Nothing extensive just answer questions....Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario. The WBS and resultant schedule should contain the following high-level activities: 1.0 Evaluate User & System Requirements 2.0 Evaluate ODHS Network Suitability 3.0 Conduct E-mail System Selection 4.0 Upgrade ODHS Network & Hardware 5.0 Develop E-mail Training 6.0 Deploy E-mail System ...