24. • 40 staff(12 in buffets ,12 in stands,8 mobile
team)
1 staff =100 TL for a day
1staf =300 TL for 3 days and 40 staff*300=1.200
TL
• 2 Lorry Driver =600 TL (from Gelibolu)
3 hours 51 min. And 273 km
STAFF
25. • 40 staff(12 in buffets ,12 in stands,8 mobile
team)
1 staff =100 TL for a day
1staf =300 TL for 3 days and 40 staff*300=1.200
TL
• 2 Lorry Driver =600 TL (from Gelibolu)
3 hours 51 min. And 273 km
STAFF