Project Management
Risks and Constraints
Intelligent project management requires
getting a handle on risks and constraints.
Here’s a primer on the most common
challenges your project will face.
Definitions
• A risk is an event that may or may not
happen. If it does happen, it will have
unwanted consequences and will result in
losses.
• A constraint is a real-world limit on the
possibilities for your project.
What Risk Management Does
• Identify potential problems and confront them when it is
cheaper and easier to do so, before there are problems
and before a crisis blows up.
• Focus on the project’s goals and consciously look for
things that may affect quality throughout the project
lifecycle.
• Identify potential problems early in the planning cycle
(the proactive approach) and provide input into
management decisions regarding resource allocation.
• Involve personnel at all levels of the project, focus their
attention on a shared project (or product) vision, and
provide a mechanism for achieving it.
• Increase the overall chances of project success.
All Projects Have a Downside
• Look at everything that will get in your way
or become a potential roadblock.
• If it is at all possible, look at both the
positive and negative sides of the project
before making a commitment to it.
Common Project Risks-1
• Funding: Will you get enough money to fund
your project’s needs?
• Time: Things can take much longer than
originally planned.
• Staffing: Do you have the right staff? Do they
have the right skill set and experience to meet
your project’s objectives?
• Customer relations: If your customer can’t or
won’t work with your project team to help define
the attributes of the project solution, watch out
down the road.
Common Project Risks-2
• Project size and complexity: When a project is
too complex or large, it will be hard to stay within
budget and get it done on time, and there will be
too many factors to control. Any of them can bite
you.
• Overall structure: As a result of political
decisions, responsibility gets split between
competing groups and organizations
• External factors: There are factors outside of
your control, such as regulations, changing
technologies, etc., that can throw your project
off.
Business Risks
• Market acceptance: Will the customer buy the
product?
• Time to market: Can you get the product out
there before anyone else does?
• Incompatible product fit: It’s a great product,
but no one can afford it.
• Difficult to sell: It’s a high-ticket item or doesn’t
offer enough incentive to sell.
• Loss of support from the higher-ups: If a new
manager is brought on board at a higher level,
your project could lose support and funding.
Acts of God, Man and War
• Your project should be insured (if possible)
against:
– Hurricanes
– Tornadoes and Hailstorms
– Floods
– Earthquakes
– Terrorism
• Be aware, though, that many insurance policies
have exclusionary clauses covering some of the
items above.
Three Types of Risk
• Known risks: You can identify these after reviewing the
project definition within the context of the technical and
business environments. Use your own experience and
that of your stakeholders to define such risks.
• Predictable risks: These are risks that might occur or
are anticipated based on work on other similar projects.
They have to do with the economy or staff turnover and
have an anticipated impact. You will be instinctively
aware of these risks.
• Unpredictable risks: The “doo-doo happens” things
beyond the control of any project manager or project
team.
Constraints to Consider-1
• Budget
• Schedule
• People
• Real life in the real world
• Equipment, facilities and infrastructure
Constraints to Consider-2
• Budget: How much money is available and
when?
– Budgets are both constraints and risks.
– Projects are more expensive than realized.
– Your company could charge your project budget for
employees you borrow and company services you
require.
– Be careful not to agree to a budget just to please
someone in management or the customer if you
already know that funds are inadequate.
Constraints to Consider-3
• Schedule: By when must the project be
completed?
– Is your project built around impossible dates?
– Even if the due date is not critical, if the
project continues beyond it, it will cause the
budget to bloat.
– Missing an end date could cause serious
marketing consequences.
Constraints to Consider-4
• People: What inside and outside
resources are required? Can you afford
them?
– If the right people aren’t available, or you can’t
afford them, you will have to make due with
what’s available, and that might not be good.
– Availability is both a risk and a constraint that
is ongoing through the life of the project.
Constraints to Consider-5
• Real life in the real world:
– Getting a project underway takes time to get
everyone working well and productively
together given all risks and constraints.
– Communication will help with project
synchronization needs.
– By the first project milestone, review all
relationships, progress and effects the actual
project has on your workforce, budget and
schedule.
Constraints to Consider-6
• Facilities, equipment and infrastructure:
– Will the required equipment and facilities be
available within the project’s timeframe?
– Document your facilities, equipment and
infrastructure constraints for the project well in
the statement of work (SOW) as part of the
scope statement, because these constraints
will limit what can be done in the project.
Tying It All Together
• Project risks and constraints should be
accounted for before the project gets
underway.
• Some projects should simply not happen.
• Be careful of inheriting problem projects.
• The impossible stays impossible, no
matter how enthusiastic and motivated the
project manager and the project team are.

More Related Content

Similar to PM-Risks-and-Constraints.ppt

PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdfMrUmairKhan1
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009Manish Chaurasia
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a projectZilicus
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsDaniel_Mccrea
 
Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Skillogic Solutions
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planningJeanette C. Patindol
 
Planning and implementing project.pptx
 Planning and implementing project.pptx Planning and implementing project.pptx
Planning and implementing project.pptxParmeshwar Biradar
 
Chapter 3 Project Identification BnFn.pptx
Chapter 3  Project Identification BnFn.pptxChapter 3  Project Identification BnFn.pptx
Chapter 3 Project Identification BnFn.pptxFedaEtefa
 
Strategy Execution - 7 ways to mitigate risk
Strategy Execution - 7 ways to mitigate riskStrategy Execution - 7 ways to mitigate risk
Strategy Execution - 7 ways to mitigate riskESI14
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skillspaulyeboah
 
Presentation-RA-R1-30-10-2022.pptx
Presentation-RA-R1-30-10-2022.pptxPresentation-RA-R1-30-10-2022.pptx
Presentation-RA-R1-30-10-2022.pptxNazrin75
 
Project Reviews - The Basics
Project Reviews - The BasicsProject Reviews - The Basics
Project Reviews - The BasicsDarrinNoel
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...Andrew John Slaney
 

Similar to PM-Risks-and-Constraints.ppt (20)

PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdf
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009
 
Mpug 111208 generic
Mpug 111208 genericMpug 111208 generic
Mpug 111208 generic
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a project
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for Professionals
 
Pm lecture
Pm lecturePm lecture
Pm lecture
 
PM_lecture.pdf
PM_lecture.pdfPM_lecture.pdf
PM_lecture.pdf
 
Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Planning and implementing project.pptx
 Planning and implementing project.pptx Planning and implementing project.pptx
Planning and implementing project.pptx
 
Chapter 3 Project Identification BnFn.pptx
Chapter 3  Project Identification BnFn.pptxChapter 3  Project Identification BnFn.pptx
Chapter 3 Project Identification BnFn.pptx
 
Unit 1 PM.pptx
Unit 1 PM.pptxUnit 1 PM.pptx
Unit 1 PM.pptx
 
Strategy Execution - 7 ways to mitigate risk
Strategy Execution - 7 ways to mitigate riskStrategy Execution - 7 ways to mitigate risk
Strategy Execution - 7 ways to mitigate risk
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skills
 
Presentation-RA-R1-30-10-2022.pptx
Presentation-RA-R1-30-10-2022.pptxPresentation-RA-R1-30-10-2022.pptx
Presentation-RA-R1-30-10-2022.pptx
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
 
Presentación
PresentaciónPresentación
Presentación
 
Project Reviews - The Basics
Project Reviews - The BasicsProject Reviews - The Basics
Project Reviews - The Basics
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...
What Qualities Make for a Great Lean Six Sigma Green Belt Project? Project Se...
 

More from Adrian Yap

ERP MODULES - Historical development details
ERP MODULES - Historical development detailsERP MODULES - Historical development details
ERP MODULES - Historical development detailsAdrian Yap
 
Product-Risk-Analysis.pdf
Product-Risk-Analysis.pdfProduct-Risk-Analysis.pdf
Product-Risk-Analysis.pdfAdrian Yap
 
Lean-project-management-lean-driven-innovation.pdf
Lean-project-management-lean-driven-innovation.pdfLean-project-management-lean-driven-innovation.pdf
Lean-project-management-lean-driven-innovation.pdfAdrian Yap
 
Issue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptxIssue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptxAdrian Yap
 
World-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdfWorld-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdfAdrian Yap
 
The internet of things
The internet of thingsThe internet of things
The internet of thingsAdrian Yap
 

More from Adrian Yap (6)

ERP MODULES - Historical development details
ERP MODULES - Historical development detailsERP MODULES - Historical development details
ERP MODULES - Historical development details
 
Product-Risk-Analysis.pdf
Product-Risk-Analysis.pdfProduct-Risk-Analysis.pdf
Product-Risk-Analysis.pdf
 
Lean-project-management-lean-driven-innovation.pdf
Lean-project-management-lean-driven-innovation.pdfLean-project-management-lean-driven-innovation.pdf
Lean-project-management-lean-driven-innovation.pdf
 
Issue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptxIssue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptx
 
World-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdfWorld-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdf
 
The internet of things
The internet of thingsThe internet of things
The internet of things
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

PM-Risks-and-Constraints.ppt

  • 1. Project Management Risks and Constraints Intelligent project management requires getting a handle on risks and constraints. Here’s a primer on the most common challenges your project will face.
  • 2. Definitions • A risk is an event that may or may not happen. If it does happen, it will have unwanted consequences and will result in losses. • A constraint is a real-world limit on the possibilities for your project.
  • 3. What Risk Management Does • Identify potential problems and confront them when it is cheaper and easier to do so, before there are problems and before a crisis blows up. • Focus on the project’s goals and consciously look for things that may affect quality throughout the project lifecycle. • Identify potential problems early in the planning cycle (the proactive approach) and provide input into management decisions regarding resource allocation. • Involve personnel at all levels of the project, focus their attention on a shared project (or product) vision, and provide a mechanism for achieving it. • Increase the overall chances of project success.
  • 4. All Projects Have a Downside • Look at everything that will get in your way or become a potential roadblock. • If it is at all possible, look at both the positive and negative sides of the project before making a commitment to it.
  • 5. Common Project Risks-1 • Funding: Will you get enough money to fund your project’s needs? • Time: Things can take much longer than originally planned. • Staffing: Do you have the right staff? Do they have the right skill set and experience to meet your project’s objectives? • Customer relations: If your customer can’t or won’t work with your project team to help define the attributes of the project solution, watch out down the road.
  • 6. Common Project Risks-2 • Project size and complexity: When a project is too complex or large, it will be hard to stay within budget and get it done on time, and there will be too many factors to control. Any of them can bite you. • Overall structure: As a result of political decisions, responsibility gets split between competing groups and organizations • External factors: There are factors outside of your control, such as regulations, changing technologies, etc., that can throw your project off.
  • 7. Business Risks • Market acceptance: Will the customer buy the product? • Time to market: Can you get the product out there before anyone else does? • Incompatible product fit: It’s a great product, but no one can afford it. • Difficult to sell: It’s a high-ticket item or doesn’t offer enough incentive to sell. • Loss of support from the higher-ups: If a new manager is brought on board at a higher level, your project could lose support and funding.
  • 8. Acts of God, Man and War • Your project should be insured (if possible) against: – Hurricanes – Tornadoes and Hailstorms – Floods – Earthquakes – Terrorism • Be aware, though, that many insurance policies have exclusionary clauses covering some of the items above.
  • 9. Three Types of Risk • Known risks: You can identify these after reviewing the project definition within the context of the technical and business environments. Use your own experience and that of your stakeholders to define such risks. • Predictable risks: These are risks that might occur or are anticipated based on work on other similar projects. They have to do with the economy or staff turnover and have an anticipated impact. You will be instinctively aware of these risks. • Unpredictable risks: The “doo-doo happens” things beyond the control of any project manager or project team.
  • 10. Constraints to Consider-1 • Budget • Schedule • People • Real life in the real world • Equipment, facilities and infrastructure
  • 11. Constraints to Consider-2 • Budget: How much money is available and when? – Budgets are both constraints and risks. – Projects are more expensive than realized. – Your company could charge your project budget for employees you borrow and company services you require. – Be careful not to agree to a budget just to please someone in management or the customer if you already know that funds are inadequate.
  • 12. Constraints to Consider-3 • Schedule: By when must the project be completed? – Is your project built around impossible dates? – Even if the due date is not critical, if the project continues beyond it, it will cause the budget to bloat. – Missing an end date could cause serious marketing consequences.
  • 13. Constraints to Consider-4 • People: What inside and outside resources are required? Can you afford them? – If the right people aren’t available, or you can’t afford them, you will have to make due with what’s available, and that might not be good. – Availability is both a risk and a constraint that is ongoing through the life of the project.
  • 14. Constraints to Consider-5 • Real life in the real world: – Getting a project underway takes time to get everyone working well and productively together given all risks and constraints. – Communication will help with project synchronization needs. – By the first project milestone, review all relationships, progress and effects the actual project has on your workforce, budget and schedule.
  • 15. Constraints to Consider-6 • Facilities, equipment and infrastructure: – Will the required equipment and facilities be available within the project’s timeframe? – Document your facilities, equipment and infrastructure constraints for the project well in the statement of work (SOW) as part of the scope statement, because these constraints will limit what can be done in the project.
  • 16. Tying It All Together • Project risks and constraints should be accounted for before the project gets underway. • Some projects should simply not happen. • Be careful of inheriting problem projects. • The impossible stays impossible, no matter how enthusiastic and motivated the project manager and the project team are.