  1. 1. 1 Amulsar – Path to Production November 2016 – Photo Journal Lydianinternational.co.uk | TSX:LYD
  2. 2. 2 Topsoil Removal at the Camp Platform.
  3. 3. 3 Excavation for the Temporary Construction Office / Contractor Laydown Area Platform
  4. 4. 4 Initial Upgrades to RD-5 from Gndevaz to Site 14
  5. 5. 5 Sediment Control Near the Temporary Construction Offices Platform, at the Base of the HLF Sediment Control on the Extended Side of the Temporary Construction Offices Platform
  6. 6. 6 Widening of RD-5
  7. 7. 7 Ripping and Removal of Materials as Part of Access Road Construction
  8. 8. 8 RD-5 Widening
  9. 9. 9 Slope Cutting and Material Removal
  10. 10. 10 Re-Routed Powerline Near the HLF