Chapter 11
Creating Information Systems
What managers need to know about the process by which
organizational information systems come to be
Chapter 11
1
Course Roadmap
• Part I: Foundations
• Part II: Competing in the Internet Age
• Part III: The Strategic use of Information Systems
• Part IV: Getting IT Done
– Chapter 10: Funding Information Systems
– Chapter 11: Creating Information Systems
– Chapter 12: Information System Trends
– Chapter 13: Security, Privacy and Ethics
2
Learning Objectives
1. To appreciate how complex it is to design and implement information systems and
the stable, robust, secure technology at their core.
2. To articulate the advantages and disadvantages of custom software design and
development versus acquisition of an off-the-shelf product.
3. To describe and be able to use the main methodologies for custom software
design and development. Specifically, you will be able to identify the major phases
of the system development life cycle (SDLC) and discuss its advantages and
disadvantages. You will also become familiar with the prototyping approach and
will be able to identify its principal advantages and disadvantages.
4. To describe the systems selection methodology and be able to use it to choose a
pre-packaged software program for a specific organization.
5. To describe the reasons for the increasing prominence of end-user development in
modern organizations and to articulate the benefits and risks of this approach to
software development.
3
Introduction
• Whether the information systems rely on custom-developed technology or
off-the-shelf software, it is critical that you as a general or functional
manager understand how information systems come to be.
• While general and functional managers need not be concerned with
hardware decisions, they must take part in the software design,
acquisition, and implementation processes.
• Involvement in information systems funding and design is essential
because never before has a firm’s success depended so much on the use
of the right software applications.
• Deciding what the characteristics of the “right” applications are is a
business decision that is based more on the business case and the
understanding of the business processes the software will enable (or
constrain!) than on any technical consideration
4
Risks & Rewards
5
How Hard Can IT Be?
• Challenge: The U.S. subsidiary of one of the major food
producers in the world inked a deal to implement SAP
(the leading enterprise system application), in an effort
to centralize and rationalize operations across its nine
divisions. The project required streamlining processes,
standardizing software applications, and implementing
the same organizational structure across the units
• Question: How much time and how much money
would you budget for this project?
• Answer: six years and over $200 million
6
How Hard Can IT Be?
• Challenge: A large hospitality company with over 2,000
branded hotels developed a customer information
system to enable its customer relationship
management (CRM) strategy. The custom-developed
functionalities of the software application at the heart
of the information system included a property-
management system, the loyalty and CRM applications,
and the reporting modules.
• Question: How much time and how much money
would you budget for this project?
• Answer: Two years and about $120 million.
7
Information Systems Development
• Technology Development
– The process of creating the core IT
– IT can be acquired and integrated into existing
infrastructure
– IT can be custom-built by (or for) the
organization
• Information System Development
– Successfully integrating the technology with the
other components to achieve a working system
8
Three Approaches
• Custom design and development
• Implementing software that is expressly made to
fit the unique needs of the organization
• System selection and acquisition
• Implement an off-the-shelf application that is
mass produced by a vendor
• End-user development
• Implement a software application that is created
by an end users, rather than the firms IS
professionals
9
Advantages of Custom
Development
• Unique Tailoring
– Molded to fit the unique features, characteristics,
and needs of the firm that commissions them.
– Off-the-shelf software may require adjustment
(customization) to fit the organization
• Flexibility and Control
– Building from scratch allows the software to be
molded into any form and modified at a later time
10
Advantages of Purchasing
• Faster Roll-Out
– Purchased software dramatically reduce the time it takes
to obtain the software and to begin the implementation
process
• Knowledge Infusion
– Software developers proactively seek out best practices in
order to code their applications
• Economically Attractive
– The firm can capitalize on economies of scale created by
the vendor
• Software Quality
– Mature off-the-shelf products have been heavily tested
11
Make and Buy
• Modern firms are blending the custom
development and selection approaches
– First firms acquire off-the-shelf systems, then they
modify them extensively
– Few firms modify off-the-shelf applications slightly
or not at all
– Off-the-shelf applications are becoming larger and
more complex, and require some modification to
fit the purchasing firm
12
Design and Development
Methodologies
13
Systems Development Life Cycle
• The SDLC approach is predicated on the
notion that detailed justification and planning
will reduce risk and uncertainty in systems
development
– Critical: Involvement from end-users and
functional managers
– Requires considerable time analyzing
requirements up front
– Requires that changes after the project has
started be kept to a minimum
14
Principal Phases of the SDLC
• Definition
– Investigation
– Feasibility Analysis
– System Analysis
• Build
– System Design
– Programming
– Testing
• Implementation
– Installation
– Operations
– Maintenance
15
Principal Phases of the SDLC
• Definition
– Investigation
– Feasibility Analysis
– System Analysis
• Build
– System Design
– Programming
– Testing
• Implementation
– Installation
– Operations
– Maintenance
16
The Definition Phase
• Concerned with clearly identifying the
features of the proposed information system
• Critical is the involvement of end-users and
functional managers at this time
• Resources (systems analysts) during this phase
will identify and articulate the system
requirements
17
The Definition Phase
• Investigation Stage
– Identify the business issues the system will pertain
to
– Formulate:
• Main goals of the system
• Scope of the design
• Value proposition of the new system
– Typically a very informal stage
18
The Definition Phase
• Feasibility Analysis Stage
– Used to ensure that organizational resources are put to the
best use
– Technical Feasibility: Evaluate whether the proposed
system is viable from a technology standpoint
– Operational Feasibility: Evaluate whether the Information
System as planned will work in the organization
– Economic Feasibility: Evaluation of the financial viability of
the system
• Perform a cost/benefit analysis in order to ensure the money
spent will meet the firm’s financial hurdles.
19
The Definition Phase
• Systems Analysis Stage
– The process of identifying and articulating the system
requirements
– Systems analysts play a major role at this stage
– Systems analysts must seek out and value the input of end-
users and other stakeholders
– The systems requirements document
• Details the inputs the systems will accept
• Details the outputs the system will produce
• Once approved (client sign-off), the requirements are “frozen”
• In a strict waterfall approach no further changes are allowed
20
The Build Phase
• Definition
– Investigation
– Feasibility Analysis
– System Analysis
• Build
– System Design
– Programming
– Testing
• Implementation
– Installation
– Operations
– Maintenance
21
The Build Phase
• The most technical phase
• The one by which people picture when they
imagine how software is designed and
developed
• Key resources involved includes systems
architects and programmers
• The objective is to take the system
requirements document and produce a
robust, secure, and efficient application.
22
The Build Phase
• Systems Design Stage
– Using the results from the definition phase, systems architects create the overall structure of
the system
– The output of this stage is a precise set of documents that programmers will employ to write
code
• Programming Stage
– The process of translating the abstract software design into a set of
instructions that can be executed by the hardware
– Thorough and clear documentation is essential for support, maintenance, and
upgrades
• Testing
– Programmers are constantly engaged in testing as they develop the system
– Formalized testing of the completed application is an essential stage of the
SDLC
– The objective it to release the application when it is good enough, not when it
is flawless
23
System Design: Example
24
The Implementation Phase
• Definition
– Investigation
– Feasibility Analysis
– System Analysis
• Build
– System Design
– Programming
– Testing
• Implementation
– Installation
– Operations
– Maintenance
25
The Implementation Phase
• The process of ensuring that the technology is
properly integrated with the other
components of the information system
• Extremely delicate time
• Success at this stage requires:
– Project management skills
– Executive involvement
26
The Implementation Phase
• Installation Stage
– The software is loaded
on the production
hardware and the
databases are
populated
– Typically occurs during
slow periods for the
organization
– Four major
implementation
approaches
27
Installation Approaches
• Parallel Installation
– Old and new systems are run for a time together,
in parallel
• Offers insurance against failure of new application
• Most costly as it requires redundancy of efforts
Old System
New System
28
Installation Approaches
• Direct (Cutover) Installation
– The old system is discontinued and the firm cuts
over to the new one.
– Most radical approach
– Unavoidable in some cases (e.g., Y2K)
Old System
New System
29
Installation Approaches
• Phased Installation
– The new system progressively replaces the
functionalities of the old one
– Best suited for componentized or modular
applications that can be rolled out in stages
New System
Old System
30
Installation Approaches
• Pilot Implementation
– Allows the firm to run the new system in one
business unit or one of the firm’s departments
before rolling it out completely
– Well suited for multi-unit operations
Old System
New System
31
The Implementation Phase
• End-user training
– Occurs during the installation phase
– Typically occurs in formal settings, such as
classrooms or make-shift computer labs
• Change Management
– Process of smoothing the transition from the old
system to the new work practices
– User resistance and inertia are the biggest dangers
32
The Implementation Phase
• Operations Stage
– At this stage the system is up and running and the firm
begins to use it
– The system becomes a permanent asset of the
organization
• Maintenance Stage
– Compiling errors requests
– Prioritizing them
– Implementing fixes and improvements
• Functionality gaps may arise and can be closed by way
of upgrades and additions
33
Advantages of SLDC Approach
• Provides a systematic approach to software
development
• Identifies roles and expectations of team
members
• Best-suited for large-scale projects
• Designed for cost control
• Enforces a means of communication between
the project team and the project stakeholders
34
Prototyping
• Rooted in the notion that it is impossible to
clearly estimate and plan complex information
systems projects
• Allows for flexibility and iteration in the design
process
• Enabled by tools that speed up the
development process
• Can be used internally within the SDLC as a
way to seek input user input
35
Prototyping Life Cycle
• Requirements Definitions
– Process of determining basic requirements
– Degree of precision is less than with SDLC because
requirements are not frozen
• Initial Prototype
– The first iteration of the software
– At this point, the software can take many forms
and can evolve in many directions
36
Prototyping Life Cycle
• Evaluation
– Stakeholders review the prototype and provide
feedback on the current design
– Offer requests for enhancements and new
functionality
• Revision
– Design and coding of the requested changes
– New prototype is developed and is submitted for
review
37
Prototyping Life Cycle
• Completion
– Occurs after multiple iterations
– The iterative evaluation and revision cycle stops
– The development team finalizes the system
– Documentation and testing occur prior to the
formal release of the software
38
Advantages of the Prototyping
Approach
• Speed
• Closer to the users expectations:
– The process require more user involvement
– Multiple iterations structure user feedback
• Enables the firm to experiment with new
technologies
• Best suited to smaller-scale projects
39
Limitations to the Prototyping
Approach
• The software is more likely to be lacking from a:
– Security
– Robustness
– Reliability
• Often less thoroughly tested and documented
• May lead to unreasonable expectations
• May lead to scope creep
40
Agile Development
• A new breed of software
development approaches has taken
hold recently, in part due to the
increasing popularity of
prototyping.
• The software development
approaches are collectively labeled
as agile software development
methodologies
– Individuals and interactions over
processes and tools
– Working software over
comprehensive documentation
– Customer collaboration over contract
negotiation
– Responding to change over following
a plan
The State of Use for Agile Methodologies
41
CMM
• Capability Maturity Model (CMM)
ranks software development
organizations according to their
ability to produce quality
software by evaluating a set of
standard processes thought to
determine software quality.
• The CMM is based on the core
notion that reliable and
consistent implementation of a
specific set of processes
represents a higher level of
software development maturity
and, as a consequence, ensures
higher quality software products
42
Outsourced Development
• Custom-designed software programs are
increasingly outsourced
• Virtual Development Teams
– Teams that work together but are not physically
located together
• Superior cost/quality ratio
– Superior quality products at a fraction of the cost
of internal development
43
Purchasing Off-the-Shelf SW
• The process of:
– Identifying
– Purchasing
– Implementing
suitable off-the-shelf
software programs
• Typically spearheaded by
management interest
44
The Definition Phase
• Investigation Stage
– Identify the business issues the system will be designed to
address
– Formulate goals and the scope of design
• Feasibility Analysis Stage
– Technical Feasibility: Evaluate whether the proposed
system is viable from a technology standpoint
– Operational Feasibility: Evaluate whether the Information
System as planned will work in the organization
– Economic Feasibility: Evaluation of the financial viability of
the system
45
The Definition Phase
• Systems Analysis Stage
– Focus on determining the specific functionalities
required of the proposed system
• Formulate Evaluation Criteria Stage
– Determine essential features & capabilities the
system must have
– Value adding features:
• Capabilities that offer significant advantages for which
the firm will pay a premium
46
The Definition Phase
• Compile Short List of Vendors Stage
– Identify potential vendors that meet the Request
For Proposal (RFP) requirements
• Compile and Distribute the RFP Stage
– RFP identifies critical system requirements and
expectations
– Interested firms will respond to the RFP
– An internal selection committee is formed
47
The Definition Phase
• Evaluate Alternatives Stage
– Determine a list of top vendors based upon the criteria
developed earlier
• Negotiate Contract Stage
– Object is to draft and sign a contract that provides the
needed solution and insulates the firm from future risk
– Focus on cost, eventual liabilities, and control of
intellectual property
48
The Build Phase
• System Design (Configuration) Stage
– The process of modifying through parameters, if necessary
• Programming (Customization) Stage
– The process of modifying the application by designing new
functionality
– Follows the system design and development approach
– Necessary to accommodate specific needs of the organization
• Testing Stage
– Concerned with system performance rather than with the
identification and correction of bugs
49
The Implementation Phase
• Similar to SDLC implementation phase
• Process change requirements are typically
greater for off-the-shelf applications than
custom software
• Users are trained to operate the software
• Change management may be substantial
• The organization should plan to invest
considerable resources
50
End-User Development
• An umbrella term capturing the many ways in
which knowledge workers, not IT
professionals, create software
• Examples:
– Spreadsheet models (written in MS Excel)
– Personal databases (MS Access)
– Software programs built with user-friendly
computer languages (Visual Basic for Application)
51
The Benefits of End-User Development
• Increased Speed of Development
– Projects can be completed independently by the
end-user
• End-user Satisfaction
– When a user creates their own applications, they
are more likely to be satisfied with the result
• Reduced Pressure on the IS Function
52
The Risks of End-user Development
• Unreliable Quality Standards
– Because of the limited skill set and knowledge of most end
users, the quality of their work varies dramatically
• High Incidence of Errors
– The focus on outcomes and rapid development increase
the likelihood of errors
• Continuity Risks
– Often difficult for anyone but the individual who wrote the
program to understand it, enhance it, or support it
53
The Recap
• Introducing an organizational information system is a two-
step process requiring technology development and the
implementation process.
• Modern firms introduce new information systems using
one of the following approaches: custom design and
development, system selection and acquisition, or end-user
development.
– In the first approach, IT professionals within the organization or
who are contracted develop uniquely tailored software for the
firm’s needs.
– In the second approach, the selection committee chooses an
off-the-shelf application.
– In the third approach, it is the firm’s end users, rather than the
IT professionals, who create the software
54
The Recap
• The main methodology for custom system development is the
system development life cycle (SDLC).
– The SDLC is articulated over three main phases—definition, build, and
implementation—and nine stages. The primary limitation of the SDLC
is the creation of substantial overhead and rigidity that limit the
project team’s ability to address the inevitable changes.
• The prototyping methodology has emerged as a viable alternative
to the SDLC.
– Prototyping is rooted in the notion that it impossible to clearly
estimate and plan in detail such complex endeavors as information
systems design and development projects.
– Instead the team is better served by staying nimble and iterating
quickly through multiple designs to zero in on the optimal one.
55
What we Learned
1. To appreciate how complex it is to design and implement information systems and
the stable, robust, secure technology at their core.
2. To articulate the advantages and disadvantages of custom software design and
development versus acquisition of an off-the-shelf product.
3. To describe and be able to use the main methodologies for custom software
design and development. Specifically, you will be able to identify the major phases
of the system development life cycle (SDLC) and discuss its advantages and
disadvantages. You will also become familiar with the prototyping approach and
will be able to identify its principal advantages and disadvantages.
4. To describe the systems selection methodology and be able to use it to choose a
pre-packaged software program for a specific organization.
5. To describe the reasons for the increasing prominence of end-user development in
modern organizations and to articulate the benefits and risks of this approach to
software development.
56

More Related Content

Similar to ch11.ppt

Software Engineering.ppt
Software Engineering.pptSoftware Engineering.ppt
Software Engineering.pptHODCOMPUTER10
 
chapter07-120827115403-phpapp01.pdf
chapter07-120827115403-phpapp01.pdfchapter07-120827115403-phpapp01.pdf
chapter07-120827115403-phpapp01.pdfAxmedMaxamuud6
 
Chapter 7 Development StrategiesInformation Technology Project Management .pptx
Chapter 7 Development StrategiesInformation Technology Project Management  .pptxChapter 7 Development StrategiesInformation Technology Project Management  .pptx
Chapter 7 Development StrategiesInformation Technology Project Management .pptxAxmedMaxamuudYoonis
 
SE_Module1new.ppt
SE_Module1new.pptSE_Module1new.ppt
SE_Module1new.pptADARSHN40
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycleSuhleemAhmd
 
L15 managing projects(1)
L15 managing projects(1)L15 managing projects(1)
L15 managing projects(1)Nikhil Saxena
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineeringmoduledesign
 
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptx
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptxUNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptx
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptxLeahRachael
 
Chapter 7 Development Strategies
Chapter 7 Development StrategiesChapter 7 Development Strategies
Chapter 7 Development StrategiesMeryl C
 
chapter04-120827115356-phpapp01.pdf
chapter04-120827115356-phpapp01.pdfchapter04-120827115356-phpapp01.pdf
chapter04-120827115356-phpapp01.pdfAxmedMaxamuud6
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxDevnath13
 
Chapter 4 Requirements ModelInformation Technology Project Management - part ...
Chapter 4 Requirements ModelInformation Technology Project Management - part ...Chapter 4 Requirements ModelInformation Technology Project Management - part ...
Chapter 4 Requirements ModelInformation Technology Project Management - part ...AxmedMaxamuudYoonis
 
Lecture 1 - Requirement Engineering.pptx
Lecture 1 - Requirement Engineering.pptxLecture 1 - Requirement Engineering.pptx
Lecture 1 - Requirement Engineering.pptxAbdulRaheem254960
 

Similar to ch11.ppt (20)

Software Engineering.ppt
Software Engineering.pptSoftware Engineering.ppt
Software Engineering.ppt
 
chapter07-120827115403-phpapp01.pdf
chapter07-120827115403-phpapp01.pdfchapter07-120827115403-phpapp01.pdf
chapter07-120827115403-phpapp01.pdf
 
Chapter 7 Development StrategiesInformation Technology Project Management .pptx
Chapter 7 Development StrategiesInformation Technology Project Management  .pptxChapter 7 Development StrategiesInformation Technology Project Management  .pptx
Chapter 7 Development StrategiesInformation Technology Project Management .pptx
 
Unit 1
Unit 1Unit 1
Unit 1
 
Software Development Life Cycle
Software Development Life CycleSoftware Development Life Cycle
Software Development Life Cycle
 
Sdlc 4
Sdlc 4Sdlc 4
Sdlc 4
 
SE_Module1new.ppt
SE_Module1new.pptSE_Module1new.ppt
SE_Module1new.ppt
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
 
SAD 1st PPT
SAD 1st PPTSAD 1st PPT
SAD 1st PPT
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
Chapter 02
Chapter 02Chapter 02
Chapter 02
 
L15 managing projects(1)
L15 managing projects(1)L15 managing projects(1)
L15 managing projects(1)
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineering
 
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptx
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptxUNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptx
UNIT 1-IDENTIFY THE NEED FOR SOFTWARE ENGINEERING DEVELOPMENT.pptx
 
Chapter 7 Development Strategies
Chapter 7 Development StrategiesChapter 7 Development Strategies
Chapter 7 Development Strategies
 
chapter04-120827115356-phpapp01.pdf
chapter04-120827115356-phpapp01.pdfchapter04-120827115356-phpapp01.pdf
chapter04-120827115356-phpapp01.pdf
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptx
 
Chapter 4 Requirements ModelInformation Technology Project Management - part ...
Chapter 4 Requirements ModelInformation Technology Project Management - part ...Chapter 4 Requirements ModelInformation Technology Project Management - part ...
Chapter 4 Requirements ModelInformation Technology Project Management - part ...
 
Lecture 1 - Requirement Engineering.pptx
Lecture 1 - Requirement Engineering.pptxLecture 1 - Requirement Engineering.pptx
Lecture 1 - Requirement Engineering.pptx
 

Recently uploaded

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 

Recently uploaded (20)

Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 

ch11.ppt

  • 1. Chapter 11 Creating Information Systems What managers need to know about the process by which organizational information systems come to be Chapter 11 1
  • 2. Course Roadmap • Part I: Foundations • Part II: Competing in the Internet Age • Part III: The Strategic use of Information Systems • Part IV: Getting IT Done – Chapter 10: Funding Information Systems – Chapter 11: Creating Information Systems – Chapter 12: Information System Trends – Chapter 13: Security, Privacy and Ethics 2
  • 3. Learning Objectives 1. To appreciate how complex it is to design and implement information systems and the stable, robust, secure technology at their core. 2. To articulate the advantages and disadvantages of custom software design and development versus acquisition of an off-the-shelf product. 3. To describe and be able to use the main methodologies for custom software design and development. Specifically, you will be able to identify the major phases of the system development life cycle (SDLC) and discuss its advantages and disadvantages. You will also become familiar with the prototyping approach and will be able to identify its principal advantages and disadvantages. 4. To describe the systems selection methodology and be able to use it to choose a pre-packaged software program for a specific organization. 5. To describe the reasons for the increasing prominence of end-user development in modern organizations and to articulate the benefits and risks of this approach to software development. 3
  • 4. Introduction • Whether the information systems rely on custom-developed technology or off-the-shelf software, it is critical that you as a general or functional manager understand how information systems come to be. • While general and functional managers need not be concerned with hardware decisions, they must take part in the software design, acquisition, and implementation processes. • Involvement in information systems funding and design is essential because never before has a firm’s success depended so much on the use of the right software applications. • Deciding what the characteristics of the “right” applications are is a business decision that is based more on the business case and the understanding of the business processes the software will enable (or constrain!) than on any technical consideration 4
  • 6. How Hard Can IT Be? • Challenge: The U.S. subsidiary of one of the major food producers in the world inked a deal to implement SAP (the leading enterprise system application), in an effort to centralize and rationalize operations across its nine divisions. The project required streamlining processes, standardizing software applications, and implementing the same organizational structure across the units • Question: How much time and how much money would you budget for this project? • Answer: six years and over $200 million 6
  • 7. How Hard Can IT Be? • Challenge: A large hospitality company with over 2,000 branded hotels developed a customer information system to enable its customer relationship management (CRM) strategy. The custom-developed functionalities of the software application at the heart of the information system included a property- management system, the loyalty and CRM applications, and the reporting modules. • Question: How much time and how much money would you budget for this project? • Answer: Two years and about $120 million. 7
  • 8. Information Systems Development • Technology Development – The process of creating the core IT – IT can be acquired and integrated into existing infrastructure – IT can be custom-built by (or for) the organization • Information System Development – Successfully integrating the technology with the other components to achieve a working system 8
  • 9. Three Approaches • Custom design and development • Implementing software that is expressly made to fit the unique needs of the organization • System selection and acquisition • Implement an off-the-shelf application that is mass produced by a vendor • End-user development • Implement a software application that is created by an end users, rather than the firms IS professionals 9
  • 10. Advantages of Custom Development • Unique Tailoring – Molded to fit the unique features, characteristics, and needs of the firm that commissions them. – Off-the-shelf software may require adjustment (customization) to fit the organization • Flexibility and Control – Building from scratch allows the software to be molded into any form and modified at a later time 10
  • 11. Advantages of Purchasing • Faster Roll-Out – Purchased software dramatically reduce the time it takes to obtain the software and to begin the implementation process • Knowledge Infusion – Software developers proactively seek out best practices in order to code their applications • Economically Attractive – The firm can capitalize on economies of scale created by the vendor • Software Quality – Mature off-the-shelf products have been heavily tested 11
  • 12. Make and Buy • Modern firms are blending the custom development and selection approaches – First firms acquire off-the-shelf systems, then they modify them extensively – Few firms modify off-the-shelf applications slightly or not at all – Off-the-shelf applications are becoming larger and more complex, and require some modification to fit the purchasing firm 12
  • 14. Systems Development Life Cycle • The SDLC approach is predicated on the notion that detailed justification and planning will reduce risk and uncertainty in systems development – Critical: Involvement from end-users and functional managers – Requires considerable time analyzing requirements up front – Requires that changes after the project has started be kept to a minimum 14
  • 15. Principal Phases of the SDLC • Definition – Investigation – Feasibility Analysis – System Analysis • Build – System Design – Programming – Testing • Implementation – Installation – Operations – Maintenance 15
  • 16. Principal Phases of the SDLC • Definition – Investigation – Feasibility Analysis – System Analysis • Build – System Design – Programming – Testing • Implementation – Installation – Operations – Maintenance 16
  • 17. The Definition Phase • Concerned with clearly identifying the features of the proposed information system • Critical is the involvement of end-users and functional managers at this time • Resources (systems analysts) during this phase will identify and articulate the system requirements 17
  • 18. The Definition Phase • Investigation Stage – Identify the business issues the system will pertain to – Formulate: • Main goals of the system • Scope of the design • Value proposition of the new system – Typically a very informal stage 18
  • 19. The Definition Phase • Feasibility Analysis Stage – Used to ensure that organizational resources are put to the best use – Technical Feasibility: Evaluate whether the proposed system is viable from a technology standpoint – Operational Feasibility: Evaluate whether the Information System as planned will work in the organization – Economic Feasibility: Evaluation of the financial viability of the system • Perform a cost/benefit analysis in order to ensure the money spent will meet the firm’s financial hurdles. 19
  • 20. The Definition Phase • Systems Analysis Stage – The process of identifying and articulating the system requirements – Systems analysts play a major role at this stage – Systems analysts must seek out and value the input of end- users and other stakeholders – The systems requirements document • Details the inputs the systems will accept • Details the outputs the system will produce • Once approved (client sign-off), the requirements are “frozen” • In a strict waterfall approach no further changes are allowed 20
  • 21. The Build Phase • Definition – Investigation – Feasibility Analysis – System Analysis • Build – System Design – Programming – Testing • Implementation – Installation – Operations – Maintenance 21
  • 22. The Build Phase • The most technical phase • The one by which people picture when they imagine how software is designed and developed • Key resources involved includes systems architects and programmers • The objective is to take the system requirements document and produce a robust, secure, and efficient application. 22
  • 23. The Build Phase • Systems Design Stage – Using the results from the definition phase, systems architects create the overall structure of the system – The output of this stage is a precise set of documents that programmers will employ to write code • Programming Stage – The process of translating the abstract software design into a set of instructions that can be executed by the hardware – Thorough and clear documentation is essential for support, maintenance, and upgrades • Testing – Programmers are constantly engaged in testing as they develop the system – Formalized testing of the completed application is an essential stage of the SDLC – The objective it to release the application when it is good enough, not when it is flawless 23
  • 25. The Implementation Phase • Definition – Investigation – Feasibility Analysis – System Analysis • Build – System Design – Programming – Testing • Implementation – Installation – Operations – Maintenance 25
  • 26. The Implementation Phase • The process of ensuring that the technology is properly integrated with the other components of the information system • Extremely delicate time • Success at this stage requires: – Project management skills – Executive involvement 26
  • 27. The Implementation Phase • Installation Stage – The software is loaded on the production hardware and the databases are populated – Typically occurs during slow periods for the organization – Four major implementation approaches 27
  • 28. Installation Approaches • Parallel Installation – Old and new systems are run for a time together, in parallel • Offers insurance against failure of new application • Most costly as it requires redundancy of efforts Old System New System 28
  • 29. Installation Approaches • Direct (Cutover) Installation – The old system is discontinued and the firm cuts over to the new one. – Most radical approach – Unavoidable in some cases (e.g., Y2K) Old System New System 29
  • 30. Installation Approaches • Phased Installation – The new system progressively replaces the functionalities of the old one – Best suited for componentized or modular applications that can be rolled out in stages New System Old System 30
  • 31. Installation Approaches • Pilot Implementation – Allows the firm to run the new system in one business unit or one of the firm’s departments before rolling it out completely – Well suited for multi-unit operations Old System New System 31
  • 32. The Implementation Phase • End-user training – Occurs during the installation phase – Typically occurs in formal settings, such as classrooms or make-shift computer labs • Change Management – Process of smoothing the transition from the old system to the new work practices – User resistance and inertia are the biggest dangers 32
  • 33. The Implementation Phase • Operations Stage – At this stage the system is up and running and the firm begins to use it – The system becomes a permanent asset of the organization • Maintenance Stage – Compiling errors requests – Prioritizing them – Implementing fixes and improvements • Functionality gaps may arise and can be closed by way of upgrades and additions 33
  • 34. Advantages of SLDC Approach • Provides a systematic approach to software development • Identifies roles and expectations of team members • Best-suited for large-scale projects • Designed for cost control • Enforces a means of communication between the project team and the project stakeholders 34
  • 35. Prototyping • Rooted in the notion that it is impossible to clearly estimate and plan complex information systems projects • Allows for flexibility and iteration in the design process • Enabled by tools that speed up the development process • Can be used internally within the SDLC as a way to seek input user input 35
  • 36. Prototyping Life Cycle • Requirements Definitions – Process of determining basic requirements – Degree of precision is less than with SDLC because requirements are not frozen • Initial Prototype – The first iteration of the software – At this point, the software can take many forms and can evolve in many directions 36
  • 37. Prototyping Life Cycle • Evaluation – Stakeholders review the prototype and provide feedback on the current design – Offer requests for enhancements and new functionality • Revision – Design and coding of the requested changes – New prototype is developed and is submitted for review 37
  • 38. Prototyping Life Cycle • Completion – Occurs after multiple iterations – The iterative evaluation and revision cycle stops – The development team finalizes the system – Documentation and testing occur prior to the formal release of the software 38
  • 39. Advantages of the Prototyping Approach • Speed • Closer to the users expectations: – The process require more user involvement – Multiple iterations structure user feedback • Enables the firm to experiment with new technologies • Best suited to smaller-scale projects 39
  • 40. Limitations to the Prototyping Approach • The software is more likely to be lacking from a: – Security – Robustness – Reliability • Often less thoroughly tested and documented • May lead to unreasonable expectations • May lead to scope creep 40
  • 41. Agile Development • A new breed of software development approaches has taken hold recently, in part due to the increasing popularity of prototyping. • The software development approaches are collectively labeled as agile software development methodologies – Individuals and interactions over processes and tools – Working software over comprehensive documentation – Customer collaboration over contract negotiation – Responding to change over following a plan The State of Use for Agile Methodologies 41
  • 42. CMM • Capability Maturity Model (CMM) ranks software development organizations according to their ability to produce quality software by evaluating a set of standard processes thought to determine software quality. • The CMM is based on the core notion that reliable and consistent implementation of a specific set of processes represents a higher level of software development maturity and, as a consequence, ensures higher quality software products 42
  • 43. Outsourced Development • Custom-designed software programs are increasingly outsourced • Virtual Development Teams – Teams that work together but are not physically located together • Superior cost/quality ratio – Superior quality products at a fraction of the cost of internal development 43
  • 44. Purchasing Off-the-Shelf SW • The process of: – Identifying – Purchasing – Implementing suitable off-the-shelf software programs • Typically spearheaded by management interest 44
  • 45. The Definition Phase • Investigation Stage – Identify the business issues the system will be designed to address – Formulate goals and the scope of design • Feasibility Analysis Stage – Technical Feasibility: Evaluate whether the proposed system is viable from a technology standpoint – Operational Feasibility: Evaluate whether the Information System as planned will work in the organization – Economic Feasibility: Evaluation of the financial viability of the system 45
  • 46. The Definition Phase • Systems Analysis Stage – Focus on determining the specific functionalities required of the proposed system • Formulate Evaluation Criteria Stage – Determine essential features & capabilities the system must have – Value adding features: • Capabilities that offer significant advantages for which the firm will pay a premium 46
  • 47. The Definition Phase • Compile Short List of Vendors Stage – Identify potential vendors that meet the Request For Proposal (RFP) requirements • Compile and Distribute the RFP Stage – RFP identifies critical system requirements and expectations – Interested firms will respond to the RFP – An internal selection committee is formed 47
  • 48. The Definition Phase • Evaluate Alternatives Stage – Determine a list of top vendors based upon the criteria developed earlier • Negotiate Contract Stage – Object is to draft and sign a contract that provides the needed solution and insulates the firm from future risk – Focus on cost, eventual liabilities, and control of intellectual property 48
  • 49. The Build Phase • System Design (Configuration) Stage – The process of modifying through parameters, if necessary • Programming (Customization) Stage – The process of modifying the application by designing new functionality – Follows the system design and development approach – Necessary to accommodate specific needs of the organization • Testing Stage – Concerned with system performance rather than with the identification and correction of bugs 49
  • 50. The Implementation Phase • Similar to SDLC implementation phase • Process change requirements are typically greater for off-the-shelf applications than custom software • Users are trained to operate the software • Change management may be substantial • The organization should plan to invest considerable resources 50
  • 51. End-User Development • An umbrella term capturing the many ways in which knowledge workers, not IT professionals, create software • Examples: – Spreadsheet models (written in MS Excel) – Personal databases (MS Access) – Software programs built with user-friendly computer languages (Visual Basic for Application) 51
  • 52. The Benefits of End-User Development • Increased Speed of Development – Projects can be completed independently by the end-user • End-user Satisfaction – When a user creates their own applications, they are more likely to be satisfied with the result • Reduced Pressure on the IS Function 52
  • 53. The Risks of End-user Development • Unreliable Quality Standards – Because of the limited skill set and knowledge of most end users, the quality of their work varies dramatically • High Incidence of Errors – The focus on outcomes and rapid development increase the likelihood of errors • Continuity Risks – Often difficult for anyone but the individual who wrote the program to understand it, enhance it, or support it 53
  • 54. The Recap • Introducing an organizational information system is a two- step process requiring technology development and the implementation process. • Modern firms introduce new information systems using one of the following approaches: custom design and development, system selection and acquisition, or end-user development. – In the first approach, IT professionals within the organization or who are contracted develop uniquely tailored software for the firm’s needs. – In the second approach, the selection committee chooses an off-the-shelf application. – In the third approach, it is the firm’s end users, rather than the IT professionals, who create the software 54
  • 55. The Recap • The main methodology for custom system development is the system development life cycle (SDLC). – The SDLC is articulated over three main phases—definition, build, and implementation—and nine stages. The primary limitation of the SDLC is the creation of substantial overhead and rigidity that limit the project team’s ability to address the inevitable changes. • The prototyping methodology has emerged as a viable alternative to the SDLC. – Prototyping is rooted in the notion that it impossible to clearly estimate and plan in detail such complex endeavors as information systems design and development projects. – Instead the team is better served by staying nimble and iterating quickly through multiple designs to zero in on the optimal one. 55
  • 56. What we Learned 1. To appreciate how complex it is to design and implement information systems and the stable, robust, secure technology at their core. 2. To articulate the advantages and disadvantages of custom software design and development versus acquisition of an off-the-shelf product. 3. To describe and be able to use the main methodologies for custom software design and development. Specifically, you will be able to identify the major phases of the system development life cycle (SDLC) and discuss its advantages and disadvantages. You will also become familiar with the prototyping approach and will be able to identify its principal advantages and disadvantages. 4. To describe the systems selection methodology and be able to use it to choose a pre-packaged software program for a specific organization. 5. To describe the reasons for the increasing prominence of end-user development in modern organizations and to articulate the benefits and risks of this approach to software development. 56