SlideShare a Scribd company logo
1 of 35
Syndicate – 7
Network Solution Assignment
13 August 2014
Symbiosis Institute Of Telecom Management, Pune
NCC
Presentation
Net Comm
Solutions For A Better World
SrNo PRN Name Designation EmailID Contact
1. 14020541070 Madhurendra CEO Madhurendra.kumarmadhukar@
sitm.ac.in
9975858007
2. 14020541043 Ramkrishna CTO Ramkrishna.chomal@sitm.ac.in 8791418495
3. 14020541025 Kunjesh CTO Kunjest.mehta@sitm.ac.in 9029937080
4. 14020541052 Shreya CTO shreya@sitm.ac.in 7774963135
5. 14020541016 Gaurav CFO Gourav.mukherjee@sitm.ac.in 9769672625
6. 14020541034 Nishant CFO Nishant.thool@sitm.ac.in 9503994506
7. 14020541007 Apurv CFO Apurv.verma@sitm.ac.in 9527430353
8. 14020541061 Tarun COO Tarun.kanade@sitm.ac.in 9579089883
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
1 of 33
Madhurendra (14020541070) – CEONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
About Us : Who We Are
NetComm Pvt. Ltd. ,Started in 2008, headquartered in Pune, is a
company employing a diverse workforce of more than 1000 dedicated and skilled
employees around the country.
What We Do
NetComm designs , develop and provide Network Solutions to Corporate
Customers. It is cost effective, secured and versatile Network Solutions to meet
any future requirements, providing trouble free environment for our customers.
How We Operate
NetComm Code of Conduct reflects the promise we have made to uphold
our most important values. It illustrates that our customers get the best services
and solutions by providing prompt and consistent services, thus outlines the
depth of permanent relationship based on trust and satisfaction.
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
2 of 33
Madhurendra (14020541070) – CEONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Problem Description
Aim: To create a network setup for a Software Company with following specifications.
Data: There are 3 buildings of the company in Pune
Building 1: 80 terminals
Building 2: 20 terminals
Building 3: 300 terminals
They also have a branch in Bangalore and a branch in Noida which needs to be connected.
Constraints:
 Common server for all 3 buildings located in building 1.
 Wi-Fi access point and cable connection for all meeting rooms
 20 terminals of each floor of Building-3 should have Wi-Fi connectivity.
 There are 500 employees in the company who works in 2 shifts. All employees sit in
Building 3.
 There should be a firewall for controlling and managing the complete network.
 Network should have a Web server, Mail server, Backup server.
 There should be different policies (security and access) for different type of users (use
Antivirus firewalls, etc.).
 Internet facility should be available (24X7).
 There should be a backup line for Internet.
 Intra-mail facility should be available.
 Every floor should have a printer in shared mode for Building 3 and for all terminals of
Building 2.
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
3 of 33
Madhurendra (14020541070) – CEONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Problem Design :
Server Room : 5
LAB-1 : 20
LAB-2 : 50
Meeting Rooms : 5
Front Office : 3
Executives : 14
Accounts : 3
Floor-1 : 50
Floor-2 : 100
Floor3 : 100
Floor-4 : 50
Building 1
Building 2
Building 3
1000 meter
100 meter
PUNE
150 Terminals BANGALORE 150 Terminals NOIDA
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
4 of 33
Shreya (14020541052) - CTONCC
Presentation
Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
5 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
48+48+24
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
6 of 33
NCC
Presentation
BUILDING 1 COMPONENTS QTY
1
Assembled server hardware (ANTIVIRUS,AD+DHCP+MAIN,MAIL,
WEB)
4
2
Assembled server hardware (MAIN BACKUP, MAIL BACKUP, WEB
BACKUP)
3
3 DATACENTER 1
4 FIREWALL 1
5 Switches (L3)(48P) 2
6 Switches (L3)(24P) 1
7 Desktop PC 85
8 Laptop 10
9 Wireless Controller 1
10 Wireless AP 7
11 Projector 7
12 Projector Screen 7
13 MFD 7
14 Printer 1
15 ProAudio SuperStore Large Office Kit 5
Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
7 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Total Cost for building 1
Rs. 81,35,330
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
8 of 33
Shreya (14020541052) - CTONCC
Presentation
B2 COMPONENT QTY
1
Switches (L3)(48P) 1
2
Switches (L3)(24P) 0
3
Desktop PC 6
4
Laptop 14
5
Wireless AP 4
6
MFD 3
7
Printer 14
Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
9 of 33
Shreya (14020541052) - CTONCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Total Cost for building 2
Rs. 13,17,430
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
10 of 33
NCC
Presentation
B3
COMPONENT
QTY
1
Switches (L3)(48P) 6
2
Switches (L3)(24P) 4
3
Desktop PC 300
4
Wireless AP 4
5
MFD 6
Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
11 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Total Cost for building 3
Rs. 1,43,72,660
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
12 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Parameters
Assembled
Server
Cisco UCS C240
M3 Rack Server
HP ProLiant
DL360e
Processor
Intel Xeon E5-
2609v2
Intel Xeon E5-2600
v2
Intel Xeon E5-
2440v2
No of cores 4 4 8
Clock speed 2.4GHZ 2.4GHZ 1.9 GHZ
Internal
Memory 384 GB DDR3 768 GB DDR3 384 GB DDR3
Price
Rs 99,500 RS 1,99,000 RS. 2,08,000
LOW End Servers :
Ramkrishna (14020541043) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
13 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
HIGH- End Servers :
Parameters
Assembled
Server
Cisco UCS
C460 M2
HP ProLiant
DL580
Processor
Intel Xeon E7-
2850v2
Intel Xeon E7-
4800
Intel Xeon E7-
4807
No of cores 12 6 6
Clock speed 2.3GHZ/2.8GHZ 1.86 1.86
Internal
Memory 1536 GB DDR 3 384 GB DDR 3 64 GB DDR 3
Price Rs . 3,02,000 Rs. 5,19,500 Rs. 5,90,000
Ramkrishna (14020541043) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
14 of 33
NCC
Presentation
Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Data Center :
Parameters SEAGATE WD Sentimel HP
MODEL
Business Storage
8-Bay Rackmount
NAS
WDBLGT0160KB
HP StoreEasy
1640
Capacity 32 TB 16 TB 32 TB
Internal
Memory
4 GB RAM 2 GB RAM 8 GB RAM
Processor Dual-core 2.3 GHz
Intel
Intel Atom 1.8 GHz
Dual Core
Intel Xeon Quad
Core
Hot-swappable yes no yes
Price Rs. 3,00,000 Rs. 1,50,000 Rs. 8,40,000
Ramkrishna (14020541043) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
15 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
DESKTOPS :
Parameters
HP
Dell
620sDesktop
Compaq
Presario
Model name 110-217IN 620sDesktop 3000Desktop
Processor I5, 4th Gen I5, 3rd Gen I5, 3rd Gen
Ram 4 GB 4GB 2 GB
Hard Disk 500 GB 1 TB 1 TB
Windows Win 8.1 Win 7 Win 8
Unit Price For each unit –
Rs. 42,000
For each unit –
Rs. 43,000
For each unit –
Rs. 38,000
Total Price For 400 PCs -
Rs. 1,68,00,000
For 400 PCs -
Rs. 1,72,00,000
For 400 PCs -
Rs. 1,52,00,000
Ramkrishna (14020541043) – CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
16 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
LAPTOPS :
Parameters Lenovo DELL Samsung
NP200B4A
Sony
Model name Thinkpad E431 Inspiron 15R Idea pad Z510 15E-SVF15318
Processor 4th Gen i5 3rd gen i5 2nd Gen i5 4th Gen i5
Ram 4GB 4 GB 2 GB 4GB
Hard Disk 500 GB 1 TB 320 GB 500GB
Windows Win8.1 Pro. Win 7 Win 7 Win8.1
Unit Price For each unit –
Rs. 51,490
For each unit –
Rs. 43,000
For each unit-
Rs.38,000
For each unit-
Rs.45,490
Total Price For 24laptops-
Rs. 12,35,760
For 24laptops-
Rs. 10,08,000
For 24 laptops
Rs. 9,12,000
For 24laptops-
Rs. 10,91,760
Ramkrishna (14020541043) – CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
17 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Switch :
Parameters D-link CISCO Netgear
Model DX-0548GTV WS-C3750-48TS-S prosafe
Ports 48 ports 48 ports 48 ports
Shared 4 # Shared SFP 4# Shared SFP 4# Shared SFP
OPERATING
TEMPERATURE
0°C to 50°C 0°C to 45°C 0° to 40° C
SWITCHING
FABRIC
184 Gbps 32 Gbps 50 Gbps
Power
Consumption
180 W 169 W 66 W
Warranty Lifetime warranty Lifetime warranty
Lifetime
warranty
Cost RS. 1,76,070 Rs. 1,50,000 Rs. 2,00,000
Ramkrishna (14020541043) – CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
18 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Wireless Access Point :
Parameters Cisco Net gear D-link
Model Cisco Linksys E900 Range max Wireless
Access Point
D-Link® Wireless
N Range Extender
(DAP-1360)
Speed Up to 300Mbps. Up to 100Mbps Up to 200Mbps
Warranty 3 year warranty 3 year warranty 1 year warranty
Security WPA2 wireless
encryption and the
integrated firewall.
WPA2 wireless
encryption
WPA2 wireless
encryption
Range More range than
802.11g products
(300 feet).
Range according to
802.11g products.
(250 feet)
Range according
to 802.11g
products.(150feet)
Cost Rs. 2,350 Rs. 3,100 Rs. 2,167
Ramkrishna (14020541043) – CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
19 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Projector :
Parameters Epson VIEWSONIC Dell
Model Eb-x03 PJD5234L 1210S
Projection
Technology
RGB liquid crystal
shutter projection
system (3LCD)
digital light processing
technology
DLP and Brilliant
Colour TM
Technology Driven
VGA Type Display
Start-Up
Period
About 5 seconds,
Warm-up Period: 30
seconds
About 7 seconds .
Warm up Period 35
seconds
About 10 seconds
Warm up period 45
seconds
Cost Rs.34,000 Rs. 40,435 Rs. 23,814
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
20 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
ANTIVIRUS :
Parameters Kaspersky Quick heal McAfee
Technology Cloud-assisting
technology.
Real time cloud
security
Cloud-based threat
intelligence service.
Number of
users
450 400 400
Important
Feature
One integrated
management
console.
Management
console not
integrated.
Management
console not
integrated.
Cost INR 550 INR 500 INR 500
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
21 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Normal Printers :
Parameters Epson Canon HP
Model L110 Canon 2900b Office Jet 7612
Printing
Speed
27 ppm (A4) 12ppm (A4) 15 ppm(A4)
Starting
Time
15 seconds 15 seconds 17 seconds
Paper size A4,A3,B5,C6 A4,Letter size A4,A3,B5
Cost Rs. 6,500 Rs. 7,000 Rs. 10,000
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
22 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Parameters ENTER Belkin Pro Power
Model name Ethernet cable A7L704
CATEGORY 6
CABLE 305M -
CAT6305M - PRO
POWER
Price
Price per unit
₹1,600
Price per unit
₹1,700
Price per unit
₹ 1,650
Total Price
For 15 units
₹24,000
For 15 units
₹25,500
For 15 unit
₹ 24,750
Cat 6 Cable :
Shreya (14020541052) - CTO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
23 of 33
Nishant (14020541034) - CFONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Hardware Cost :
SR NO PRODUCT NAME MANUFACTURER QUANTITY
UNIT
PRICE(RS)
TOTAL
COST(RS)
1 High End Server
Intel-
Xeon/SuperMicro 4 ₹ 3,02,000 ₹ 12,08,000
2 Low end Server
Intel-
Xeon/SuperMicro
3 ₹ 99,500 ₹ 2,98,500
3 DATACENTER Seagate 2 ₹ 3,00,000 ₹ 6,00,000
4 FIREWALL CYBEROAM 1 ₹ 4,67,280 ₹ 4,67,280
5 Switches (L3)(48P) D-Link 9 ₹ 1,76,070 ₹ 15,84,630
6 Switches (L3)(24P)
D-Link 5 ₹ 1,42,660 ₹ 7,13,300
7 Desktop PC HP 400 ₹ 42,000 ₹1,68,00,000
8 Laptop Lenovo 24 ₹ 51,490 ₹ 12,35,760
9 Wireless Controller CISCO 1 ₹ 1,50,000 ₹ 1,50,000
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
24 of 33
Gourav (14020541016) – CFONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Hardware Cost Contd. :
SR NO PRODUCT NAME MANUFACTURER QUANTITY
UNIT
PRICE(RS)
TOTAL
COST(RS)
10 Wireless AP
CISCO LINKSYS 15 ₹ 2,350 ₹ 35,250
11 Optical Fiber
TOSLINK 2 ₹ 1,60,000 ₹ 3,20,000
12 CAT - 6 Cable
ENTER 15 ₹ 1,600 ₹ 24,000
13 Projector Epson 8 ₹ 34,000 ₹ 2,72,000
14 Projector Screen Inlight 7 ₹ 6,000 ₹ 42,000
15 MFD HP 16 ₹ 22,700 ₹ 3,63,200
16 Printer Epson 15 ₹ 6,500 ₹ 97,500
17
ProAudio SuperStore Large
Office Kit
Assembled 5 ₹ 1,14,000 ₹ 5,70,000
18
Network Racks
7 ₹ 10,000 ₹ 70,000
TOTAL ₹ 2,48,51,420
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
25 of 33
Apurv (14020541007) – CFONCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Software Cost :
SR NO PRODUCT NAME
MANUFACTU
RER
QUANTITY
UNIT
PRICE(RS)
TOTAL
COST(RS)
1 MS Office 2013 Professional Microsoft 400 ₹ 17,500 ₹ 70,00,000
2 MS Windows 2012 Server Standard
OLP (2 Proc) AE License ESD
Microsoft 8 ₹ 62,000 ₹ 4,96,000
3 IP Calling NCH Software 14 packs ₹ 7,800 ₹ 1,09,200
4 Antivirus
Kaspersky 450 ₹ 550 ₹ 2,47,500
TOTAL ₹ 78,52,700
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
26 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Service Cost :
. PRODUCT NAME
MANUFACTUR
ER
QUANTITY
UNIT
PRICE(RS)
TOTAL
COST(RS)
1
Internet BSNL FTTH Fibro ULD
9999 (30Mbps) BSNL 1 line ₹ 1,09,989 ₹ 1,09,989
2 Infinity 4 Mbps PLUS Tata Indicom 1 line ₹ 60,000 ₹ 60,000
3 VPN Reliance 1 line ₹8,50,000 ₹8,50,000
4
H/W Installation
425 ₹ 500 ₹ 2,12,500
5
S/W Installation
₹1,50,000
6
N/W Installation + 1 Year AMC
₹ 2,00,000
TOTAL ₹ 15,82,489
Apurv (14020541007) – CFO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
27 of 33
Tarun (14020541061) – COO
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Deployment Plan :
 A Deployment Plan defines the sequence of operations or steps that must
be carried to deliver changes into a target system environment
 The transportation of hardware components may take 15 days.
 The internet connection line to get connected and ON in the campus would
take 25 days.
 The total setup will be ready within 50 days.
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
28 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Installation Plan :
Task
No.
Task Days
Required
Dependency Labour
Required
1. Internet Connection 30 Days On Weather 10
2. Server Room 5 Days On ELectricity 5
3. Meeting Room, Lab
1, Lab 2
3 Days On Electricity 10
Tarun (14020541061) – COO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
29 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Task
No.
Task Days
Required
Dependency Labour
Required
4. Front Office,
Executives, Accounts
3 Days On Electricity 10
5. Floor 1, Floor 2,
Floor 3, Floor 4
5 Days On Electricity 5,10,10,5
Tarun (14020541061) – COO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
30 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Total Labour & Days required :
Total Labours Total Days
40 46
Tarun (14020541061) – COO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
31 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Offer Overview :
 1 year consulting free
 On site service management for 24x7.
 Reduction in installment days and cost beared by us.
 5% discount on full advance Payment
Madhurendra (14020541070) – CEO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
32 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Final Design Solution and Offer :
Component Cost
HARDWARE INR. 2,48,51,420
SOFTWARE INR. 78,52,700
SERVICES INR. 15,82,489
Misc INR. 1,00,000
TOTAL INR. 3,52,86,609
Service tax INR. 1,95,595.64
GRAND TOTAL INR. 3,45,82,204.64
5% Discount INR . 17,29,110.23
Final Price INR. 3,28,53,094.41
 1 year
consulting free
 On site service
management for
24x7.
 Reduction in
installment days
and cost
bearded by us.
Madhurendra (14020541070) – CEO
Symbiosis Institute Of Telecom Management, Pune
Syndicate No - 7
33 of 33
NCC
Presentation
N e t C o m m
S o l u t I o n s F o r A B e t t e r W o r l d
Madhurendra (14020541070) – CEO
Thank
You

More Related Content

Similar to Network deployment

Subha Prasanna Das
Subha Prasanna DasSubha Prasanna Das
Subha Prasanna Das
Subha P
 
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docxCisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
clarebernice
 
NETWORKING SYSTEMS .docx
NETWORKING SYSTEMS                                                .docxNETWORKING SYSTEMS                                                .docx
NETWORKING SYSTEMS .docx
dohertyjoetta
 
Major project report
Major project reportMajor project report
Major project report
Praveen Singh
 

Similar to Network deployment (20)

Subha Prasanna Das
Subha Prasanna DasSubha Prasanna Das
Subha Prasanna Das
 
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docxCisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
Cisco Network Proposal Part 1by Jesse HolmesSubmission d.docx
 
Report (2)
Report (2)Report (2)
Report (2)
 
IRJET- Implementation of Arduino UNO based Two Directional [2D] Plotter
IRJET- Implementation of Arduino UNO based Two Directional [2D] PlotterIRJET- Implementation of Arduino UNO based Two Directional [2D] Plotter
IRJET- Implementation of Arduino UNO based Two Directional [2D] Plotter
 
Sudip chatterjee
Sudip chatterjeeSudip chatterjee
Sudip chatterjee
 
[IJET-V1I3P17] Authors :Prof. U. R. More. S. R. Adhav
[IJET-V1I3P17] Authors :Prof. U. R. More. S. R. Adhav[IJET-V1I3P17] Authors :Prof. U. R. More. S. R. Adhav
[IJET-V1I3P17] Authors :Prof. U. R. More. S. R. Adhav
 
Network Design For Alliance Française de Dhaka
Network Design For Alliance Française de DhakaNetwork Design For Alliance Française de Dhaka
Network Design For Alliance Française de Dhaka
 
NETWORKING SYSTEMS .docx
NETWORKING SYSTEMS                                                .docxNETWORKING SYSTEMS                                                .docx
NETWORKING SYSTEMS .docx
 
H820 usermanual eng
H820 usermanual engH820 usermanual eng
H820 usermanual eng
 
IP Core Design of Hight Lightweight Cipher and its Implementation
IP Core Design of Hight Lightweight Cipher and its Implementation IP Core Design of Hight Lightweight Cipher and its Implementation
IP Core Design of Hight Lightweight Cipher and its Implementation
 
IP CORE DESIGN OF HIGHT LIGHTWEIGHT CIPHER AND ITS IMPLEMENTATION
IP CORE DESIGN OF HIGHT LIGHTWEIGHT CIPHER AND ITS IMPLEMENTATIONIP CORE DESIGN OF HIGHT LIGHTWEIGHT CIPHER AND ITS IMPLEMENTATION
IP CORE DESIGN OF HIGHT LIGHTWEIGHT CIPHER AND ITS IMPLEMENTATION
 
Network design
Network designNetwork design
Network design
 
Bottle Filling Application using Arduino
Bottle Filling Application using ArduinoBottle Filling Application using Arduino
Bottle Filling Application using Arduino
 
Major project report
Major project reportMajor project report
Major project report
 
Digitization of Cycle Time in Riveting Machine
Digitization of Cycle Time in Riveting MachineDigitization of Cycle Time in Riveting Machine
Digitization of Cycle Time in Riveting Machine
 
Resume 5+exp in networking
Resume 5+exp in networkingResume 5+exp in networking
Resume 5+exp in networking
 
SMART LATHE MACHINE
SMART LATHE MACHINESMART LATHE MACHINE
SMART LATHE MACHINE
 
Gopal Resume
Gopal ResumeGopal Resume
Gopal Resume
 
IRJET- Secured LAN Network Topology of a Small Office with Redundancy
IRJET-  	  Secured LAN Network Topology of a Small Office with RedundancyIRJET-  	  Secured LAN Network Topology of a Small Office with Redundancy
IRJET- Secured LAN Network Topology of a Small Office with Redundancy
 
Micro PLC_Manal for new comer plc learner
Micro PLC_Manal for new comer plc learnerMicro PLC_Manal for new comer plc learner
Micro PLC_Manal for new comer plc learner
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

Network deployment

  • 1. Syndicate – 7 Network Solution Assignment 13 August 2014 Symbiosis Institute Of Telecom Management, Pune NCC Presentation
  • 2. Net Comm Solutions For A Better World SrNo PRN Name Designation EmailID Contact 1. 14020541070 Madhurendra CEO Madhurendra.kumarmadhukar@ sitm.ac.in 9975858007 2. 14020541043 Ramkrishna CTO Ramkrishna.chomal@sitm.ac.in 8791418495 3. 14020541025 Kunjesh CTO Kunjest.mehta@sitm.ac.in 9029937080 4. 14020541052 Shreya CTO shreya@sitm.ac.in 7774963135 5. 14020541016 Gaurav CFO Gourav.mukherjee@sitm.ac.in 9769672625 6. 14020541034 Nishant CFO Nishant.thool@sitm.ac.in 9503994506 7. 14020541007 Apurv CFO Apurv.verma@sitm.ac.in 9527430353 8. 14020541061 Tarun COO Tarun.kanade@sitm.ac.in 9579089883
  • 3. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 1 of 33 Madhurendra (14020541070) – CEONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d About Us : Who We Are NetComm Pvt. Ltd. ,Started in 2008, headquartered in Pune, is a company employing a diverse workforce of more than 1000 dedicated and skilled employees around the country. What We Do NetComm designs , develop and provide Network Solutions to Corporate Customers. It is cost effective, secured and versatile Network Solutions to meet any future requirements, providing trouble free environment for our customers. How We Operate NetComm Code of Conduct reflects the promise we have made to uphold our most important values. It illustrates that our customers get the best services and solutions by providing prompt and consistent services, thus outlines the depth of permanent relationship based on trust and satisfaction.
  • 4. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 2 of 33 Madhurendra (14020541070) – CEONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Problem Description Aim: To create a network setup for a Software Company with following specifications. Data: There are 3 buildings of the company in Pune Building 1: 80 terminals Building 2: 20 terminals Building 3: 300 terminals They also have a branch in Bangalore and a branch in Noida which needs to be connected. Constraints:  Common server for all 3 buildings located in building 1.  Wi-Fi access point and cable connection for all meeting rooms  20 terminals of each floor of Building-3 should have Wi-Fi connectivity.  There are 500 employees in the company who works in 2 shifts. All employees sit in Building 3.  There should be a firewall for controlling and managing the complete network.  Network should have a Web server, Mail server, Backup server.  There should be different policies (security and access) for different type of users (use Antivirus firewalls, etc.).  Internet facility should be available (24X7).  There should be a backup line for Internet.  Intra-mail facility should be available.  Every floor should have a printer in shared mode for Building 3 and for all terminals of Building 2.
  • 5. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 3 of 33 Madhurendra (14020541070) – CEONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Problem Design : Server Room : 5 LAB-1 : 20 LAB-2 : 50 Meeting Rooms : 5 Front Office : 3 Executives : 14 Accounts : 3 Floor-1 : 50 Floor-2 : 100 Floor3 : 100 Floor-4 : 50 Building 1 Building 2 Building 3 1000 meter 100 meter PUNE 150 Terminals BANGALORE 150 Terminals NOIDA
  • 6. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 4 of 33 Shreya (14020541052) - CTONCC Presentation Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d
  • 7. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 5 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d 48+48+24 Shreya (14020541052) - CTO
  • 8. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 6 of 33 NCC Presentation BUILDING 1 COMPONENTS QTY 1 Assembled server hardware (ANTIVIRUS,AD+DHCP+MAIN,MAIL, WEB) 4 2 Assembled server hardware (MAIN BACKUP, MAIL BACKUP, WEB BACKUP) 3 3 DATACENTER 1 4 FIREWALL 1 5 Switches (L3)(48P) 2 6 Switches (L3)(24P) 1 7 Desktop PC 85 8 Laptop 10 9 Wireless Controller 1 10 Wireless AP 7 11 Projector 7 12 Projector Screen 7 13 MFD 7 14 Printer 1 15 ProAudio SuperStore Large Office Kit 5 Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Shreya (14020541052) - CTO
  • 9. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 7 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Total Cost for building 1 Rs. 81,35,330 Shreya (14020541052) - CTO
  • 10. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 8 of 33 Shreya (14020541052) - CTONCC Presentation B2 COMPONENT QTY 1 Switches (L3)(48P) 1 2 Switches (L3)(24P) 0 3 Desktop PC 6 4 Laptop 14 5 Wireless AP 4 6 MFD 3 7 Printer 14 Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d
  • 11. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 9 of 33 Shreya (14020541052) - CTONCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Total Cost for building 2 Rs. 13,17,430
  • 12. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 10 of 33 NCC Presentation B3 COMPONENT QTY 1 Switches (L3)(48P) 6 2 Switches (L3)(24P) 4 3 Desktop PC 300 4 Wireless AP 4 5 MFD 6 Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Shreya (14020541052) - CTO
  • 13. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 11 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Total Cost for building 3 Rs. 1,43,72,660 Shreya (14020541052) - CTO
  • 14. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 12 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Parameters Assembled Server Cisco UCS C240 M3 Rack Server HP ProLiant DL360e Processor Intel Xeon E5- 2609v2 Intel Xeon E5-2600 v2 Intel Xeon E5- 2440v2 No of cores 4 4 8 Clock speed 2.4GHZ 2.4GHZ 1.9 GHZ Internal Memory 384 GB DDR3 768 GB DDR3 384 GB DDR3 Price Rs 99,500 RS 1,99,000 RS. 2,08,000 LOW End Servers : Ramkrishna (14020541043) - CTO
  • 15. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 13 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d HIGH- End Servers : Parameters Assembled Server Cisco UCS C460 M2 HP ProLiant DL580 Processor Intel Xeon E7- 2850v2 Intel Xeon E7- 4800 Intel Xeon E7- 4807 No of cores 12 6 6 Clock speed 2.3GHZ/2.8GHZ 1.86 1.86 Internal Memory 1536 GB DDR 3 384 GB DDR 3 64 GB DDR 3 Price Rs . 3,02,000 Rs. 5,19,500 Rs. 5,90,000 Ramkrishna (14020541043) - CTO
  • 16. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 14 of 33 NCC Presentation Syndicate No - 7Syndicate No - 7Syndicate No - 7Syndicate No - 7 N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Data Center : Parameters SEAGATE WD Sentimel HP MODEL Business Storage 8-Bay Rackmount NAS WDBLGT0160KB HP StoreEasy 1640 Capacity 32 TB 16 TB 32 TB Internal Memory 4 GB RAM 2 GB RAM 8 GB RAM Processor Dual-core 2.3 GHz Intel Intel Atom 1.8 GHz Dual Core Intel Xeon Quad Core Hot-swappable yes no yes Price Rs. 3,00,000 Rs. 1,50,000 Rs. 8,40,000 Ramkrishna (14020541043) - CTO
  • 17. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 15 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d DESKTOPS : Parameters HP Dell 620sDesktop Compaq Presario Model name 110-217IN 620sDesktop 3000Desktop Processor I5, 4th Gen I5, 3rd Gen I5, 3rd Gen Ram 4 GB 4GB 2 GB Hard Disk 500 GB 1 TB 1 TB Windows Win 8.1 Win 7 Win 8 Unit Price For each unit – Rs. 42,000 For each unit – Rs. 43,000 For each unit – Rs. 38,000 Total Price For 400 PCs - Rs. 1,68,00,000 For 400 PCs - Rs. 1,72,00,000 For 400 PCs - Rs. 1,52,00,000 Ramkrishna (14020541043) – CTO
  • 18. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 16 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d LAPTOPS : Parameters Lenovo DELL Samsung NP200B4A Sony Model name Thinkpad E431 Inspiron 15R Idea pad Z510 15E-SVF15318 Processor 4th Gen i5 3rd gen i5 2nd Gen i5 4th Gen i5 Ram 4GB 4 GB 2 GB 4GB Hard Disk 500 GB 1 TB 320 GB 500GB Windows Win8.1 Pro. Win 7 Win 7 Win8.1 Unit Price For each unit – Rs. 51,490 For each unit – Rs. 43,000 For each unit- Rs.38,000 For each unit- Rs.45,490 Total Price For 24laptops- Rs. 12,35,760 For 24laptops- Rs. 10,08,000 For 24 laptops Rs. 9,12,000 For 24laptops- Rs. 10,91,760 Ramkrishna (14020541043) – CTO
  • 19. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 17 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Switch : Parameters D-link CISCO Netgear Model DX-0548GTV WS-C3750-48TS-S prosafe Ports 48 ports 48 ports 48 ports Shared 4 # Shared SFP 4# Shared SFP 4# Shared SFP OPERATING TEMPERATURE 0°C to 50°C 0°C to 45°C 0° to 40° C SWITCHING FABRIC 184 Gbps 32 Gbps 50 Gbps Power Consumption 180 W 169 W 66 W Warranty Lifetime warranty Lifetime warranty Lifetime warranty Cost RS. 1,76,070 Rs. 1,50,000 Rs. 2,00,000 Ramkrishna (14020541043) – CTO
  • 20. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 18 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Wireless Access Point : Parameters Cisco Net gear D-link Model Cisco Linksys E900 Range max Wireless Access Point D-Link® Wireless N Range Extender (DAP-1360) Speed Up to 300Mbps. Up to 100Mbps Up to 200Mbps Warranty 3 year warranty 3 year warranty 1 year warranty Security WPA2 wireless encryption and the integrated firewall. WPA2 wireless encryption WPA2 wireless encryption Range More range than 802.11g products (300 feet). Range according to 802.11g products. (250 feet) Range according to 802.11g products.(150feet) Cost Rs. 2,350 Rs. 3,100 Rs. 2,167 Ramkrishna (14020541043) – CTO
  • 21. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 19 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Projector : Parameters Epson VIEWSONIC Dell Model Eb-x03 PJD5234L 1210S Projection Technology RGB liquid crystal shutter projection system (3LCD) digital light processing technology DLP and Brilliant Colour TM Technology Driven VGA Type Display Start-Up Period About 5 seconds, Warm-up Period: 30 seconds About 7 seconds . Warm up Period 35 seconds About 10 seconds Warm up period 45 seconds Cost Rs.34,000 Rs. 40,435 Rs. 23,814 Shreya (14020541052) - CTO
  • 22. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 20 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d ANTIVIRUS : Parameters Kaspersky Quick heal McAfee Technology Cloud-assisting technology. Real time cloud security Cloud-based threat intelligence service. Number of users 450 400 400 Important Feature One integrated management console. Management console not integrated. Management console not integrated. Cost INR 550 INR 500 INR 500 Shreya (14020541052) - CTO
  • 23. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 21 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Normal Printers : Parameters Epson Canon HP Model L110 Canon 2900b Office Jet 7612 Printing Speed 27 ppm (A4) 12ppm (A4) 15 ppm(A4) Starting Time 15 seconds 15 seconds 17 seconds Paper size A4,A3,B5,C6 A4,Letter size A4,A3,B5 Cost Rs. 6,500 Rs. 7,000 Rs. 10,000 Shreya (14020541052) - CTO
  • 24. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 22 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Parameters ENTER Belkin Pro Power Model name Ethernet cable A7L704 CATEGORY 6 CABLE 305M - CAT6305M - PRO POWER Price Price per unit ₹1,600 Price per unit ₹1,700 Price per unit ₹ 1,650 Total Price For 15 units ₹24,000 For 15 units ₹25,500 For 15 unit ₹ 24,750 Cat 6 Cable : Shreya (14020541052) - CTO
  • 25. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 23 of 33 Nishant (14020541034) - CFONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Hardware Cost : SR NO PRODUCT NAME MANUFACTURER QUANTITY UNIT PRICE(RS) TOTAL COST(RS) 1 High End Server Intel- Xeon/SuperMicro 4 ₹ 3,02,000 ₹ 12,08,000 2 Low end Server Intel- Xeon/SuperMicro 3 ₹ 99,500 ₹ 2,98,500 3 DATACENTER Seagate 2 ₹ 3,00,000 ₹ 6,00,000 4 FIREWALL CYBEROAM 1 ₹ 4,67,280 ₹ 4,67,280 5 Switches (L3)(48P) D-Link 9 ₹ 1,76,070 ₹ 15,84,630 6 Switches (L3)(24P) D-Link 5 ₹ 1,42,660 ₹ 7,13,300 7 Desktop PC HP 400 ₹ 42,000 ₹1,68,00,000 8 Laptop Lenovo 24 ₹ 51,490 ₹ 12,35,760 9 Wireless Controller CISCO 1 ₹ 1,50,000 ₹ 1,50,000
  • 26. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 24 of 33 Gourav (14020541016) – CFONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Hardware Cost Contd. : SR NO PRODUCT NAME MANUFACTURER QUANTITY UNIT PRICE(RS) TOTAL COST(RS) 10 Wireless AP CISCO LINKSYS 15 ₹ 2,350 ₹ 35,250 11 Optical Fiber TOSLINK 2 ₹ 1,60,000 ₹ 3,20,000 12 CAT - 6 Cable ENTER 15 ₹ 1,600 ₹ 24,000 13 Projector Epson 8 ₹ 34,000 ₹ 2,72,000 14 Projector Screen Inlight 7 ₹ 6,000 ₹ 42,000 15 MFD HP 16 ₹ 22,700 ₹ 3,63,200 16 Printer Epson 15 ₹ 6,500 ₹ 97,500 17 ProAudio SuperStore Large Office Kit Assembled 5 ₹ 1,14,000 ₹ 5,70,000 18 Network Racks 7 ₹ 10,000 ₹ 70,000 TOTAL ₹ 2,48,51,420
  • 27. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 25 of 33 Apurv (14020541007) – CFONCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Software Cost : SR NO PRODUCT NAME MANUFACTU RER QUANTITY UNIT PRICE(RS) TOTAL COST(RS) 1 MS Office 2013 Professional Microsoft 400 ₹ 17,500 ₹ 70,00,000 2 MS Windows 2012 Server Standard OLP (2 Proc) AE License ESD Microsoft 8 ₹ 62,000 ₹ 4,96,000 3 IP Calling NCH Software 14 packs ₹ 7,800 ₹ 1,09,200 4 Antivirus Kaspersky 450 ₹ 550 ₹ 2,47,500 TOTAL ₹ 78,52,700
  • 28. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 26 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Service Cost : . PRODUCT NAME MANUFACTUR ER QUANTITY UNIT PRICE(RS) TOTAL COST(RS) 1 Internet BSNL FTTH Fibro ULD 9999 (30Mbps) BSNL 1 line ₹ 1,09,989 ₹ 1,09,989 2 Infinity 4 Mbps PLUS Tata Indicom 1 line ₹ 60,000 ₹ 60,000 3 VPN Reliance 1 line ₹8,50,000 ₹8,50,000 4 H/W Installation 425 ₹ 500 ₹ 2,12,500 5 S/W Installation ₹1,50,000 6 N/W Installation + 1 Year AMC ₹ 2,00,000 TOTAL ₹ 15,82,489 Apurv (14020541007) – CFO
  • 29. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 27 of 33 Tarun (14020541061) – COO NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Deployment Plan :  A Deployment Plan defines the sequence of operations or steps that must be carried to deliver changes into a target system environment  The transportation of hardware components may take 15 days.  The internet connection line to get connected and ON in the campus would take 25 days.  The total setup will be ready within 50 days.
  • 30. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 28 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Installation Plan : Task No. Task Days Required Dependency Labour Required 1. Internet Connection 30 Days On Weather 10 2. Server Room 5 Days On ELectricity 5 3. Meeting Room, Lab 1, Lab 2 3 Days On Electricity 10 Tarun (14020541061) – COO
  • 31. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 29 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Task No. Task Days Required Dependency Labour Required 4. Front Office, Executives, Accounts 3 Days On Electricity 10 5. Floor 1, Floor 2, Floor 3, Floor 4 5 Days On Electricity 5,10,10,5 Tarun (14020541061) – COO
  • 32. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 30 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Total Labour & Days required : Total Labours Total Days 40 46 Tarun (14020541061) – COO
  • 33. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 31 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Offer Overview :  1 year consulting free  On site service management for 24x7.  Reduction in installment days and cost beared by us.  5% discount on full advance Payment Madhurendra (14020541070) – CEO
  • 34. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 32 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Final Design Solution and Offer : Component Cost HARDWARE INR. 2,48,51,420 SOFTWARE INR. 78,52,700 SERVICES INR. 15,82,489 Misc INR. 1,00,000 TOTAL INR. 3,52,86,609 Service tax INR. 1,95,595.64 GRAND TOTAL INR. 3,45,82,204.64 5% Discount INR . 17,29,110.23 Final Price INR. 3,28,53,094.41  1 year consulting free  On site service management for 24x7.  Reduction in installment days and cost bearded by us. Madhurendra (14020541070) – CEO
  • 35. Symbiosis Institute Of Telecom Management, Pune Syndicate No - 7 33 of 33 NCC Presentation N e t C o m m S o l u t I o n s F o r A B e t t e r W o r l d Madhurendra (14020541070) – CEO Thank You

Editor's Notes

  1. All buildings are connected via Fiber Optics to avoid bottleneck between building 2 and 3 and faster connectivity.
  2. We have taken two internet lines one direct fiber line from bsnl(30Mbps for first 150 Gb and then 10 Mbps) and another backup Tata line of 4 Mbps 4 main servers for Web, Mail, Ad+DHCP, Antivirus 3 low end backup servers for web , mail, AD+DHCP 1 Data Center Firewall
  3. Building 2 is connected to both building 1 & 3 with optical fibre. It contains Front office, Executives and Accounts department. We have provided personal printers to all Executives and a shared MFD for each department. Main switch is of 48 ports. Executives are also provided laptops and others are provided desktop. 1 wireless AP is also provided here for laptops.
  4. Building 2 is connected to both building 1 & 3 with optical fibre. It contains Front office, Executives and Accounts department. We have provided personal printers to all Executives and a shared MFD for each department. Main switch is of 48 ports. Executives are also provided laptops and others are provided desktop. 1 wireless AP is also provided here for laptops.
  5. Building 3 has 4 floors. It is connected with building 1 and 2 with optical fibre for best results. We have provided 1 shared printer between every 50 terminals. Every floor has a wireless access point. We have also used stacks in switches which will provide flexibility to network. Main switch is of 48 ports stacked with 24 ports rack.
  6. Building 3 has 4 floors. It is connected with building 1 and 2 with optical fibre for best results. We have provided 1 shared printer between every 50 terminals. Every floor has a wireless access point. We have also used stacks in switches which will provide flexibility to network. Main switch is of 48 ports stacked with 24 ports rack.
  7. Processor Specs for assembled servers Intel Xeon E5-2609v2 --- Smart cahce: 10 mb QPI :6.4 GT/s Intel Xeon E7-2850V2-- Smart cahce: 24 mb QPI : 7.2 GT/s The Intel QuickPath Interconnect (QPI) a point-to-point processor interconnect developed by Intel which replaced the front-side bus (FSB) in Xeon. T-transfers per second. Supermicro motherboard.
  8. Processor Specs for assembled servers Intel Xeon E5-2609v2 --- Smart cahce: 10 mb QPI :6.4 GT/s Intel Xeon E7-2850V2-- Smart cahce: 24 mb QPI : 7.2 GT/s
  9. Since Hp is expensive and single point failure , we choose Two seagate Business Storage instead of Hp Raid Levels for Seagate: RAID 0, 1, 5, 6, 10 Raid Levels for WD: RAID 0, 1, 5, 6, 10 Raid Levels for HP: 0 , 1 , 1 ADM , 10 , 5 , 50 , 6 , 60
  10. We have selected HP because it is most trusted desktop brand. I5 processor is sufficient for office use but better than i3 . Hard disk space of 500 GB is enough ,thus we did not go to 1 TB space. Operating system available with this PC is Windows 8.1.
  11. We have selected laptop of Lenovo company. The processor is very good in it. Ram of 4GB is also sufficient for office work. As laptops will be used in office ,the operating system installed in it is Win 8.1 Professional version which is not present in its competitors. Thus it is costlier than others. The price is Rs. 51490.
  12. We have selected D-link switch because it has better features than others and still cheap. Operating temperature range is maximum for D-link switch. Switching fabric is greater in D-link switch than its competitors. But the power consumption is also maximum in D-link. SFP-The small form-factor pluggable (SFP) is a compact, hot-pluggable transceiver used for both telecommunication and data communications applications.  It interfaces a network device motherboard (for a switch, router, media converter or similar device) to a fiber optic or copper networking cable.
  13. We have selected Cisco wireless Access Point. Range is 150
  14. 1.Kaspersky uses cloud-assisting technologies for malware protection. 2.The Pc performance and efficiency are not compromised.
  15. We have selected Epson Printer.
  16. If client need any more negotiations or any further changes we will look into it.