Council Directive 79/409/EEC on the conservation of wild birds, Article 4:
 Relates to the conservation of all species of naturally occurring birds.
 Covers the protection, management and control of these species and lays down rules for
their exploitation.
Article 4:
 Subject to special conservation measures with regard to their habitat to ensure survival
and reproduction.
 Member states are obliged to classify the suitable territories for the conservation of
these species.
 Measures must be taken for the regularly occurring migratory species as well.
 They shall notify the Commission all the related information so that it can coordinate to
protect the species in the areas where the Directive applies.
 Member States shall take appropriate steps to avoid pollution or deterioration of habitats
• Applicant- Commission of the European Communities (represented
by Ingolf Pernice, a member of the legal department)
• Defendant- Federal Republic of Germany (represented by Ernst
Röder)
• Third party / Intervener- United Kingdom of Great Britain and
Northern Ireland (represented by S. J. Hay)
The application initially comprised two claims-
1. Dredging and filling operations in the Rysumer Nacken.
2. Second concerning dyke-building operations carried out in the Leybucht.
With regard to the first claim-
 Rysumer Nacken is not designated as a special protection area
 they will have to bear the costs relating to the point as put forward by the defendant
Regarding the second claim-
 Dyke-building operations in the Leybucht disturb birds which enjoy special protection
under the Directive and damage.
 Member states need to take positive states to avoid any deterioration or pollution of
the habitat
 Theirs coastal defence measures are only acceptable in case of a threat to human
life
The 1st Claim-
• the defendant argued the Commission had all the information regarding
legal status of Rysumer Nacken.
• The place is not under the special protection area and is not a new
argument.
• New line of the dyke in the Leybucht and the areas located on the
landward side of the dyke are excluded from the protected areas.
• The competent authorities took account of all bird conservation
requirements and balanced against the requirements of coastal
protection.
• new line of the dyke and the temporary disturbances constitute the
smallest possible interference
• Commission has not furnished any evidence for impair the protection of
• Commission failed to establish significant effect under the
Directive- The United Kindom
• Commission materials does not support the idea that the project in
Leibucht involve deterioration of habitat of the birds.
• Supports the evidence provided by the defendant that the works at
issue will significantly improve ecological conditions in the
Leybucht.
• Member States must be able to take into account the interests of
persons living in or around a special protection area.
• Maps and information about the park were given by Germany in
1988.
• Rysumer Nacken has no defenses.
• The limits of the Leybucht have been established.
• A state may limit a protected area's size for reasons other than
ecological.
• Aerial fortification and dike construction are justified if they do
not reduce the particular protection area
• The state sets the size.
• Fortification of coastal areas and daches Wattenmeer's avocet
population is stable. They haven't updated population figures.
• Application was dismissed.
• The Commission was ordered to pay the costs including
the costs of the intervener and those related to the
application for interim measures.
Leybucht-Wild-Birds-Protection-Case.pptx

More Related Content

Similar to Leybucht-Wild-Birds-Protection-Case.pptx

Ramsar: The Convention of Wetlands of International Importance. BMN dela Cruz
Ramsar: The Convention of Wetlands of International Importance. BMN dela CruzRamsar: The Convention of Wetlands of International Importance. BMN dela Cruz
Ramsar: The Convention of Wetlands of International Importance. BMN dela CruzBevs Dela Cruz
 
Presentation battleby may14
Presentation battleby may14Presentation battleby may14
Presentation battleby may14Zoltan Kun
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfAnonymousTxhyGf
 
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *Pan Baltic Scope / Baltic SCOPE
 
Trilateral Wadden Sea Cooperation
Trilateral Wadden Sea CooperationTrilateral Wadden Sea Cooperation
Trilateral Wadden Sea Cooperationriseagrant
 
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Shortijlstra
 
How Conservation Impinges on Planning
How Conservation Impinges on PlanningHow Conservation Impinges on Planning
How Conservation Impinges on Planningnettyharley
 
Lesson 8 Concerns | The Harnessed Atom (2016)
Lesson 8 Concerns | The Harnessed Atom (2016)Lesson 8 Concerns | The Harnessed Atom (2016)
Lesson 8 Concerns | The Harnessed Atom (2016)ORAU
 
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...Potential Climate Change Litigation under the United Nations Fish Stocks Agre...
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...Dr. William C.G. Burns
 
Environmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate InductionEnvironmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate InductionSimon Bell MSc AIEMA
 
Land remediation and conservation - the interaction of regulatory regimes
Land remediation and conservation - the interaction of regulatory regimesLand remediation and conservation - the interaction of regulatory regimes
Land remediation and conservation - the interaction of regulatory regimesIES / IAQM
 
ENVIRONMENTAL LAW [Autosaved].pptx
ENVIRONMENTAL LAW [Autosaved].pptxENVIRONMENTAL LAW [Autosaved].pptx
ENVIRONMENTAL LAW [Autosaved].pptxkenjiekris
 
Large scale marine energy projects in Natura2000 - legal aspects
Large scale marine energy projects in Natura2000 - legal aspectsLarge scale marine energy projects in Natura2000 - legal aspects
Large scale marine energy projects in Natura2000 - legal aspectsEIP Water
 
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Aaron Organ
 
Exclusive economic zone and legal provisions
Exclusive economic zone and legal provisionsExclusive economic zone and legal provisions
Exclusive economic zone and legal provisionsAthanasios Pitatzis
 

Similar to Leybucht-Wild-Birds-Protection-Case.pptx (20)

Ramsar: The Convention of Wetlands of International Importance. BMN dela Cruz
Ramsar: The Convention of Wetlands of International Importance. BMN dela CruzRamsar: The Convention of Wetlands of International Importance. BMN dela Cruz
Ramsar: The Convention of Wetlands of International Importance. BMN dela Cruz
 
Bilge management
Bilge managementBilge management
Bilge management
 
Presentation battleby may14
Presentation battleby may14Presentation battleby may14
Presentation battleby may14
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdf
 
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *
Baltic SCOPE stakeholder workshop on FISHERIES - conflicts and synergies *
 
Zeetex CEDRE
Zeetex CEDREZeetex CEDRE
Zeetex CEDRE
 
ZeeTex CEDRE
ZeeTex CEDREZeeTex CEDRE
ZeeTex CEDRE
 
Trilateral Wadden Sea Cooperation
Trilateral Wadden Sea CooperationTrilateral Wadden Sea Cooperation
Trilateral Wadden Sea Cooperation
 
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short
20100507 Presentatie Voor Ger Mix Dd 7mei2010 Short
 
How Conservation Impinges on Planning
How Conservation Impinges on PlanningHow Conservation Impinges on Planning
How Conservation Impinges on Planning
 
Environmental Laws
Environmental LawsEnvironmental Laws
Environmental Laws
 
Taming the Resource Curse Part 1
Taming the Resource Curse Part 1Taming the Resource Curse Part 1
Taming the Resource Curse Part 1
 
Lesson 8 Concerns | The Harnessed Atom (2016)
Lesson 8 Concerns | The Harnessed Atom (2016)Lesson 8 Concerns | The Harnessed Atom (2016)
Lesson 8 Concerns | The Harnessed Atom (2016)
 
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...Potential Climate Change Litigation under the United Nations Fish Stocks Agre...
Potential Climate Change Litigation under the United Nations Fish Stocks Agre...
 
Environmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate InductionEnvironmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate Induction
 
Land remediation and conservation - the interaction of regulatory regimes
Land remediation and conservation - the interaction of regulatory regimesLand remediation and conservation - the interaction of regulatory regimes
Land remediation and conservation - the interaction of regulatory regimes
 
ENVIRONMENTAL LAW [Autosaved].pptx
ENVIRONMENTAL LAW [Autosaved].pptxENVIRONMENTAL LAW [Autosaved].pptx
ENVIRONMENTAL LAW [Autosaved].pptx
 
Large scale marine energy projects in Natura2000 - legal aspects
Large scale marine energy projects in Natura2000 - legal aspectsLarge scale marine energy projects in Natura2000 - legal aspects
Large scale marine energy projects in Natura2000 - legal aspects
 
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
 
Exclusive economic zone and legal provisions
Exclusive economic zone and legal provisionsExclusive economic zone and legal provisions
Exclusive economic zone and legal provisions
 

Recently uploaded

Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Hyderabad Escorts Agency
 
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...Amil baba
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsMonica Sydney
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...kumargunjan9515
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...kumargunjan9515
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAaimanhadi215
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Hyderabad Escorts Agency
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...Envirotac Inc.
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfgarthraymundo123
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesMonica Sydney
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 

Recently uploaded (20)

Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 

Leybucht-Wild-Birds-Protection-Case.pptx

  • 1. Leybucht Wild Birds Protection Case Presented By- Shahal Ibn Islam Joy Neptun ID-JRKVWY Mahmuda Rahman Bristy Neptun ID-VELW28 Shahria Tanzil Neptun ID-A2T5YS
  • 2.
  • 3.
  • 4.
  • 5. Council Directive 79/409/EEC on the conservation of wild birds, Article 4:  Relates to the conservation of all species of naturally occurring birds.  Covers the protection, management and control of these species and lays down rules for their exploitation. Article 4:  Subject to special conservation measures with regard to their habitat to ensure survival and reproduction.  Member states are obliged to classify the suitable territories for the conservation of these species.  Measures must be taken for the regularly occurring migratory species as well.  They shall notify the Commission all the related information so that it can coordinate to protect the species in the areas where the Directive applies.  Member States shall take appropriate steps to avoid pollution or deterioration of habitats
  • 6. • Applicant- Commission of the European Communities (represented by Ingolf Pernice, a member of the legal department) • Defendant- Federal Republic of Germany (represented by Ernst Röder) • Third party / Intervener- United Kingdom of Great Britain and Northern Ireland (represented by S. J. Hay)
  • 7. The application initially comprised two claims- 1. Dredging and filling operations in the Rysumer Nacken. 2. Second concerning dyke-building operations carried out in the Leybucht. With regard to the first claim-  Rysumer Nacken is not designated as a special protection area  they will have to bear the costs relating to the point as put forward by the defendant Regarding the second claim-  Dyke-building operations in the Leybucht disturb birds which enjoy special protection under the Directive and damage.  Member states need to take positive states to avoid any deterioration or pollution of the habitat  Theirs coastal defence measures are only acceptable in case of a threat to human life
  • 8. The 1st Claim- • the defendant argued the Commission had all the information regarding legal status of Rysumer Nacken. • The place is not under the special protection area and is not a new argument. • New line of the dyke in the Leybucht and the areas located on the landward side of the dyke are excluded from the protected areas. • The competent authorities took account of all bird conservation requirements and balanced against the requirements of coastal protection. • new line of the dyke and the temporary disturbances constitute the smallest possible interference • Commission has not furnished any evidence for impair the protection of
  • 9. • Commission failed to establish significant effect under the Directive- The United Kindom • Commission materials does not support the idea that the project in Leibucht involve deterioration of habitat of the birds. • Supports the evidence provided by the defendant that the works at issue will significantly improve ecological conditions in the Leybucht. • Member States must be able to take into account the interests of persons living in or around a special protection area.
  • 10. • Maps and information about the park were given by Germany in 1988. • Rysumer Nacken has no defenses. • The limits of the Leybucht have been established. • A state may limit a protected area's size for reasons other than ecological. • Aerial fortification and dike construction are justified if they do not reduce the particular protection area • The state sets the size. • Fortification of coastal areas and daches Wattenmeer's avocet population is stable. They haven't updated population figures.
  • 11. • Application was dismissed. • The Commission was ordered to pay the costs including the costs of the intervener and those related to the application for interim measures.