension system slightly to push the main runner in one direction so that the rout holes are better aligned. • Hangers with hook clip options can be inserted in alternate direction on the main runner for better stability. • Border cross tees should be more than 300mm but less than 600mm in length. • Cut the excess portion or bend the wire as shown in the picture. • Insert an additional row of main runner or alternatively suspend all border cross tees longer than 600mm. 12 KEY POINT TO NOTE Main runner and border cross tee should not be more than 600mm distance from the wall
  • 13. • As per diagram 1.1 (page 5) install border cross tee 448mm (2mm allowance is kept for cross tee to rest on the wall angle easily). • Install border cross tees temporarily to the wall molding using a clamp to keep them intact. • Install two 1200 cross tees between the two main runners at an distance of 600mm. • A click sound confirms that the cross tee has been properly locked into the main runner. • Measurements should be taken diagonally in the 600 x 1200mm module. Both the diagonals must be of the same length. • In case of any deviation in the measurement of the diagonals gently tap at the corners. • This will ensure that the entire ceiling grids will be in a perfect shape. • Once the system is in perfect shape run another string line at the first cross tee slot on the main runner to the far adjacent wall angle using the first two square mains as the guide. This ensure the tee rout holes on all the main runners stay in aligned. 13 Step 7: Cross Tees Installation Y X a b 1200 600 600 MAIN RUNNER (a-b) shold be less than 1mm for 600x600mm tiles and less than 2mm for 600x1200mm tiles. KEY POINT TO NOTE Click sound confirms cross tee locked Clamp Diagram 1.6 String Line Main runner Cross tee
  • 14. • Check the level once again using line laser leveller. • Ensure that all the services placed on service tiles are tested and confirmed by the principal contractor. Only after that, laying of field tiles can be commenced. • Use fresh / clean Gloves while installing the ceiling tiles. • Ensure that there are no dust and stain marks on the gloves. • While installing down lighters, spotlights, sprinklers, speakers, smoke detectors etc. 6mm plywood (pattress backing must be placed on the grid). • It is mandatory to independently suspend modular light fixtures. • GI wire 2.5 mm is recommended to suspend the light fixtures. • Hook Clips and Chains are not recommended. Step 8: Installation of Field and Service Tiles   KEY POINT TO NOTE Patress a must for installing services to avoid direct loading on ceiling system 14 Patress backing
  • 15. • Measure the border tile size. • Mark the border size on back side of the tile. • Use a grid or a steel ruler (2 ft long) to mark and cut the border tiles. • While installing, slightly tilt the tile and gently rest it on the main runner and adjacent cross tee and wall angle. How to make tegular and curved shape edges on border tile A) Tegular edge • Use a sharp knife. • Lay the tile on a smooth surface. • Make vertical cut into face of the tile. • Make horizontal cut to form tegular edge. 15 KEY POINT TO NOTE Chalk the cut edges of border tiles Step 9: Measure and Cut Border Tiles
  • 16. Installing end cap in tegular edge installation • End cap ensures that a tegular look is achieved at the border. • Lift the steel angle and insert the end cap between the tee and the wall angle. • End cap ensures aligned level difference at the perimeter. B) Curved shape (square edge) • Use a sharp knife. • Lay the tile on a smooth surface. • Use a cardboard or plywood template. • Mark outline of the template. • Use a sharp knife to cut through. 16
  • 17. 17 • Measure and mark the line on the metal tile using a pencil. • The bent edge of tile should be cut using aviation snip. • Use a shear machine to cut the face of the metal tile. • Use an end profile for MetalWorks lay-in cut tiles. • Slide the edge cap in to the cut tile. Install the tile into the ceiling grid. Metalworks Tiles Cutting Procedure KEY POINT TO NOTE KEY POINT TO NOTE Cut the metal tile edge using aviation snip and only then use shear machine Use edge cap for cut tiles
  • 18. Wall angle and Shadow molding: Available in 3.6mtr. and 3mtr. lengths respectively Main Runner: Available in 3.6mtr. and 3mtr. length respectively. Cross Tees: Available in 1200mm and 600mm respectively. Mineral fibre Lay-in tiles: Sizes available in 600x1200mm, 600x600mm and 300x1200mm. Ceiling Components Section Applicable Tile Edge Details 'L' Angle 1) Board (site cut or full tile) for wet-felt or soft 2) Tegular or Bevelled Tegular (site cut square) for wet-felt, soft or wood with cross tee supported by perimeter fill-in block 3) Tegular or Bevelled Tegular (site recut to recess edge) for wet-felt or soft with cross tee supported by perimeter trim 4) Bevelled Tegular (site cut square) on Silhouette steel angle with cross tee supported by perimeter trim 'L' Angle 1) Board (site cut or full tile) for Ceramaguard used in 100% RH areas and other applications using corrosion resistant steel angle 2) Metal clip-in tiles Shadowline 1) Bevelled Tegular (site cut square) on Silhouette steel angle with cross tee supported by perimeter trim 2) Vector (site cut square) for Ultima wet-felt or Optra soft tiles with cross tee supported by perimeter upper ledge 19 32 19 7 7 14 *All above measurements in mm. Tile Edge Compatibility Grids/Edge Flange 24mm face 24mm face 15mm face 15mm face (Silhoutte) Board/Square edge Angle Tegular Bevelled Tegular Silhouette Bevelled Tegular 4.7mm 9.5mm 9.5mm 18
  • 19. Accessories: (refer accessories manual for more details) Hook clip: This is a height adjustment clip to align the ceiling system and ensure it’s rigidity. Hanger wire: 2.5mm pre-straightened wire to hang the suspended ceiling from the ceiling slab. Anchor fastener: It is anchored into the ceiling soffit and used to suspend the GI wire. Recommended fasteners: • 1½ “ screws/nails on wood • Screws on metal surface. • Expanded fasteners on concrete and brick wall surfaces. • Fence staples for dry wall partitions. Ladder safety: Ladders are recommended for ceiling heights from the flooring up to 3 meters, provided the flooring surface is level, with a plain finish. Ladders are not recommend for ceiling heights exceeding 3 meters, a Platform with 4-sided pillars is recommended. Armstrong recommends that installers wear a tool belt for easy access to tools during installation. It is unsafe to keep tools on the ceiling tiles. Safety precautions 19 Ceiling Components Wrong standing position Platform Wheels Locked Right standing position   
  • 20. Item Description Hard Hat Prevents injury to the head from small falling objects at construction site. Rubberized Gloves (CL3) Prevents injury to the hand from flared edges. Jacket Provides better visibility at low visibility construction site. Glasses Prevents small particles while cuting from entering into the eyes and causing injury. Steel Toes Prevents toe injury due to sharp or obstructive objects laying on the floor. Personal protective equipment (PPE): Armstrong World Industries advocates a strong safety policy and thus all installers MUST wear PPE consisting of hard hat, rubberized gloves, jacket, steel toes and glasses during installation of the ceiling system. Safety Precautions 20
  • 21. Distance meter: Hand drill /driver: Aviation snip: Pop Rivet: 21 Tools Measuring Tape: Chalk line: Wire snip: Knife: Line laser leveler: Rotary hammer machine: Clamp: Slitting shear machine:
  • 22. Maintenance Standard Maintenance Armstrong Ceiling Systems require no more maintenance than painted drywall ceilings. However, when maintenance is necessary, certain procedures should be followed to insure continued high performance and attractive appearance. Dust and loose dirt may easily be removed by brushing or with a vacuum cleaner. Vacuum cleaner attachments such as those designed for cleaning upholstery or walls do the best job. Be certain to clean in one direction only. This will prevent rubbing dust into the surface of the ceiling. After loose dust has been removed, pencil marks, smudges, or clinging dirt may easily be erased with an ordinary art gum eraser. Armstrong metal ceilings may be cleaned with a moist cloth or a sponge dampened in water containing mild soap. The sponge should contain as little water as possible. After washing, the soapy film should be wiped off with a cloth or sponge slightly dampened in clean water. 22
  • 23. Project Name : Location: Area : m2 Checklist For Lay-in Ceiling Installation Phase q Activity i. Preparation Phase Storage q Store materials at site in a covered space isolated from ground free of undulations, debris, humidity and precipitation. q Material should be free of damages (Inspect material to assess damages, if any). Drawings q Reflected ceiling plan (RCP) and sectional drawings received from Architect and duly verified for suitability of installation at site and services like lights, AC diffusers correctly marked in the drawings. Site preparation q All relevant work that preceeds ceiling installation have been completed (e.g. the drywall perimeter, AC ducts, cable trays, under-deck insulation) before commencing ceiling installation. Ceiling height q Has been approved by the concerned authority. Installation phase q All work completed as per co-ordinated drawing. ii. Suspension accessories Anchor Fasteners Precondition: q Marked location on structural soffit on the basis of the ceiling plans issued by the Architect. q Suspension wires located and fixed at 1200mm centre-to-centre max and not more than 600mm away from wall/perimeter. q Suspension wires are not above services like HVAC ducts or any other obstruction/provided additional suspension (trapeze installation method) locations to ensure verticality of hanger and adequate transfer of load. Material: q Minimum M6 Grade Anchor Fasteners/appropriate quality used/procured. Installation: q Appropriate hole size for inserting the anchor fasteners. q Anchor fasteners fixed and secured properly to take the load of the ceiling hanger wire. Precondition: q Anchor fasteners fixed properly at appropriate locations. q Location of suspension wires such that they can be hanged vertically without obstructions. Material: q Minimum 12 gauge hanger wires (i.e. 2-2.6mm diawires) used/procured. q Hanger wires procured/used are pre-straightened- no local kinks or bends (Ideally, machine-straightened wires recommended). q Appropriate gauge of wire used to suite quick hangers/ hook or butterfly clips. Installation: q Hanger wires cut to appropriate size (ceiling drop +150mm to 200mm allowance for tying on either ends). q Top and bottom ends secured to the anchor fastener and grid/quick hanger respectively with minimum three tight twists within 75mm of the ends. q Wire adjusted appropriately to ensure that the grid is in perfect level (verified using laser leveller). q Hanger wires should be perpendicular after grids are suspended (a maximum 5 degree variation allowed). q Distance of hanger wires from the base of slab should not be greater than 1.8mtr. q If hanger wire distance from the base of slab is more than 1.8mtr., counter splaying wires installed. Quick hangers (optional) Precondition: q 2.5mm of hanger wire is used to suit the quick hanger/hook clip. q Hanger wires are maintained absolutely straight to ensure line and level. Material: q Tensile strength of quick hangers (or hook clip of Armstrong) offers adequate resistance against movement of the hanger wire (pull test). 
  • 24. Installation: q Hanger wires secured to the quick hanger (or hook clips) with the other hanger wire (or the hook clip end) inserted into the rout hole of grid and secured. q Level of the grid to be adjusted by pressing the ends of the clip/hanger and released to secure the hanger wire once the level has been appropriately adjusted. iii. Grid Precondition: q All relevant works like service ducts, cable trays, plastering and painting of walls, drywall perimeter trims, hanger wires have been completed. q The site conditions, humidity, temperature etc., are as within control and very close to actual usage. Material: q All services like lights, A/C, fire alarms etc. are suspended directly from structural soffit. q Suitable to tile edge (e.g. board, tegular, bevelled tegular, SL2, K2C2) and colour has been procured. Installation: q Wall angles installed first by securing to the wall or plaster trim at every 450mm max centre to centre (Incase of floating ceilings, the perimeter trims-Axioms should be installed after grid components). q Main runners suspended preferably along the longer side of room/ceiling at every 1200 mm centre to centre. q Main runners are not spaced more than 600mm from the perimeter. q Hanger wire suspensions to main runners do not exceed 1200mm centre to centre. q 1200mm cross tees placed across by spanning the main runners and be placed at every 600mm intervals. q 600 mm cross tees are fixed by spanning 1200mm cross tees with the slots provided in the 1200mm cross tees. q All the cross tees connected with each other from the right side (for proper alignment). q Double locking in cross tees ensured. iv. Tile Precondition: q The grid is in absolute line, level squareness and as per the RCP. q The tiles are acclimatized to the actual site conditions 24 hours before commencing installation. q All service fixtures like 600x600 light fittings, AC diffusers and other service items are rested on the grid and independently suspended. q 2mm gap given between corner tile and wall angle for ease of removal during maintenance. q Protective cover removed on the metal tiles before placing the tile. Material: q Tile edges are suitable to grid (e.g. Prelude 24mm, Suprafine Silhouette 15mm). q Extra tiles (attic stock) are procured in case of damage of tiles during installation or after handover. Installation: q Service tiles (e.g. tiles carrying services like Speakers, Fire Alarm system, spotlights installed) first. q Border tiles installed subsequently. q Field cut tegular edges incorporated at periimeters (depending on edge detail) or shadow molding used (esp. in case of soft fibre tiles)/metal end cap used (in case of metal tiles with tegular edge). q Field tile modules installed. v. Commissioning Phase Pre-handover checks q Ceiling checked for line and level. q Ceiling checked for squareness. q Broken/damaged tiles checked and replaced with new tiles from attic stock. q Tiles are cleaned and without stains. Handover q Joint inspection and handover by client representative and the ceiling installer completed. Remarks: Date: / / Name Signature
  • 25. Glossary 1. Plenum: The space between the main structural slab and suspended ceiling is called the plenum. 2. Tegular: A functional edge detail that allows a suspended ceiling tile to extend below the grid, making the grid less noticeable. 3. Rout hole: A hole on main runner to insert and lock the cross tees on the main tee. 4. Plumb mark: Measuring either from the floor or roof level and marking the ceiling height is known as plumb mark. From the plumb mark point, the entire ceiling level will be marked. 5. Plaster bulk heads: Plaster bulkhead is otherwise called Plaster board boxing. Plaster bulkhead is designed to accommodate HVAC grilles vertically. 6. Flange: The visible area of the grid from below the ceiling i.e. the horizontal surface on the face on the main runner or cross tee. Knauf Ceiling Solutions (India) Private Limited Boomerang, A-304, Chandivali Farm Road (near Chandivali Studio) Andheri (E), Mumbai - 400 072. Contact us: 1860 266 7080 | e-mail : Helpdeskindia@knaufarmstrong.com